Drawing List 01 02 03 04 05 06 08 09 10 11 12 13 14 15 16 17 18 21 22 23 24 25 26
©TVS architects 6/04/2017 3:39:48 PM
Sheet Name Cover Sheet Perspective Views Perspective Views Perspective Views Perspective Views Perspective Views Design Intent Development Statistics Location Plan Site Context Diagram ESD Strategies Shadow Diagrams Sun Penetration Design Study For Sunshading Sun Penetration Design Study For Sunshading Communal Open Space Diagrams Waste Management Plan Staging Plan Site Plan Lower Basement 2 Plan Upper Basement 1 Plan Ground Floor Plan Level 1 Floor Plan Level 2 Floor Plan
Rev Issue Date 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017
Sheet Number 27 28 29 30 31 32 33 34 40 41 42 43 50 51 52 53 60 70 71 72 80 81 82
Sheet Name Level 3 Floor Plan Level 4 Floor Plan Level 5 Floor Plan Level 6 Floor Plan Level 7 Floor Plan Level 8 & 9 Floor Plan Level 10 Floor Plan Roof Plan Typical Unit Plans Typical Unit Plans Typical Unit Plans Typical Unit Plans Elevations Elevations Elevations Elevations Site Sections Materials & Finishes Materials & Finishes Materials & Finishes Library Zoning Plan- Ground Library Zoning Plan- Level 1 Survey Plan
Rev Issue Date 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017 03.04.2017
DA Issue 03/04/17
Sheet Number
Drawing List
Cover Sheet 5490.01 [ 1 ]
©TVS architects 7/04/2017 8:44:55 AM
DA Issue 03/04/17
Renders are preliminary only
Perspective Views 5490.02 [ 1 ]
©TVS architects 6/04/2017 3:39:50 PM
DA Issue 03/04/17
Renders are preliminary only
Perspective Views 5490.03 [ 1 ]
©TVS architects 6/04/2017 3:39:52 PM
DA Issue 03/04/17
Renders are preliminary only
Perspective Views 5490.04 [ 1 ]
©TVS architects 6/04/2017 3:39:56 PM
DA Issue 03/04/17
Renders are preliminary only
Perspective Views 5490.05 [ 1 ]
©TVS architects 6/04/2017 3:40:00 PM
DA Issue 03/04/17
Renders are preliminary only
Perspective Views 5490.06 [ 1 ]
The subject site is situated in a central location in the town centre of Forster, and there is an opportunity to create a landmark building and precedent for the surrounding area. Proposed is a mix of uses integrated into a vertical residential retirement community developed with improved economic & accessibility infrastructure. The development is proposed to be built in four stages. The character of the built form is designed to sit within and enhance the urban setting of Forster. A contemporary aesthetic is used, incorporating elements that provide modulation and interest. The design expression draws inspiration from the forms, materials, patterns, shapes and colours of the natural environment surrounding the site.
Sustainability Goals The landmark mixed use development creates a vibrant, transit oriented hub as a focal point for the community, expressing innovative, cost effective ESD strategies as an integral part of the design. It will deliver improved comfort levels, reduced energy and water consumption and reduced impact on the environment for residents and users. Designing a high level sustainable living environment, will help to achieve social, environmental and economic benefits for the household, operator and the broader community. This Triple Bottom Line (TBL) approach provides a means of holistically assessing the performance of a building, the aim being to improve all aspects of sustainability in building design. The three fundamental aspects of the TBL approach are interrelated, however these are broken down into a series of more clearly defined goals according to the most relevant area. Innovative features proposed include:
The project aims to develop an exemplary urban design outcome of high quality architecture tailored to the needs of the council, resident, community, context and client. The development is comprised of the following: Community uses – A council library, community centre, community lounge and civic plaza are integrated within stage one. Commercial uses – A mix of commercial uses are provided across the four stages, comprising a convenience supermarket, restaurant/café precinct & retail as well as complimentary uses such as a childcare centre, gym, nightclub and cinema. It is envisaged that these complimentary uses shall draw a trade from within the development and from the wider Forster community. Private resident facilities are provided such as craft rooms, wellness centre (therapy/day spa/gymnasium/ pool), billiards, home theatre, lounge, bar and kitchen with a roof terrace BBQ area, communal gardens and outdoor recreation spaces.
Hotel Accommodation – A luxury hotel is proposed in stage 4 a tower on podium with 86 Hotel Rooms plus 12 One Bedroom & 6 Two Bedroom Serviced Apartments. The Hotel Podium houses the Lobby, Hotel Services, Restaurant, Function rooms, Night Club, Retail and Childcare Centre. Car parking – Community, retail and restaurant car parking is provided in basement 1. Hotel car parking is provided in basement 2 and podium. Residential car parking is provided on podium levels. Urban Design intent In line with the requirements of MidCoast Council, the development’s design has been modelled and layered to achieve compatibility with the surrounding neighbourhood. Significance and contribution of the property to the urban domain The site has three street frontages being located at the corner of Lake Street, West Street and Middle Street. Positioned on the North-Western side of the town in the café/beach precinct, the development is ideally located to service the both Forster & Tuncurry with high amenity. The site is closely located to the main arterial route for the town of Forster. There is an opportunity to create a project that will set the standard for and lead the way in the urban design of this precinct. We propose that this site be a hub for the surrounding suburb by designing a striking building that sits comfortably in the precinct and natural environment, sets a benchmark for mixed use ESD design in the area and achieves exemplary urban design outcomes. Height of buildings and design quality is proposed to create a recognizable visual landmark. Equitable access for members of the community will be addressed throughout the development, in particular to public areas and entrances to the buildings. A landmark for the community can be achieved in a variety of ways - Visual, Social, Economic and Environmental. An integration of theses aspects will ensure a holistic sustainable and vibrant outcome as outlined below:
The design of a building for environmental sustainability needs to address, but is not limited to, energy, water, materials, waste and landscaping. The sitting of the building and the landscaping considers the natural features of the site, including topography, the local climate, local flora and fauna, and natural and cultural features. Element
Passive solar design strategies
Goals
Articulation
Retail level: retail on ground level has an increased height reflecting the difference of use and requirement for servicing etc. Articulation of this level allows it to transition from the podium above. Podium: The façade references natural seaside forms and materials. The undulating curves and palisade battening of the screens is abstracted from the forms of the beach and estuary. Planters behind the screen create a green wall over two levels. Residential levels: Located at higher levels, units are angled to capture views and block overlooking. Screens are employed for sun shading and articulation.
Entry Areas
Awnings
Facade treatment
Entry areas are given prominence by features such as changes of materials, height and volume which in turn assist in way-finding. The community centre and library entry on Lake Street is designed as a physical indent in the building's form. It creates an eddy on the side of the activity of the street, recessing it away from the faster pace of activity and movement. The entry is given legibility through scale of door and feature entry frame. Residential entries express the tower design down at street level, introducing an identity distinct from the retail aesthetic. Retail entries are in shopfronts, many of which shall fold open to outdoor areas and engage with the street.
Natural lighting
Maximized natural daylight entry including naturally lit residential lobbies reduce the need for artificial lighting. Opportunities to optimization daylight penetration into dwellings and tenancies has been assessed by a thermal performance assessor.
Active technology
Minimised sizing of AC due to above described passive strategies result in a minimised impact to the environment and cost. All systems will be efficient, high quality technology.
Photovoltaics
Economic viability of a photovoltaic system will be investigated.
Energy Efficiency
The project has been master planned and controlled through the development process to demonstrate that positive passive solar design has been given a high level of consideration. The project has been designed to minimise extremities in temperatures, including negative microclimatic factors. The design of public spaces optimises microclimatic conditions. Design elements including high performance insulation, shading devises, vegetation buffers, passive solar design and appropriate glazing systems will be implemented to ensure the development creates a comfortable environment, meeting all Section J and Basix requirements. Opportunities to optimise daylight penetration into dwellings and tenancies have been assessed. Energy efficient lighting shall be provided The implementation of podium carparking is intended to reduce the need for mechanical ventilation.
Water
At a minimum, fixtures will include: • Showerheads that use equal to or less than 6 litres per minute; and • Taps to bathrooms, kitchen and laundry that use equal to or less than 6 litres per minute. • Locally native (endemic) plant species will be used wherever appropriate. In community facilities, waterless urinals & taps with water usage of 6 litres or less per minute will be used. A water conservation system is being designed for stormwater harvesting and re-use for onsite irrigation. This will aid in the reduction of consumption of potable water and benefit the success of the community garden on the site.
Waste
Materials
A legible articulation of the building massing allows the observer to perceive that changes of use occur within. Articulation and patterning of the façade is related to individual unit levels and uses,giving scale and reference to the street and greater site context. A variety of finishes, colours and textures enliven the building’sfaçade and spaces to create interest and enrich the areas that are close to interaction at a human scale. Curvilinear forms are given to podium and ground floor levels which accommodate community and retail uses. Angular forms radiating around for views and privacy express the residential. Service areas are screened from view. They are accessed via the basement and service roads within the site. Activation of the streetscape and strengthening of the link to the Estuary parkland, café precinct & main street are important Social initiatives and are linked to the main civic plaza by an extended civic space along Lake Street.
Artwork
A community artist is proposed to participate in the creation of the “oyster pole” landscaping feature which will enrich the vibrancy of the centre and link to the Wallis Lake foreshore boardwalk. Artwork gives an opportunity to engage with the local sense of place and to reinforce mindful connectivity and enhance local pride of place
Connectivity
Visual Connectivity with the surrounding area is achieved by using appropriately scaled elements, patterning of the façade and Materials. In conjunction with the local council urban renewal plan, bikeway development plan and upgrades to the streetscape, the combined outcome will encourage increased pedestrian travel to and through the site
©TVS architects 4/04/2017 9:08:10 AM
Passive solar strategies are central to the design to minimize the need for non-renewable energy, impose less carbon emissions on the environment and save cost.
