Design Portfolio

Page 1

MLP

Maria L. Padron

https://www.tiktok.com/@maria.padron https://www.issuu.com/mlpadron

PORTFOLIO


ARCHITECTURAL ILLUSTRATION


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Sketches produced with the Procreate application.


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Sketches produced with the Procreate application.


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Sketches produced with the Procreate application.


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Sketches produced with the Procreate application.


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Sketches produced with the Procreate application.


TECHNICAL DRAWINGS


B

A

D

C

N1

N

F

E

N1

N1

N

G

H

N1

N

B

A

N

K1

K

D

C

J

F

E

K1

K

G

H

K1

J

K

J

UNIVERSITYOFIOWA HOSPITALS& CLINICS

UNIVERSITYOFIOWA HOSPITALS& CLINICS

University of Iowa Health Care

University of Iowa Health Care

JANITOR

3

3

3

6001-Z

3A

1

2B

3

3

Consultants:

2839 Northgate Drive | Iowa City, Iowa 52245 319.354.3040 | fax 319.354.6921 | www.shivehattery.com

3

Iowa | Illinois | Indiana

AD24

B

B

2B

B

2B

B

3A

ELEVATOR LOBBY EE

AA24

AD24

LVL-6

B

0"

3A

6081-A

B

4'-

2B

RESTROOM

1

Consultants:

2839 Northgate Drive | Iowa City, Iowa 52245 319.354.3040 | fax 319.354.6921 | www.shivehattery.com

4'0"

Iowa | Illinois | Indiana

B

3

6012

CORRIDOR

AD25

A

C

A

B

B

E2

AA08 AA03 AA07

C

AD07 AD09

EE3

LVL-6 E2

A300

AD08 A

EE3

° 45.00

C

A

A B

11'-11 145/256"

ELEVATOR LOBBY E

AA15

E6

E2

2A

B

B

B EE3

J CLNG

24x24 Grid +7' - 8 3/4"

A

2

AD08

2

AD03

ROOM

ELECTRICAL

6016

6016-1

2A

2A

AA15

AA03 AA08

E3

AD26 CLOSE AND PROVIDE PLASTIC ZIPPER DOOR WHEN DOING DUST PRODUCING ACTIVITIES IN THIS FLOOR

E3

E3

A

2

C

A C

A

AA28

3

3

C

2

B

AA28

2A

C

0"

C

A

A

B

AD26

° 45.00

4'-

C

A

0" 4'-

2

B

AC02

LVL-4

C

ELEVATOR LOBBY EE

2A

5'-10"

A500 F5 AA29

IC03

IC03

SIM

6006-1

AD03

LVL-6

A

2A

7'-9 7/8"

4'-0"

ELEVATOR LOBBY E

C

C

C

2A

7'-5 3/4"

C

A

A

IC09

LVL-6

PATH LAB

2

IC01

2B

J CLNG CLNG J

ELEVATOR LOBBY E

EE2

IC03

LVL-5

E1

A

IC04

EE2

IC03 ELEVATOR LOBBY EE

A

EE2

IC03

AA07

AD07 AD09

B

IC04

IC08

AA03 C

IC02

AC03

2B

SIM F6 A500

AA08

B

B

B

B

IC04

E1

AA33

LVL-7

IC01

IC04

AA15 S3B 11

2B

AD08

C

A C

ELEV EE - MACHINE ROOM

IC04

2

AD03

AD26 E1

C

A IC04

C

IC02

C

.

AD25

IC05

A

A

4'-0" MIN

EE1 IC03

C

EE1 IC03

6001-Z

EE1 IC03

2

2

AA28

1B

1B

1B CORRIDOR

OFFICE

6215-Z

6014 AA28 AA28

F

1B

1B

BUILD UI # :

NORTH

A4

ELEVATOR EE - INFECTION CONTROL - LEVEL 4 1/4" = 1'-0"

0

6'

NORTH

C4

ELEVATOR EE - INFECTION CONTROL - LEVEL 5 1/4" = 1'-0"

0

6'

E4

ELEVATOR EE - INFECTION CONTROL - LEVEL 6 1/4" = 1'-0"

0

ARCHITECT # :

G4

6'

UIHC PROJECT # : 220-1714 NORTH

1193460

ELEVATOR EE - INFECTION CONTROL - LEVEL 7 1/4" = 1'-0"

0

A4

6'

ELEVATOR E - LEVEL 6 - DEMO 1/4" = 1'-0"

0

NORTH

D4

6'

ELEVATOR E - LEVEL 6 1/4" = 1'-0"

0

F4

6'

ELEVATOR E - LEVEL 6 - RCP 1/4" = 1'-0"

0

6'

Key Plan

KEYNOTE LEGEND DEMO

ARCHITECTURAL DEMOLITION NOTES KEY

1.

INFECTION CONTROL GENERAL NOTES

IC05 IC08

IC09

1.

EACH ZONE AND PHASE OF CONSTRUCTION SHALL BE CONSIDERED A SEPARATE CONTAINMENT AREA.

2.

WORK OUTSIDE OF A PRIMARY CONTAINMENT AREA (SECONDARY CONTAINMENT AREA) SHALL BE SCHEDULED IN ADVANCE WITH THE OWNER'S REP AT A MINIMUM OF FOURTEEN (14) DAYS BEFORE WORK IS TO COMMENCE. WORK SHALL BE PERFORMED OFF HOURS (PREMIUM TIME) AND THE CEILING SHALL BE CLOSED WHEN WORK IS COMPLETED AT THE END OF EACH SHIFT. WORK SHALL BE CONTAINED WITHIN A FULL HEIGHT, PORTABLE ENCLOSURE. OPENING SHALL BE SEALED UPON ENTERING AND EXITING THE ENCLOSURE. CONSTRUCTION EQUIPMENT SHALL NOT BE STORED OUTSIDE THE ENCLOSURE AT ANY TIME, AND DUST SHALL NOT BE TRACKED OUTSIDE OF ENCLOSURE.

3.

INFECTION CONTROL PLASTIC DUST PARTITION FOR ALTERNATE #1 FLOORING WORK. IF DONE AT SEPARATE TIME FROM OTHER LOBBY WORK, WORK TO BE DONE ON ONE SIDE OF CORRIDOR AT A TIME.

2.

GENERAL CONTRACTOR SHALL COORDINATE INFECTION CONTROL ENTRY LOCATIONS WITH OWNER.

3.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR LABELING AND NOTIFYING OWNER'S STAFF OF RESTRICTIONS FOR ACCESS TO CONTRACTORS WORK AREAS, THE OPERATION OF NAM'S AND TEMPORARY LOCATIONS OF INTERIM LIFE SAFETY MEASURE WHEN REQUIRED.

A

4.

WORK REQUIRING INFECTION CONTROL MEASURES THAT CAN BE CONTAINED INSIDE AN INDIVIDUAL ROOM MAY BE PERMITTED WHEN SCHEDULED AT LEAST SEVEN (7) DAYS BEFORE THE WORK IS TO COMMENCE. THE ROOM SHALL BE TREATED AS A CONTAINMENT AREA WITH DOORS CLOSED AND SEALED WHILE WORK IS BEING PERFORMED. HVAC DUCT, GRILLES AND DIFFUSERS SHALL BE SEALED OR CAPPED. MATERIALS SHALL BE TRANSPORTED TO AND FROM THE ROOM IN TIGHTLY SEALED CONTAINERS. CONSTRUCTION EQUIPMENT SHALL NOT BE STORED OUTSIDE THE ENCLOSURE AT ANY TIME, AND DUST SHALL NOT BE TRACKED OUTSIDE OF ENCLOSURE.

GENERAL CONTRACTOR SHALL MAINTAIN EXIT ACCESS AT ALL TIMES. CONTRACTOR SHALL INSTALL TEMPORARY OR SUPPLEMENTAL EXIT SIGNAGE WHEN TEMPORARY BARRIERS WILL BLOCK OR OTHERWISE DIMINISH VIEW OF EXISTING EXIT LIGHTS.

D

C

F

E

Description

Date

1

4.

