1
Competition Entry
Agrani Bank Headquarter
Location II Dhaka, Bangladesh Typology II Office Project Status II Unbuilt Supervisor II Mujtaba Ahsan Role: II Designer Agrani Bank is one of the major public Bank in Bangladesh. Due to rapid growth and imposed the need for a new headquarters. This competition design brief required a building that would be a landmark in the urban texture of Dhaka. This Bank was designed for predominantly as a office building with Multipurpose area, Branch office, Prayer Hall, Car Park, Healthcare, Guest Houses, Daycare facilities, etc.
3D Diagram
Circulation Program
th
u So
t
es W Program and Circulation
Arrangement &Orientation
Lifted and Reorganize
Connection & Circulation
l
3D
i Bu
g
n di
ai D
Horizontal Pargola
Vertical Louver
Horizontal Louver
Open Courtyard
Green Garden
3D Diagram
Program 14
13
6 7 5
13 6
10
Zoning
12
Core Guest Room Daycare Prayer Space Health Care Cafe Regional Branch Office Space Meeting Conference Multipurpose
4
7
5
7 6
4 9
7
3 12
2
6 12
1
5
5 2
Second Floor Plan
11
12 6
6
18
7 5
16
4 15
Basement Plan
12
4
17
7
6
6 1 2 3 4 5 6
Drop-0ff Ramp Lobby Elevator Core Toilet Stair
7 HVAC Room 8 Meeting space 9 Conference 10 Multipurpose area 11 Office Space 12 Green garden
13 Regional Branch 14 Vault Room 15 Car Park 16 Footpath 17 Storage 18 Central Hvac Space
First Floor Plan
11
Seventh Floor Plan
5
Section AA’
West Elevation
Professional Works
2
Molla Motors Office and Showroom
Location II Chuadanga, Bangladesh Typology II Retail & office Project Status II Under Construction Supervisor II Irfan Khan Role: II Architectural Designer First Floor Plan
Storage
Second Floor Plan Side walk
Main Street
Site Plan
Sheet Number:
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
7
5' - 0"
5' - 0"
5' - 0"
5' - 0"
A104
8
5' - 0"
5' - 0"
5' - 0"
3' - 0"
Top Of the Roof 27' - 0"
3' - 0"
4' - 4"
Roof 25' - 0" L2 Upper Ceiling 23' - 0"
0' - 6"2' - 0"
3' - 0" 2' - 4"
22' - 0"
Level 2 13' - 0" L1 Upper Ceiling 11' - 0" L1 Lower Ceiling 10' - 6"
Seal:
9' - 8"
15' - 4"
2' - 6"
2' - 6"
ree Deg
5' - 0"
0.00 12
10' - 0"
5' - 0"
2' - 0"
11' - 1"
Email: trinbar@msn.com Phone: 267.271.7766
5' - 0"
6
Project Number: 02 05 2001 2023
5' - 0"
5
Address: 1125 MASON AVENUE DREXEL HILL, PA 19026
5' - 0"
4
Henry Building Services, LLC
3
2' - 0"
1
Level 1 1' - 0" Grade 0' - 0"
Elevation
Seal:
RF Plan @ First floor Revisions No.
Date
Discription
1
3
Ceramic Stone Cap
1
3
4
4
1/2" Plaster Wall
5
5
6
6
7
7
8
4 A108
8
Second Floor Plan Top Of the Roof 27' - 0"
2' - 0" 2' - 0" 0' - 6"2' - 0"
1/2" Plaster Wall (Cement sand ratio 1:2)
1' - 6"
1/2" DPC Cut 1/2" Cement Plaster ratio 1:0
10" Brick Wall
10 mm Vaper Barior
Upper Level 1 1/2 " Thick Gypsum Board Drop Ceiling See Details in interior Layout
L1 Upper Ceiling 11' - 0" L1 Lower Ceiling 10' - 6"
9' - 6"
See Finishing Details for Floor materials 4" Concret Slab Filled with Rebar 3 " Crushed Stone 1" Rammed Sand
Lower Level 1 1/2 " Thick Gypsum Board Drop Ceiling See Details in interior Layout
Level 2 13' - 0"
27' - 0"
Lower Level 1 1/2 " Thick Gypsum Board Drop Ceiling See Details in interior Layout
6" Concrete Slab filled with Rebar
5 A108
6 A108
Mud Slab
4' -0"x4'-10" 1'-0" Footing filled with Rebar
A
C
D
E
Level 1 1' - 0" Grade 0' - 0"
5' - 0"
Section 1 1/4" = 1'-0"
1
B
1' - 0"
1' - 6"
10 mm Vaper Barior
See Finishing Details for Floor materials 4" Concret Slab Filled with Rebar 3 " Crushed Stone 1" Rammed Sand Mud Slab
Footing -5' - 0" 3 A109
E
2"-0" x4'-0" Sheet Metal Exterior Panel Concrte Drop wall filled with Rebar
10"x12" Structural Concrete Beam Filled with Rebar
Level 1 1' - 0" See Finishing Details for Floor materials 4" Concret Slab Filled with Rebar 3 " Crushed Stone 1" Rammed Sand Rammed Earth 4' -0"x4'-10" 1'-0" Footing filled with Rebar
2
Section 2 1/4" = 1'-0"
Rammed Earth
Section 2 1/4" = 1'-0"
5' - 0"
2' - 0" 2' - 0"
0' - 6"2' - 0"
2' - 7" 2' - 5"
Level 2 13' - 0"
L1 Upper Ceiling 11' - 0" L1 Lower Ceiling 10' - 6"
Alumion Frame Clear glass Curtain Wall
Concrete Ramp
Concrete Ramp
7 A108
Level 1 1' - 0" Grade 0' - 0"
5' - 0"
Alumion Frame Clear glass Curtain Wall
Level 2 13' - 0"
L1 Upper Ceiling 11' - 0" L1 Lower Ceiling 10' - 6"
9' - 6"
7' - 0"
4' - 3"
0' - 6"2' - 0"
Glass Panel
9' - 6"
See Finishing Details for Floor materials 4" Concret Slab Filled with Rebar 3 " Crushed Stone 1" Rammed Sand
2
10' - 0"
5' - 0"
Level 1 1' - 0"
SECTION BB’
Glass Panel
5' - 0"
1 A109
4' -0"x4'-10" 1'-0" Footing filled with Rebar
2"-0" x6'-0" Sheet Metal Exterior Panel Hand Rail
5' - 0"
3' - 6" 3' - 0" 0' - 6"2' - 0"
3' - 6" 4' - 0"
6' - 6"
1/2" Cement sand Plaster (Ratio 1:2)
Roof 25' - 0"
Hand Rail
Footing -5' - 0" 7 A108 1' - 0"
1 A109
2"-0" x6'-0" Sheet Metal Exterior Panel
10" Brick Wall Lower Level 1 1/2 " Thick Gypsum Board Drop Ceiling See Details in interior Layout
Top Of the Roof 27' - 0"
Level 1 1' - 0" Grade 0' - 0"
5' - 0"
1/2" Cement sand Plaster (Ratio 1:2)
9' - 6"
10" Brick Wall Lower Level 1 1/2 " Thick Gypsum Board Drop Ceiling See Details in interior Layout
2 A109
2' - 7"
6 A109
Level 2 13' - 0"
6 A109
2' - 5"
Level 2 13' - 0"
Concrte Drop wall filled with Rebar
L2 Upper Ceiling 23' - 0"
4' - 3"
3"x10" concrete Sill Level Beam
3' - 0"
3"x10" concrete Lintel Level Beam Anderson 50" X 48" aluminium frame double glazed double casement window with partially Oparable
0' - 6"2' - 0"
10" Brick Wall 1 1/2 " Thick Gypsum Board Ceiling
3"x10" concrete Sill Level Beam
2"-0" x4'-0" Sheet Metal Exterior Panel
7' - 0"
3' - 6"
10"x12" Structural Concrete Beam Filled with Rebar
Anderson 50" X 48" aluminium frame double glazed double casement window with partially Oparable
2 A109
6' - 6"
3"x10" concrete Lintel Level Beam
1/2" Cement sand Plaster (Ratio 1:2)
6" Concrete Slab filled with Rebar
1 1/2 " Thick Gypsum Board Ceiling
Roof 25' - 0"
L2 Upper Ceiling 23' - 0"
4' - 0"
10" Brick Wall
3 A109
Ceramic Stone Cap
Top Of the Roof 27' - 0" 2' - 0"
6" Concrete Slab filled with Rebar
D
2' - 0"
C
10' - 0"
Ceramic Stone Cap
B
1/2" Cement sand Plaster (Ratio 1:2)
1' - 0"
A
3' - 6"
SECTION AA’
Section 1 1 1/4" = 1'-0"
9' - 6"
4' -0"x4'-10" 1'-0" Footing filled with Rebar
L1 Upper Ceiling 11' - 0" L1 Lower Ceiling 10' - 6"
6 A108
Level 1 1' - 0" Grade 0' - 0"
Footing -5' - 0"
1/2" Plaster Wall (Cement sand ratio 1:2) 1/2" DPC Cut 1/2" Cement Plaster ratio 1:0
9' - 6"
Upper Level 1 1/2 " Thick Gypsum Board Drop Ceiling See Details in interior Layout
10"x12" Structural Concrete Beam Filled with Rebar
0' - 6"2' - 0"
10' - 0"
10" Brick Wall
See Details for Interior wall Finish Anderson 50" X 48" aluminium frame double glazed double casement window with partially Oparable
Level 2 13' - 0"
27' - 0"
L2 Upper Ceiling 23' - 0"
10"x12" Structural Concrete Beam Filled with Rebar
1' - 0"
6" Concrete Slab filled with Rebar
5 A108
Roof 25' - 0"
5' - 0"
See Details for Interior wall Finish Anderson 50" X 48" aluminium frame double glazed double casement window with partially Oparable
6" Concrete Slab filled with Rebar
10"x12" Structural Concrete Beam Filled with Rebar
10' - 0"
4 A108
1/2" Plaster Wall
1 1/2 " Thick Gypsum Board Coumpound Ceiling
L2 Upper Ceiling 23' - 0"
10" Brick Wall
1 1/2 " Thick Gypsum Board Coumpound Ceiling
Ceramic Stone Cap
10" Brick Wall
Roof 25' - 0"
2' - 0"
First Floor Plan
Top Of the Roof 27' - 0"
2' - 0"
6" Concrete Slab filled with Rebar
10"x12" Structural Concrete Beam Filled with Rebar
Footing -5' - 0"
Professional Works
3
River-Front Development
Location
II Malayasia
Typology
II Master plan
Project Status II Conceptual Proposal (unbuilt) Supervisor
II Teah Teh
Role:
II Conceptual Planner
H O TEL S E RVICED A PARTMENTS
O FFI CE
M I XED D EVELOPMENT M A R INA M I XED D EVELOPMENT
CONTINUITY : LINK : EFFICIENT : GREEN : RHYTHMIC : SEPARATION : VISUAL : ICONIC : INNOVATIVE
M A R INA CLUB
M I XED D EVELOPMENT
R E TAIL/ BUSINESS SUITS
R E TAIL/ SERVICED APARTMENT
03 Mixed-Use Development
Professional Works
4
Company Location Project Status Year Responsibilities
Mixed-used Complex
Location
II Malayasia
Typology
II Mixed-Used
-SN Low & Associates -Danga Bay, Johor, Malaysia -Under Construction -2012/13
- Concept Development - Schematic design -3d Modeling + Visualization
Project Status II Under Construction Supervisor
II Teah Teh
Role:
II Conceptual Designer
2nd Floor Plan
Podium Floor Plan
Car-park Floor Plan
Apartment Level Plan
First Floor Plan
Zoning Section
Master plan
Car-park Floor Plan
Apartment Level Plan
2nd Floor Plan
Podium Floor Plan
Car-park Floor Plan
Apartment Level Plan
Professional Works Professional Works
5
Excelon Headquater Renovation
Location
II Kennett Square, PA
Typology
II Commacial office
Project Status
II
In construction
Supervisor
II
Patricia Stanford
Interior Designer II Collobration with Gensler Role:
II
Architectural Designer
Currently, Alexander Perry, Inc. is providing full service design development and construction for two buldings of Kennett Square in Philadelphia, PA. Now we are also working hand in hand with the Exelon team providing Move Management Services while COVID-19 regulations are in place to provide the safety and health of their employees during this time.