Ventilation strategies Site - the built form and site configuration is designed to catch the cooling N.E. sea breezes and optimize natural ventilation via breezeways and cross ventilation throughout the site; Buildings - cross ventilated residential corridors promote well ventilated internal spaces. In addition, “breezeway doors” to each apartment offer a unique combination of ventilated screen doors and solid front door, an idea borrowed from the traditional Queenslander House (this feature has been successfully used in the Village Centre at Kelvin Grove).
Spatially interesting, the curving overhang of level 2 and lower awning manipulates the space along the street. The two story height of the civic precinct overhang provides a larger gesture to the community.
Streetscape activation / Linkage
Goals
Initial construction
A thorough site analysis prior to planning and design has been conducted. The project has been planning, designed and is to be constructed in a manner that achieves a balanced earthworks outcome. Planning, implementation and maintenance of effective erosion and sediment control measures will be delivered during construction.
Ongoing maintenance and running
Initiatives integrated from the initial design result in a number of cost savings during operation including: • During operation, BASIX & Section J compliance ensures a high level of thermal performance through accuracy, leakage and sealant control. Energy efficient design, green roofs and passive solar strategies reduce heating / cooling loads; • Well design appropriate units for a variety of income levels; • Rain water harvesting to offset water consumption costs; • Solar or heat pump heating to pools to reduce electricity consumption; • Materials of durable, low maintenance characteristics are proposed, resulting in low life cycle and running cost. • Off street bicycle parking and bicycle storage to encourage low energy transportation; In addition, building management initiatives are proposed to reduce body corporate costs.
Future modification
The design minimizes the need for future modifications to cater for the occupants changing mobility requirements.
Job creation / retail use
Strengthening of retail use in this locality with well considered uses is essential for the continued and improved economic prosperity of the area, including the creation of new employment opportunities.
Community Costs
The project has been designed to encourage a safe environment, with reduced crime and will encourage positive interaction between residents/employees/visitors and other local people using the area. The provision of a diverse array of retail and community facilities offers a definite economic opportunity for the local community.
The Development seeks to encourage and enhance active transport options amongst the community by providing off street bicycle parking, bicycle storage, improved pathway access to the immediate site, improved transport linkages and improved access for public transport.
Natural ventilation
Landscaping Service areas
Element
Goals
Orientation Orientation of the built form with maximised northern aspects for solar control, east and west facades with minimal openings, limited to providing desired cross-ventilation and views. A Sun Solar Study has been completed for the Design Concept to assess areas for potential improvement.
ARCHITECTURAL/URBAN DESIGN ELEMENTS Element
The project is driven by a clear vision, with defined environmental, economic, social sustainability and liveability goals. Economic sustainability needs to address, but is not limited to, initial construction, ongoing maintenance and running, and future modification costs.
ENVIRONMENTAL SUSTAINABILITY
Transport Independent Living Units (ILU's) - 143 ILU's located in three towers of between 7 & 11 stories built in 3 stages. Stage 1 Tower A accommodates 53 ILU's with a mix of 5 One Bed Units, 25 Two bed Units and 23 Three Bed Units. Stage 2 Tower B accommodates 59 ILU's with a mix of 28 Two bed Units, 29 Three Bed Units, 1 Four Bedroom & 1 Five Bedroom Penthouses. Stage 3 Tower C accommodates 31 ILU's with a mix of 19 Two bed Units, 12 Three Bed Units and 2 Three Bedroom Penthouses.
ECONOMIC SUSTAINABILITY
Ecosystems
Mechanical infrastructure to separate general and recyclable waste from residential towers will be incorporated. The location of a community garden area opposite the site on West Street will allow for management of green waste and biodegradable food scraps from commercial and residential areas (subject to management framework and community agreements). The overall design has taken into consideration the future uses of the building to minimise the requirement for modifications and material disposal. Building products will also be chosen with consideration for their recyclable properties. Feature environmentally friendly materials will include: Park/Commercial furniture which have a recycled content or supplementary cement materials will used where possible. All vegetative debris from the site will be mulched and reused wherever possible. Any non-contaminated topsoil will be stockpiled and reused where possible. Structural timber will be AFS (Australian Forestry Standard) or FSC (Forest Stewardship Council) accredited. Minimum 50% of the carpet shall have a rating of level 2 or greater under the Australian Carpet Classification, Environmental Classification Scheme. Low emissions paints, sealants, adhesives & engineered wood products should all be considered as standard. A thorough site analysis has been conducted prior to planning and design to identify: • Areas of prime ecological significance; • Areas where clearing and/or major earthworks should specifically not occur; • Potential soil issues; and • The suitability of the site for potential earthworks and construction. Biophilic elements are integrated throughout the site including green roofs, podiums, retention and provision of shade trees, trellis systems and landscaped areas to improve air quality, increase biodiversity and reduce the heat island effect. These increase the health and wellbeing, provide amenity and a pleasant atmosphere. The stormwater management design will demonstrate: • Appropriate water sensitive urban design principles shall be applied to protect both water cycle and infrastructure; and Incorporate stormwater management provisions during and post construction to avoid enhanced risk of flooding and flood damage and to reduce risk of pollution entering waterways. Valuable existing vegetation will be retained wherever practically possible with amendment of mulch and revegetate soils disturbed during construction.
SOCIAL SUSTAINABILITY The design of a buildings for social sustainability needs to address, but is not limited to, human health and comfort, safety, security and universal design, as well as addressing issues of the broader community. Creation of a social environment to encourage interaction will be achieved through creation of a place of special meaning.
Element
Goals
Human Comfort The building provides an internal environment that is thermally comfortable while at the same time minimises the presence of and Health toxic chemicals within the building. Improved air quality by integrated vegetation, increased use of natural ventilation taking advantage of the prevailing South-Easterly sea breezes, and reduced need for air conditioning. Safety
The likelihood of injuries occurring in and around the building for the aged is reduced. The design minimises the possibility of accidental falls, burns and poisoning.
Security
Attention is given to transparency of facades at street level to ensure that there is passive surveillance and overlooking of publicly accessible areas as well as informal surveillance of the street. The building uses designs, fixtures and fittings to reduce crime and protect the building from malicious intruders. Urban design elements to encourage community safety; such as visual connectivity through low height vegetation where appropriate.
Universal design
Community Building
Equitable access for members of the community will be addressed throughout the development, in particular to public areas and entrances to the buildings. The building is versatile and comfortable for people with varying physical abilities and at different stages of their lives. It is easy to move around the building, and the operation of fittings and fixtures caters for people with varying abilities. The provision of a community facilities, new town library and additional community garden area demonstrates a genuine effort to allow improved community involvement and support services. In conjunction with the local council urban renewal plan, bikeway development plan and upgrades to the streetscape, the combined outcome will encourage increased pedestrian travel to and through the site. By integrating a wide mix of uses we can introduce variety to the activities, their times of use for a wider demographic. The building successfully contributes to an improved community identity. Additional features include edible gardens for community use, green scapes / trellis systems to soften the urban environment and artwork to engender community pride as well as internet/ intranet connections for increased community connectivity.
DA Issue 03/04/17
THE DESIGN PROPOSAL
Design Intent 5490.08 [ 1 ]
©TVS architects 3/04/2017 3:21:58 PM
DA Issue 03/04/17
Usage & Area Schedule
Development Statistics 5490.09 [ 1 ]
Police Station and Court House
Project Site
Surf Lifesaving Club
Sea Baths
Forster High St Shopping Precinct Tuncurry High St Shopping Precinct
Great Lakes Aquatic & Leisure Centre Forster Public School
Tuncurry Public School
Forster Golf Club
MacIntosh Street/Main Road Access through Forster/Tuncurry
MidCoast Council Chambers and Library Forster Shopping Centre
©TVS architects 3/04/2017 3:22:01 PM
DA Issue 03/04/17
Lake Forshore Boardwalk Wallis Lake
Location Plan 5490.10 [ 1 ]
Vie ws t
WALLIS ST
W
12
11
10
Site MIDD
9
8
7 6
LE ST
S N LE HE
ST
13
E
120°
summer morning
STRAND ST
ST
DA Issue 03/04/17
18
14
H ST
17
15
MACINTOS
16
summer afternoon
LITTL E
60°
290°
WEST S T
Views to lake
LAKE ST
240°
©TVS architects 3/04/2017 4:43:29 PM
winter morning
ch
winter afternoon
o
bea
N
li n o Co
E N g
s e z e e r b
Site Context Diagram 5490.11 [ 1 ]
Magnetic latch to provide fire safety
Ecologically Sustainable Design (ESD)
Sliding screens facing the East and West aspect
Entry door
The building design reflects a considered and efficient use of natural resources. Low embodied energy, low maintenance and high durability materials will be used where possible. Effective cross-flow ventilation will be achieved in the apartments with the use of tested ‘breezeway entry doors’ (see diagram adjacent) and open central stairs/corridors. This allows natural cross ventilation without the loss of visual privacy or security. Sun studies have informed the positioning of external sunscreens to allow shading to protect glazing form direct sunlight. Apartment lourve door on sliding track (or hinged).
The building will incorporate energy and water efficient devises appropriate to the specification of the building and awareness of needs unclear on this. Details are provided in the BASIX report.