WHEN WORKING ABOVE METAL SLATTED CEILING, CAREFULLY MOVE FABRIC ABOVE CEILING AS NOT TO DAMAGE. PROVIDE PLASTIC AROUND WORK AREA ABOVE CEILING TO LIMIT DUST EXPOSURE TO ADJACENT CEILING.

5.

ALL INFECTION CONTROL MEASURES SHALL BE COMPLETELY INSTALLED BEFORE THE BALANCE OF THE WORK BEGINS. DUST BARRIERS SHALL BE WIPED DOWN DAILY.

6.

IF A NEGATIVE AIR MACHINE FAILS, WORK SHALL BE STOPPED IMMEDIATELY AND THE OWNER NOTIFIED.

7.

ALL VACUUMING OUTSIDE OF THE CONTAINMENT AREAS SHALL BE DONE USING HEPA/ULPA VACUUMS.

8.

NOT ALL INFECTION CONTROL MEASURES MAY BE SHOWN ON DRAWINGS. CONTRACTOR SHALL ENSURE ALL WORK DONE ON THE PROJECT FOLLOWS THE GUIDELINES SET FORTH IN THE INFECTION CONTROL RISK ASSESSMENT (ICRA) PROJECT REQUIREMENTS - SECTION 01 35 33.

ROUTE OUT LETTERS COMPLETELY TO SEE WALL BEHIND EDGE WITH PLAM. PAINT WALL BEHIND WITH ACCENT COLOR TO MATCH FLOORING ACCENT COLOR.

06/11/2020 DATE: ISSUED FOR: BID DOCUMENTS Drawing

6"

ELEVATOR EE - INFECTION CONTROL AND PHASING PLAN

2

G202 C

D

E

3.

COORDINATEGWITH OWNER ANY ITEMS TO BE SALVAGED.

AD09

4.

OWNER WILL COORDINATE REMOVAL OF WALL ARTWORK, PEDESTAL ARTWORK, TRASH CANS, RECYCLE BINS AND FURNITURE FROM THE CONSTRUCTION AREA PRIOR TO START OF CONSTRUCTION UNLESS NOTED OTHERWISE.

5.

MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT WEATHER IS POSSIBLE.

6.

REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES ADHESIVES, GROUTING BEDS, ANCHORING DEVICES, ASSOCIATED WALL BASE, ETC. CLEAN 2'-6"AND PREPARE SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.

7.

COORDINATE WITH OTHER TRADES CUTTING AND PATCHING REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.

8.

ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD VERIFICATION AND COORDINATION WITH THE ARCHITECT PRIOR TO COMMENCING WITH STATED WORK.

9.

ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION, MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO LIKE NEW CONDITION.

H

AD24 AD25

AD26

F

G

H

ALL DOORS IN STUD WALL CONSTRUCTION ARE TO BE LOCATED WITH EDGE OF FRAME 4” FROM FACE OF ADJACENT PARTITION UNLESS NOTED OTHERWISE. DIMENSIONS LOCATING DOORS NOT DIRECTLY ADJACENT TO WALLS ARE GIVEN TO OUTSIDE EDGE OF FRAME.

4.

ALL ANGLED PARTITIONS SHOWN SHALL BE AT A 45° ANGLE UNLESS NOTED OTHERWISE.

5.

ARCHITECTURAL DIMENSIONS AND DESIGN INTENT ARE INDICATED ON ARCHITECTURAL DRAWINGS. IF THE INSTALLATION OF EQUIPMENT FROM OTHER TRADES INTERFERES WITH COMPLIANCE OF THE DESIGN INTENT, NOTIFY THE ARCHITECT BEFORE PROCEEDING.

AA28

6.

DO NOT SCALE DRAWINGS; DIMENSIONS GOVERN LOCATION OF BUILDING ELEMENTS. IF DIMENSIONS ARE NOT AVAILABLE, CONTACT THE ARCHITECT.

AA29 AA33

AA08 AA15 AA24

CEILING PLAN NOTES

NOTE PROVIDE ELEVATOR LOBBY STAINLESS STEEL DOOR. PROVIDE ELEVATOR LOBBY CALL BUTTONS. PROVIDE BLOCKING TO SUPPORT AS REQUIRED. INFILL/PATCH WALL AT LOCATION OF REMOVED TO MATCH EXISTING AND PAINT WALL CORNER TO CORNER. PROVIDE HALL LANTERN. PROVIDE STAINLESS STEEL PLATE TO COVER ANY HOLE LEFT FROM REMOVED HALL LANTERN. PROVIDE HALL DESIGNATION SIGNAGE. CLEAN THRESHOLDS TO REMAIN. MODIFY EXISTING WALL BUMPER TO STOP 2" SHORT OF NEW DOOR EDGE OR FRAME. USE SALVAGE END CAP TO FINISH END. PROVIDE FULL HEIGHT STAINLESS STEEL CORNER GUARD. PAINT WALL CORNER TO CORNER IF WALL PATCH AREA REMAINS EXPOSED. PAINT ENTIRE LOBBY, ALL WALLS. PROVIDE NEW DOORS, FRAMES AND HARDWARE. SEE SCHEDULE AND DETAILS ON PAGE A600.

2839 Northgate Drive | Iowa City, Iowa 52245 319.354.3040 | fax 319.354.6921 | www.shivehattery.com

9"

9"

6"

1'-0"

1'-0"

1/8"

WOOD PANEL

WOOD PANEL EDGE 3" = 1'-0"

0

1 1/2" = 1'-0" 0

F4

1'

C

ALTERNATE #3 - ELEVATOR EE - SIGN DETAIL 1 1/2" = 1'-0" 0

Project

UIHC - ROY J. CARVER PAVILLION - UPGRADE ELEVATORS IN E & EE BANKS

1'

0811501

BUILD UI # :

4

UIHC PROJECT # : 220-1714 1193460

ARCHITECT # :

2

Key Plan

TYP

EE 5'-2"

2B

F4 A406

TYP

2'-0"

2A

6"

2

LEVEL 4 175' - 8 7/8"

5

F5

ALTERNATE #3 - ELEVATOR EE - SIGN ELEVATION 1/4" = 1'-0"

0

N

6'

Issue & Revision Dates

Description

1B

2

2A

2'-6"

2'-0"

TYP

5'-2"

TYP

DOOR TRANSITION NORA FLOORING UNDER DOOR.

6

No.

2B

D4 A406

DOOR FRAME

EXISTING FLOORING

Date

2 E

6"

ELEVATOR LOBBY SIDE

NEW FLOORING

LEVEL 4 175' - 8 7/8"

06/11/2020 DATE: ISSUED FOR: BID DOCUMENTS Drawing

D6

TYPICAL TRANSITION LOCATION 3" = 1'-0"

0

6"

F6

ALTERNATE #1 #2 #3 - DETAILS

ALTERNATE #2 - ELEVATOR E - SIGN ELEVATION 1/4" = 1'-0"

0

6'

A406 A

B

C

D

E

Healthcare project produced with REVIT.

F

6.

AT REMOVE AND REINSTALL LAY-IN CEILINGS CONTRACTOR IS RESPONSIBLE FOR REPLACING CEILING GRID, PANELS AND DEVICES THAT ARE MARRED, DAMAGED OR BROKEN DURING THE COURSE OF THE WORK, MATCH EXISTING. SALVAGED FROM THE PROJECT CAN BE INSTALLED IF IN LIKE-NEW CONDITION.

N Issue & Revision Dates

Description

Date

G

H

No.

NOTE REMOVE METAL CEILING. PROVIDE 2’X2’ LAY IN CEILING, GRID AND SUSPENSION SYSTEM IN THE LOBBY AT SAME HEIGHT AS EXISTING CEILING. CUT AND PATCH EXISTING CEILING AND GRID AROUND NEW WALL. REMOVE AND INSTALL DEVICES AS NEEDED.

Drawing

VYNIL BASE TO EDGE OF SIGN

VYNIL BASE TO EDGE OF SIGN

ALTERNATE #2 - ELEVATOR E - SIGN DETAIL

ALL CEILING LIGHT FIXTURES AND DEVICES TO BE CENTERED ON CEILING PANELS UNLESS SHOWN OTHERWISE. GRID OR PANEL IS TO BE CENTERED IN ROOM UNLESS SHOWN AND DIMENSIONED OTHERWISE.