EXELON BUILDING 200 BY ADJACENCIES
BUILDING 200 LEVEL 03 PROPOSED RE-STACK PLAN
EXELON BUILDING 200 ALL PHASES LEGEND:
Building Core
M&D RESEARCH CENTER
Area Not in Contract GEN Central Design 09470 E.Flick (1 PO, 1 Wkstn)
STAIR #3
GEN Ofc Nuclear Engineer VP 08060 M.Gillin (1 PO) Rick Everett, 08060 (1 PO) GEN Outage Mgmt 08043 (1 Wkstn)
WOMEN'S RESTROOM
MEN'S RESTROOM
VEST.
JC
VEST.
GEN Outage Support 08042 (1 PO, 3 Wkstn)
ELEC. ROOM
GEN Chemistry 08076 (1 PO, 3 Wkstn) SERVICE ELEV.
ELEV.
GEN Outage Services ISFSI 08040 (1 Wkstns)
ELEV. STORAGE
STAIR #2
ELEC. ROOM
Executives Conference GEN Maintenance 08014 (6 Workstations)
NUCLEAR FUEL
BUILDING 200 LEVEL 02 PROPOSED RE-STACK PLAN
GEN West RSS 08035 ( 2 Wkstns) Common/Shared Building Core Space
• GEN BWR Fuel Services [08056] • GEN Spent Fuel + Decommissioning [08058] • GEN PWR Fuel Services [08063] • GEN Safety Analysis [08064] • GEN Nuclear Fuel-Ind Methods [05094]
GEN ofContract Sr. VP Office Support 08022 (1 PO, 4 Wkstns) AreaOffice Not in
P1
GEN Work Control 08019 (1(2 Wkstn) GENCorporate Ofc Nuclear Engineering 08060 PO, 11 Wkstns) GEN Assesment 05031 (108080 PO, 5(3 Wkstns) GENFleet Components Programs Wkstns) STAIR #3
BSC Legal Regulatory 00678 (1 PO) GEN Cent Engineering 08068 & 09470 (12 Wkstns) Wholesale Legal 86692 (1 PO) GEN Asset Mgmt 08008 (6 Workstations)
WOMEN'S RESTROOM
JC
VEST.
GEN Finance Nuclear 00305 (1 PO, 1 Wkstn) GEN Elec Engineering 05059 (6 Workstations)
BUILDING 200 LEVEL 02 PROPOSED RE-STACK PLAN ELEV.
CONSTELLATION
PHASE LEGEND
GEN Ops Mgmt 08016 (1 PO, 2 Wkstns) GEN Digital Plant Innovation 05035 (2 Workstation)
ELEC. ROOM
SERVICE ELEV.
ELEV. STORAGE
STAIR #2
ELEC. ROOM
ISSUE DATE: 05/20/2020
PHASE 1 DEPARTMENTS
MEN'S RESTROOM
VEST.
Constellation Department [83419, 81670, 81678, 81700, 81780, 81820, 83376, 83446, 83545, 84272, 83604, 83766, 83806, 86702]
GEN Communication GenCorp 09404 (1 PO, 1 Wkstn)
LEGEND:
Constellation (3 PO, 38 Wkstns, 2 Open) GEN Mech Engineering 08061 (4 Workstations) 1. ANTI-STATIC HR Department
CLEANING IS REQUIRED AT THE END OF
GEN Non-Component Prog. 08027 (4 Workstations) LEGEND: EVERY PHASE MOVE DUE TO Executive Department (10 PO, 2 Wkstns)
COVID-19 ALL PERSONNEL
Scale: 1/32” = 1’-0”
STAIR #1
CENTRAL DESIGN ORGANIZATION • Central Design Organization [09470] ALEXANDER PERRY, INC. + • Oversight [08068]
SERVER RM.
Exelon Buildings 200 & 300 | Kennett Square | ReStack Department Plans | 4.30.2020
WOMEN'S RESTROOM
STAIR #3
JC
VEST.
EXTENSION AND LAST NAME FOR WITH MOVE Common/Shared GEN ComponentsSpace Programs 08080 (3 Wkstns) COORDINATION PLAN FOR 4 IT/ELECTRICIAN/SECURITY/ GEN Fuel Services08068 08056&( 09470 1 PO, 15 GEN BWR Cent Engineering (12Workstations) Wkstns) 3. SAFETY WILL BE SUBMITTED AFTER PHASING APPROVAL Nuclear IT (2 PO, 31 Workstations, 1 Storage Rm) GEN Asset Mgmt 08008 (6 Workstations) GEN Fuel Services 0806308060 ( 1 PO,(215PO, Workstations) GEN PWR Ofc Nuclear Engineering 11 EASY Wkstns)IDENTIFICATION
P3
PHASE 3 DEPARTMENTS Nuclear 08070 (1PO, 8 Workstations) GEN ElecPM Engineering 05059 (6 Workstations)
MEN'S RESTROOM
VEST.
GEN Spent Fuel & Decomissioning 08058 (7 Workstations) Building Core ITEMS WILL GEN Generation Support Rad Prot 08077 (2 Workstations) GEN I/C 2. BE TAGGED WITH Area NotEngineering in Contract 08062 (1 PO, 2 Workstations)
GEN Nuclear Records Mgmt 08044 Digital Plant Innovation 05035(4 (2Workstations) Workstation)
ELEC. ROOM
SERVER RM SERVICE ELEV.
GEN Risk 08009 (1 PO, 4(4Workstations) MechMgmt Engineering 08061 Workstations)
BUILDING 200 LEVEL 01 PROPOSED RE-STACK PLAN ELEV.
ELEV. STORAGE
ENGINEERING
STOR.
• GEN Risk Management [08009] • GEN Non-Component Programs [08027] • GEN Nuclear Records Management [08044] • GEN Ofc Nuclear Engineering VP [08060] • GEN Mechanical Engineering [08061] • GEN I/C Engineering [08062] • GEN Reliability Engineering [08066]
Spent FuelEngineering & Decomissioning (7 Workstations) GEN Reliability 08066 08058 (6 Wkstns) LEGEND: Building Core GEN I/C Engineering 08062 (1 PO, 2 Workstations) Server Room
STOR.
• GEN Electrical Engineering [05059] • GEN Central Perf Monitoring [05092] • GEN Asset Management [08008]
GEN Analysis 08064 Wkstns) & 05094 (9 Wkstns) GEN Safety Non-Component Prog.(11 08027 (4 Workstations)
STAIR #2
ELEC. ROOM
BOARD ROOM DIVIDABLE ROOM
SERVER RM.
Area Not in Contract GEN PWR Fuel Services 08063 ( 1 PO, 15 Workstations)
LARGE CONFERECE RM
Retail Space Common/Shared Space
Scale: 1/32” = 1’-0”
MAIL ROOM
Common/Shared GEN BWR Fuel Space Services 08056 ( 1 PO, 15 Workstations)
COPY ROOM STAIR #3
Hotel Space Nuclear IT (2 PO, 31 Workstations, 1 Storage Rm)
STAIR #1 IT
Drug Screening Nuclear PM 08070 (1PO, 8 Workstations)
KITCHEN KITCHEN
Mothers Room
BUILDING 200 LEVEL 01 PROPOSED RE-STACK PLAN Exelon Buildings 200 & 300 | Kennett Square | ReStack Department Plans | 4.30.2020
WOMEN'S RESTROOM
MEN'S RESTROOM
ALEXANDER PERRY, INC. +
SWITCHGEAR
STORAGE OFFICE
PANTRY
SERVER RM
VEST. SHOWER RM
SHOWER RMVEST.
LEGEND: GEN Risk Mgmt 08009 (1 PO, 4 Workstations) GEN Corp Work Control 08019 (1 Workstation)
STOR.
CAFETERIA
SERVICE ELEV.
Building Core Analysis 08064 (11 Wkstns) & 05094 (9 Wkstns) GEN Safety GEN NOS Internal Audit 05034 (4 Workstations) & GEN NOS 08049 (1 PO) Area Not in Contract GEN Reliability Engineering 08066 (6 Wkstns) CISS (2 PO)
BUILDING 200 LEVEL 01 PROPOSED RE-STACK PLAN ELEV.
ELEV.
STOR.
JC
STAIR #2
ELEC. ROOM
BOARD ROOM DIVIDABLE ROOM
LARGE CONFERECE RM
COPY ROOM MAIL ROOM
• GEN Centralized Design Engineering [09470] • GEN CDO Proj Cntl Gov + Oversight [08068]
STAIR #3
BOARD ROOM DIVIDABLE ROOM
LARGE CONFERECE RM
Scale: 1/32” = 1’-0” WOMEN'S RESTROOM
STAIR #1
MEN'S RESTROOM
KITCHEN
STORAGE OFFICE COPY ROOM
JC VEST. SHOWER RM
SHOWER RMVEST.
SERVICE ELEV.
KITCHEN
PANTRY
Coporate Nuclear Security [08021] STAIR #3
STOR.
CAFETERIA
Exelon Buildings 200 & 300 | Kennett Square | ReStack Department Plans | 4.30.2020
IT
ALEXANDER PERRY, INC. +
ELEV.
JC
WOMEN'S RESTROOM
MEN'S RESTROOM
SWITCHGEAR
STORAGE OFFICE
VEST. SHOWER RM
SHOWER RMVEST. CAFETERIA
ELEV. EQUIP. ROOM
ELEC. ROOM
ELEV.
STOR.
GEN NOS Internal Audit 05034 (4 Workstations) & GEN NOS Radwaste & (1 Enviro GEN 08049 PO) Mgmt 08015 (1 PO, 7 Wkstns)
PHASE 3 DEPARTMENTS
JC
CISS (2 PO) Accounting/Finance (3 PO, 23 Workstations)
STAIR #2
ELEV. EQUIP. ROOM
GEN Emer PrepareCorp 08007 (1 PO,08081 7 Workstations) Ofc Nuclear Training (1 PO, 4 Workstations)
Alexander Perry, Inc + Gensler WATER SERVICE
GEN Radwaste Office of NGG Licensing Renewal 08002 (2 PO, 18 Wkstns) GEN & Enviro Mgmt&08015 (1 PO, 7 Wkstns) Nuclear Security Accounting/Finance (3 PO, 23 Workstations)
Scale: 1/32” = 1’-0”
L/R Decommisioning 08058 (4 Workstations) GEN Ofc Nuclear Corp Training 08081 (1 PO, 4 Workstations)
STAIR #1
GEN Office of NGG Licensing & Renewal 08002 (2 PO, 18 Wkstns) Nuclear Security
Exelon Buildings 200 & 300 | Kennett Square | ReStack Department Plans | 4.30.2020
WATER SERVICE
3
P3
CISS (2 PO)Mgr. (1 PO) Document GEN Corp Control Emer Work Prepare 0800708019 (1 PO,(17Workstation) Workstations)
SERVICE ELEV.
ELEV.