Unit Entry Breezeway
The following ESD initiatives have been incorporated into the design:
Water • •
•
•
1 Rainwater harvesting and re-use in units and landscape 2 Swimming pool/ spa water efficiency achieved by efficient filtrations system, and backwash treatment & re-use 3 Reduced potable occupant amenity water consumption by efficient fixtures and fittings 4 Vegetation uses native drought tolerant species where appropriate
Sliding Screens
Materials
Emissions/ Transport
Energy
Indoor environment quality
Initiatives
•
•
•
• • •
• • • • • • • • • •
•
• •
6 The use of recycled timber to promote conservation values 7 Locally sourced materials to reduce emissions (low embodied energy materials) 8 Selection of high durability materials 9 VOC emissions will be reduced through the use of natural fibre carpets and low VOC paints for occupied spaces
• •
•
10 Pedestrian links to bus stations, ocean boulevard and lake boardwalk 11 Cycling paths linked to urban surrounds 12 Secure bicycle parking and end of trip facility to encourage active travel options 13 Naturally ventilated podium carpark & trellis wall
14 Passive solar design (screening, building orientation) 15 Apartments have been designed so living areas are open to daylight and take advantage of winter sun 16 Thermal comfort will be achieved by inclusion of ceiling fans within apartments 17 Energy efficient appliances
•
•
•
•
•
18 Dwelling ceiling fans promote ventilation 19 Louvers to bedrooms increase cross ventilation 20 Breezeway entry doors and natural ventilation to lobby corridors 21 Dwelling design inclusive of private external spaces with appropriate solar access and shade to improve health and wellbeing 22 Large translucent skylights with sunshades to public plaza to maximise natural light whilst reducing directsolar heat gain
23 24 25 26 28 29 30 31 32 33
Waste management plan Domestic sub-metering for water, electricity and gas Open landscaped areas for active recreation and exercise Shaded seating areas activates outdoor usage for pedestrians Residential swimming pool Open yoga lawn terrace for informal seating and gathering Roof top planters to reduce solar heat gain Roof top gardens for residential use to promote an active community Street shade trees & median planting to soften pedestrian walkways Co-location of community services, supermarket, restaurants in an integrated mixed use development
1
3 7 8 9 14 15 16 17 18 19 20 21 24 1
3 7 8 9 14 15 16 17 18 19 20 21 24
Apartments
Apartments
31 4 2 25 28 29
Outdoor Recreation
4 30
Cinema
Cinema
7 8 9 14
Cinema Carparking
13 7 8 9
Library Library
Carparking
22
Carparking
7 8 9
Residents Club
7 8 9
Plaza 4
Carparking 7 8 9 33
26
Retail
Carparking 1
©TVS architects 3/04/2017 3:22:10 PM
Carparking 1
ESD Diagram - Sectional Perspective
Supermarket
Retail
30 13 30 13
10 11 4
12 26
DA Issue 03/04/17
31
4
ESD Strategies 5490.12 [ 1 ]
Latitude: Longitude:
Site - Summer Solstice 9am
©TVS architects 3/04/2017 3:24:52 PM
Site - Winter Solstice 12pm
Site - Summer Solstice 12pm
Site - Winter Solstice 3pm
Site - Summer Solstice 3pm
DA Issue 03/04/17
Site - Winter Solstice 9am
-32.180237 152.511502
Shadow Diagrams 5490.13 [ 1 ] 0
30
60
Scale (m) 1 : 1500 @A1
90
120
150
Scale (m) 1 : 3000 @A3
10am Winter Solstice - Level 6
11am Winter Solstice - Level 6
Scale @ A1
Scale @ A1
Scale @ A1
12pm Winter Solstice - Level 6
1pm Winter Solstice - Level 6
2pm Winter Solstice - Level 6
Scale @ A1
3pm Winter Solstice - Level 6 Scale @ A1 ©TVS architects 3/04/2017 3:31:03 PM
Scale @ A1
Scale @ A1
DA Issue 03/04/17
9am Winter Solstice - Level 6
Sun Penetration Design Study For Sunshading 5490.14 [ 1 ] 0
15
30
Scale (m) 1 : 750 @A1
45
60
75
Scale (m) 1 : 1500 @A3
Scale @ A1
12pm Summer Solstice - Level 6 Scale @ A1
3pm Summer Solstice - Level 6 Scale @ A1 ©TVS architects 3/04/2017 3:36:22 PM
10am Summer Solstice - Level 6 Scale @ A1
1pm Summer Solstice - Level 6 Scale @ A1
11am Summer Solstice - Level 6 Scale @ A1
2pm Summer Solstice - Level 6 Scale @ A1
DA Issue 03/04/17
9am Summer Solstice - Level 6
Sun Penetration Design Study For Sunshading 5490.15 [ 1 ] 0
15
30
Scale (m) 1 : 750 @A1
45
60
75
Scale (m) 1 : 1500 @A3
Lake Street
Civic Plaza
West Street
Civic Plaza
Middle Str eet
Ground Floor Plan
Mezzanine/ Library/Level 1
Level 3
Legend Public domain Exclussive use outdoor dining Semi public domain - Library and Community Centre Resident's communal open space
Note
Level 5 ©TVS architects 3/04/2017 3:37:06 PM
Level 6
DA Issue 03/04/17
Residential private open space is provided via attached balconies.
Communal Open Space Diagrams 5490.16 [ 1 ]
Lake Street
Lake Street Res Lobby
Building B Refuse
Res Lobby
Restaurant/Cafe Restaurant/Cafe
Visitor Information Centre
West Street
Building C Refuse
Supermarket Cinema Lobby
Refuse
Community Centre/ Common Building
Loading Res Lobby
Refuse collection bay Gym
Library Ramp 1:5
West Street
Building A Refuse
Property boundary
Restaurant/Cafe
Restaurant/Cafe
Articulated Vehicle Loading zone
Retail
Hotel Back of House
Childcare
Loading
Hotel Refuse
Hotel Lobby Hotel Lobby
Note: Residential apartment waste deposited into Refuse bins via chutes from towers above. Recycling and general waste is via single chute with diverter. Bulk bins located in refuse rooms in Basement are taken to the refuse collection point for designated collection times.
Refuse collection point
Middle St
reet
Note: Commercial refuse is taken to a central refuse room on ground floor adjacent to the loading bay for collection of bulk bins.
Middle St
Lower Ground/Basement 1 Plan Scale @ A1
Lake Street
1 : 500
reet
Ground Level- Waste Management Plan Scale @ A1
1 : 500
Building B Refuse
Building C Refuse
Hotel Refuse
Typical Tower Refuse Scale @ A1
©TVS architects 3/04/2017 4:15:20 PM
Middle St
reet
1 : 500
DA Issue 03/04/17
West Street
Building A Refuse
Waste Management Plan 5490.17 [ 1 ] 0
10
20
Scale (m) 1 : 500 @A1
30
40
50
Scale (m) 1 : 1000 @A3
Staging Legend Stage 1 Stage 2 Stage 3 Stage 4
Basement 1 / Lower Ground Level
Level 2
Level 3
Level 6 ©TVS architects 3/04/2017 3:38:33 PM
Level 7
Ground Floor Plan
Level 4
Level 8/9
Mezzanine/ Library/Level 1
Level 5
Level 10
DA Issue 03/04/17
Basement 2
Staging Plan 5490.18 [ 1 ] 0
20
40
Scale (m) 1 : 1000 @A1
60
80
100
Scale (m) 1 : 2000 @A3
Street Parking
Lake Street
Street Parking
Loading zone
4.54
4000
3600
5.55
4.67
4.93
5.20
Temporary sales office
Community Plaza 6000
Building B
3590
West Street
4500
5.90
Awning at L1
Amenities at L6
5.90
Roof Terrace at L6
Roof Terrace at L5
2500
Planter at L2
Pool at L6
2500
Roof at L3
Building A
Planter
Skylight at L2 5.80 7000
Roof Terrace at L5
Building C
5.60
Roof Terrace at L3
6000
2800
5.25
5.10
Roof at L2
3.98
Building D 3590
3.31
2.91 2.53 2.40
RPD 2.30 2.30 2.27 2.28
2.29
Lots 11, 12 and 13 on DP47987 Corner of West and Lake Street, Forster NSW Site Area: 12,153.4m²
2.33 2.68
Middle S treet Site Plan Scale @ A1 1 : 400
©TVS architects 3/04/2017 3:38:48 PM
DA Issue 03/04/17
2.58
Site Plan 5490.21 [ 1 ] 0
8
16
Scale (m) 1 : 400 @A1
24
32
Scale (m) 1 : 800 @A3
40
Parking Schedule Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level
Description Hotel Library Employee Library Loading Bay PWD Bay Retail Bay Retail Bay (Small)
Count
BLDG A - Level 1 BLDG A - Level 1 BLDG A - Level 1
3.2 Residential Bay 3.8 Residential Bay
13 4 17
BLDG A - Level 2 BLDG A - Level 2 BLDG A - Level 2 BLDG A - Level 2 BLDG A - Level 2
2.4 Residential Bay 3.2 Res. Tandem Bay 3.2 Residential Bay 3.8 Residential Bay
4 27 44 2 77
BLDG B - Level 1 BLDG B - Level 1 BLDG B - Level 1 BLDG B - Level 1
3.2 Res. Tandem Bay 3.2 Residential Bay 3.8 Residential Bay
20 35 6 61
BLDG B - Level 2 BLDG B - Level 2 BLDG B - Level 2 BLDG B - Level 2
3.2 Res. Tandem Bay 3.2 Residential Bay 3.8 Residential Bay
18 40 6 64
BLDG C - Basement 2 BLDG C - Basement 2 BLDG C - Basement 2 Grand Total
Hotel PWD Bay
3 2 1 6 233 7 252
39 3 42 513
B 60
Tandem
Tandem
1:10
Ramp 1:5
Tandem
Hotel Parking
Night Club
PWD.
PWD.
PWD.
Store
3.32
Lower/Basement 2 Plan Scale @ A1
3.48
3.64
©TVS architects 3/04/2017 3:38:58 PM
1 : 250
DA Issue 03/04/17
Plant room
Amenities
Amenities
3.77
Lower Basement 2 Plan 5490.22 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
B 60
Parking Schedule
Lake Street Fan Room
Sprinkler & Hydrant Pump Room
6.09
Tree preservation zone
Plenum
Sprinkler & Hydrant Pump Water Tank
UP
Plenum
5400
Tree foliage zone
6000
Stair up to Community Plaza
S
A 60
UP
10800
Refuse
Plenum
S
PWD.
UP
PWD.
Refuse
S
UP
Roller Door
Ramp 1:40
Lift pit
10800
West Street
S
Fan Room
Ramp 1:5
RL 1.400
1:10
PWD.
6000
Opening created at Stage 2
PWD.