ELEVATOR E FLOOR PLANS LEVEL 6

2"

A406

D4

6"

COORDINATE WITH ALL TRADES TO CONFIRM THE LOCATION OF ACCESS PANELS WITH ASSOCIATED INSTALLED EQUIPMENT. INFORM ARCHITECT OF PROPOSED LOCATIONS PRIOR TO INSTALLATION AND CONSTRUCTION OF NEW WORK.

5.

06/11/2020 DATE: ISSUED FOR: BID DOCUMENTS

#4 SST TRIM EASE EDGES, ALL SIDES OF WOOD PANEL

B4

4.

AC03

WALL BUMPER 2"

VYNIL BASE TO EDGE OF SIGN

COORDINATE WITH ALL TRADES TO CONFIRM THEIR WORK CAN BE INSTALLED TO ACHIEVE CEILING HEIGHTS AS SHOWN. TRADE PRIORITY SHALL BE AS FOLLOWS UNLESS DIRECTED OTHERWISE BY THE ARCHITECT. - ELECTRICAL LIGHTING FIXTURES - MECHANICAL GRILLES AND DIFFUSERS - MECHANICAL DUCTWORK - ELECTRICAL CONDUIT - PIPING SYSTEMS

KEYNOTE LEGEND RCP

B4 VYNIL BASE TO EDGE OF SIGN

3.

KEY

COORDINATE WITH OWNER SIGNAGE. WALL BUMPER TO BE 2" FROM OWNER PROVIDED MAP/DIRECTIONAL SIGNAGE THAT EXTENDS TO FLOOR.

WALL BUMPER

2"

1/4"

ROUTE PANEL TO FIT TRIM

LOCATIONS OF LIGHT FIXTURES, DIFFUSERS, ETC. SHALL BE AS SHOWN ON THE ARCHITECTURAL REFLECTED CEILING PLANS AND DETAILS. NOTIFY ARCHITECT OF ANY CONFLICTS PRIOR TO PROCEEDING WITH CONSTRUCTION. REFER TO DRAWINGS AND SPECIFICATIONS OF ALL TRADES FOR SYSTEM DESIGN AND ADDITIONAL INFORMATION.

AC02

PLAM

3"

B4 A406

WALL BUMPER 2"

NOTIFY ARCHITECT OF INADEQUATE CLEARANCES FOR CEILING LAYOUT PRIOR TO COMMENCING WORK.

2.

A106 3"

COORDINATE WITH OWNER SIGNAGE. WALL BUMPER TO BE 2" FROM OWNER PROVIDED MAP/DIRECTIONAL SIGNAGE THAT EXTENDS TO FLOOR.

1.

Iowa | Illinois | Indiana

B

5'-2"

5'-2"

6"

WALL BUMPER

C:\shive\Revit_Local_2019\1193460-A-Cent_MPADRON.rvt 6/11/2020 4:17:49 PM

3.

AA03 AA07

Consultants:

3

PORTFOLIO

ALL NEW PARTITIONS ARE DIMENSIONED TO FACE OF STUD, MASONRY, OR CONCRETE COMPONENT UNLESS NOTED OTHERWISE. DIMENSIONS TO EXISTING ELEMENTS ARE TO EXPOSED FACE.

14. ALL NEW AND EXISTING PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING DECKS SHALL BE THE RESPONSIBILITY OF THE PRIME CONTRACTOR AND SHALL RECEIVE UL AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH RATING REQUIREMENT OF AREA BEING PENETRATED.

A

INTERIOR WALL

tiktok.com/@maria.padron issuu.com/mlpadron

REFER TO DRAWINGS OF ALL TRADES FOR ADDITIONAL INFORMATION REGARDING ITEMS PENETRATING FLOORS, WALLS, AND CEILINGS.

2.

REQUIRED OF EXISTING MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT. MATCH EXISTING FINISHES.

6

PLAM

Maria L. Padron

KEY

1.

11. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION. ROUTE OUT LETTERS COMPLETELY TO SEE WALL BEHIND THE EDGE WITH 12. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE PREVENTED FROM ENTERING PAINT BEHIND WITH EXISTING HVAC SYSTEM AND ADJOINING SPACES WITH TEMPORARY PLAM. BARRIERS ASWALL REQUIRED. ACCENT COLOR TO MATCH FLOORING ACCENT COLOR. 13. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR DEMOLITION AND PATCHING

2'-0"

C:\shive\Revit_Local_2019\1193460-A-Cent_MPADRON.rvt 6/11/2020 4:18:02 PM

PLASTIC DUST PARTITION FOR NIGHT OR WEEKEND WORK.

B

AD08

KEYNOTE LEGEND ARCH

CONSTRUCTION NOTES

NOTE REMOVE ELEVATOR LOBBY STAINLESS STEEL DOOR. REMOVE ELEVATOR LOBBY CALL BUTTONS AND COVER PLATE. REMOVE HALL LANTERN ABOVE ELEVATOR DOOR. REMOVE HALL DESIGNATION SIGNAGE CAREFULLY AS NOT TO DAMAGE FRAME. REMOVE AND REINSTALL SIGNAGE TO ALLOW VINYL WALL COVERING TO BE REMOVED AND/OR WALL TO BE PAINTED. CUT AND REMOVE VINYL BASE AS NEEDED TO INSTALL NEW CONSTRUCTION. REMOVE PORTION OF WALL BUMPERS AS NEEDED FOR NIVERSITYOFKEEP IOWA NEW U CONSTRUCTION. ENDCAPS FOR REUSE. HOSPITALS &C LINICSWITH OWNER PRIOR TO COORDINATE BUMPER SALVAGE University of Iowa Health Care DISCARDING. REMOVE INTEGRAL CORNER GUARD. PATCH WALL AS REQUIRED FOR NEW WALL OR NEW CORNER GUARD.

10. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS, INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE, MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA. DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND APPROVAL.

6

A

OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION FROM THE OWNER.

2'-6"

No.

AD03 AD07

2.

5 N Issue & Revision Dates

2'-0"

5

TEMPORARY BARRIER. HARD BARRIER WALLS TO UNDERSIDE OF EXISTING CEILING INSIDE BARRIER. ON FLOORS WITH SLATTED CEILINGS, CREATE A DUST BARRIER CEILING BY TAPING PLASTIC UP TO THE UNDERSIDE OF THE SLATTED CEILING. PROVIDE DOOR WITH KEYED LOCK. WHEN HALL DOOR HAS BEEN REMOVED FOR REPLACEMENT, PROVIDE 2 HOUR INFILL EACH NIGHT OR ANY TIME OPENING IS LEFT WITHOUT DOOR WHEN NOT ACTIVELY WORKING ON INSTALLATION. PROVIDE AIR SCRUBBER ANYTIME WORK IS BEING DONE IN LOBBY EACH LEVEL OR IF THE ELEVATOR CAB DOORS ARE OPEN. PROVIDE AIR SCRUBBER IN MACHINE ROOM AND IN PLAN ROOM DURING EQUIPMENT OR DEMOLITION MATERIAL TRANSPORT THROUGH THE ROOM. INSTALL OWNER FURNISHED STARC WALL TEMPORARY BARRIER AT THIS LOCATION TO UNDERSIDE OF EXISTING CEILING FOR WORK ON ELEVATOR DOORS, LOBBY HALL SIGNAL OR CALL BUTTONS, OR WORK ON LOBBY WALLS. CREATE DUST BARRIER BY TAPING PLASTIC TO UNDERSIDE OF SLATTED CEILING INSIDE BARRIER. DURATION OF BARRIER IN THIS CONFIGURATION IS LIMITED TO 7 DAYS TOTAL. TEMPORARY BARRIER. HARD BARRIER WALLS TO UNDERSIDE OF EXISTING CEILING. BARRIER IN THIS LOCATION FOR ALL WORK ON THE ELEVATORS THAT DOES NOT INVOLVE REPLACEMENT OF LOBBY DOORS, LOBBY HALL SIGNALS OR CALL BUTTONS, OR WORK ON LOBBY WALLS.