Common/Shared Space Building Core GEN Radwaste & Enviro Mgmt 08015 (1 PO, 7 Wkstns) Hotel Space Area Not in Contract Accounting/Finance (3 PO, 23 Workstations) Drug Screening Retail Space GEN Ofc Room Nuclear Corp Training 08081 (1 PO, 4 Workstations) Mothers Common/Shared Space GEN OfficeMgr. of NGG Licensing & Renewal 08002 (2 PO, 18 Wkstns) Document (1 PO) Hotel Space Nuclear Security GEN Corp Work Control 08019 (1 Workstation) Drug Screening
PANTRY
JC
STAIR #2
PHASE 2 DEPARTMENTS
L/R Decommisioning 08058 (4 Workstations) GEN NOS Internal Audit 05034 (4 Workstations) & Mothers GEN NOSRoom 08049 (1 PO)
KITCHEN
ELEV.
ELEC. ROOM
IT
SECURITY
KITCHEN
SWITCHGEAR
MAIL ROOM
P2
Retail Space LEGEND: Server Room GEN Emer Prepare 08007 (1 PO, 7 Workstations)
STOR. ELEV. EQUIP. ROOM
• GEN Component Programs [08080]
3
GEN Nuclear Records Mgmt 08044 (4 Workstations) Document Mgr. (1 PO)
JC
ALEXANDER PERRY, INC. +
Scale:
L/R Decommisioning 08058 (4 Workstations)
2
Alexander Perry, Inc + Gensler
Professional Works Professional Works
Signature SPA
shelve washing & dryer
II Retail
Role:
II Designer
7'-0"
77'-01 2"
fire extinguisher Type ABC
9'-6"
7'-6"
47'-2"
existing wall
3'-4"
toilet
2'-6"
office
5
waxing 4
4'-31 2"
II Henry Travor
Washing Basin
4'-41 2"
Nail Station Desplay
Project Status II Under Construction Supervisor
a-2 16"x16" hand towel dryer washing basin
3
4 21" interior new partition wall
F.e.
4 21" interior new partition wall
4 21" interior new partition wall
6
2
F.e.
Reception Desk
Nail Bar station (Set of 8)
Waiting area
18'-6"
Typology
1 36" GRAB BAR
HAND WASHING
II 43 Baltimore Pike, Springfield,PA
A-2
42" GRAB BAR
Paper towel dispenser
6'-6"
Location
9'-4"
7
See toilet Detail Soap Dispenser bASIN MIRROR
pedicure station (Set of 8)
micro. oven
sink
STERILIZATION AREA
Rff
Mini Kitchen
NAIL DRYER 1
DN existing wall
rff
A-2
4 21" interior new partition wall
See kitchen Detail
12'-0"
28'-9"
4'-0"
fire extinguisher Type ABC
sCREEN
1 a-2
First Floor Plan (PROPOSED) 1 A-1 SCALE: 1/4"=1'-0" LEGEND: chandelier COVE LIGHTING SPOT LIGHT
2 RCP Plan @ First Floor A-1 SCALE: 1/4"=1'-0" 9'-51 2"
4'-0"
Toilet Paper Dispenser paper towel dispenser
77'-01 2"
13'-2"
existing wall
existing wall
existing wall
20'-6"
existing wall
existing wall existing wall
Powder room
7
Lash room
8
interior wall to remain
waxing 02 4 21" interior new partition wall
32'-01 2"
4 21" interior new partition wall
9 10
22'-7"
4'-0"
existing wall
existing wall
existing wall
81'-9"
3 Basement Plan A-1 SCALE: 1/4"=1'-0"
3D AXON
existing wall
4 21" interior new partition wall
3'-41 2"
interior wall to remain
18'-9"
existing wall
7'-31 2"
VIEW FROM THE ENTRANCE
2 a-2
SCALE: 1/4"=1'-0"
Gypsum board Hanging pole cove lighting
Front Elevation
1-3/4"
A
HM
6
2'-6"
7'-0"
1-3/4"
A
HM
7
1'-3" 3'-0"
7'-0"
1-3/4"
A
HM
all exposed surface to be plam
2'-2"
2'-6"
door hinge "grasse #3903 (3000 series snap on hinge) Self-closing P. LAm Door All Side
4
HM HM HM
5
1.6 7
A. 8 9
LAm counter
2'-0"
1'-8"
3
2'-0"
Drawer: " Mepla 5ds 2061 stee; drawer sides & slides w/3/4" melamine bottom & back polished Brass Pulls(typ)
2'-10" TO COUNTRER
4"
4"
4" 6"
4" p.lam backsplash
2 3
door hinge "grasse #3903 (3000 series snap on hinge) Self-closing 10-1/2" P.lam Adj. Shelf
10
2.
SIZE W
H
3" MIN-6" mAX
T
20161411-222
1 8'-112"
04/19/2020
TYPE MAT.
3'-0"
7'-0"
1-3/4"
A
ALUM
3'-0"
7'-0"
1-3/4"
A
HM
3'-0"
7'-0"
1-3/4"
A
PROJECT NOTES: 3 3'-0" 7'-0" A 1-3/4" 3'-0"
4
7'-0"
1-3/4"
A
HM HM 36" MIN
HM
1 2'-6" A HM FIXTURE ,7'-0" FINISHES, & EQUIPMENT 1-3/4"
3'-0"
7'-0"
1-3/4"
A
Sprin 3" MIN-6" mAX
7'-0"
1
24" MIN
18" MIN
3'-0"
NO.
12" MIN
HM
ALL FIXTURE, FINISHES, & EQUIPMENT (INTERIOR & EXTER 3'-0" 7'-0" HM BE SELECTED BY1-3/4" OWNER A & SUPPLIED & INSTALLED BY 3'-0" G.C. 7'-0" A FINAL HMLOCATIONS, SELECTIO 1-3/4" U.N.O. TO COORDINATE CONNECTIONS OWNER &AAPPROPRIATE TRADES. 3'-0" 7'-0" W/ 1-3/4" HM 39"min -41" Max
HM
33"min -36" Max
HM
A
13"min -15"Max
HM
A
1-3/4"
M.M.H.
A
1-3/4"
7'-0"
17"min -19"Max seat
1-3/4"
7'-0"
3'-0"
34"-48" Max TO bottom of Towel dispenser
7'-0"
3'-0"
42" Max TO bottom of mirror
2
3'-0"
4
accessory Schedule 6 deferred submission: height/length Item 1'-6" 2
WALL CONSTRUCTION: Note; provide ada approved pipe
A. EXTERIOR WALLSinsulation ARE 2X6 WOODpipes STUDS @16 O.C., Material/finishes at all exposed
insulation at all exposed pipes
4 HANDICAP TOILET ROOM DETAILS a-2 Level 1 SCALE: 1/2"=1'-0" 0' - 0"
A1 A2 D1
Grab Bar - BASEMENT, FIRST floor plan 7 - Details - Demolishing Plan
SEAL:
4"
DIMENSIONED FROM INSIDE FACE OF STUD TO OUTSIDE stain. Stl. Paper Towel Dispenser 34" min to 48" Max. towel slot 1 all mechanical, electrical, and plumbing to be submitted on SHEATHING (U.N.O.) REFER TO SECTIONS & DETAILS FOR subsequent permits, engeering to be coordinated between 7 FINISHES. OUTSIDE FACE OF SHEATHING TO ALIGN W/ FA stain. Stl. kitchen front2 elevation side elevation Toilet Paper Dispenser 14" min 19" max A.f.f. to outlet accessory Schedule 6 tokitchen the owner and contractor. HANDICAP TOILET ROOM DET FOUNDATION 4 U.N.O. a-2to bottom Material/finishes Item Desig. SCALE: 1/2"=1'-0" SCALE: of 1/2"=1'-0" height/length stain. Stl. B. SEE PLANS FOR LOCATIONS & CONSTRUCTION OF ALL R Mirror 40" max reflective surface 3 a-2 SCALE: 1/2"=1'-0" WALLS. stain. Stl. 34" min to 48" Max. towel slot Paper Towel Dispenser 1 stain. Stl. property 48" owner: Soap Dispenser max to controls ( rech range varies) C. G.C. TO INSTALL 3 21" SOUND DEADENING INSULATION IN A 4 stain. Stl. 14" min to 19"BATHROOM max A.f.f. to outlet Toilet Paper Dispenser WALLS. 2 43 Baltimore Pike stain. Stl. 7'-6" 33" min to 36" max. A.f.f. Grab Bar ( Rear) 5 D. TO SUBSTITUTE 21" CEMENTITIOUS BACKER BOARD FOR Springfield, PA-19164 stain. Stl. Mirror 40" max to bottom of reflective surface 3 ALL TILE LOCATIONS. INSTALL MOISTURE RESISTANT GWB stain. Stl. 33" min to 36" max. A.f.f. Grab Bar ( side) 6 ALL WET LOCATIONS. stain. Stl. Soap Dispenser 48" max to controls ( rech range varies) 4 E. ALL WALLS TO BE TAPED, SPACKED,SANDED SMOOTH stain. Stl. 39" min to 41" max. A.f.f to bottom Grab Bar ( vertical) 7 DRAWING INDEX: PRIMED LEVEL 4 FINISH. stain. Stl. 33" min to 36" max. W/ A.f.f. Grab Bar ( Rear) 5 Note; F. ALL STUCCO FINISH BY "STO" OR APPROVED EQUAL IN - site plan, drawing index, CODES, and general stain. Stl. 33" min to 36" max.SPEC'S A.f.f. ,COLOR& TEXTURE MANUF. TO BE SELECTED BY Grab Bar ( side) provide ada approvedsp pipe 6 notes. OWNER. 27" min.
5 a-2
Desig.
1'-8"
2 3
3/4"x4"
5
4
ALUM
P. lam adjustable shelves pins
4"
6
7
A
7'-6"
EQ
4 HANDICAP TOILET ROOM DETA a-2 SCALE: 1/2"=1'-0" Door sCHEDULE
TYPE MAT.
1-3/4"
2018 international buildings code ( IBC) 8 3'-0" 7'-0" 1-3/4" 2015 international residential code (IRC) A 9 3'-0" conservation 7'-0" A 1-3/4" 2015 international energy 10 3'-0" 7'-0" A 1-3/4" code (IECC) 2009 Ansi-a117.1 Existing building usage "b" Proposed building usage "b" No change
2'-10" TO COUNTRER
rff
1 42" Max bottom of 8'-11TO 2" mirror
12'-0"
Note; provide ada approved pipe insulation at all exposed pipes
Level 1 0' - 0"
1
1'-6"
34"-48" Max TO bottom of Towel dispenser
1 8'-112" Max
8'-0" 17"min -19"Max seat
7'-6"
6 2
7
3
-
1
T
7'-0"
( vertical)
REVISIONS:
Note; provide ada approved pipe insulation at all exposed pipes
5
18" MIN
1'-8"
5
2
-
33"min -36"
3'-0"
1
5
1'-3"
2
Roof 12' - 0" 4
7 6
3" MIN-6" mAX
18" MIN
3'-0"
12" MIN
3
6'-9"
4"
EQ
building codes:
42" MIN
13"min -15"Max
8'-0"
8'-0"
10-1/2" P.lam Adj. Shelf
SCALE: 1/2"=1'-0"
34" max.
2'-0" 4"
4 a-2
door hinge "grasse #3903 (3000 series snap on hinge) Self-closing
HANDICAP TOILET ROOM DETAILS
4"
2'-10" TO COUNTRER
Drawer: " Mepla 5ds 2061 stee; drawer sides & slides w/3/4" melamine bottom & back polished Brass Pulls(typ)
42" Max TO bottom of mirror
24" MIN
34"-48" Max TO bottom of Towel dispenser
2'-2"
1
LAm counter
2'-0"
36" MIN
10'-0"
7'-6"
door hinge "grasse #3903 (3000 series snap on hinge) Self-closing P. LAm Door All Side
3" MIN-6" mAX
EQ
6'-9"
4
P. lam adjustable shelves pins
12" MIN
H
3'-0"
5
54" MIN
Roof 12' - 0"
EQ
10'-0"
3
39"min -41" 12'-0" Max TO BOTTOM
EQ
SCALE: 1/4"=1'-0"
code analysis:
1'-3"
all exposed surface to be plam
1 8'-112"
1'-3"
a-2
33"min -36" Max
7
Elevation 2 Front FRONT ELEVATION
Section 01 1 a-2 SCALE: 1/4"=1'-0"
W
1
34" max.