UP
S
Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level
Description Hotel Library Employee Library Loading Bay PWD Bay Retail Bay Retail Bay (Small)
Count
BLDG A - Level 1 BLDG A - Level 1 BLDG A - Level 1
3.2 Residential Bay 3.8 Residential Bay
13 4 17
BLDG A - Level 2 BLDG A - Level 2 BLDG A - Level 2 BLDG A - Level 2 BLDG A - Level 2
2.4 Residential Bay 3.2 Res. Tandem Bay 3.2 Residential Bay 3.8 Residential Bay
4 27 44 2 77
BLDG B - Level 1 BLDG B - Level 1 BLDG B - Level 1 BLDG B - Level 1
3.2 Res. Tandem Bay 3.2 Residential Bay 3.8 Residential Bay
20 35 6 61
BLDG B - Level 2 BLDG B - Level 2 BLDG B - Level 2 BLDG B - Level 2
3.2 Res. Tandem Bay 3.2 Residential Bay 3.8 Residential Bay
18 40 6 64
BLDG C - Basement 2 BLDG C - Basement 2 BLDG C - Basement 2 Grand Total
Hotel PWD Bay
3 2 1 6 233 7 252
39 3 42 513
Openings created at Stage 2
Refuse S
Tree foliage/ preservation zone
5.4 x 2.6m typical car bays
Staff access only from basement Lib. Bay
Lift
Lib. Van Bay
6.24 S
PWD.
Ramp 1:5
PWD.
5400
1:10
6000
Plenum
Store
Fan Room
Rain Water tank below parking level slab
10800
Car Bays created at Stage 2 - Circulation isles for Stage 1
6000
6100 Cinema lifts
Plenum
Nightclub Mezzanine
Roller Door Stage 4 Exit/Entry
Plenum
UP
Fan Room
Ramp connects to basement in Stage 4
Store
Ramp up
Ramp 1:9 Ramp 1:16
Loading
Ramp 1:16
Back of House
Void
Tree foliage zone
Business Centre
Hotel Lobby RL 3.500
Tree preservation zone
Tree preservation zone Tree foliage zone
3.32
3.48
Tree foliage/ preservation zone
Lower Ground/Basement 1 Plan Scale @ A1
1 : 250
©TVS architects 3/04/2017 3:39:09 PM
3.64
DA Issue 03/04/17
3.77
Upper Basement 1 Plan 5490.23 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
B
Lake Street
60
4.67
4.93
5.20
5.55
Existing kerb line 4.54
Carkpark air exhaust
Community Plaza
UP
Restaurant/Cafe
Restaurant /Cafe
Restaurant/Cafe
Res Lobby
Gate
Office
RL 5.000
UP
RL 5.000
RL 5.800
5.90 Switch Room UP
Community Plaza
Restaurant/Cafe
UP
RL 5.800
UP
Riser
Retail
Entry
UP
Community Centre/ Common Building
Activity Room 1
Store
Cinema Lobby
Planter
RL 5.800
10780
Break-out Area
Carkpark air exhaust
RL 5.800
Planter Amenities
Switch Room
5.80
RL 5.000
Supermarket
UP
Cinema lifts
BOH
Lift
Retail
UP
Visitor Information Centre
Drop down projection screen over
Amenities
5.90
West Street
Line of L1 slab above
RL 5.800
RL 5.800
Carkpark air exhaust
MSB
Ramp 1:14
3490
Riser
UP
Line of void over
Activity Room 2
RL 5.000
Refuse Room
Letter boxes
Loading dock
Res Lobby
Lift
Line of L1 slab above
Stairs
Library Loading bays
Gym RL 5.800
Male Amenities
Female Amenities
Activity Room 3
11450
Activity Room 4
Bike enclosure
Loading zone
UP
5.25
Break-out Area
UP
4880
Articulated Vehicle Bay
Entry Only
Children's Garden
UP
Carkpark air exhaust
10670
RL5.000 Ramp 1:16
Driveway
5.10
Carkpark air exhaust
RL 5.000
Catering Kitchen Ramp 1:5
5.60
Dock
External Reading Area
Skylight above at L2
RL 5.800
Tree foliage/ preservation zone
18 18
Lift
RL 5.000 Line of structure above
Count
Lift
Vo id
RL 5.800
Description Bike Rack Grand Total 1:10
Outdoor Dining
60
RL 5.700
RL 5.800
79 79
Ramp 1:5
Res Lobby
9550
A
Outdoor Dining
1:10
RL 5.700
Count
Bicycle Parking Schedule
Gate
Ramp 1:5
Outdoor Dining
Description 2.6 Street Parking Grand Total
9620
11870
Community Plaza
Street Parking Schedule
Transformer
Driveway
Transformer 5870
Lake Lane
Line of structure above UP
Carkpark air exhaust
Retail RL 5.000
3.98
RL 5.000
Ramp 1:9
Void to Dock
Childcare
Exit Only
Ramp up
Outdoor Play
Void
RL 4.900
RL 5.000
Ground Level
Ramp 1:16
Ramp 1:16
Nightclub Entry
Scale @ A1
1 : 250
5420
Office
3.31
Void
Tree foliage zone
Driveway
Tree preservation zone
7680
Public - Open Space
2.53
Tree preservation zone Tree foliage zone
Tree foliage/ preservation zone 2.30
3.64 2.33 ©TVS architects 3/04/2017 3:39:33 PM
Middle St
reet
2.58
DA Issue 03/04/17
12230
Ground Floor Plan 5490.24 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
Lake Street B
Parking Schedule
7960
7080
5810
60
Line of floor over
Tandem Storage
9050
Tandem
A 60
Lift Core
Riser
Planter d Voi
Tandem Lobby
Awning
Fire Stair
Fire Stair
Tandem
3B.1 Managers Unit A101
7480
Residents Club Deck
Residents Storage
Lobby
Planter
Extermal Reading Deck
2A.2 Sales Unit B101
Lift
RL 10.300
Managers Store
Riser/ Refuse
UP
Residents Club
Lift
to Co m be mun low ity Lo un ge
UP
UP
Full height wall
Tandem
2500
Skylight over
BLDG A - Level 1 BLDG A - Level 1 BLDG A - Level 1
3.2 Residential Bay 3.8 Residential Bay
13 4 17
BLDG A - Level 2 BLDG A - Level 2 BLDG A - Level 2 BLDG A - Level 2 BLDG A - Level 2
2.4 Residential Bay 3.2 Res. Tandem Bay 3.2 Residential Bay 3.8 Residential Bay
4 27 44 2 77
BLDG B - Level 1 BLDG B - Level 1 BLDG B - Level 1 BLDG B - Level 1
3.2 Res. Tandem Bay 3.2 Residential Bay 3.8 Residential Bay
20 35 6 61
BLDG B - Level 2 BLDG B - Level 2 BLDG B - Level 2 BLDG B - Level 2
3.2 Res. Tandem Bay 3.2 Residential Bay 3.8 Residential Bay
18 40 6 64
BLDG C - Basement 2 BLDG C - Basement 2 BLDG C - Basement 2 Grand Total
Hotel PWD Bay
3 2 1 6 233 7 252
RL 9.200
Tandem
Cinema stair
Count
Balustrade Void
39 3 42 513
Void
id
West Street
Library
Drop down projection screen over
UP
Ramp 1:5
Tandem
Tandem
Description Hotel Library Employee Library Loading Bay PWD Bay Retail Bay Retail Bay (Small)
Lift
UP
Tandem
Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level BLDG A - Basement 1 / Lower Ground Level
Vo
Store Riser
UP
Store
Ramp 1:5
Cinema lifts
Store
Residents Storage
Planter Lift
Fire Stair
3.8
1:10
Lift Core
3.8
3.8
Store
3.8
Residential Parking RL 10.300
9600
Library BOH
Residents Storage
RL 10.300
Including Staff room & 2 x Staff toilets (1 PWD WC + Shower & 1 WC) UP
3.8
3.8
Store
3.8
3.8
UP
Fire Stair
10180
3.8
3.8 UP
UP
Fire Stair
UP
8890
clear 3m
Pool
Fire Stair
Restaurant 6820
WC
Level 1 Floor Plan Terrace Dining/Bar
Scale @ A1
Amenities
1 : 250
RL 9.000
4250
Bar
Store
Kitchen Amenities
Smoking Lounge
Pool Terrace
4380
Fire Stair
4760
Lounge
©TVS architects 3/04/2017 3:39:50 PM
Function Rooms 2a & 2b
3530
Middle St
reet
DA Issue 03/04/17
Funtion Room 1
Level 1 Floor Plan 5490.25 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
Lake Street
B
7960
6010
4770
8840
5810
5460
2690
60
Planter
3A.2 A202
Planter
3B.1 A203
3C.1 B203
60
Lift Core Tandem RL 13.300
Lobby
Fire Stair
Tandem
Sto re
Riser
3A.1 A201
Line of tower over
Lobby RL 13.300
Lift Core
Planter
Store
Tandem
A
2A.1 B202
2A.2 B201
9020
7480
Store
UP
Fire Stair
Tandem
Tandem
UP
Tandem
UP
Riser
1A.1 A204
Tandem
Tandem
Screening to carpark