GENERAL CONTRACTOR SHALL SEAL ALL UNFORESEEN FIRE RATING DEFICIENCIES THROUGH RATED WALLS OR CEILING NOT NOTED ON THE BID DOCUMENTS. NOTIFY OWNER OF EXISTING CONDITIONS AND B COORDINATE WORK. SEE ALLOWANCE #1.

6"

IC04

1.

FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF DEMOLITION WORK. NOTIFY ARCHITECT IN WRITING OF DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS AND FIELD CONDITIONS ENCOUNTERED.

1'-2"

IC02 IC03

NOTE

C:\shive\Revit_Local_2019\1193460-A-Cent_MPADRON.rvt 6/11/2020 4:17:21 PM

IC01

GENERAL CONTRACTOR GENERAL NOTES

2'-0"

KEY

1193460

ARCHITECT # :

Key Plan

KEYNOTE LEGEND IC

0811501

BUILD UI # :

4 NORTH

NORTH

UIHC - ROY J. CARVER PAVILLION - UPGRADE ELEVATORS IN E & EE BANKS

0811501

UIHC PROJECT # : 220-1714 NORTH

Project

6043-S

UIHC - ROY J. CARVER PAVILLION - UPGRADE ELEVATORS IN E & EE BANKS

4

1B

STAIR

Project

D

E

F

G

H


A

B

C

D

E

G

F

H

KEYNOTE LEGEND

C24

C31

C33

AE40

1'-3 1/4" 1'-5 1/4"

7'-2"

1'-5 1/4"

EQ

10"

C61 C62

C55

AE49

AE47

AE31 AE32 AE36

EQ

AE38 AE39 AE40 AE05

AE46

AE41

C60

C54

C35

D5 A501

C59

C53

G4 A500

1'-4"

3'-1"

2'-4"

29" D

29" D

44" D

AE55

AE41 AE42

AE48

3/8" = 1'-0"

0

D4

4'

VAULT C - WEST ELEVATION 0

3/8" = 1'-0"

AE43 4'

AE44 AE45 AE46 AE47 AE48

4'-3"

AE59

A2

AE12

AE65

AE66

AE71

G2

D6

4'-1"

A500

A501

A501

AE50 AE50 AE08

AE63

4

OPEN TO BEYOND

AE69 AE60

209 1'-2"

209

AE77 AE19

4'-0"

AE65

201B

206C

207C

204B

202

208

110

105

117

113

203

208

1'-3"

3'-0"

1'-9 1/2"

2'-1"

DOOR

DOOR

1'-2"

AE61

209

9"

AE70

AE05

A5

5'-0"

2'-0"

AE73

3/8" = 1'-0"

0

B5

4'

DOORS

CONTROL ROOM - EAST ELEVATION 3/8" = 1'-0"

0

AE78

3'-10 1/2"

AE74

AE72

AE68

AE67 AE05

AE76 AE75

AE05

3'-0" 13" DEEP

CONTROL ROOM - NORTH ELEVATION

D5

4'

CONTROL ROOM - SOUTH ELEVATION 3/8" = 1'-0"

0

4'

E5

CONTROL ROOM - WEST ELEVATION 3/8" = 1'-0"

0

AE85 2'-6" 12" DEEP

6

AE82 AE83 AE84

2'-10" 12" DEEP

AE85 AE87

3 3'-8" 12" DEEP

AE82

Printed:

A6

CORRIDOR - NORTH ELEVATION 3/8" = 1'-0"

0

4'

A

B6 B

EQUIPMENT - WEST ELEVATION 3/8" = 1'-0"

0

C6

4'

C

EQUIPMENT - SOUTH ELEVATION 3/8" = 1'-0"

0

E

F

G

D

26.7

26.3

E

A01

A04 A05 A05

A12

A12

AC05

A16 AC03

01565-C-1

A36 A23 A29

S0B 01

A10 A32 AC04

A33

4'-0 1/16" ISOCENTER TO FINISHED WALL A09

A12 S3A 11

A30

A01 AC06 A27 AC07

A34 AC01

G4 A500

A200 C6

S1B 01

AC04 A32

A6 A500

A12 A10

A23

A07 A08

S0B 01

A09 A10 A11

T A26

A13

A08

A12

A16 A35 A04 A14

A2

A22 A08

A11

D4 A200 E2 A4

VAULT C

S0B 01 AC03 A16

ROOM 01564

AC03

A35

A A A K

AC02

01565-A-2

A12

A06 A21 A11 LIMITS A11 LIMITS

A31 A39

A12

A23

A12 A13

A17

S3A 11

A03 A12

A12

A07

A23

S0B 01

01565-A FJ BA CA 2,3

A11

A15 A13 A38

A23

A20 A13

A35

3'-8 7/8"

A501

A18

A14 A15

D5 CONTROL ROOM 01565 FC A BA A A CA A -2'-7 1/4"

FIELD VERIFY

D6

A19

A16 E2 A500

A36 A06

A38 A13

A02

A28

G6

A6 A501

A600

A31 ALIGN WITH EXISTING CORNER EXISTING CARPET

C2 A500

A6

LOBBY

E4 A600

A13

S0B 01

A24 A25

A5 E5 A200 B5

A200

LOBBY A FC BA X X CA X

CORRIDOR 01565-Z

NEW CARPET

H

A17 A18 A19

PROVIDE PHYSICS CONDUIT CASEWORK. SEE DETAILS A6/A500. PROVIDE TRANSITION STRIP. PROVIDE VCT FLOORING IN EQUIPMENT CABINET WITH TRANSITION STRIP. CARPET TO EXTEND UNDER DOORS PROVIDE RADIATION DOOR AND FRAME. GROUT IN STEEL DOOR FRAME. PATCH GYPSUM BOARD AND FRAMING AS REQUIRED AND PAINT WALL CORNER TO CORNER. RECESS NEW CABINET BACK TO CONCRETE. PROVIDE GYPSUM BOARD SOFFIT ABOVE CABINET TO EXTEND 1" ON ALL SIDES. SEE INTERIOR ELEVATIONS PROVIDE FIXED COUNTERTOP AND CONCEALED SUPPORT BRACKETS. (PLAM 3) REINSTALL SHARPS BIN RAIL, HAND SANITIZERS, GLOVE BOX DISPENSER, SOAP DISPENSERS, PAPER TOWEL DISPENSERS, CLOCKS AND OTHER MISC. WALL MOUNTED ITEMS. SEE ELEVATIONS OFOI MARKER BOARD. PROVIDE LOCKERS. PROVIDE CUSTOM SHOE CUBBY, SEE INTERIOR ELEVATIONS OFOI CONTROL ROOM FURNITURE. REMOVE ALUMINUM PLATE AND SUPPORTS ABOVE GLASS CEILING. REINSTALL SUPPORTS 2' NORTH OF EXISTING. PROVIDE CASEWORK WING WALLS TO MATCH EXISTING. SEE INTERIOR ELEVATIONS AND DETAILS A2, C2 AND E2/A500 PROVIDE 18X36 MIRROR. COORDINATE MOUNTING HEIGHT AND LOCATION ON SITE WITH DESIGN TEAM PROVIDE CYLINDER RESTRAINT SIMILAR TO LAB SAFETY MODEL NUMBER 8B-18318. COORDINATE MOUNTING LOCATION WITH ARCHITECT IN FIELD. PROVIDE 90 DEGREE CORNER GUARD FROM FLOORING TO SOFFIT. SEE DETAIL E2/A500 WRAP ALL THREE EDGES OF OPENING IN WALL WITH GYPSUM BOARD EDGE BEAD CUT OFF CONDUIT SO THAT TOP OF REMOVAL CAP IS FLUSH WITH VCT. PROVIDE REMOVAL CAP ON CONDUIT ALL CONDUITS AND PIPING TO BE TIGHT TO CONCRETE. ALLOW FOR INSULATION ON INSTALLED PIPING. MAINTAIN MASONITE FLOOR PROTECTION TO PROTECT FINISHES FROM DAMAGE UNTIL ELEKTA HAS COMPLETED INSTALLATION WORK PROVIDE SOLID BACKING FOR MONITOR MOUNT. SEE INTERIOR ELEVATIONS FOR LOCATION. INSTALL OWNER FURNISHED MONITOR MOUNTS. COORDINATE LOCATION WITH OWNER PAINT WALL CORNER TO CORNER AND PROVIDE VINYL BASE TO MATCH EXISTING. MODIFY AND REPAIR CASEWORK AS SHOWN ON ELEVATIONS. PROVIDE DOOR FRAME ONLY, NO DOOR.