6 2
1'-6"
1'-6"
43 Balt
Level 1 Door sCHEDULE 0' - 0" SIZE
NO.
13"min -15"Max
1'-8"
SCALE: 1/4"=1'-0"
17"min -19"Max seat
1
1 a-2
Section 01
42" Max TO bottom of SOAP DISPENSER
4
1'-3"
5
3
Nail Bar
EMAIL: TRINBAR@MSN.COM
8'-0"
Level 1 0' - 0" Pedicure Station
4
42" Max TO bottom of SOAP DISPENSER
10'-0"
Henry Building 3'-0" Services, LLC
EQ
Nail Bar
SEAL:
Level 1 0' - 0"
42" Max TO bottom of mirror
Shelving
12'-0"
10'-0"
4 HANDICAP TOILET ROOM DETAILS a-2 SCALE: 1/2"=1'-0"
1'-8"
6'-9"
12'-0" 10'-8"
1
DRAWN BY: DATE:
3'-0"
10'-0"
1'-0"
Shelving
1'-0"
Pedicure Station
3
PROJECT NUMBER:
Roof 12' - 0"
EQ
10'-0"
Tele: 215-219-7203
EQ
stain. Stl.
39" min to 41" max. A.f.f to bottom
3.
WINDOWS:
A.
WINDOWS SHALL BE DOUBLE PANE, LOW-E BY NORTHES BUILDING PRODUCTS" OR APPROVED QUUAL Q/ U-VAL 0.35. SEE PLANS & ELEVATION FOR SIZE . FINAL SELECT OWNER. ALL CASEMENT WINDOWS TO HAVE SASH GUAR
2.
Roof 12' - 0"
1'-0"
13"min -15"Max
A-2
1.
chandelier spot light
33"min -36" Max
17"min -19"Max seat
DWG. NO.:
DESCRIPTION
cove lighting
18" MIN
18" MIN 39"min -41" Max TO BOTTOM
33"min -36" Max
13"min -15"Max
17"min -19"Max seat
0' - 0"
1125 MASON AVENUE DREXEL HILL, PA 19026
Section 01 1 a-2 SCALE: 1/4"=1'-0"
Roof Gypsum board 12' - 0" Hanging pole
12'-0" 10'-8"
Level 1 Nail Bar
Nail Bar
SCALE: 1/4"=1'-0"
chandelier spot light
2
Note; provide ada approved pipe Level 1 insulation at0' all- exposed pipes 0"
Shelving
DATE
6'-9"
Shelving
4 HANDICAP TOILET ROOM DETAILS 1 Section 01 a-2 SCALE: 1/2"=1'-0" a-2 SECTION
Gypsum board Hanging pole cove lighting
1'-3"
1'-0"
2
34" max.
12'-0" 10'-8"
1 8'-112"
4"
Pedicure Station
6 kitchen side elevation a-2 SCALE: 1/2"=1'-0"
1'-0"
Roof 12' - 0"
Pedicure Station
7'-6"
5 kitchen front elevation a-2 SCALE: 1/2"=1'-0"
Level 1 0' - 0"
chandelier spot light
Note; provide ada approved pipe insulation at all exposed pipes
10-1/2" P.lam Adj. Shelf
6
5
Gypsum board Hanging pole cove lighting
1'-0"
door hinge "grasse #3903 (3000 series snap on hinge) Self-closing
7
61'-0"
42" Max TO bottom of SOAP DISPENSER
7
34" max.
Drawer: " Mepla 5ds 2061 stee; drawer sides & slides w/3/4" melamine bottom & back polished Brass Pulls(typ)
7 5
10'-0"
4"
4"
1'-6"
10'-0"
2'-0"
2'-10" TO COUNTRER
4" p.lam backsplash
4"
12'-0"
2'-10" TO COUNTRER
rff
12'-0" 10'-8"
2'-0"
1'-8" 6"
4"
1'-8"
34"-48" Max TO bottom of Towel dispenser
2'-2"
2'-6"
3'-0"
1
6 2
1'-0"
42" MIN
Roof 12' - 0"
12" MIN
24" MIN
LAm counter
4
36" MIN
1
5
3/4"x4"
12" MIN 3" MIN-6" mAX
4
door hinge "grasse #3903 (3000 series snap on hinge) Self-closing P. LAm Door All Side
54" MIN
chandelier spot light
3
P. lam adjustable shelves pins
3
4"x4"
p.lam plash
all exposed surface to be plam
42" Max TO bottom of mirror
1'-3"
Roof 12' - 0"
EQ
- Design Development - 3d visualization -Working Drawing (Elevation & Detailing)
Professional Works
Row House 1401 N 31st Street MaxHeight Height38'-0" 38'-0" Max
2'-2" 8" 0'0'- -8"
wall finish (typ) 2"x6" Stud wall @ 16" C.C.
4" brick wall
1" insulation
42'-6"
2"x6"Stud Studwall wall@ @16" 16"C.C. C.C. 2"x6"
11'-6"
Pressure treated 2"x6" stud R-19 Insulation.
ThirdFloor FloorPlan Plan Third 20'--6" 6" 20'
R-19Insulation. Insulation. R-19 37'-0"
1/2"Proxy ProxyAnchor Anchor@16" @16"C.C. C.C. 1/2"
2'-8"
p5
NewFloor Floor2" 2" New x10"@16 @16c.c. c.c. x10"
5/8"GWB GWB 5/8"
2/2"X10" 10" 2/2"X 2/2"x6" 2/2"x6"
3'-6"
11'-3"
11'-0"
2'-8"
C.h. 10'-11"
3'-6" 2'-10"
p3
1 2"x12"Anchor
SECOND FLOOR Second FloorPlan Plan Second Floor
5/8" GWB 2x6 Bearing wall @16'o.c./typ 4" cmu wall
3'-1" 19'-8"
First Floor Plan
p1
3 s-1
new stair opening
SCALE: 1/4"=1'-0"
28'-9"
1 2" -5
3'
3 4" T&G PLYWOOD SUBFLOOR 2"x6" Stud wall 16" C.C. 2x6 Bearing wall@(TYP) GLUEDAND NAILED @16'o.c./typ
Grade Grade
FIRST FLOOR 0'0'--0"0"
ceramic tile grout Latex Portland cement morter SOUND CONTROL MAT SUBFLOOR
HARDWOOD flooring Foam pad (optional) 3/4" firm-fill gypsum concrte SOUND CONTROL MAT SUBFLOOR
Layersofof5/8" 5/8"GWB GWB 22Layers
-2 "
Existing Foundation
Replacement Rotted 2x10 joists@ 16" C.C
Second Floor Plan 11' - 6"
BasementPlan Plan Basement -6'--6" 6" WALL -6'
10'-10"
6'-0"
6 s-1
bedroom 01
p1
Hardwood floor detail SCALE: 1"=1'-0"
3'-6"
tile Floor details Wall section Detail 01 3 Wall section Detail 01 3
SCALE: 1"=1'-0"
1/2" gwb 15 Ml (min) water barrier 1" air space
9'-0"
Pilotroof roofhouse houseconstr. constr. Pilot
3/4"==1'-0" 1'-0" 3/4"
-Metaldrip drip edge edge -Metal -5/4x8 x8fascia fasciaw/ w/ex exnailer nailer -5/4 -Cont.vented ventedvinyl vinylsoffit soffit -Cont. 2"x6" Stud wall @ 16" C.C.
4 Front WALL SECTION DETAILS s-1 SCALE: 1/4"=1'-0"
Existing foundation Party Wall wall "Simpson"HH2.5 2.5hurricane hurricane "Simpson" Existing tietyp. typ.@ea. @ea.rafter. rafter. tie Pressure installper permanuf. manuf.spec's. spec's. treated 2"x6" stud install R-19 Insulation.
p1
3'-6"
7 s-1
2'-
2'-
2"
p1
81 2"
12'-9"
p2
masonary venner attached to the structural penel w/ galvanized masonry wall ties @16" o.c. both
1/2" gwb
1" rigid continius insulation (r5) min. 21", 4-0" wide plywood structural panels apa rated brick 2"x6" WOOD frame @ 16"
wall
15 Ml (min) water barrier 1" air space 1/2" GWB green board At bathroom conc. wall 2x4 wood furring w/3"
min. 21", 4-0" wide plywood structural panels apa rated 2"x6" WOOD frame @ 16"
1/2" Proxy Anchor @16" C.C. vapor barrier 5 " type 'x' over 8 exterior grade GWB
1/2" GWB
2/2"x6"
3-1/2 WOOD Studs @16"
3#5"AN A 3#5" @12" 12"C @
5/8" GWB Pilot roofhouse house constr. Pilot roof constr. 2 Layers of 5/8" GWB
-5/8"Type Type"x" "x"gwb gwb(level (level44finish) finish) -5/8" -Fiberglassbatt battinsulation insulationlaid laidon ontop topofofgwb gwbtoto -Fiberglass extendtotosheathing sheathing extend -Roofrafter@ rafter@ 16"o.c. o.c.(see (seeframing framingplan) plan) -Roof 2 Layers 16" of 5/8" GWB -5/8"OSB OSBsheathing sheathing -5/8" -Ice&&Replacement watershield shieldover overentire entire roof -Ice water roof Rotted 2x10 joists@ 16" -Bituminous torchdown downroofing. roofing. -Bituminous torch C.C
First Floor Plan 2' - 6"
2 Layers of 5/8" GWB 3/4" C/D ply deck
Replacement Rotted 2x10 joists@ 16" C.C
Roof Plan 29' - 6" 2 Layers of 5/8" GWB 5/8" GWB
Ne ins Br
3/4" C/D ply deck 5/8" GWB 2 Layers of 5/8" GWB
Detail-Pilothouse houseEAVE EAVE Detail-Pilot 55 1"==1'-0" 1'-0" 1" Wall section Detail 01
1/2"2/2"X GWB 10" green board At bathroom
2"xx6" 6" 2" plate plate EE FF
3/4" C/D ply deck
2/2"X 10" Existing foundation wall 2/2"x6"
C.h. 9'-6"
20161411-222
Pilot House 38' - 0"
2 Layers of 5/8" GWB
2/2"X 10" Pressure treated 2"x6" stud 2/2"x6" Existing Floor Joist R-19 Insulation. R-19 Insulation. 1/2" Proxy Anchor @16" C.C.
4"Concrete Concreteslab slab 4"
Existingfoundation foundationwall wall Existing
0' - 8"
2"x6" Stud wall @ 16" C.C. Pressure treated 2"x6" stud Detail-Pilothouse houserake rake R-19 Insulation. Detail-Pilot 4 Existing Party 4 Wall 1"==1'-0" 1'-0" 1" R-19 Insulation. 1/2" Proxy Anchor @16" C.C.
sealant
2'
14'-2"
1 2"x12"Anchor
Existingfoundation foundationwall wall Existing
up
p2
Elevation
Layers 5/8"GWB GWB 22Layers ofof5/8" 4" brick wall
R-19Insulation. Insulation. R-19
p5
p5
living room
p1
5/8"GWB GWB 5/8"
2/2"X10" 10" 2/2"X 2/2"x6" 2/2"x6"
5'-6"
9 see stair s-2 detail
1/2" Proxy Anchor @16" C.C. 4" cmu wall 5/8 EXT. Ply 2/2"X 10" 5/8" GWB 2/2"x6" wall finish (typ) Rubber Flashing 2x6 Bearing wall @16'o.c./typ New cap flashing @ wall
1/2"Proxy ProxyAnchor Anchor@16" @16"C.C. C.C. 1/2"
Front elevation
1" insulation
p5
C.h. 10'-3"
up
5'-0"
Closet
FirstFloor FloorPlan Plan First 6" 2'2'--6" 3/4"C/D C/Dply plydeck deck 3/4"
28'-9"
9 see stair s-2 detail
p5
ReplacementRotted Rotted2x10 2x10joists@ joists@16" 16" Replacement C.C C.C
Pressuretreated treated2"x6" 2"x6"stud stud Pressure R-19Insulation. Insulation. R-19
p5
new steel stair
new steel stair new stair opening
2x6Bearing Bearingwall wall 2x6 @16'o.c./typ @16'o.c./typ
8" 0'0'- -8"
5/8" GWB Existing Party Wall Pilotwall roof house constr. finish (typ) Pilotroof roofhouse houseconstr. constr. Pilot -Metal drip edge -5/4 x8 fasciaPressure w/ ex nailer treated 2"x6" stud R-19 Insulation. -Metal-Cont. drip edge edge -Metal drip vented vinyl soffit -5/4x8 x8fascia fasciaw/ w/ex exnailer nailer -5/4 -Cont.vented ventedvinyl vinylsoffit soffit -Cont.
