Appendix 3 – Summary of feedback received on the Draft Integrated Water Cycle Management Strategy Date received
From
Feedback
MidCoast Water Ref
Action
05-Jan-16
Coomba Park
When will Coomba Park receive town water and sewer?
A543233
Replied by email pointing to relevant section of OWOF and explaining that the schemes are funding dependent.
15-Feb-16
Bundabah
Supporting sewer connection for Bundabah
A548001
Replied thanking them for their feedback
22-Feb-16
Elands
Suggests that MCW should consider including in the Plan further investigations into the possible health impacts of the fluoridation of the water supply
B505766
Replied thanking them for their feedback and directing them to NSW Health website for more information on fluoride in water supplies.
22-Feb-16
North Pindimar
Supporting water and sewer for Pindimar and surrounds, sceptical about future connection
A548903
Replied thanking them for their feedback
24-Feb-16
DPI Water
Refer to email
B505838
Replied with responses to each point. Amended Table 11 of the Draft IWCM to reflect DPI Water's specific concerns regarding Peg Leg Creek. Amended Section 7.2.6.1 of Chapter 7 to correct on error regarding the water sharing plan. Amended page 54 of the Draft IWCM to say “Once the Nabiac scheme is implemented, we will have a back-up supply; however the Nabiac scheme will initially not have the capacity to cater for the entire Manning scheme. We may consider raising the dam wall and getting the most out of the existing Bootawa Dam, utilising this existing footprint to mitigate further ecological impacts where possible.”
26-Feb-16
DPI Water
Refer to email
A549636
Replied with responses to each point. Amended Table 11 of the Draft IWCM to reflect DPI Water's specific concerns regarding Peg Leg Creek. The relevant section in Chpater 10 was also amended. Amended page 54 of the Draft IWCM to
IWCM Strategy 2015
80