Tandem
Tandem
Planter
Tandem
Tandem
Tandem
Tandem
Tandem
Tandem
Store Line of floor over
Tandem 1:10
Cinema Stair
Lift
UP
Line of floor over
ylig ht
2500
Cinema lifts
Riser
Store
Tandem
Ramp 1:5
Store
Tandem
Sk
Tandem Ramp 1:5
West Street
Tandem
Tandem Store
Lift Fire Stair Core
Store
3.8
Store
Store
3.8
Residential Carpark Stage 2/3
Residential Carpark Stage 1
RL 13.300
RL 13.300
Fire Stair
3.8
3.8
10180
UP
Fire Stair
3.8
Store
UP
3.8
Small
UP
UP
clear 3m 8890
Bridge link
0A.1 D221
9050 6580
Fire Stair
0A.1 D220 0A.1 D219
0A.1 D201
0A.1 D218
0A.1 D203
0A.1 D217
0A.1 D204
0A.1 D216
0A.1 D205
0A.1 D215
0A.1 D206
0A.1 D202
RL 12.800
7050
Roof
Level 2 Floor Plan Scale @ A1 1 : 250
Lobby Fire Stair
0B.1 D214
4400
0C.1 D213
0D.1 D212
0D.2 D211
0A.1 0A.1 D210 D209
0A.1 0A.2 D208 D207
©TVS architects 3/04/2017 3:40:04 PM
Middle St
reet
4470
6350
3530 4890
6520
5280
DA Issue 03/04/17
6260
Lift Core
Level 2 Floor Plan 5490.26 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
B
5810
Building B
4750
60
Building A
3A.2 A302
60
Lift Core 6340
RL 16.500
Storage
Light well
2A.1 B306
3C.1 B307
3B.1 A303
Riser
Lobby
Lobby
6290
Fire Stair
RL 16.500
3A.1 A301
Light well
3D.1 B308
3D.1 B301 Planter
Cinema storage
Courtyard
1A.1 A304 Riser
2A.1 A312
2A.1 A305
2A.1 A311
2A.1 A306
Cinema undecroft
Cinema bar
Lift
RL 16.300
Cinema
2500
7480
Lift Core
2A.1 B304
Fire Stair
3C.1 B302
A
2A.2 B305
Cinema lifts Cinema undecroft
Building C
Planter
Mech Plant
F
2A.1 A307
2A.1 A310
Fire Stair
M
10920
Covered pathway Offices
Landscaped area
Cinema undecroft
3A.1 A308 Fire Stair
2F.1 A309
lear 3m c
0A.1 D321
9050 6460
8400
6600
Bridge link roof
Fire Stair
0A.1 D320
0A.1 D301
0A.1 D319
0A.1 D302
0A.1 D318
0A.1 D303
0A.1 D317
0A.1 D304
0A.1 D316
0A.1 D305
0A.1 D315
0A.1 D306 RL 16.000
Level 3 16330
Scale @ A1 1 : 250
Lobby Fire Stair
7030
0B.1 D314 0C.1 D313
Lift Core
0D.1 D312
0D.2 D311
0A.1 0A.1 0A.1 0A.2 D310 D309 D308 D307
4890
3530
©TVS architects 3/04/2017 3:20:54 PM
Building D
DA Issue 03/04/17
4000
Level 3 Floor Plan 5490.27 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
B
5810
Building B
4750
60
Building A
3A.2 A402 7480
A
2A.2 B404
2A.1 B403
60
2A.1 B405
3B.1 A403
3C.1 B406
Lift Core
Storage
Light well
Lobby
Fire Stair
Light well
3D.1 B401
RL 19.700
3A.1 A401
6290
Fire Stair
RL 19.800
6320
Lobby
3D.1 B407
Lift Core
3C.1 B402
Riser
1A.1 A404
2A.1 A412
2A.1 A405
2A.1 A411
2A.1 A406
2A.1 A410
2A.1 A407
Cinema 1
Tickets and Snack bar
Void
Planter
UP
3670
Cinema Lobby Break out
Cinema lifts
Cinema 2 RL 19.600
Lift
Fire Stair
Building C
10920
Void to Plant
Break out
Roof to walkway
Cinema 3
3A.1 A408 Fire Stair
3A.1 A409
6460
9030
9250
5820
4680
0 540
0A.1 D421
Fire Stair
0A.1 D420
0A.1 D401
0A.1 D419
0A.1 D402
0A.1 D418
0A.1 D403
0A.1 D417
0A.1 D404
0A.1 D416
0A.1 D405
0A.1 D415
0A.1 D406 RL 19.200
Level 4 Floor Plan Scale @ A1
1 : 250
Lobby Fire Stair
0B.1 D414
4240
0C.1 D413
0D.1 D412
0D.2 D411
0A.1 0A.1 D410 D409
0A.1 0A.2 D408 D407
©TVS architects 3/04/2017 3:40:35 PM
Building D
4470
3530 6350
4890
6520
5280
DA Issue 03/04/17
6260
Lift Core
Level 4 Floor Plan 5490.28 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
B
8840
A
3A.2 A502
2A.2 B504
2A.1 B503
60
2A.1 B505
7480
3C.1 B506
3B.1 A503
Lift Core RL 25.800 Light well
3D.1 B501
Lobby
Lobby
6290
Fire Stair
RL 21.900
Light well
3A.1 A501 3D.1 B507
Activity 1 Communal Rec. Facility RL 25.800
Void to pool
1A.1 A504
Fire Stair
6310
Lift Core
3C.1 B502
6010
Building A 7960
5810
Building B
4750
60
2A.1 A512
2A.1 A505
2A.1 A511
2A.1 A506
2A.1 A510
2A.1 A507
Activity 2 Planter below
3580
Activity 3
C502 C505
Terrace
Roof Terrace
8960
Building C
Lift Core
2A.1 C504
Fire Stair
2A.2 C501
10920
3B.2 C503
2A.3 C502
3A.1 A509 Planter
Fire Stair
Lobby
3A.1 A508
6280
4950
0 492
0A.1 D521
9050
Fire Stair
0A.1 D520
0A.1 D501
0A.1 D519
0A.1 D502
0A.1 D518
0A.1 D503
0A.1 D517
0A.1 D504
0A.1 D516
0A.1 D505
0A.1 D515
0A.1 D506
17580
6460
RL 22.400
Level 5 Floor Plan Scale @ A1 1 : 250
Lobby Fire Stair
0B.1 D514 0C.1 D513
0D.1 D512
0D.2 D511
0A.1 0A.1 D510 D509
0A.1 0A.2 D508 D507
©TVS architects 3/04/2017 3:40:51 PM
3530
Building D
6980 4470
4890
6520
5280
DA Issue 03/04/17
Lift Core
Level 5 Floor Plan 5490.29 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
B
6010
Building A
8840
7960
5810
Building B
4750
60
3A.2 A602 7750
A
2A.1 B603
2A.2 B604
60
2A.1 B605
3B.1 A603
3C.1 B606
Lift Core
Light well
3D.1 B601
2A.1 B608
Lobby
Fire Stair
RL 25.100
3A.1 A601
Light well
3D.1 B607
Toilets/shower /sauna
Courtyard
Lobby
6290
Fire Stair
RL 25.800
6340
2A.1 A612
Pool
1A.1 A604
2A.1 A605
3760
Roof terrace
Spa
Lift Core
3C.1 B602
Planter
2A.1 A611
Courtyard
2A.3 C606
3B.2 C605
2A.1 A606
10920
8950
Building C
2A.2 C601
Fire Stair
Lift Core
2A.1 C604
2A.1 A610
2A.1 A607
3A.1 A609
3A.1 A608
RL 25.800
Lobby
3B.2 C603
6220
4280
Fire Stair
2A.3 C602
Fire Stair
2D.1 D618 9050
1B.1 D601 2B.1 D602
2C.1 D617 1B.1 D616
6460
Level 6 Floor Plan Scale @ A1
1E.1 D603
1B.1 D615 1B.1 D614
1 : 250
16320
2B.1 D604
1B.1 D613 RL 25.600
1B.1 D605 Lobby Fire Stair
6260
4240
2E.1 D611
1D.1 D610
2B.1 1B.1 D609 D608
1B.1 1B.1 D607 D606
©TVS architects 3/04/2017 3:41:08 PM
4890
6520
5280 3530
Building D
DA Issue 03/04/17
Lift Core
1C.1 D612
Level 6 Floor Plan 5490.30 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
B 60
3C.1 B702
A
2A.1 B703
Building A
5810
Building B
2A.2 B704
60
2A.1 B705
3C.1 B706
Lift Core 6310
RL 28.800
Lobby
Fire Stair
2A.1 B708
3D.1 B707
3760
3D.1 B701
Building A Roof 2A.3 C706
3B.2 C705
8950
Building C
Lift Core
2A.1 C704
2A.2 C701
Fire Stair
RL 28.800
3B.2 C703
4280
2A.3 C702
Fire Stair
1B.1
2C.1
Level 7 Floor Plan
9050 6230
1B.1
2B.1
1B.1
2B.1
Scale @ A1
1 : 250
1B.1
1B.1
1B.1 RL 28.600
Fire Stair
2B.1 6250
1B.1
1B.1
1B.1
2E.1
3860
5280 3160
Building D
©TVS architects 3/04/2017 3:41:20 PM
DA Issue 03/04/17
Lift Overrun
1C.1
Level 7 Floor Plan 5490.31 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
B 60
Building A
5310
Building B
2A.2
A 60
3C.1
2A.1
B802 B902
B803 B903
B804 B904
2A.1
B805 B905
3C.1
B806 B906
Lift Core 6310
Level 8 - RL 31.800
Lobby
Level 9 - RL 34.800
Fire Stair
3D.1
2A.1
3D.1
B807 B907
B808 B808
3760
B801 B901
Building A Roof 3B.2
2A.3
C805 C905
C806 C906
8350
Level 8 - RL 31.800
Building C
Lift Core
2A.1 C804 C904
Fire Stair
Level 9 - RL 34.800
2A.2 C801 C901
Lobby
3B.2
2A.3
C803 C903
C802 C902
Level 8 & 9 Floor Plan Scale @ A1 1 : 250
Building D
©TVS architects 3/04/2017 3:41:32 PM
DA Issue 03/04/17
Building D Roof
Level 8 & 9 Floor Plan 5490.32 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