Layersofof5/8" 5/8"GWB GWB 22Layers
grade
C.h. 9'-6"
Existing Floor Joist
Layersofof5/8" 5/8"GWB GWB 22Layers
2x6Bearing Bearingwall wall 2x6 @16'o.c./typ @16'o.c./typ 3'-6"
4'-6"
Powder room
Metal Railing
Section22 Section 22 1/4"==1'-0" 1'-0" 1/4"
5/8"GWB GWB 5/8"
DN
p5
2 Layers of 5/8" GWB
11'--6" 6" 11'
2/2"X10" 10" 2/2"X 2/2"x6" 2/2"x6"
first floor
New Floor 2" x10" @16 c.c
5/8" GWB
T&G PLYWOOD SUBFLOOR 2/2"X 10" GLUEDAND 2/2"x6" NAILED (TYP)
1/2"Proxy ProxyAnchor Anchor@16" @16"C.C. C.C. 1/2"
DN
Third Floor Plan 20' - 6"
3/4" C/D ply deck
3 4"
ReplacementRotted Rotted2x10 2x10joists@ joists@16" 16"C.C C.C Replacement
3/4"C/D C/Dply plydeck deck 3/4"
DN
Replacement Rotted 2x10 joists@ 16" C.C
1/2" Proxy Anchor @16" C.C.
Layersofof5/8" 5/8"GWB GWB 22Layers 1" insulation
Pressure treated2"x6" 2"x6"stud stud Pressure treated R-19Insulation. Insulation. R-19
p3
DN
2 Layers of 5/8" GWB
wall finish R-19 (typ) Insulation.
4" brick wall
ExistingParty PartyWall Wall Existing
4'-8"
p5
C.h. 8'-9"
New Flo
5/8" GWB
5/8" GWB Pressure treated 2"x6" stud
2x6Bearing Bearingwall wall 2x6 @16'o.c./typ @16'o.c./typ
PROJECT NUMBER:
4" cmu wall
Existing Party Wall 4" cmu wall
3'-8"
4'-7"
bathroom
2'-8"
69'-5"
p5
2 Layers of 5/8" GWB
2"x6" Stud wall @ 16" C.C.
3d Visualization
3/4" C/D ply deck
wall finish (typ)
Layersofof5/8" 5/8"GWB GWB 22Layers
second floor
Shower
Roof Plan 29' - 6"
5/8" GWB
2/2"X 10" Existing Floor Joist 2/2"x6" 5/8" GWB
3/4"C/D C/Dply plydeck deck 3/4"
Ne ins Bri
Replacement Rotted 2x10 joists@ 16" C.C
1/2" Proxy Anchor @16" C.C.
ReplacementRotted Rotted2x10 2x10joists@ joists@16" 16"C.C C.C Replacement
Pressuretreated treated2"x6" 2"x6"stud stud Pressure
2 Layers of 5/8" GWB
4
GLUEDAND NAILED (TYP)
Layersofof5/8" 5/8"GWB GWB 22Layers
ExistingParty PartyWall Wall Existing
p5
NewFloor Floor2" 2"x10" x10"@16 @16c.c. c.c. New Existing Party Wall 3 R-19 Insulation. SUBFLOOR " T&G PLYWOOD
Grade 0' - 0"
New Fl 2 Layers of 5/8" GWB
3/4"C/D C/Dply pl 3/4"
4" Concrete slab
Pilotroof house constr. Pilot house 2roof Layers ofconstr. 5/8" GWB Basement
Plan -6' - 6"
Replacement Rotted 2x10 joists@ 16" C.C -5/8"Type Type"X" "X"GWB GWB (level4 4finish) finish) -5/8" (level -Fiberglassbatt battinsulation insulation laid ontop top gwbtoto -Fiberglass on ofofgwb Thirdlaid Floor Plan extendtotosheathing sheathing extend 20'plan) - 6" -Roofrafter@ rafter@16" 16"o.c. o.c.(see (seeframing framing plan) -Roof 3/4" C/D ply deck -5/8"OSB OSBsheathing sheathing -5/8" -Ice&&water watershield shieldover overentire entireroof roof -Ice New Floor 2" -Bituminoustorch torchdown downroofing. roofing. -Bituminous x10" @16 c.c 5/8" GWB Detail-D Detail-Do
A-19146
10'-6"
1 2"x12"Anchor
01/05/2021
2"x6" Stud wall @ 16" C.C. 5/8" GWB
Layersofof5/8" 5/8"GWB GWB 22Layers
tHIRD FLOOR
10'-6"
C.h. 10'-11"
22'-10"
4" cmu wall
5/8"GWB GWB 5/8"
2/2"X10" 10" 2/2"X 2/2"x6" 2/2"x6"
10'-6"
42'-6"
bed room 02
New cap flashing @ wall
1/2"Proxy ProxyAnchor Anchor@16" @16"C.C. C.C. 1/2"
p5
4'-7"
2'-8"
dinning
Rubber Flashing
3/4"C/D C/Dply plydeck deck 3/4"
M.M.H.
RoofPlan Plan Roof 29'--6" 6" 29'
Pressuretreated treated2"x6" 2"x6"stud stud Pressure R-19Insulation. Insulation. R-19
NewRebuild Rebuildwall finish (typ) New insulated insulated 5/8 EXT. Ply BrickStud StudWall Wall Brick
EMAIL: TRINBAR@MSN.COM
ReplacementRotted Rotted2x10 2x10joists@ joists@16" 16"C.C C.C Replacement
third floor
3d Visualization
5/8" GWB
Layersofof5/8" 5/8"GWB GWB 22Layers
Pilot House 38' - 0"
DRAWN BY: DATE:
2"x6"Stud Studwall wall@ @16" 16"C.C. C.C. 2"x6"
6'-0"
6'-0"
toilet
1" insulation
ExistingParty PartyWall Wall Existing R-19Insulation. Insulation. R-19
0' - 8"
Parapet Parapet Pilot roof house constr. Existing Floor Joist -Metal drip edge GWBw/ ex nailer -5/45/8" x8 fascia New Deck New Deck -Cont. ventedwall vinyl soffit 4" cmu
1 2"x12"Anchor
2"x6"Stud Studwall wall@ @16" 16"C.C. C.C. 2"x6"
1'-8"
p5
Closet
Tele: 215-219-7203
roof
2'-1"
rff 21'-10"
0" 8'8'- -0" FrontSetback Setback Front
4" brick wall
1125 MASON AVENUE DREXEL HILL, PA 19026
RubberFlashing Flashing Rubber
sliding door
p5
3 4" PLYWOOD DECKING T&G APA RATED
ROOF
5/8EXT. EXT.Ply Ply 5/8
Newcap capflashing flashing@ @wall wall New
p5
Hardwood Flooring
RUBBER ROOFING
SEAL:
bed room 03
13'-6"
3'-0" 3'-0"
9'-0"
p3
11'-4"
p3
PREMOLDED CANT STRIP
Henry Building Services, LLC
3'-0"
-Metaldrip drip edge edge -Metal -5/4x8 x8fascia fasciaw/ w/ex exnailer nailer -5/4 -Cont.vented ventedvinyl vinylsoffit soffit -Cont.
2.
p3
ALUM. ROOF CAPPING METAL FLASHING COUNTER FLASHING
PilotHouse House Pilot 38'--0" 0" 38'
Pilotroof roofhouse houseconstr. constr. Pilot
SEAL:
3'-8"
2'-2"
DESCRIPTION
2'-5"
p3
kitchen
S-1
12'-6"
1'-6"
1'-9"
ON AND DETAILS
2'-10"
REVISIONS:
12'-6"
3'-8"
DWG. NO.:
3 Zp
DATE
3 Zp
1.
Location II Philadelphia, PA Typology II Row House Project Status II Completed Supervisor II Casalina Design Role: II Junior Designer
1'-8"
6
tailing)
2 Layers of 5/8" GWB
99
3/4"==1'1 3/4"
4'-0"
28'-9"
use group: Rm-1(Residential Multi-Family-1)
deferred submission: all mechanical, electrical, and plumbing to be submitted on subsequent permits, engeering to be coordinated between the owner and contractor.
District-RSA-5
GENERAL NOTES:
Occupied Area Open area Rear yard depth building height
2. 3.
4.
5.
6.
7.
8. 9.
10.
11.
12. 13.
all work to be compliance with all applicable, state, &local codes all contractor(s) performing work shall have applicable licence. controctor(s) is responsible for obtaining building permits unless noted otherwise (u.n.o.) contractor(s) is responsible for obtaining mechanical,electrical,plumbing& sprinkler permits u.n.o. contractor(s) is to have applicable insurance as required by the building owner and municipality. contractor(s) is to responsible for notifying the building inspector a minimum of 24 hours prior to commencing work. contractor (s) is responsible for contacting the building inspector for any/all required inspections for the duration of the project. contractor(s) is to verify existing site condition prior to commencing work, notify architect immediately regarding ant discrepancies between field conditions and architectural documents. do not scale drawings. contractor(s) is responsible for providing required site fencing around parameter of job site as per osha and municipality requirements and guidelines. contractor(s) is responsible to acquire any/all street & sidewalk closure permits as well as any required dumpster permits. provide portable job toilet and telephone on site for the duration of the project(as required by owner). contractor(s) to provide daily clean-up to site dumpster. the Engineer is not responsible for the contractor(s) means and methods of construction.
Lot Area
16'-0" 1600 sq. ft 75% 25%
16'-0" 1600 sq. ft
42'-6" 3'-6"
8'-0"x12'-6" 1600 sq. ft New Addition top of the existing 2story
100 sq. ft. 62% 991.25 sq. ft. 608.75 sq. ft. 38%
100 sq. ft.