A20 A21

ROOM 01566

VAULT 01565-B

A22 A23 A24 A25

Autodesk Revit 2021

A26 A27

A29 A30 1'-2"

H HIG

S2B 01 A31 A37

10"

CLEAR

40° 40°

A31

CLEAR

AR EA

N TIO DIA RA

RA DIA TIO N

EA AR

HIG H

4

A28

ROOM 01567

A32

ROOM 01643

A33 A34 A35 A36 A37

NORTH

A5

LOWER LEVEL PLAN 1/4" = 1'-0"

0

A38 A39

6'

GENERAL CONSTRUCTION NOTES

Keynote Text PROVIDE E-FRAME. SEE SPECIFICATION 05 80 00 FOR MORE INFORMATION ON INSTALLATION. SANDBLAST TOP EDGE AND 1/2" DOWN SIDES TO EXPOSE METAL FRAME WHERE IT WILL BE EXPOSED. PRIME AND PAINT TO MATCH FLOORING COLOR. PATCH WALL, PAINT CORNER TO CORNER. PROVIDE TWO WALL HOOKS, MAXIMUM 1 1/2" DEEP. CONFIRM HOOKS SIZED TO HANG TALL PATIENT BOARD. PATCH WALL WHERE LASER RECESS WAS RELOCATED. PAINT ENTIRE SOFFIT TO MATCH WALL COLOR. PROVIDE NEW LASER RECESS AT NEW ISOCENTER LOCATION. PROVIDE CASEWORK CABINET FOR MONITORS AND ASSOCIATED ITEMS. SEE INTERIOR ELEVATIONS AND DETAIL D6/A500 PROVIDE NEW CABINET, TOP ALIGNED WITH EXISTING CASEWORK TOPS. PROVIDE SOFFIT INFILL TO MATCH ADJACENT SOFFIT. PAINT WALL. REINSTALL COAT HOOKS FROM ADJACENT WALL. PROVIDE BLOCKING FOR MONITOR MOUNTING RAILS. AFTER ALL ITEMS ARE CONCEALED, PROVIDE GYPSUM BOARD ON WALLS. PATCH, FINISH AND SAND SMOOTH TO PREPARE FOR FINISH TIE WALL INTO CEILING SOFFIT AND TRIM OF GLASS CEILING TILES ALONG ELEKTA WALL, SEE DETAIL B6/A500 PROVIDE WOOD DOOR, WOOD FRAME AND HARDWARE. PROVIDE DECORATIVE WALL PROTECTION TO APPROX. 46" HIGH ENTIRE WALL. COORDINATE WITH DEVICE LOCATIONS FOR EXACT HEIGHT. WALL DEVICES TO BE FULLY ABOVE WALL PROTECTION. PROVIDE PLAM CABINET RECESSED INTO WALL, TIGHT TO CONCRETE, SHIM OFF CONCRETE AS REQUIRED TO LEVEL. SEE INTERIOR ELEVATIONS PROVIDE SIGNAGE ON ALL NEW AND EXISTING CASEWORK SHELVES, DOORS AND DRAWERS. SEE DETAIL G4 AND G6/A501 AND INTERIOR ELEVATIONS FOR NUMBERING AND LOCATIONS PROVIDE SINGLE FIXED FACE FOR SINK CABINET (PLAM 1) AND ATTACH WITH HAFELE KEKU CLIPS IN EACH CORNER PROVIDE SOLID SURFACE APPLIED BACK SPLASH THAT EXTENDS TO UNDERSIDE OF UPPER CABINETS, MOUNTED ABOVE EXISTING BACK SPLASH. PROVIDE CUT OUTS FOR ACTIVE ELECTRICAL BOXES IN BACK SPLASH. REMOVE AND REINSTALL UNDER COUNTER LIGHTING TO ACCOMMODATE BACK SPLASH. PROVIDE ALUMINUM PLATE MOUNTED ON STANDOFFS FOR LASER MOUNTING ON ALL LASERS. PROVIDE CABINET AROUND LASER OPENINGS. SEE DETAIL C3/A500. PROVIDE UNISTRUT FRAME FOR FRONT LASER ONLY (EAST) MOUNTED TO CONCRETE APPROXIMATELY 24" BEHIND WALL FOR PLATE MOUNTING AT NEW LASER LOCATION. DETAIL A4/A500

A02 A03

ROOM 01563

E2 A501

A12

H

KEYNOTE LEGEND ARCH

VAULT 01561-B

B6 A200

G

F

26

Key Value

1

6

C 27

A200

4'

D

B 27.3

A12

OFCI HAND SANITIZER HOLDER DOOR OPENER INDICATOR LIGHT EMERGENCY POWER OFF AND SHUNT TRIP BUTTONS PROVIDE 18"X36" TACK SURFACE J-BOX AND WALL DUCT BEHIND WALL FIXED PLAM 2 COUNTER, NO BACK SPLASH. PROVIDE 5 GROMMETS WOOD CABLE TRAY STAINED TO MATCH CHERRY CABINETS EXPERIMENTAL CONDUIT BOX. PROVIDE ACROVYN COVER CUT APPROXIMATELY 1/2" LARGER THAN BOX ON ALL SIDES. USE MAGNET STRIPS TO ATTACH TO ELECTRICAL BOX ABOVE COUNTER. PROVIDE SPACER ON BOX IF NEEDED TO BRING MAGNET OUT TO FACE OF BOX VAC LOCK STORAGE MAGNETIC TOUCH LATCH DOOR IN THESE TWO PANELS 01565-2 FJ A CORNER GUARD A BA COORDINATE LOCATIONS AND SIZES OF CASEWORK IN EQUIPMENT ROOM - CA/CK WITH EQUIPMENT ITEMS. A -PLAM CABINET WITH ADJUSTABLE SHELVING, NO DOORS 4" GROMMET HOLE IN CABINET SIDE FOR CONDUIT ACCESS P

AE84 2'-6" 12" DEEP

AE83

AE72

A

MLP

1/4" TYP

ORIENTATION WITH ADJACENT EXISTING

3 1/2" 2" ALIGN PATTERN REVEALS IN THE VERTCAL

1'-4 1/2"

AE79

A

4 2" OAK TRIM AT PERIMETER PLAM CASEWORK PLAM CASEWORK N PULL OUT DRAWERS WITH LABEL PHYSICS BOX 5" WOOD TRIM WALL COVERING WOOD DOOR AND FRAME EXISTING MED/GAS VALVES CONCEALED SUPPORT BRACKET NURSE CALL WALL PHONE JACK D3 A401 OFOI FURNITURE Z-LOCKERS (PLAM 1) ANCHOR TO WALL OFOI 3' X 4' MARKER BOARD CUSTOM SHOE CUBBY ON 4" BASE WITH FIXED SHELVES AND SOLID BACK PANEL (PLAM 1) SHORTEN BUMPERS TO ACCOMMODATE LOCKER INSTALLATION EQUIPMENT 01565A-1 NEW LIGHT SWITCH LOCATION FV/FP A OFOI MICROPHONE (CONTRACTOR ROUGH IN) BA A 2 WOOD TRIM A 5CT WALL BUMPERS, MATCH EXISTING

AE68 AE69 AE70 AE71 AE72 AE73 AE74 AE75 AE76 AE77 AE78 AE79 AE80 AE81

4'

5

3 1/2" 2"

AE81

AE64

1'-5" 2'-6"

AE80

AE49 AE50 AE51 AE52 AE53 AE54 AE55 AE56 AE57 AE58 AE59 AE60 AE61 AE63 AE64 AE65 AE66 AE67

DRAWN:

A4

VAULT C - SOUTH ELEVATION

3

NOTE: KEYNOTES AC01-A07 BELOW ARE TO BE COMPLETED DURING THE ELEKTA MACHINE INSTALLATION. COORDINATE DATES WITH OWNER DURING INSTALLATION.