B
5310
Building B
6890
60
5A.1 B1001
4A.1 B1002
A 60
Lift Core 6310
RL 37.800 Lobby
Fire Stair
3760
7520
3E.1 C1001 RL 37.800
Fire Stair
Building C
Lift Core
Lobby
8360
3E.2 C1002
Level 10 Floor Plan
©TVS architects 3/04/2017 3:41:43 PM
1 : 250
DA Issue 03/04/17
Scale @ A1
Level 10 Floor Plan 5490.33 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
B
Fall
Fall
Fall
Fall
Fal l
60
Fa ll ll Fa
Fall
Fall l Fal
Fall
A 60
Fall ll Fa
l Fal
Fall
Fal l
Fall
ll Fa
Fall
Fall
Fall Fall
Fall Fall
Fall
Fall
Fa ll
Fall
Fall
Roof Plan Scale @ A1 1 : 250 Fall
©TVS architects 3/04/2017 3:41:57 PM
DA Issue 03/04/17
Fall
Fall
Fall
Roof Plan 5490.34 [ 1 ] 0
5
10
Scale (m) 1 : 250 @A1
15
20
Scale (m) 1 : 500 @A3
25
Balcony
Balcony
Bed 1 Bed 1
Balcony
Bed 1
Bed 1 Balcony
Living
Living
WIR
Bed 2
Living Bed 2
ENS
WIR
Dining
LDRY
R
Bed 2 R
Living
R
Dining
Lin
ENS
Store
ENS
Lin Kitchen
Entry
Entry
Ldry
Bath
Bath Ldry
Kitchen
Ldry
Bath
Kitchen Entry
Entry Area Schedule Unit 1A.1
Typical Unit - (1A.1) Scale @ A1
Name 1A.1 1A.1
1 : 100
Area 77.4 m² 16.0 m² 93.3 m²
Area Schedule Unit 2A.1
Typical Unit - (2A.1) Scale @ A1
ENS
Lin
Kitchen
Media
WIR
R
Dining
Dining
WIR
Name 2A.1 2A.1
1 : 100
Typical Unit - (2A.2)
Area 107.0 m² 20.4 m² 127.4 m²
Scale @ A1
1 : 100
Area Schedule Unit 2A.2 Name 2A.2 2A.2
Typical Unit - (2A.3)
Area 109.8 m² 20.4 m² 130.2 m²
Scale @ A1
1 : 100
Area Schedule Unit 2A.3 Name 2A.3 2A.3
Area 112.6 m² 20.9 m² 133.5 m²
Balcony Balcony R
R
Lin
Bed 3
Bed 1
Balcony
Living Bath
Study
Bed 2
Living
Bed 2
Living
Ldry Entry
Dining
Living
Bed 1
WIR
Bed 1
Dining
WIR
Dining
R Lin R
ENS
Bed 2 Bed 2
ENS
Dining
WIR Kitchen
Bed 3
R
ENS Bed 3
Entry
Bed 1
WIR
Typical Unit - (3A.1) 1 : 100
ENS
Area Schedule Unit 3A.1 Name 3A.1 3A.1 Grand total
Area 126.3 m² 16.7 m² 142.9 m²
Ldry
Bath
Typical Unit - (3A.2) Scale @ A1
Bed 2
Balcony
Store
Area Schedule Unit 3A.2 Name 3A.2 3A.2
1 : 100
Area 124.6 m² 16.9 m² 141.5 m²
Bath
Typical Unit - (3B.1) Scale @ A1
Bath/ Ldry
Ldry
1 : 100
Typical Unit - (3B.2)
Area Schedule Unit 3B.1 Name 3B.1 3B.1
Area 131.7 m² 30.0 m² 161.7 m²
Scale @ A1
Dining
Kitchen
Living
Living
Ldry
Dining WIR R
Kitchen
Ldry
Bath
Lin
Courtyard
ENS WIR Bed 1 Bed 2
Bath
Kitchen
Bath
R
Bed 3
Entry
Typical Unit - (3C.1) Scale @ A1
1 : 100
©TVS architects 3/04/2017 3:42:45 PM
Area Schedule Unit 3C.1 Name 3C.1 3C.1
Area 123.7 m² 17.4 m² 141.1 m²
Area 124.6 m² 22.7 m² 147.3 m²
Lin
Bed 1
Dining
Name 3B.2 3B.2
ENS
Balcony
Living
1 : 100
Area Schedule Unit 3B.2
Bed 1
WIR
Bed 3
Kitchen
Bed 3
Kitchen
Typical Unit - (3D.1) Scale @ A1
1 : 100
Area Schedule Unit 3D.1 Name 3D.1 3D.1
Area 125.4 m² 26.7 m² 152.2 m²
Typical Unit - (2F.1) Scale @ A1
1 : 100
Area Schedule Unit 2F.1 Name 2F.1 2F.1
Area 107.7 m² 29.6 m² 137.2 m²
Bed 2
DA Issue 03/04/17
Balcony
Scale @ A1
Kitchen
Lin
R
Typical Unit Plans 5490.40 [ 1 ] 0
2
4
Scale (m) 1 : 100 @A1
6
8
Scale (m) 1 : 200 @A3
10
Master suite Ensuite
Dining
Study
Kitchen
Courtyard Living
Outdoor dining
Media Room
ve Roof o
Dining
Kitchen
Media room
Living
r
Dressing room Scullery
Courtyard Scullery
Laundry Pdr Pdr Pond Bed 2
Bed 3
Unit B1002
Master Bed r ht ove Skylig
Scale @ A1
Ens
WIR
B1002 Outdoor
Ens
Pool
Bed 2
Teen lounge
ENS
ENS
Bed 3
Bed 4
1 : 100 Area 456.3 m² 133.3 m² 589.7 m²
ENS Bed 5
Unit B1001 Scale @ A1
1 : 100
B1001 Outdoor
Bed 4
Area 499.9 m² 103.3 m² 603.2 m²
Courtyard
Pdr Laundry
ENS
WIR
ENS
WIR
Bed 2
Master suite
WIR
Living
Courtyard Dining
Unit C1002 1 : 100 Area
©TVS architects 3/04/2017 3:43:04 PM
Balcony
Kitchen
Balcony Media room
Balcony
Scale @ A1
Bed 3
Scullery
DA Issue 03/04/17
ENS
Typical Unit Plans 5490.41 [ 1 ] 0
2
4
Scale (m) 1 : 100 @A1
6
8
Scale (m) 1 : 200 @A3
10
ov er
Kitchen/ Dining
1B.1
8 m²
43 m²
Entry
Lower Level (L6)
Hotel Typical - (0A.1) Scale @ A1
1 : 100
Ens 1
Bath
Bed 1
R
Study
1B.1 Balc
Bath Vo ov id er
Vo id
Living
1E.1
Entry
1E.1 Balc
86 m²
15 m²
Area Schedule Unit 0A.1 Name 0A.1 0A.1 Balc
Kitchen
Area 43.2 m² 6.7 m² 49.8 m²
Living Dining
Ens
Level 6
Bed 1 1B.1 22 m²
R
Upper Level (L7)
Serviced Apt. - (1B.1)
Hotel Typical - (0B.1) Scale @ A1
1 : 100
Name 1B.1 1B.1 Balc
1 : 100
Area Schedule Unit 0B.1 Name 0B.1 0B.1 Balc
Area 38.7 m² 10.4 m² 49.1 m²
1C.1 Balc
Area 64.5 m² 7.6 m² 72.1 m²
Serviced Apt. - (1E.1) Scale @ A1
1 : 100
Area Schedule Unit 1E.1 Name 1E.1 1E.1 Balc
Area 85.8 m² 15.2 m² 101.0 m²
Entry
Void ove r
Scale @ A1
Area Schedule Unit 1B.1
1C.1 38 m²
10 m²
Kitchen/ Dining
Living
Bath
Lower Level (L6) 1C.1 22 m²
Bed 1
Ens
R
Upper Level (L7) Scale @ A1
1 : 100
Area Schedule Unit 0C.1 Name 0C.1 0C.1 Balc
Area 41.5 m² 14.9 m² 56.4 m²
Serviced Apt. - (1C.1) Area Schedule Unit 1C.1 Scale @ A1
1 : 100
R
Bed 1
Area 60.9 m² 10.4 m² 71.3 m²
Kitchen Voi do ver
Ens
Name 1C.1 1C.1 Balc
1D.1 Entry 59 m² Dining
Living
1D.1 Balc 21 m²
Level 6
Hotel Typical - (0D.1) Scale @ A1
1 : 100
©TVS architects 3/04/2017 3:43:31 PM
Area Schedule Unit 0D.1 Name 0D.1 0D.1 Balc
Area 34.2 m² 10.9 m² 45.1 m²
Serviced Apt. - (1D.1) Scale @ A1
1 : 100
Area Schedule Unit 1D.1 Name 1D.1 1D.1 Balc
Area 59.3 m² 21.2 m² 80.5 m²
DA Issue 03/04/17
Hotel Typical - (0C.1)
Typical Unit Plans 5490.42 [ 1 ] 0
2
4
Scale (m) 1 : 100 @A1
6
8
Scale (m) 1 : 200 @A3
10
ov er
2B.1 Balc
2B.1
9 m²
42 m²
Bath Entry
Vo ov id er
Vo id
Kitchen/ Dining
Living
V
2D.1 Balc
Kitchen/ r e ov Dining oid
2D.1 R
Bed 2 88 m²
21 m²
Living
Entry R
Lower Level (L6) Bed 1
Bath
Ens 1
Level 6
Ens 1 Bed 1
R
Serviced Apt. - (2D.1)
2B.1 52 m²
Scale @ A1
Area Schedule Unit 2D.1 Name 2D.1 2D.1 Balc
1 : 100
Ens 2
Area 87.6 m² 20.7 m² 108.3 m²
Bed 2 R
Upper Level (L7)
Serviced Apt. - (2B.1) 1 : 100
Scale @ A1
Kitchen/ Dining oid over
Area Schedule Unit 2B.1 Name 2B.1 2B.1 Balc
Entry
V
Area 94.0 m² 8.8 m² 102.8 m²
2E.1
Pwdr
42 m²
Living
2E.1 Balc 14 m²
Lower Level (L6) 7 m²
2C.1 42 m²
Entry
Vo ov id er
2C.1 Balc R
2E.1
Ens 2
46 m²
R
Lower Level (L6) Ens 1
Bed 1
Bed 2
2E.1 Balc 10 m²
Upper Level (L7)
Serviced Apt. - (2E.1)
R
Scale @ A1 Bed 1
Ens 1
1 : 100
Area Schedule Unit 2E.1 Name 2E.1 2E.1 Balc
Area 87.5 m² 24.1 m² 111.6 m²
2C.1 59 m²
Ens 2 Bed 2
Upper Level (L7)
Serviced Apt. - (2C.1) Scale @ A1
1 : 100
©TVS architects 3/04/2017 3:43:53 PM
Area Schedule Unit 2C.1 Name 2C.1 2C.1 Balc
Area 100.4 m² 7.4 m² 107.8 m²
DA Issue 03/04/17
R
Typical Unit Plans 5490.43 [ 1 ] 0
2
4
Scale (m) 1 : 100 @A1
6
8
Scale (m) 1 : 200 @A3
10
Building B Maximum height
Sliding sun shade screens
Building A Maximum height
Existing Neigbour
Line of Basement
Batten screen with trellis planting
Exisiting Ground Line
North Elevation - Lake Street Scale @ A1