9'-0"
28'-9"
Same
38'-0"
37'-0"
37'-0"
30%
existing roof
building zone
SITE LOCATION: 1243 S 15th Street PHILADELPHIA, PA-19146
16'-0" walking zone
28'-9"
Lot Width
New deck on top of the existing 2-story
proposed 3rd floor addition
12'-0"
sp - site plan, drawing index, CODES, and general notes. S-1 - floor plans, ELEVATION, section AND DETAILS S-2 - Deck Plan and details
Existing
finishing zone
s 15TH street one way
12/26/12
finishing zone
LOCATION MAP
SCALE: n.T.S.
walking zone building zone
site plan 1 s-1 SCALE: 1/8"=1'-0"
12'-0"
req./allowed
DRAWING INDEX:
1.
deck
Zoning Code DATA
8'-0"
1243 S 15th Street PHILADELPHIA, PA-19146
Alley Way
property owner:
4'-0"
II Architectural Designer
6'-0"
II Henry Travor
2'-0"
Role:
12'-6"
26'-0"
Supervisor
Rear Yard
2'-0"
Project Status II Under Construction
-
pa ucc 2018 international buildings code ( IBC) 2015 international residential code (IRC) 2010 international energy conservation code (IECC) 2010 Philadelphia building code 2009 Ansi-a117.1
6'-0"
II Row House
-
4'-0"
Typology
code analysis:
100'-0"
II Philadelphia
Philadelphia, PA-19146
71'-3"
Location
Alley Way
Street
7
Row House Renovation 1243 S15th Street
6'-0"
1243 s 15th street
Professional Works Professional Works
14'-1"
14'-1"
15'-7"
15'-7"
4 s-1
3'-6"
9'-0"
14'-1"
15'-7"
4 s-1
6'-0"
SCALE: 1"=1'-0"
exterior
p1
tile Floor details 7 s-1
exterior
exterior
interior
type 'P1' 1" rigid continius
type 'P2' type 15 Ml (min) 'P1' water barrier
insulation (r5) min. 21", 4-0" wide plywood structural panels apa rated brick
1" air space
2"x6" WOOD frame @ 16" o.c. r-13 insulation
interior
1'-6"
type 'P1'
exterior
exterior exterior
5 s-1 type 'P2'
2x4 wood furring w/3" ridig insulation (r 10) between furring
sealant
ceramic tile grout Latex Portland cement morter 4" brick wall SOUND CONTROL MAT 1 SUBFLOOR 2"x12"Anchor
4" cmu wall 5/8" GWB wall finish (typ)
Existing Floor Joist 3 SUBFLOOR 4" T&G PLYWOOD Existing Foundation WALL GLUEDAND NAILED (TYP)
exterior
1.
2x4 wood 2"x6" WOOD frame @ 16" furring w/3" ridig insulation (r 10) o.c. r-13 insulation between furring
min. 21", 4-0" wide plywood structural panels apa rated
interior
exterior
vapor barrier 5 " type 'x' over 8 exterior grade GWB
exterior
interior interior
interior
type 'P4'type 'P3' 1/2" GWB
2"x6" WOOD frame @ 16" o.c. r-13 insulation
exterior
interior
type 'P4'
interior exterior
type 'P5'
PROJECT NUMBER: DRAWN BY: DATE: 8'-0" Alley Way 20161411-222 4'-0" 01/05/2021
EMAIL: TRINBAR@MSN.COM
M.M.H.
42'-6" 28'-9" 12'-0"
6'-0"
2'-0"
01/05/2021
M.M.H.
3-1/2 WOOD Studs @16" o.c. w treated wood
type 'P5'
SEAL:
26'-0"
SEAL:
2'-0"
6'-0"
5/8" GWB wall finish (typ)
3 4" T&G PLYWOOD SUBFLOOR GLUEDAND NAILED (TYP)
2.
2"x6" WOOD frame @ 16" o.c. r-19 insulation
interior
1/2" GWB green board At bathroom 3-1/2 WOOD Studs @16" o.c. w treated wood sill plate
interior
type 'P5'
Note: contractor to field verify all on site dimension
REVISIONS:
12'-0"
4'-0"
DESCRIPTION
4" cmu wall
1/2" GWB
interior
type 'P4'
1/2" GWB green board At bathroom
sill plate Note: to field verify interiorcontractor interior all on site dimension
2"x6" WOOD frame @ 16" o.c. r-19 insulation
SCALE: 1"=1'-0" type 'P3'
vapor barrier 5 1/2" GWB over 8" type 'x' green board exterior gradeAt bathroom GWB 3-1/2 WOOD Studs @16" 2"x6" WOOD frame @ 16" o.c. w treated wood 2"x6" WOOD frame @ 16" o.c. r-13 insulation sill plate o.c. r-19 insulation 1 min. ", 4-0" wide 1/2" 2GWB plywood structural panels apa rated
4 Front WALL SECTION DETAILS s-1 SCALE: 1/4"=1'-0" interior
interior
5/8" GWB
Existing Floor Joist
Existing Floor Joist
1/2" gwb
15 Ml (min) water barrier vapor barrier 1" air space min. 21", 4-0" wide 5 " type 'x' over 8 1/2" GWB plywood structural exterior grade green board At bathroom conc. wall panels apa rated GWB
1/2" gwb
wall Schedule
interior
wall finish (typ)
site plan 1 s-1 SCALE: 1/8"=1'-0"
SCALE: n.T.S.
type type 'P3' 'P2'
1/2" GWB green board At bathroom conc. wall
wall
EMAIL: TRINBAR@MSN.COM
Tele: 215-219-7203
SEAL: SEAL:
FIRST FLOOR
1/2" gwb
1" rigid continius 15 Ml (min) water barrier insulation (r5) 1" air space min. 21", 4-0" wide 1/2" GWB plywood structural conc. wall green board Atpanels bathroom apa rated brick wall 2x4 wood furring w/3"WOOD frame @ 16" 2"x6" ridig insulation o.c. (r 10) r-13 insulation between furring interior
5/8" GWB 5/8" GWB
Front WALL SECTION DETAILS DETAILS 4 Front WALL SECTION 4 s-1 s-1 SCALE: 1/4"=1'-0" SCALE: 1/4"=1'-0"
tile Floor details
SCALE: 1"=1'-0"
Existing Floor Joist 4" cmu wall
4" cmu wall
1.
FIRST FLOOR
Existing Foundation WALL SCALE: 1"=1'-0"
1/2" gwb
interior
masonary venner attached to the structural penel w/ galvanized masonry wall ties @16" o.c. both horizontal & vertical
1 2"x12"Anchor
wall finish (typ) 1" insulation 3 4" T&G PLYWOOD SUBFLOOR GLUEDAND NAILED (TYP)
tile Floor details
SCALE: s-1 1"=1'-0" SCALE: 1"=1'-0"
1/2" gwb
15 Ml (min) water barrier 1" air space
3'-6"
Hardwood floor detail
7 s-1
3 4" T&G PLYWOOD SUBFLOOR GLUEDAND NAILED (TYP)
2.
LOCATION MAP
81 2"
2"
masonary venner attached to the structural penel w/ galvanized 3'-6" masonry wall ties @16" o.c. both horizontal & vertical
4 s-1
REVISIONS:
5/8" GWB
1 2"x12"Anchor
SEAL:
5'-0"
3'-6"
5'-6" 28'-9"
4" cmu wall Existing Floor Joist 5/8" GWB 5/8" GWB wall finish (typ) 4" cmu wall 4" brick wall
4" brick wall
2'-
2'9'-0"
wall finish (typ)
Existing Floor Joist
DATE
37'-0" 11'-3" 3'-6"
building zone
ceramic tile grout Latex Portland cement morter SOUND CONTROL MAT SUBFLOOR
1" rigid continius 15 Ml (min) water barrier insulation (r5) 1" air space min. 21", 4-0" wide plywood structural masonary venner attached to the panels apa rated brick structural penel w/ galvanized wall wall ties @16" o.c. both 2"x6" WOOD frame masonry @ 16" horizontal & vertical o.c. r-13 insulation
5/8" GWB
wall finish (typ)
zone
ceramic tileflooring HARDWOOD grout Foam pad (optional) Latex Portland cement morter 3/4" firm-fill gypsum concrte SOUND CONTROL CONTROL MAT MAT SOUND SUBFLOOR SUBFLOOR
1/2" gwb
15 Ml (min) water barrier
1" air space detail Hardwood floor
4" cmu wall
5/8" GWB
sealant
7
wall finish (typ)
SEAL:
4" cmu wall T&G PLYWOOD SUBFLOOR 5/8" GWB GLUEDAND NAILED (TYP) wall finishwalking (typ) 3 4"
SECOND FLOOR
sealant
SCALE: 1"=1'-0"
5/8" GWB
wall finish (typ)
Street
zone
1" insulation
3 Front elevation s-1 SCALE: 1/4"=1'-0"
6 s-1
5/8" GWB
4" cmu wall
3 4" T&G PLYWOOD SUBFLOOR GLUEDAND NAILED (TYP)
5/8" GWB finishing
1" insulation
Hardwood floor detail
Tele: 215-219-7203 PROJECT NUMBER: DRAWN BY: DATE: 1125 MASON AVENUE DREXEL HILL,20161411-222 PA 19026
37'-0"
37'-0" 11'-6" 11'-0"
4'-8"
wall finish (typ) Existing Floor Joist
grade
HARDWOOD flooring Foam pad (optional) 3/4" firm-fill gypsum concrte SOUND CONTROL MAT SUBFLOOR
Existing Floor Joist
1 2"x12"Anchor
SECOND FLOOR
1 2"x12"Anchor
HARDWOOD flooring Foam pad (optional) 3/4" firm-fill gypsum concrte SOUND CONTROL MAT SUBFLOOR
PLYWOOD DECKING T&G APA RATED
5/8" GWB
wall finish (typ) 1" insulation 3 4" T&G PLYWOOD SUBFLOOR GLUEDAND NAILED (TYP)
SECOND FLOOR
grade
p1
3'-6"
1125 MASON AVENUE DREXEL HILL, PA 19026
11'-6"
11'-6"
10'-6" 3'-8" 2'-8"
11'-0"
4'-8"
3'-1"
2'-8"
11'-0"
19'-8"
3'-6"
1'-6"
9'-0"
5/8" GWB
1 2"x12"Anchor
p5
p1
6 s-1
Henry Building Services, LLC Henry Building Services, LLC
42'-6" 10'-6"
10'-6"
42'-6"
42'-6"
4" brick wall
first floor
p1 elevation 3 Front first floor s-1 SCALE: 1/4"=1'-0"
3 4"
4" cmu wall
12/26/12
DESCRIPTION
10'-6"
6'-0"
6'-0"
10'-6"
1'-8"
1'-8" 6'-0" 10'-6"
C.h. 10'-11"
10'-6"
3'-8" 2'-8"
one way
5/8" GWB
grade
16'-0"
RUBBER ROOFING
s 15TH street
4" cmu wall Existing Floor Joist 5/8" GWB 5/8" GWB wall finish (typ) 4" cmu wall 4" brick wall
4" cmu wall
wall Schedule first floor plan first floor plan 1 1 2 SECOND floor plan2 SECOND floor5plan 4 s-1 s-1 s-1 s-1 SCALE: 1"=1'-0" SCALE: 1/4"=1'-0" SCALE: 1/4"=1'-0" s-1 s-1 SCALE: 1/4"=1'-0" SCALE: 1/4"=1'-0" 1'-7"
tHIRD FLOOR
second floor
first floor
5'-0"
9'-0"
1" insulation
4" cmu wall 3 SUBFLOOR 4" T&G PLYWOOD 5/8" GWB finishing GLUEDAND NAILED (TYP) wall finishzone (typ)
PREMOLDED CANT STRIP
1243 S 15th Street PHILADELPHIA, PA-19146
p1
walking 5/8" GWB zone
1 2"x12"Anchor
4" brick wall
exterior
3'-0"
p3
5'-6"
1'-7"
wall finish (typ) Existing Floor Joist
4" brick wall
p3
6 s-1
building zone
5/8" GWB
existing roof
PLAN, ELEVATION AND DETAILS 15th Street ELPHIA, PA-19146
1'-0"
3'-0"
9'-0"
2'2" 2'81 2"
1'-6"
4 s-1
6'-0"
12'-9"
bedroom 01
3'-6"
tHIRD FLOOR
1" insulation
C.h. 9'-6"
bedroom 01
p1
1'-0" 9'-0"
1'-7"
C.h. 9'-6"
p2
p1
p1 3'-0"
p2
"
p1
1" insulation 3 4" T&G PLYWOOD SUBFLOOR GLUEDAND NAILED (TYP)
1" insulation
1" insulation Existing Foundation WALL
-2 2'
p1
1'-0"
bedroom 01 p1
p5
p1
12'-9"
12'-9"
p2
1 2" -5
living room p2
up
p1
Existing Floor Joist 4" cmu wall 5/8" GWB 5/8" GWB 4" cmu wall wall finish (typ) 4" brick wall 5/8" GWB 1 2"x12"Anchor wall finish (typ)
FIRST FLOOR
C.h. 9'-6"
28'-9" 14'-2"
p2
up
third floor
p5
3'
14'-2"
9 see stair p2 s-2 detail
4" brick wall
4" cmu wall
3 Front elevation s-1 SCALE: 1/4"=1'-0"
p5
p5
p5
C.h. 10'-3"
14'-2"
living room
5'-6"
new stair opening
living room
9 see stair s-2 detail
28'-9"
up
up
1 2" " -5 -2 2' 3'
28'-9"
up
up
37'-0"
1 2"x12"Anchor
SITE LOCATION: 1243 S 15th Street PA-19146 third PHILADELPHIA, floor
1 2" " -5 -2 2' 3'
new steel stair new stair opening
37'-0"
ROOF
tHIRD FLOOR
second floor
3'-1"
see stair
28'-9"
9
C.h. 10'-3" detail s-2
10'-10"
9 see stair s-2 detail
28'-9" 6'-0"
Metal Railing
38'-0"
30%
Same
28'-9"
second floor
DN
5'-0"
p5
DN
19'-8"
DN
9'-0"
third floor
10'-10" 2'2" 2'81 2"
new steel stair new stair opening
DN
4'-6"
new steel stair new stair opening
3'-6"
3'-6" 2'-10"
4'-8"
4'-6"
2'-8"
Metal Railing
19'-8"
Metal Railing
1" insulation
1" insulation
DN
4'-6"
69'-5"
C.h. 8'-9"
100 sq. ft.
