KEVIN MILLER
Experienced architectural professional with 8 years of experience practicing sports, higher ed, and adaptive reuse corporate projects. Extensive background in programming, concept development, project coordination, and technical drawings. Passionate about expanding on this strong foundation with a team that values innovation, sustainability and firm culture. Confident in abilities to coordinate in internal, consultant and client facing roles to deliver an exceptional product.
Experienced architectural professional with extensive background in programming, design, and technical drawings specific to sports design. Eight years with HEERY Sports, now a studio with SLAM Collaborative, has provided a strong foundation in concept development, programming, project coordination, and all technical phases of the architectural process. Passionate about expanding this foundation with an established understanding of the market.
a team that values innovation, sustainability and firm culture.
Beyond a strong background in the professional realm lies an unwavering commitment to growth and a desire to engage with multidisciplinary peers especially about topics related to watershed and cities.
Beyond a strong background in the professional realm lies an unwavering commitment to growth and a desire to engage with multidisciplinary peers especially about topics related to watershed and cities.
Education
Professional Experience:
Georgia Institute of Technology Master of Architecture
Heery
International / SLAM Collaborative
Professional Experience
Clemson University Bachelor of Art in Architecture
Universitat Politecnica de Catalunya Satellite Campus Studies
The HEERY Sports studio was bought and sold two times during this 8 year tenure. The first acquisition was to CBRE in 2018 then SLAM in Jan 2020 where the sports studio left behind the interiors group, engineering, and project managment. The multidissiplinary structure of this team and flexibilty to adjust to any circumstance was implemental in building a strong understanding of coordination and what it takes for a project team to succeed.
S/L/A/M Collaborative - Atlanta, GA
Staff Architect, May 2023 - July 2024
Staff Architect
Recruited by the principle of the sports studio to lead project documentation and consultant coordination of GT SAPC. This is a new student athlete performance center at Bobby Dodd Stadium. Promotes the GT brand offering innovative performance and recovery technology and sustainable construction techniques
Leading the documentation and consultant coordination of GT SAPC - a new student athlete performance center attached to Bobby Dodd Stadium. This is a state of the art facility focusing on innovation through technology and the use of sustainable construction techniques.
-hosted bi weekly project design calls with consultant team
- hosted bi-weekly project design calls with consultant team
-exposed to mass timber construction
- exposed to mass timber construction
-coordinated products and details for documentation -lead code and life safety analysis
- coordinated products and details for documentation
- led code and life safety analysis
S/L/A/M Collaborative - Atlanta, GA
Project Architect
Project Architect, Nov. 2021 - Aug. 2022
2135 American Industrial Way tenant fitout project. This 35,000SF adaptive resuse project was delivered to the client 8/22 and is now the home of Wheels Up. Design opportunities included pinched lintel openings in double wythe exterior walls, large roll-up doors open to covered patio creating a open-air cafe and lounge space, exposed tounge and groove canopy and a mural by a local artist.
A 35,000SF adaptive reuse project for tenant fit-out now the home of Wheels Up private airline bookings. Design opportunities included pinched lintel opening in double wythe exterior walls, large roll-up doors to a covered patio creating a open-air cafe and lounge space, exposed tongue and groove canopy and a large wall mural completed by a local artist.
-lead project documentation team
- led project documentation team
-coordinated between developer and GC during preconstruction meetings
-exposed to practice management in contract reviews
- coordinated between developer and GC during preconstruction
- exposed to practice management in contract reviews
Architectural Designer
HEERY International - Atlanta, GA
Architectural Designer, Nov. 2015
The path towards licensure begins with the sports studio at HEERY International, now SLAM Collaborative. The sports studio focuses on collegiate athletic facilities; stadiums, arenas, indoor practice facilities, and student athlete performance centers. In a competitive market projects prioritize fan experience and recruiting the most talented student athletes.
The path towards licensure begins with the sports studio at HEERY International, now S/L/A/M Collaborative. The sports studio focuses on collegiate athletic facilities; stadiums, arenas, indoor practice facilities and team operations facilities. In a competitive market projects prioritize fan experience and recruiting the most talented student athletes.
-developed benchmarking studies for project pursuits
-supported campus masterplanning efforts for feasability studies
-introduced new workflows to enhance project delivery, renders and project templates
- introduced new workflows to enhance project delivery; renders and project templates
-presented firm projects at a national sports conference
- supported campus master planning efforts for feasibility studies
- presented firm projects at a national sports conference
Architect Magazine, Adaptive Reuse - GSU Stadium, Atlanta Dec. 2017 Awards + Press
May 2023
Jan 2022
- developed benchmarking studies for project pursuits
AIA Georgia, Excellence Award for Built Project – Nippert Stadium, Cincinnati
Awards + Press
IIDA NE Chapter, Education Under 50,000SF - UGA Butts-Mehre Heritage Hall - Athens, GA
AIA Georgia, Excellence Award for Built Project - Nippert Stadium, Cincinnati
IIDA NE Chapter, Education Under 50,000SF - UGA Butts-Mehre Heritage Hall - Athens, GA
Architect Magazine, Adaptive Reuse - GSU Stadium, Atlanta
Selected Projects
GT Student Athelete Performance Center - Atlanta, GA
UGA Track & Field Renovation - Athens, GA
Aug 2020
May 2023
Mar 2019
Jan 2022
Aug 2020
July 2017
Mar 2019
Dec 2016
Dec 2015
July 2017
Dec 2016
Dec 2015
GT Student Athlete Performance Center - Atlanta, GA
UTK Neyland Stadium Renovation - Knoxville, TN
UGA Track & Field Renovation - Athens, GA
WVU Football Ops Expansion - Morgantown, WV
UTK Neyland Stadium Renovation - Knoxville, TN
CCU Football Stadium Upgrades - Conway, SC
WVU Football Ops Expansion - Morgantown, WV
UNT Master Plan & Indoor Practice Facility - Denton, TX
CCU Football Stadium Expansion - Conway, SC
GSU Football Stadium Retrofit - Atlanta, GA Budget $67,690,000 $4,744,400
UNT Master Plan & Indoor Practice Facility - Denton, TX
GSU Football Stadium Retrofit - Atlanta, GA
CD, CA DD, CD, CA
Concept, SD, DD, CD (50) SD, DD, CD SD, DD, CD (50) Concept, SD, DD, CD Concept, SD, DD, CD, CA