1 : 200
Building A
Exisiting Ground Line
East Elevation Scale @ A1
©TVS architects 3/04/2017 3:49:15 PM
1 : 200
Line of Basement
Maximum Height
DA Issue 03/04/17
Sliding sun shade screens
Elevations 5490.50 [ 1 ] 0
4
8
Scale (m) 1 : 200 @A1
12
16
Scale (m) 1 : 400 @A3
20
Middle Street
Building C Property Boundary
Building D
West Elevation - West Street Scale @ A1
1 : 200
Building D
South Elevation - Middle Street Scale @ A1
1 : 200
©TVS architects 3/04/2017 3:57:14 PM
DA Issue 03/04/17
Maximum height RL 31.600
Elevations 5490.51 [ 1 ] 0
4
8
Scale (m) 1 : 200 @A1
12
16
Scale (m) 1 : 400 @A3
20
Building A Maximum height
Sliding sun shade screens
Skylight
Civic Plaza
Community Lounge
Activity Room 3
Line of Basement
Existing Ground Line
Building A - West Sectional Elevation Scale @ A1
1 : 200
Building C
Building B
Maximum Height RL 41.800
Maximum Height RL 41.800
Building D Maximum Height RL 31.600
Line of Basement
Building B, C and D - East Sectional Elevation Scale @ A1
1 : 200
©TVS architects 3/04/2017 4:04:01 PM
Civic Plaza
DA Issue 03/04/17
Community Lounge
Elevations 5490.52 [ 1 ] 0
4
8
Scale (m) 1 : 200 @A1
12
16
Scale (m) 1 : 400 @A3
20
Building B
Maximum height RL 41.800
Property Boundary
West Street Property Boundary
Building C
Maximum height RL 41.800
Building A Maximum height RL 31.200
Loading Bay
Decorative batten screen
Line of Basement
South Sectional Elevation 1 : 200
Stage 1 - West Elevation Scale @ A1
1 : 200
(Demonstrating facade treatement planned, if Stage 2 doesn't follow immediately.) ©TVS architects 3/04/2017 4:08:59 PM
Temporary glazing to retail
Decorative paintwork
Temporary decorative screening to be reused in Stage 2
DA Issue 03/04/17
Boundary
Scale @ A1
Elevations 5490.53 [ 1 ] 0
4
8
Scale (m) 1 : 200 @A1
12
16
Scale (m) 1 : 400 @A3
20
Maximum height RL 41.800
RL 41.800
Property Boundary West Street
Property Boundary
Building B
BLDG B - Max Height
Penthouse Penthouse
Units
Units
Units
Units
Units
Units
Units
Units
RL 37.800
BLDG B - Level 10
RL 34.800
BLDG B - Level 9
RL 31.800
BLDG B - Level 8
RL 28.800
BLDG B - Level 7
RL 25.800
BLDG B - Level 6
RL 22.800
BLDG B - Level 5
RL 19.800
BLDG B - Level 4
RL 19.600
BLDG B - Cinema
RL 16.500 RL 16.300
BLDG B - Level 3 BLDG B - Cinema
RL 13.300
BLDG B - Level 2
RL 10.300
BLDG B - Level 1
RL 5.800
BLDG B - Ground Level
RL 1.400
BLDG A - B1/Lower GL
Building A Maximum height RL 31.200
BLDG A - Max Height RL 31.200
Units BLDG A - Level 6 RL 25.100 Units
Lift shaft
Units
BLDG A - Level 5 RL 21.900 Units
Units
Units
BLDG A - Level 4 RL 19.700 Units BLDG A - Level 3 RL 16.500 Units
Skylight roof
Units
Units
Units
Units
Podium carpark
BLDG A - Level 2 RL 13.300 Units
Podium carpark
BLDG A - Level 1 RL 10.300 BLDG A - Mezz/Library RL 9.200
Restaurant/ Cafe BLDG A - Ground Level RL 5.000
Basement 1 carpark BLDG A - B1/Lower GL RL 1.400 Rainwater tank
Existing Ground Line
Section A Building C
Building B
Maximum height RL 41.800
Maximum height RL 41.800 RL 41.800
Penthouse
Units
Penthouse
Units
Units
Maximum height RL 31.600
RL 31.600
Units
Units BLDG C - Level 7
BLDG C - Level 6
BLDG C - Level 5
BLDG C - Level 4
RL 25.600
Serviced apartment
Hotel rooms
Hotel
rooms
Hotel rooms
Hotel
rooms
Units
Units
Lift Shaft/ Fire stair core
RL 34.800
BLDG B - Level 9
RL 31.800
BLDG B - Level 8
RL 28.800
BLDG B - Level 7
Units
RL 25.800
BLDG B - Level 6
RL 22.800
BLDG B - Level 5
RL 19.800
BLDG B - Level 4
RL 19.600
BLDG B - Cinema
RL 16.500
BLDG B - Level 3
RL 16.300
BLDG B - Cinema
RL 13.300
BLDG B - Level 2
RL 10.300
BLDG B - Level 1
RL 5.800
BLDG B - Ground Level
RL 1.400
BLDG A - B1 & Lower GL
Units
Communal Activity Rooms
Units
Units
RL 19.200
Cinema Hotel
BLDG B - Level 10
Units
RL 22.400
Hotel rooms BLDG C - Level 3
Units
RL 37.800
Units
RL 28.600
Serviced apartment
BLDG B - Max Height
Units
Building D BLDG C - Roof
Property Boundary Lake Street
1 : 200
Middle Street Property Boundary
Scale @ A1
Cinema Units
rooms
RL 16.000 Podium carpark Hotel rooms
BLDG C - Level 2
Hotel
rooms
RL 12.800 Podium carpark Function rooms
Restaurant
RL 9.000 Driveway Hotel lobby
BLDG C - Ground Level
RL 5.000
BLDG C - Basement 1
RL 2.000
BLDG C - Basement 2
RL - 0.800
Supermarket
Retail
Retail
Basement 1 carpark Basement 2 carpark
Existing Ground Line
Section B Scale @ A1
Childcare
Loading
1 : 200
©TVS architects 3/04/2017 4:09:25 PM
DA Issue 03/04/17
BLDG C - Level 1
Site Sections 5490.60 [ 1 ] 0
4
8
Scale (m) 1 : 200 @A1
12
16
Scale (m) 1 : 400 @A3
20
8 timber (column treatement)
Forster Main Beach
Colour palette concept image
3 paint monument
7 coloured precast concrete - ochre
4 paint brown
1 paint white
Concept image - residential balconies sliding screens a mix of brown tones with black frames 11
black (window screens and glazing frames) 5 2
3
1
4
10
9 compact laminate cladding timber look finish or natural timber
6 concrete natural Colour palette concept images
Community plaza concept images
Community lounge and library concept image
©TVS architects 3/04/2017 4:09:29 PM
Library facade concept image
Cinema concept image Patterned perforated aluminium screening 12
Concept image - screening 11
Carpark screening concept image
DA Issue 03/04/17
Community lounge and library concept image
Materials & Finishes 5490.70 [ 1 ]
3
3
9
5 10 9 5 10 3 1
11
4
5 10 4
7 3
9 1 1 11 1
7
5 10 7 4
11 7
1 9 8 5 9 10
1 2 3 4 5 6 7 8 9 10 11 12
©TVS architects 6/04/2017 3:42:42 PM
paint - white paint - teal paint - monument paint - ochre paint - black concrete - natural concrete - ochre timber - clear timber - compact laminate glass - green tint aluminium - painted batten screen aluminium - perforated screen white
DA Issue 03/04/17
Materials/Colour Legend
Materials & Finishes 5490.71 [ 1 ]
9
1
5 10
3
3
9
11
7 4 4
1 1
1 12 11 11 9 1
8
1 2 3 4 5 6 7 8 9 10 11 12
©TVS architects 6/04/2017 3:42:44 PM
paint - white paint - teal paint - monument paint - ochre paint - black concrete - natural concrete - ochre timber - clear timber - compact laminate glass - green tint aluminium - painted batten screen aluminium - perforated screen white
DA Issue 03/04/17
Materials/Colour Legend
Materials & Finishes 5490.72 [ 1 ]
Lake Street
Stage 1
Stage 2
Library Zoning Legend Community Centre Common Building Areas Library
Planter
Line of Basement under
Visitor Centre
Planter
Raised access floor system
Ramp Up
Line of Level 2 floor over
Lawn
Cafe 119 m²
Residential Lobby
Offices
UP
Lift
Secondary VIC access
A/H Returns 2 m²
Amenities UP
Lift
Solid Operable wall
Operable wall
Meeting Rooms 1& 2 A1 115 m²
Including 1x Kitchenette & 1x Staff PWD WC