608.75 sq. ft. 38%
25%
ALUM. ROOF CAPPING New Addition top METAL FLASHING COUNTER FLASHING of the4" existing 2brick wall story 1 2"x12"Anchor Existing Floor Joist PREMOLDED CANT STRIP 1" insulation 5/8" GWB RUBBER ROOFING 4" cmu wall 3 4" PLYWOOD DECKING T&G 5/8" GWB APA RATED wall finish (typ)
1 2"x12"Anchor
DN
DN
p5
4" brick wall
4" brick wall
DN
DN
DN
100 sq. ft. 62% 991.25 sq. ft. roof
1 2"x12"Anchor
3'-1"
DN
1'-8"
2'-1"
2'-1" 1'-8"
11'-4"
6'-0"
22'-10"
6'-0"
6'-0" 10'-6"
4'-7"
2'-8"
DN
1600 sq. ft
1600 sq. ft
75%
ROOF
3'-6"
S-1
PLYWOOD DECKING T&G APA RATED
ROOF
roof
1'-8"
2'-1"
2'-10"
3'-8"
4'-7"
3'-6"
42'-6"
2'-8"
2'-8"
22'-10"
22'-10"
C.h. 10'-11"
2'-8" 2'-8"
C.h. 8'-9"
3'-6"
69'-5"
2'-8" 69'-5"
4'-7"
4'-7"
2'-8"
dinning
42'-6"
4'-7"
Hardwood Flooring
C.h. 10'-11"
2'-8"
dinning
42'-6"
1'-8"
21'-10"
rff
Hardwood Flooring
p5
Closet
to be compliance with all applicable, state, &local codes 2. all contractor(s) performing work shall sliding have applicable licence. door toilet toilet p5 p5 p5 3. controctor(s) is responsible for obtaining building permits unless noted otherwise p5 Closet (u.n.o.) 4. contractor(s) is responsible for obtaining p5 p5 dinning mechanical,electrical,plumbing& sprinkler permits u.n.o. toilet 5. contractor(s) is to have applicable p5 bed room bed room insurance as required by the building 02 02 owner and municipality. 6. contractor(s) is to responsible for p5 notifying the building inspector p5 p5a minimum of p5 prior to commencing work.p5 24 hours contractor (s) is responsible for contacting the building inspector for Shower Shower bed room any/all required inspections for the 02 duration of the project. p5 7. contractor(s) is to verify p5 existing site p5 condition prior to commencing work, notify bathroom bathroom p5 architect immediately regarding ant p3 discrepancies between field conditions p5 p5 and C.h. 8'-9" Shower architectural documents. C.h. 10'-11" C.h. 10'-11" 3'-6" 8. do not scale drawings. 2'-10" 9. contractor(s) isp3responsible for providing required site fencing around p5 parameter of job site as per osha and bathroom p5 Powder municipalityPowder requirements and guidelines. room room p3 10. contractor(s) is responsible to acquire p5 C.h. 9'-6" C.h. 9'-6" any/all street & sidewalk closure permits C.h. 10'-11" as well as any required dumpster permits. p5 p3 new steel new steel Closet Closet 11. provide portable jobp1toilet and stair stair p5 p5 telephone on site for the duration of the stair new stair project(asnew required by owner). Powder opening opening room 12. contractor(s) to provide daily clean-up to site dumpster. p5 p5 C.h. 9'-6" p5 p5 C.h. 10'-3" 13. the Engineer is not responsible for the 9 see stair 9 see stair p5 contractor(s) means and methods of s-2 detail s-2 detail new steel Closet p1 construction. stair p5 10'-6"
3'-0"
p5
9'-0"
p3
Closet bed room 1. all work 03
sliding door
p5
GENERAL NOTES: 13'-6"
3'-0"
Hardwood Flooring
p5
21'-10"
p3
sliding door 21'-10"
3'-0"
rff
rff
kitchen
Occupied Area roof Open area Rear yard depth building height
p3
p3
1600 sq. ft
Lot Area
03
11'-3"
03
8'-0"x12'-6"
16'-0"
3'-6"
2'-2"
16'-0"
Lot Width
3 4"
S
ALUM. ROOF CAPPING METAL FLASHING COUNTER FLASHING
PREMOLDED CANT STRIP
REVISIONS:
sp - site plan, drawing index, CODES, and general notes. 2'-2" p3 3'-8" p3 p3 S-1 - floor plans, ELEVATION, section AND DETAILS bed -room bed room S-2 Deck Plan and details 3'-0"
New deck on top ALUM. of the existing ROOF CAPPING 2-story COUNTER FLASHING METAL FLASHING DWG. NO.:
proposed 3rd floor addition
RUBBER ROOFING
11'-3"
3'-0"
p3
10'-10"
3'-0"
Existing
req./allowed
12'-6"
2'-5"
3'-0"
District-RSA-5
11'-4"
p3
1'-6"
1'-9"
deck
2'-2"
DATE
3'-0"
kitchen
3'-8"
2'-2"
p3 DRAWING INDEX:
3 Zp
13'-6"
2'-10"
3'-0"
kitchen
p3
2'-5"
DW
S-1
Zoning Code DATA
12'-6"
12433'-8" S 15th 2'-2" Street PHILADELPHIA, PA-19146
1'-6" 2'-2"
DWG. NO.:
, ELEVATION AND DETAILS
12'-6"
2'-5"
1'-9"
9'-0"
2'-10"
p3
12'-6" 3'-8"
3'-8"
1'-6"
4'-7"
3 Zp
1'-9"
11'-4"
2'-10"
property owner:
12'-6"
3'-6"
3'-8"
3 Zp
9'-0"
12'-6"
3 Zp
71'-3"
3 Zp
13'-6"
3 Zp
100'-0"
all mechanical, electrical, and plumbing to be submitted on subsequent permits, engeering to be coordinated between the owner and contractor.
3 s-2
vinyl cap by 'rdi: avalon" or Aproved equal
12'-6" 36" h. Hand rail typ. by RD: Avalon" or EQ
EQ
EQ
EQ
EQ
DBL PT 2x10 rim board 4x4 post w/ aluminum sleeve by " RDI: Avalon or Approved Equal 5'-0"
5'-0"
2x10 rim joist 4x4 posts for guardrail support, post down to masonry parapet or roof Below
all guard to comply w/ height, load, & spacing requirements of irc 2009
5'-0"
5'-0"
5'-0"
5'-0"
2x10 blocking, typical ( at mid-span of joists)
42'-6"
5'-0"
42'-6"
5'-0"
36" h. Hand rail typ. by RD: Avalon" or EQ
EXHAUST
42'-6"
5'-0"
42'-6"
5'-0"
2x10joist @ 16" c.c
threaded rod through 4x4 post & 2x10 joist & blocking 2/s.s. nut & washed e.a to existing elevation varies
℄ of parapet wall
Section through the opening SCALE: 1"=1'-0"
2x6 knee wall const., align with b.o. 2x10 joist for level finish surface
1 2'
gwb
new 2x6" stud wall 2x6"
to existing elevation varies
3 / 121"x12" lvl
3 4"
T&G PLYWOOD SUBFLOOR GLUEDAND NAILED (TYP)
FLOOR
3/2" x6 stud
2"X 6" PLATE 2"X 10"rim board
3/2" x6 stud
1/2" epoxy anchors@ 18'c/c
6'-0" sliding door
6'-3"
5'-5"
3'-10"
3'-10"
5'-5"
Party wall
p3
3'-6"
p5
DN
p5
3'-6"
7 s-2 DN
p5
11'-0"
p5
8 s-2
6 s-2
p5
7 s-1
DN
walking closet
SCALE: 1"=1'-0"
SCALE: 3/4"=1'-0" MAX. 30° ANGLE FROM VERTICAL
3 4"
10'-9" 10'-9"
C.h. 8'-5"
10'-9"
C.h. 8'-5"
Studwall detail @ party wall
new door lintel
11'-0"
walking closet
8'-0"
up
6'-3"
3rd floor addition
8'-0"
step up
TYPICAL STAIR NOISING PROFILE
p1
EQ
FLOOR FINISH (PER OWNER) SHEATHING (PER DETAILS)
28'-9"
FLOOR SHEATHING PER DETAILS
EQ
TO LANDING
SEE NOTES
4'-1"
1 2" -5
1 2" -5
SEE NOTES
LOCATE FLOOR HEADER TO INTERSECT BOTTOM OF CARRIAGES
V.I.F.
(3) 2X12 CARRIAGE OR BOX STAIR
10'-10"
6'-0"
bed room 16'-6"
10'-10"
6'-0"
"
"
-2
-2
2'
2'
bed room
2X CONT. CLEAT
3'
3'
28'-9"
4'-1"
EQ
16'-6"
2"x10"
2"X 10" PLATE
7 s-2
p5
6 s-2
2x12 rim board w/ blocking @ each post
5 DETAIL@ low roof s-2 SCALE: 1"=1'-0"
8 s-2
6'-3"
2x10 joist @ 16" c.c.
5'-0"
5'-0"
5 s-2
6'-0"sliding door w/ 3/2"x 12" Lvl lintel
1x6 trex decking or Approved equal
2x12 rim board w/ blocking @ each post
3 DETAIL@ parapet s-2 SCALE: 1"=1'-0"
EXHAUST
4"
1x6 trex decking or equal
2x6 sill or silealer anchored w/ 5/8" ∅" hilti" hit-a rod @ 4'-0" c.c. drilled and expoxied into cap and brick masonry using hilti" hit-hy 150 adhesive system with hit s screen tube installed per manuf. spec's ( embed through masonry cap and 3 3 8" into brick) or approved equal.