5

KEYNOTE LEGEND CONSTRUCTION Key Value AC01

Keynote Text CONNECT POWER FOR ELEKTA INSTALL CREW ON THE 3RD DAY OF INSTALL (ROUGHLY 10 DAYS AFTER COMPLETION OF WORK) MODIFY CEILING FOR TBI LASER. REFER TO KEYNOTE RCP12 ON A102. FIELD CUT AND FINISH OPENING FOR LASER APERTURE. PROVIDE CARDBOARD COVER FOR BOX TO ALLOW DETERMINATION OF PROPER SIZE AND LOCATION FOR OPENING. PROVIDE 5" WIDE WOOD TRIM AT ELEKTA MACHINE EDGE TO FINISH WALL EDGE AROUND ELEKTA MACHINE. STAINED TO MATCH WOOD DOORS. INSTALL EKETA PROVIDED KV FILTER CASSETTE MOUNTS WITH WOOD TRIM. SEE DETAIL E2/A501. PROVIDE FINISHED FLOORING OVER ELEKTA FLOOR BOARDS NEAR COUCHTOP. REINSTALL ALUMINUM PLATE ABOVE ISO-CENTER ON SUPPORTS RELOCATED BY KEYNOTE A27 ON A101. COORDINATE EXACT POSITION WITH ELEKTA

AC02 AC03 AC04 AC05 AC06 AC07

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION RELATED CONDITIONS PRIOR TO STARTING DEMOLITION OR NEW CONSTRUCTION. NOTIFY ARCHITECT WITH ANY DISCREPANCIES. 2. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO OWNER'S OCCUPIED AREAS ADJACENT TO DEMOLITION AND NEW CONSTRUCTION. CONTRACTOR TO PROVIDE ALL LABOR AND MATERIALS TO REPAIR ALL DISTURBED ELEMENTS AT CONSTRUCTION ACCESS AND ACCESS ROUTES. ALL REPAIRS SHALL MATCH EXISTING CONSTRUCTION AND FINISH. THERE ARE A WIDE VARIETY OF PAINT COLORS THROUGHOUT THE BUILDING. ANY PAINT REPAIRS MUST MATCH THE EXISTING.

A Autodesk Revit 2021

Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Healthcare project produced with REVIT.

B

C

D

E

F

G

1

3. CONTRACTOR SHALL BE RESPONSIBLE FOR STORAGE AND PROTECTION OF ALL SALVAGED ITEMS TO BE REUSED IN THIS PROJECT. THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING ALL DEMOLITION DEBRIS FROM THE BUILDING. ALL CARDBOARD TO BE REMOVED FROM THE SITE AND RECYCLED. 4. IF UNANTICIPATED ASBESTOS CONTAMINATED MATERIAL IS DISCOVERED, CONTRACTOR SHALL CEASE OPERATIONS IMMEDIATELY AND NOTIFY THE OWNER.

2

5. ALL MATERIALS REUSED FROM DEMOLITION SALVAGE ARE TO BE THOROUGHLY CLEANED & IN ACCEPTABLE USABLE CONDITION BEFORE INSTALLATION. 6. THE CONTRACTOR SHALL PROTECT ALL ITEMS IN ROOMS FROM DUST AND DIRT CREATED BY CONSTRUCTION ACTIVITY. CONTRACTOR SHALL COVER FLOORS AS REQUIRED TO PROTECT FROM DAMAGE. REMOVE DIRT AND DUST CAUSED BY CONSTRUCTION BY VACUUMING AND DUSTING. 7. PATCH ALL WALLS OPENED FOR CONCEALING CONDUIT AND WIRING AND FOR INSTALLATION OF NEW ELECTRICAL OUTLETS, DATA OUTLETS, AND OTHER MISC. WALL ITEMS. PAINT CORNER TO CORNER TO MATCH EXISTING. 8. IF THERE ARE DISCREPANCIES BETWEEN THE FOR REFERENCE ELEKTA DOCUMENTS AND THE BID DOCUMENTS, THE CONTRACTOR SHALL CONFIRM THE CORRECT CONSTRUCTION WITH THE ARCHITECT. 9. PROTECT ANY EXISTING FINISHES TO REMAIN.

3

10. EQUIPMENT ROOM NORTH AND WEST WALLS ARE EXISTING CONCRETE. EAST AND SOUTH WALLS ARE NEW TO STRUCTURE. PAINT CONCRETE STRUCTURE ABOVE.

FLOOR PLAN SYMBOLS LEGEND

M12A S 44

DOOR MARK

WALL CORE MATERIAL WALL CORE WIDTH WALL HEIGHT CODE

4

WALL GYP LAYERS WALL MODIFIER CODE CW

GLAZED OPENING MARK

FINISH PLAN SYMBOLS LEGEND

MATERIAL TAG

FINISH LEGEND FLOOR: FV VCT FJ HOMOGENEOUS SHEET VINYL FY EXISTING TO REMAIN FC CARPET FP PAINTED CONCRETE

WALLS: A PAINT K VINYL WALL COVERING X NO FINISH REQUIRED

5

BASE: BA VINYL BY EXISTING TO REMAIN

CEILING: CA ACOUSTICAL LAY-IN CK PAINTED GYPSUM BOARD CT PAINTED CONCRETE

NOTES: 1. DO NOT INSTALL VCT UNDER MACHINE LOCATION, PAINT EXPOSED CONCRETE IN THAT AREA. SEE ELEKTA SITE SPECIFIC DRAWINGS FOR LOCATION. 2. PROVIDE VINYL BASE ALONG BASE OF MACHINE AFTER MACHINE INSTALL. SEE DETAIL C2/A501. 3. PAINT ALL SOFFITS. SOFFITS ABOVE CASEWORK TO MATCH WALLS. SOFFIT AT GLASS CEILING TO MATCH EXISTING.

6

Printed:

6

2839 Northgate Drive | Iowa City, IA 52245 319.354.3040 | www.shive-hattery.com

C19

1'-8"

C36A

C58

C52

AE45

AE54

Iowa | Illinois | Indiana | Nebraska

C23

C36B

1'-0"

C18

C36 C32

C57

3 1/2"

C16

C22 C25-30

2'-8"

C36C

AE39 C17

4'-0 13/16"

C21

AE09

C50 C51

2'-6"

C15

AE23

3

AE51

AE11

C36D

1'-8"

C36E

C20 AE39

AE30

720 Melrose Avenue Iowa City, IA 52242

AE29

AE58

UIHC

AE53

H

0873501 UIHC#: 221-2027

A500

A101

UI PROJ #:

AE27 AE28

AE57

FIELD BOOK:

AE24 AE25 AE26

AE56

UIHC - Pomerantz Family Pavilion - Install Linear Accelerator Vault C

A500

AE52

02/26/2021

CLEAR

G6

JMC

2'-2 1/2"

CLEAR

MLP

2'-11 1/2"

CLEAR

PROJECT NO: 1207570

1'-2 1/2"

2

DATE:

AE23

ISSUED FOR: BID

OPEN TOE KICK

4'

B6 AE12

AE08

AE14 AE15 AE16 AE17 AE19 AE21 AE22

DRAWN:

REMOVE CABINET. PROVIDE TALL STORAGE CABINET TO MATCH HEIGHT OF ADJACENT. PATCH SOFFIT. AE44 AE14

AE43

AE42

0

C13

APPROVED:

AE31

VAULT C - EAST ELEVATION 3/8" = 1'-0"

AE38

C11

FLOOR PLAN

E2

C9

REMOVE DRAWER, GLIDES AND DOOR. MODIFY CABINET TO ELIMINATE TOE KICK ON LEFT HALF OF CABINET. PROVIDE VERTICAL DIVIDER BETWEEN ADJACENT CABINET/DRAWER AND VERTICAL CABINET EDGE AND BACK TO FLOOR. RUN CARPET AND VINYL BASE UNDER THIS CABINET .