Operable wall
Screen/ Fence
Security point
Community Lounge/ Foyer C1 311 m² Planter
Secure external staff breakout area
Returns L2 25 m²
Auto Doors Security points
Planter UP
Stair Void Over
Auto Doors
Secure External Reading Area
Planter
Library Entrance & Customer Service 92 m²
Roller shutter
Family Wc C8 6 m²
User Kitchenette A6 11 m²
Level 1 Floor over
Roller shutter
Corridor 25 m²
PWD Wc C7 6 m² Catering Kitchen A7 25 m² Female C4/C6 35 m²
Male C3/C5 36 m²
PWD Shr 7 m²
Lift
Activity Rooms 3 & 4 A3 217 m²
Children's Collection 296 m² Line of slab over
Bicycle Enclosure (18) 38 m²
Escape stairs
Secure external courtyard area
UP
Screen/ Fence
Screen/ Fence
Escape stairs
Ground Level- Library Zoning Plan Scale @ A1
©TVS architects 3/04/2017 4:09:53 PM
Screen/ Fence
After hours access door
Operable wall
Operable wall
User St. A5 12 m²
Servery
Cleaner C9 4 m²
Lending Collection Ground 320 m²
1 : 200
Line of Basement under
Secure external Childrens Area
DA Issue 03/04/17
Riser 11 m²
Visitor Information Centre BOH 190 m²
Primary VIC access (Auto doors)
L2 Skylight Over
MSB 20 m²
Escape stair
Visitor Information Centre V1/V2 165 m²
Auto Doors
Furniture/ Meeting Store A2/A4 59 m²
Staff Kitchenette/ Staff Amenities
Riser 13 m²
Access to Cafe
Feature portal framed entry
d Voi
Lift
LINE OF BASEMENT UNDER
Restaurant/ Cafe
Ramp Up
Voi d
Stairs to carpark under
Library Zoning PlanGround 5490.80 [ 1 ] 0
4
8
Scale (m) 1 : 200 @A1
12
16
Scale (m) 1 : 400 @A3
20
Stage 1
Stage 2
Library Zoning Legend Community Centre Common Building Areas Library Visitor Centre Raised access floor system
Line of floor over
Planter
Residential Unit
Secure External Reading Deck id Vo
52 m² Deck
Lift Lobby
Young Adult 73 m²
Residential Building Manager's store
Riser/ Refuse Chute/ Cleaner (Residential)
Full height glazing Drop down projection screen over
UP
Ramp Up
Residents Club
Lift
Escape Stair
Study/ Family/ Local History 204 m²
Lending Collection L1 342 m² Lift
to Co m be mun low ity Lo un ge
Full height glazed wall
id Vo
id Vo
Balustrade
Vo
id
Entry Portal below
Riser
L2 Skylight over
Storage
UP
Planter Lift
Library BOH 380 m²
Concrete slab built as part of Stage 1 but not accessed until Stage 2
Including Staff room & 2 x Staff Toilets (1 PWD + 1 WC)
Line of slab over
Level 1 Library Zoning Plan Scale @ A1 ©TVS architects 3/04/2017 4:10:07 PM
1 : 200
DA Issue 03/04/17
Escape stairs
Library Zoning Plan- Level 1 5490.81 [ 1 ] 0
4
8
Scale (m) 1 : 200 @A1
12
16
Scale (m) 1 : 400 @A3
20
5.80
ora Angoph 1.1dia d 18sprea h ig h 18.35
12
8 .34 5 6.5
8° 47' 55"
157.6.724 Conifer 0.6dia d 5.43 12sprea h ig h .1 12
tt Blackbu ia d .8 0 d 14sprea ig h 19.9 h
.519 5.1 4.99
5.52 5.52 Pine Norfolk 0.7dia d 6sprea 25.2high 5.56
5.43
5.50
4.55
60 2.
9 .63 3.3 4 rlaurel Campho urel 0.6dia mphorla a d C a e r p s 8 1dia 14high d 10sprea 81 15high 8.5 1.4 .323 3 137.3 0 9 .4 3 21.6 8 9.9 3.45
tt Blackburead p s 2 1 ia 1d 17.3high 2.60
2.30 2.30 1.427.27
Conifer 0.6dia 8spread 12.8high
46.815
2.28
2.29
31.766.53
108° 21.78 8' 555" 2.9
5.03
tt Blackbu 0.8dia d 10sprea h ig h .8 5 1 4.95
5.15
Brick B uilding Roof RL 10.00 20 0.0 5 1.0
3.27
3.733.60 4 3.6.7 19 2
4.43
4 5.1 4.144 .15
Concrete Drivewa y
uilding Roof RL 12.27
Fig 0.4dia d 10sprea h 12.3hig
2 7 9 6 6 4 . D.P
.80 F3ig 1.4dia d 20sprea0 6 h . ig 3 16.1h 3.41 3.40
LAKE LANE
4.30
4.16
4.16 4.16 4.144.01
Brick B
ATION C U D E F DEPT. O AINING AND TR
4.53
ny Mahoga ia 0.8d d 20sprea h 17.3hig 4.29 4.15
4.83
Tree 0.6dia spread 48.617high 1
4.16
37 .2.2 42 1
145.8.847
4.10
3.80
3.49
3.34
3.21 2.74
MIDDL E 2.71
4.801 4.8
4.17
4.00 3.82
52.021.29 4.68
4.86
2.58 2.68
4.99
4.93
4.20
1.8 81 51.0
4.81
62.7 28.289 ° 1 4.60 0 8 7' 30"4.4 4 4 .240.17
4.92
3.57
2.33
tt Blackbu ia d 0.8 spread 5 159.2.65 11 14.4high 5.18
4.89
0 4.4 .602 146.3
4.17
3.98
5.36
Tree 0.5dia 6spread 6.7high
52.2 .05 11
159.5.545
4.81
11
5.24
4 5.7 .05
4.52 4.55
4 .7723.8 231.7 tt Blackbu read p s 1dia 8 18high
2.40
©TVS architects 3/04/2017 4:10:10 PM
65 5 0.7 3.5
54.915 18° 17 ' 30"
Conifer 0.6dia d 12sprea 42.5 .01 16 16.4high
3.88
3. 2.91 00 2. 80 2.532.72
2 3.11
da Jacaran 0.6dia 8spread 12.7high
5.15
5.06
5.09
Silk Oak 0.4dia 6spread 14high
52.358.28
5.08
55.66
5.60
5.40
5.20
36 51.5 8.2
13
52 52.2 3.5
5.22
ox Brush B 0.7dia d 14sprea h ig h .6 6 1
5.49 22.05
5.27
153.6.268
4.29
5.54
5.39
Pine Norfolk ia 0.3d d 10sprea ig 18.3h h
11 51.3 8.1 5.18
51 5 2.4 2.6
0
WEST
4.66
5.50
ox 66 Brush B .5.0 59 1 0.6dia 8spread 13.5high 5.41
5.61
5.44
0 5.6
6 4.
3.31
62 108° 1 .75 7' 30"
4.93 5.03
3.948.19
5.63
0 4.8
0 80 .60 .40 3.20 0 0 0 0 0 3 3 5.0 4.8 4.6 4.4 4.2 4.0 3.
4.87
5.64
ox Brush B ia d .6 0 d 10sprea h 16.5.78hig 5 9 .50 5.6
6.16
5.53
5.66 24.02
5.72
Pine Norfolk 1dia d 5.67 14sprea 34.2.346 6 h ig h .1 28 05 5.7 sh Box 5.6 aurel Bru dia rl o h p m Ca 0.9 0.65dia spread 0 1 h ox 12hig ad 5.49 Brush B re 17high 10sp 1 9 ia .9 .8 5.96 d 7 5 1 94 0.7 51.7 6.7 1 5.72570.7.82 spread 5 0 .6 6 2 5 .3 1 .5 .6 4 2 .6 5 2 .519.978 .4high 52 52 16 5.51 5.76 5.25 5.78 5.10
tt Blackbu 0.9dia d 14sprea h ig h .1 18
98 .6.7 53 2
5.51
rlaurel Campho dia 6.05 0.9 d 17.05 8sprea 11high
5.80
.278 56.5
77 52.1 5.6
Pine Norfolk ia d 0.5 d 10sprea h 20.5hig Conifer 0.7dia 5.27 d 10sprea h 12.8hig
.78 2.820
3.00
3.20
3.16
2.84
STREE T
2.63
DA Issue 03/04/17
6.05
ox Brush B 0.6dia 158.6.553 8spread 12.9high
.80 o4ra Angoph 0.6dia d 12sprea h ig h .1 16 8 5.0 4.9 0
2 0 52.014.14 9.3 51.1
Gum 0.3dia 8spread 14.2high5.15
4.49 4.52 44.5.579
85.66 188° 50'
5.81
.43 08 52.6
5.63
5.62
rlaurel Campho 1dia d 12sprea h ig h 5 12.1
65.04
07 5.9 5.9
CAR
STREET
5.87
5.68
5.73
PARKING
5.86
.32 87 61.1
ox Brush B ia 0.6d d 10sprea h ig h .7 14
5.80
5.60
6.10 5.90
5.66
ia Gum0.4dd a e r 8sp 5.52 11.2high
6.08 5.78
5.73
5.90 dia Gum 0.6 d 10sprea 5.88 h ig 16.34h
61.93
Gum 0.5dia d 10sprea h ig 18.2h 5.40
.685 253.4
5.2 0
6.05
98° 50' 15"
38 6.2 51.8
.834 175.0
5. 40
Fig 6 dia .0216.2 620 .1 6 6 0 5.7515.7.8 d 12sprea h 16.2hig
61.93 52.825.19
8° 50' 75.35
Pine Norfolk 266.0.990 1dia d 12sprea ig 20.8h h 5.83
4.54 4.52 7 8.6 .6 4.64 4.6 86 4 49.6 4.67 4.72
4.67 4.88 4.90 4.96
4.77 5.04 5.05 5.15
4.86 .14 5 4 .2 5 6 5 .3 55.2 .308
4.99 4.93 4 5.2 5.14 5.29 5.26 5.34 5.31
5.095.25 5.55 5.58 5.755.80
5.20 .47 5 5.63 5.65 5.74
5.33 55.3 .459.41 .400 5.61 5.5555.655.65 5.68 5.451.43 5.65 8 .7 3 7 654.75 1 5 5 .5 .3 5 7 .69 5.454.45 55.6 5 .783 .7 .7 5 5 2 5.86 6 5.90 5.6 5.7 5.87
STREET
5. 00
LAKE
Survey Plan 5490.82 [ 1 ] 0
8
16
Scale (m) 1 : 400 @A1
24
32
Scale (m) 1 : 800 @A3
40