Our Water Our Future

Page 88

Appendix 3 – Summary of feedback received on the Draft Integrated Water Cycle Management Strategy Date received

From

Feedback

MidCoast Water Ref

Action

05-Jan-16

Coomba Park

When will Coomba Park receive town water and sewer?

A543233

Replied by email pointing to relevant section of OWOF and explaining that the schemes are funding dependent.

15-Feb-16

Bundabah

Supporting sewer connection for Bundabah

A548001

Replied thanking them for their feedback

22-Feb-16

Elands

Suggests that MCW should consider including in the Plan further investigations into the possible health impacts of the fluoridation of the water supply

B505766

Replied thanking them for their feedback and directing them to NSW Health website for more information on fluoride in water supplies.

22-Feb-16

North Pindimar

Supporting water and sewer for Pindimar and surrounds, sceptical about future connection

A548903

Replied thanking them for their feedback

24-Feb-16

DPI Water

Refer to email

B505838

Replied with responses to each point. Amended Table 11 of the Draft IWCM to reflect DPI Water's specific concerns regarding Peg Leg Creek. Amended Section 7.2.6.1 of Chapter 7 to correct on error regarding the water sharing plan. Amended page 54 of the Draft IWCM to say “Once the Nabiac scheme is implemented, we will have a back-up supply; however the Nabiac scheme will initially not have the capacity to cater for the entire Manning scheme. We may consider raising the dam wall and getting the most out of the existing Bootawa Dam, utilising this existing footprint to mitigate further ecological impacts where possible.”

26-Feb-16

DPI Water

Refer to email

A549636

Replied with responses to each point. Amended Table 11 of the Draft IWCM to reflect DPI Water's specific concerns regarding Peg Leg Creek. The relevant section in Chpater 10 was also amended. Amended page 54 of the Draft IWCM to

IWCM Strategy 2015

80


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Infiltration Reduction

0
page 68

Appendix 3 – Summary of feedback received on the Draft Integrated Water Cycle Management Strategy

2min
pages 88-89

Appendix 2 – Components of the Base Scenario

2min
pages 86-87

Glossary

0
page 82

Sustainability

2min
pages 72-73

Servicing small villages

3min
pages 69-71

Long-term solutions

5min
pages 62-64

Catchment Management

1min
page 53

The Manning Scheme

3min
pages 60-61

Bulahdelah

1min
page 55

Gloucester

3min
pages 56-57

Leakage and Pressure Management

1min
page 50

Stormwater

1min
page 51

Education

0
page 48

Community Engagement ....................................................................................................................................................................... v The community engagement process............................................................................................................................. v Project Reference Group............................................................................................................................................................... v What you told us.................................................................................................................................................................................. v What is Integrated Water Cycle Management?

2min
pages 9-10

Rainwater tanks

1min
page 47

Levels of Service

3min
pages 27-28

What is our plan for the future?

0
pages 43-44

What are the possible solutions?

2min
pages 37-38

Who we are

1min
pages 11-12

What has been achieved?

1min
page 20

Water Smart Rebates

1min
page 46
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.