101

AE27

AE26

4'

AE38 C7

PROVIDE FIXED CABINET FACE ATTACHED WITH KEKU CLIPS

AE11 AE12 AE13

5'-0"

0

C3

AE25 AE26

AE17

C13B

S

AE16

AE10

AE87

VAULT C - NORTH ELEVATION 3/8" = 1'-0"

AE15

C13A

3'-5 1/4"

A2

C5

C39A

AE15

C9A C9B C11A C11B

01565-A

10" DEEP

2

C38A

C1

AE07

AE05

C7B

T

C7A

H

2'-4 1/2"

C37A

2'-10"

AE10 AE36

AE28

C39B

6"

C39

AE11

13'-1 1/2" WIDE X 8'-5" TALL CONTRACTORS

C38B

C14

FASCIA OPENING (CENTERED ON ISOCENTER)

C38

C10

2'-3 1/2"

C37B

C8

T

C37

AE08

AE04

AE38 C12 C6

01565-A-2A

AE38

C4 AE32 C2

AE24

2839 Northgate Drive | Iowa City, IA 52245 319.354.3040 | www.shive-hattery.com

AE38

AE23

Iowa | Illinois | Indiana | Nebraska

OPEN

720 Melrose Avenue Iowa City, IA 52242

C39C

AE21

1

UIHC

C39D

C38C

AE06

126

AE07 AE08 AE09

4'-0 3/4" 0873501 UIHC#: 221-2027

C38D

C37C

AE11

UI PROJ #:

C37D

AE22 1'-6"

FIELD BOOK:

C39E

02/26/2021

C39F

C38E

JMC

C38F

C37E

PROJECT NO: 1207570

C37F

ISSUED FOR: BID

7"

DATE:

AE17

1

APPROVED:

AE15

AE14

AE29

AE30

INTERIOR ELEVATIONS

AE12

AE02

A500

A & M HARDWARE 933-58 24"X24" SUPPORT, MOUNT UPSIDE DOWN WITH ANGLE SUPPORTING BOTTOM OF CABINET PAINTED CONCRETE PLAM 1 CABINET PLAM CABINET WITH ADJUSTABLE SHELVING, NO DOORS. 4" VINYL BASE KV FILTER MOUNTING LOCATION, RECESS INTO WALL CAVITY, TRIM WITH STAINED OAK PLAM 1 LASER CABINET OFCI TRIPPLE GLOVE DISPENSER PROVIDE DOWEL FOR HANGING PAD. VERIFY SIZE AND MOUNTING HEIGHT LOCATION WITH OWNER. FIXED SHELF, 1 1/2" THICK, MOUNTED WITH 1 1/2" X 1 1/2" X 1/8" THICK ALUMINUM ANGLES EMERGENCY POWER OFF PAINTED GYPSUM BOARD REMOVE GYPSUM BOARD AND STUDS BEHIND NEW CABINET LOCATION. RECESS CABINET FLUSH WITH ADJOINING WALL. SOLID BACKING FOR MONITOR MOUNT SOLID WOOD ADJUSTABLE SHELVING WITH ROUNDED/EASED FRONT EDGE TYPICAL THIS CABINET. CFCI MIRROR, COORDINATE MOUNTING HEIGHT DURING INSTALL REMOVABLE PANEL (PLAM 1) WALL PHONE PROVIDE HOOKS ON SIDE OF CABINET GYPSUM BOARD SOFFIT TO LAY-IN CEILING (CEILING APPROX 8'-6" AFF) 1" WIDER AND DEEPER THAN CABINET. ALIGN BOTTOM OF SOFFIT WITH EXISTING SOFFIT ALONG EAST WALL ABOVE CASEWORK RIGID VINYL WALLCOVERING TO 46" AFF. COORDINATE WITH DEVICE LOCATIONS. HORIZONTAL DIVIDER ON INSIDE OF CABINET PROVIDE VERTICAL DIVIDER INSIDE CABINET IN LOWER HALF ONLY INSTALL SALVAGED J HOOKS IN THE CABINET ONE CABINET. PROVIDE 4 J-HOOKS FOR SECOND CABINET. EXISTING PHYSICS CONDUIT TO BE CUT INTO LOWER LEFT CABINET PROVIDE NEW SWINGING DOOR PANEL. LEAVE 3/8" GAP BETWEEN BOTTOM OF PANEL AND EXISTING CABINET BELOW. MOVE CAMERA/LASER ROUGH-INS TO ISOCENTER, SEE ELECTRICAL AND TELECOM SHEETS REMOVE ALL STUDS BEHIND CABINET, TO RECESS CABINET BACK TO CONCRETE SOFFIT PAINT COLOR TO MATCH WALL COLOR REINSTALL PT AND SOAP DISPENSER REMOVE HORIZONTAL PLAM BOTTOM SITTING ON SOLID SURFACE. REFACE PLAM ON ALL VERTICAL SIDES FULL HEIGHT. PROVIDE L BRACKET TO ATTACH VERTICAL TO COUNTER AT TWO POINTS ON EACH SIDE ADJUST/REPAIR MARKED SAGGING CABINET DOORS SO THEY DON'T HIT EACH OTHER OR FRAME PLAM 1 DOOR WITH PULL OUT SHELF (ALIGN WITH ADJACENT DOOR/DRAWER FACES) REMOVE EXISTING DRAWERS. PROVIDE DRAWERS IN NEW LAYOUT AS SHOWN CIRCULAR CONE APPLICATOR (OFOI) REMOVE DRAWERS AND GLIDES AND PROVIDE PLAM SHELVES. RESURFACE TOP, BOTTOM AND SIDES OF OPENING. PROVIDE 2 1/2 LEXAN COVERED METAL ANGLES WITH ROUNDED CORNERS LEXAN COVERED 2X2 METAL ANGLE (TYP). (FOR 5 BLOCK TRAYS, BLOCK TRAYS ARE OFOI), COORDINATE LOCATION OF ANGLES IN THE FIELD WITH EQUIPMENT. EXISTING MED GAS REINSTALL EXISTING WALL MOUNT BRACKET AND OFCI SHARPS BOX. RADIOCAM JUNCTION BOX REINSTALLED AT NEW LOCATION PROVIDE LEXAN TO COVER ENTIRE SHELF REMOVE EXISTING PLAM SHELVING. PROVIDE SOLID WOOD ADJUSTABLE SHELVING IN ENTIRE CABINET WITH ROUNDED/EASED FRONT EDGE. BOARD STORAGE (OPEN, NO DOOR) VOLUME CONTROL 1 PLAM LASER CABINET

AE02 AE03 AE04 AE05 AE06

D6

AE13

Keynote Text

AE01

4'-10"

24" DEEP

AE01

UIHC - Pomerantz Family Pavilion - Install Linear Accelerator Vault C

Key Value 8'-0"

AE03


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Residential project produced with AutoCAD.


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Skematic Design for an urban development.


FITNESS 1,850 SQ FT

CARDIO CLASSES 1,680 SQ FT

WEIGHTS 2,040 SQ FT

LOCKER ROOMS 4,320 SQ FT

GYMNASIUM 10,800 SQ FT

NATATORIUM 21,360 SQ FT

TIFFIN RECREATION CENTER

Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Space allocations study for a government project.

SPACE ALLOCATIONS


RENDERINGS


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Renderings produced with Enscape.


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Renderings produced with Enscape.


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Renderings produced with Enscape.


PAINTINGS


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Left: Watercolor and Pencil Right: Watercolor and Pencil


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Left: Gouache and Ink Right: Gouache and Pencil


Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Painting produced with Procreate app.


GRAPHIC DESIGN


Activity 7: Visit the Friends Meetinghouse

Junior Rangers Herbert Hooverlearn believed as much education as theyhelped can about himthe become national successful. parks they Thevisit. education The more they Herbert learn, received the better in his they West canBranch help park school rangers allowed carehim for the to later parks. attend Stanford University.

Herbert Hoover and his family werePRAIRIE Quakers. They worshipped at the GRAVESITE Friends Meetinghouse twice a week. Quakers believed in living simply, being honest, treating others fairly, and avoiding violence. Herbert Hoover’s Quaker values led him to help millions of people around the world who needed food.

people are learned 11 12 about?

Quilt

8

Stove

13

Which subjects are taught? Boulder

Sign Post

10 7 6

My name is _________________________________.

Question:

About This Park

Answer:

Activity Who are 10:Junior Visit the Rangers? Gravesite of PresidentSTATUE and Mrs. OF ISIS Hoover

What is used to complete homework? Wagon Wheel Which famous Horseshoe

5

Who was Herbert Hoover?

Junior Rangers are important people who help Park Rangers with their jobs. HerbertSCHOOLHOUSE Hoover was the 31st A Junior Rangerwent at Herbert Hoover National Historic Site will: President. As a child in West Branch, Iowa Award Globe 1 Herbert Hoover from being a boy in a small two-room cottage to Iowa, he learned the importance of the 31stExplore President of the Hoover United States. After he died, thousands of people ■ Herbert National Historic Site BIRTHPLACE 9 10buried here. From the gravesite, they could see the house family, hard BLACKSMITH work, and education. watched as heand was COTTAGE safely responsibly. He also believed in honesty, fairness, SHOP FRIENDS where he was born. MEETINGHOUSE and peace. ■ Learn about Herbert Hoover and his home town of West Branch. Do you believe in living simply, being honest,While treating others fairly,Hoover or visiting Herbert Think about Herbert Hoover’s accomplishments, or the avoiding violence? From where or whom did you learnHistoric it? National Site, think about Hitching Post Indian Clubs ■ Protect Herbert Hoover Historic Site important things he didNational during his long life, and then answer the how these values helped him andquestions other national below.parks. 14 15 grow up to become a successful businessman, a world humanitarian, VISITOR and a President of the United States. Earn Your Junior Ranger Badge CENTER 1. What important things would you like to accomplish? Using your Activity Book: _____________________________________________________________________ Marble Block Water Pump

Get Caring Started for Others

Herbert Hoover (on the right) with a park ranger in Yellowstone National Park.

142

3.

The Hoovers’ religion was Methodist. ______ 3 Find the answers to these questions in the exhibit at the Visitor Center.

1.

Find and list two objects in the exhibit that used to belong to the Hoover family. ____________________________________________________________

2. What year did the Hoovers move into the House of the Maples? If you were going to give a gift to someone who helped you, what would ____________________________________________________________ you give? 3. What degree did Herbert Hoover earn at Stanford University? Circle one. A. Physics

B. History

C. Geology 12 4

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Conservation Park Rangers

What is Herbert Hoover National Historic Site?

1. Complete Activity 1 on page 4. _____________________________________________________________________ 11 6 7 Herbert Hoover National Historic Site is a national park. There are over 400 2. In addition to Activity 1, complete the number of activities required for Activity 1: 8: Watch Visit the the Statue film and of Isis explore the exhibit at the Activity 9: 2: Visit Interview the Tallgrass a Park Ranger Prairie _____________________________________________________________________ national parks in the United States. your age (see chart below). Visitor Center _____________________________________________________________________At the start As of World War I,this Herbert Herbert Park Rangers Hoover answer lovedquestions, being outdoors. patrol, He andbelieved clean up.inTheir conserving green and natural grey you explore park: Hoover quit a successful career as a 3. Ask a Park Ranger at the Visitor Center to check your Activity Book mining engineer to provide food relief to the war-torn country of Belgium. resources uniforms make by protecting them easy orto not find. wasting them. He created many national parks is where people find information and plan their visit. 2. Herbert Hoover once said: “In no other land could a boy from a country The Visitor■Center when you are done. Know the rules and how to be safe. As a thank you for his help, the people of Belgium gave him this Statue of Isis. when he was president. This Tallgrass Prairie is a symbol of his commitment There is a 12-minute film and an exhibit about Herbert Hoover. village, without inheritance or influential friends, look forward with The artist chose Isis, the the park ancient Egyptian goddess of life, asand a symbol theto learn moreto conservation. ■ Use map and guide, exhibits, film, audioof tour unbounded hope.” What do you think he meant? Find a Park Ranger and ask the following questions to learn lives Herbert Hoover aboutsaved. Herbert Hoover. If You Are: Complete: about rangers and their jobs. _____________________________________________________________________ Watch the film. Mark “T” for the sentences that are true and “F” Stand on the observation deck at the Tallgrass Prairie. Look, ■ Ask a park ranger if you have a question or need help. for the sentences that are false. 5 to 7 years old 4 activities _____________________________________________________________________ listen, and feel what is around you, then write or draw what you President and Mrs. Hoover choose this spot to place the statue for 8 to 10 years old 6 activities a very specific reason. Look in the same direction that Isis is facing saw, heard or felt. 1. What is your name? _____________________________________________________________________ andHoover draw the scene you. 1. Herbert was thebefore 31st President. ______ 11 years old and older 9 activities ________________________________________________________________ _____________________________________________________________________ Look: Listen: Feel: 2. Herbert’s nickname was Bertie. ______

I am ____________ years old.

Maria L. Padron

President Herbert Hoover

4

______________________________

3

Junior Ranger Activity Book - Herbert Hoover National Historic Site

Park Ranger

Where Privy does the Rocking Chair teacher sit? 6 7

Clothesline

Accomplishments Be Junior Ranger Fora Me:

For Herbert:

______________________________

Question: 1 2 How is the school heated in the winter months?

PRESIDENTIAL

Write down one question LIBRARY AND you have about the Friends Meetinghouse.MUSEUM Try to find the answer by reading the signs or brochures, by listening to the audio tour, or by asking a Park Ranger.

Junior Ranger Pledge

Find at least 10 of these 15 items. Look around the schoolhouse. Answer the questions about what it wasyou Are like 8when or younger? Herbert went Placetoan school X over in each the 1800s item as and you what finditit.is like for you today. Are you 9 or older? Write the number of the item on the map where you found it.

TALLGRASS

As a Junior Ranger, I promise to preserve, protect, and teach others about Herbert Hoover National Historic Site.

ACTIVITY BOOK

Activity 3: 6: Go Visitonthe a Scavenger Schoolhouse Hunt

__________________________________________________

JUNIOR RANGER

Quaker Values

who has successfully completed the requirements to become a Junior Ranger at Herbert Hoover National Historic Site.

National Historic Site Iowa

Education Explore the Park

Congratulations to

National Park Service U.S. Department of the Interior

Herbert Hoover National Historic Site Junior Ranger

Herbert Hoover

2.

What is your job? ________________________________________________________________

3.

Have you worked at other National Parks? Which ones? ________________________________________________________________ ________________________________________________________________

4.

What do you most respect about Herbert Hoover? Why? ________________________________________________________________

________________________________________________________________ Do you think it is important to conserve this Tallgrass Prairie? Why? 5.

What can I do to help the National Parks? ________________________________________________________________ ________________________________________________________________ 13 5


May 13, 2016 at 3 pm

College of Public Health

GRADUATION CEREMONY, HONORS, & RECEPTION The College of Public Health Building 145 N. Riverside Dr. Callaghan Auditorium, N110 CPHB Parking is available in the Newton Road Parking Ramp

Please RSVP by May 4th to cph-rsvp-graduation@uiowa.edu (Names of attendees needed at time of RSVP)

Individuals with disabilities are encouraged to attend all University of Iowa sponsored events. If you are a person with a disability who requires accommodation in order to participate in this program, please contact us in advance at (319) 384-1507 or by email: becky-toner@uiowa.edu.

Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

Left: Dean’s Club Invitation - College of Public Health Right: Graduation Invitation - College of Public Health


IOWA

s t e ival F l ou S August 17th & 18th, 2018

Kicking things off

Friday

evening during the Friday Night Concert Series with The Candymakers and The Maytags -- stay and enjoy the fashion show!

Free ission m d A

Saturday:

w w w

◗ Main stage entertainment with choirs, youth dancers, African dancers, rappers, PLUS The Damani Phillips Band and Front Page. ◗ Black Business Leaders Panel, Black Authors Panel and Barbershop Panel ◗ Artist Booths, Soul Food Vendors, FUN Stops and late night entertainment .s u at local businesses.

m m

Presented By

Maria L. Padron

tiktok.com/@maria.padron issuu.com/mlpadron PORTFOLIO

er oft he ART S.org

Left: Soul Festival Poster - Summer of the Arts Right: Harrison Elementary Shcool - Logo Design (visit https://www.davenportschools.org/harrison/)



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.