2"x10" joist @ 16" c/c
4"
openning
s.s. threaded rod thrugh 4x4 post & 2x10 joist 7 blocking w/s.s.nut7 washer E.A
2x10 rimboard
Deck sys. by "trex" or EQ
4 DETAIL@ connection s-2 SCALE: 1"=1'-0"
1'-8"
EQ
"simpson" or equal joist hanger
EQ
EQ
2/3"x4"x83" angle
2x10 joiost @ 16" c.c.
vinylrailing ststem by 'RDI: avalon" or approved equal, railing system to comply w/ section 311 od the 2009 IRC code
12'-6"
Note: contractor to field verify all on site dimension
1x6 trex decking or approved equal
SIMPSON OR EQUIV JOIST HANGER FLOOR FINISH (PER OWNER)
5 8"
gwb (type x)
SHEATHING (PER DETAILS) NOTES:
EQ
LOCATE FLOOR HEADER TO INTERSECT BOTTOM OF CARRIAGES
3 V.I.F.
THIRD FLOOR Plan 1 s-2 SCALE: 1/4"=1'-0"
2 DECK plan s-2 SCALE: 1/4"=1'-0"
1.
EQ
2'2" 2'81 2"
2'2" 2'81 2"
p1
TO LANDING
9 Stair Detail s-2 SCALE: 1"=1'-0"
2. 3.
SIMPSON OR EQUIV JOIST HANGER (3) 2X12 CARRIAGE OR BOX STAIR 5 8"
gwb (type x)
= 7 43" (IBC 2009) =8 41 " (PA UCC) MIN. STAIR tread = 11" (IBC 2009) =10" (PA UCC) SIDE CARRIAGES MAY BE HUG FROM HEADER OR ATTACHED TO WALL FRAMING. CONTRACTOR MAY OPT TO INSTALL BOX STAIR WITH APPROVAL OF OWNER. G.C. TO VERIFY ALL HEIGHTS IN FIELD BEFORE ORDERING BOX STAIRS OR CONSTRUCTING STAIR. ALL STAIR TO COMPLY W/ APPLICABLE CODES. MAX. STAIR raiser
3.30m
Fire Hose
UP
Fire Door
4.34m
1.00m
GENERATOR
2.67m x7.14 m
1.00m UP
1.29m
5.21m
UP
STAIR 4.83mx3.84m
LIFT 1.82 m x 3.84 m
1.14m
6.05m x3.05 m
0.86m
Fire Door
7.68m
2.881m
5.671m
ELECTRICAL ROOM
3.06m
Fire Door
GENERATOR 2.67m x7.14 m
±0
FIRE STAIR 2.29mx5.33 m
1.91m
Fire Hose
5.871m
BASEMENT LINE
Fire Extinguisher
0.86m
LIFT
Fire Extinguisher
1.91m
UP
6.05m x3.05 m
14
8.06m
22.93m
Fire Extinguisher
1.82 m x 3.84 m
1.14m
1.00m
12
2.54m
3.05m
3.05m
1.55m
1.00m
5.21m
11
2.92m
4.62m
10
+0.15
Fire Extinguisher
+0.30m
1.25m
2.08m
4.78m
FIRE STAIR 2.29mx5.33 m
1.91m
GUARD POST
9
4.15m
GREEN SPACE +0.15
GARBAGE COLLECTION
C
8
5.16m
22.93m
4.62m
1.75m
7
4.15m
ELECTRICAL ROOM
2.18m
R O A D
6
GREEN SPACE
5.671m
D
+0.30m
Fire Door
5.57m
2.00m
LOBBY/ RECEPTION 4.10 m x 4.32 m
TYPE-B
LOBBY/ RECEPTION 4.10 m x 4.32 m
+0.30m
+0.30m
±0 DN
5.27m
CARE TAKER 2.88m x 2.20m
A
8.081m
8.081m
7.571m
RAMP (SLOPE 1:8)
4.95m
5.325m
4.28m
5.25m
RAMP (SLOPE 1:8) ±0
GARBAGE COLLECTION
4.95m
22.94m
2.246m
FIRE HYDRANT
FIRE EXIT
GREEN SPACE
2.00m
4.78m
2.246m
22.93m
2.246m
2.881m
7.571m
BASEMENT LINE
GUARD POST
GREEN SPACE
7.896m
GREEN SPACE
RAMP (SLOPE 1:8)
KITCHEN 1.74 m x 2.10m
W.C. 1.01mx1.10 m
CARE TAKER 2.88m x 2.20m
DN
4.70m
±0
4.25m
SHOWER 1.01mx1.10 m
GREEN SPACE
W.C. 1.01mx1.10 m
SHOWER 1.01mx1.10 m
KITCHEN 1.74 m x 2.10m
4.70m
9.025m
5.27m
B 4.00m
23.75m
TYPE-A
±0
4.25m
4.32m
±0
23.75m
4.83m
27.286m
W I D E
II Chuadanga, Bangladesh II Housing II Under Construction II Irfan Khan II Architectural Designer
2.08m
FIRE EXIT
1 2 . 19 m
Novia Tower
Location Typology Project Status Supervisor Role:
A
E
5
2.92m
STAIR 4.83mx3.84m
1.29m 3.17m
±0
2.881m
4
2.54m
±0
BASEMENT LINE
G F
3
8.06m
3.05m
1
5.871m
ENTRY
8
B
56.402m
Professional Works
GREEN SPACE
2.881m
1.25m
ENTRY 8.281m
A V E N U E 32
2
6
4.15m
7
7.54m
8
9
5.65m
8.281m
12
±0
30 1
3
31
1 2 . 19 m
13
W I D E
R O A D
7A
GROUND FLOOR PLAN
10 12 2A
E
2B
1A
3
4
1
14
22
3
5.871m
4
8.06m
5
2.54m
2.92m
6
7
8
9
II. LAND COVERAGE PROVIDED = 943.30 Sqm. ( 61.29% OF LAND AREA)
2.08m
4.15m
5.16m
10
4.15m
11
2.08m
12
2.92m
14
2.54m
8.06m
5.871m
6.07m
BED 3.81mx4.70m
3.17m 2.18m
C
4.83m
FAMILY 5.35 m x 3.81 m
3.94m
TYPE-B
17.665m
DINING 5.33mx5.23m FOYER
9.025m
B
G.BED 3.96 m x4.45m
TOILET 2.24mx 2.55m
M.BED 5.33 m x 4.71 m
4.00m
LIVING 5.05 mx 6.45 m
A
2.50m
4.78m
2ND TO 13TH FLOOR PLAN
2.50m
1.87m
5.26m
7.54m
3
4.15m
6
1.00m 3.49m
1.50m
0.91m
21.00m
5.16m
7
1.75m
4.60m
3.06m
5.671m
5.821m
5.65m
2
0.75m 1.00m
1.75m
1.87m
5.821m
8.281m
SCALE -1:100
5.26m 21.00m
VER. 4.60m x 1.75m
4.15m
8
7.54m
9
5.65m
12
B
8.281m
13
7.896m
4.60m
VER. 1.87m x 1.75m
6.571m
3.49m
VER. 1.87m x 1.75m
5.821m
1.50m
5.671m 6.571m
7.896m
0.91m
VER. 4.60m x 1.75m
0.75m 1.00m
1.75m
1.00m
A
Perspective
E D
Fire Door
3.12 m x 3.80 m
F
1.91m
1.55m
1.75m
1.57m
TOILET 1.65m x2.43m
1.55m
TOILET 1.65mx2.43m
1.14m 2.29m 1.91m
LAUNDRY 1.65mx2.16m
LIFT 1.82 m x 3.84 m
1.00m UP BED 3.81mx4.70m
G
DRESS 2.05 mx2.03m
G.BED 3.96 m x4.45m
2.24mx 2.55m
VER. 2.16m x 1.58m
5.085m
5.085m
4.00m
LIVING 5.05 mx 6.45 m
TOILET
1.00m
2.16m
TOILET 2.54mx1.52m
DRESS 2.05 mx2.03m
M.BED 5.33 m x 4.71 m
UTILITY 1.30 mx1.91m
1.22m 1.22m
0.86m
TOILET 2.54mx1.52m
B
Fire
Fire Door
4.34m 3.06m
Fire Extinguisher
3.68m
VER. 1.50 m x 3.94m
TYPE-A
FAMILY 5.35 m x 3.81 m
VER. 1.52m x 2.41m
VER. 1.50m x 3.94m
17.665m
3.94m
4.83m
FOYER 3.12 m x 3.80 m
0.86m
1.97m
FIRE STAIR 2.29mx3.33 m KITCHEN 4.88m x3.05m
UP Hose
1.22m
1.22m
1.22m
DINING 5.33mx5.23m
5.671m 2.92m
VER. 2.31 m x1.27m
MAID 2.54 m x 2.04 m
1.22m
STAIR 4.83mx3.84m
Fire Door
Fire Door
C
MAID 1.52 mx1.01m
MAID 2.54 m x 2.04 m
Fire Hose UP LIFT 1.82 m x 3.84 m
LAUNDRY 1.65mx2.16m
1.00m
MAID 1.52 mx1.01m
STAIR 4.83mx3.84m
UTILITY 1.30 mx1.91m
Fire Extinguisher
9.16m
3.30m
1.14m
VER. 2.31 m x1.27m
KITCHEN 4.88m x3.05m
2.29m
BED 3.81mx4.70m
21.00m 4.78m
FIRE STAIR 2.29mx5.33 m
1.91m
BED 3.81mx4.70m
9.16m
VER. 1.52m x 2.41m
2.92m
1.55m
TOILET 1.65mx2.43m
TOILET 1.65m x2.43m
1.57m
D
1.97m
1.00m UP
6.07m
1.91m
E
VER. 2.16m x 1.57m
3.68m
2.18m
A
3.05m
3.05m
3.17m
8
6 4
21.00m 2.16m
0.25m
1.75m
2
22
5.671m
G
1.55m
21
7
1
F
PROPOSED SITE
3
RO AD 140
3.05m
20
12
10
6
19
B
5
24
R O A D 137
6 8
21
7
9
SCALE -1:100
3
23
26
5
4
D
1B
25
8
3
6
2
7B
7A
11
6B
9
7B
7
6A
C
27
12
10
8
5
6B
4
6A
29
6
2
30
RO AD 138
28
26
3
5.16m
B
1
G U L S H A 22 N 24 16
5
SCALE -1:1600
4.15m
56.402m
F
SITE PLAN
7.54m
RO AD 136
20 18
5.65m
A
1
MEMBRANE ROOFING TO BE RUN UP & OVER PARAPET WALL-ATTACH AS PER MANUF. SPEC'S. ALUM. COPING SLOPED 1/4" PER FT. 5/8" Cement Plaster
1
MEMBRANE ROOFING TO BE RUN UP & OVER PARAPET WALL-ATTACH AS PER MANUF. SPEC'S.
158'-2 2
SBS MODIFIED BITUMEN MEMBRANE ROOF SYSTEM
1" PARAPET
5/8" Cement Plaster
1" PARAPET
158'-2 2
1" PARAPET 156'-2 2
158'-2 2
1" ROOF
CONCRETE PLANK ROOF DECK (SLOPED 1/4" PER FT.)(SEE STRUCTURAL DWGS)
156'-2 2
1" ROOF
1
1
ALUM. COPING SLOPED PER FT. ALUM. 1/4" COPING SLOPED 1/4" PER FT. 5/8" Cement Plaster 5/8" Cement Plaster
4" MIN. RIGID INSULATION CONCRETE PLANK ROOF DECK (SLOPED PLANK 1/4" PER FT.)(SEE CONCRETE ROOF DECK STRUCTURAL (SLOPED 1/4" PER DWGS) FT.)(SEE STRUCTURAL DWGS)
1" ROOF
156'-2 2
CONCRETE PLANK ROOF DECK (SLOPED 1/4" PER FT.)(SEE STRUCTURAL DWGS)
MEMBRANE ROOFING TO BE RUN UP & OVER PARAPET MEMBRANE ROOFING TO BE WALL-ATTACH AS PER RUN UP & OVER PARAPET MANUF. SPEC'S. WALL-ATTACH AS PER MANUF. SPEC'S. SBS MODIFIED BITUMEN MEMBRANE ROOF SYSTEM SBS MODIFIED BITUMEN MEMBRANE SYSTEM 4" MIN. RIGIDROOF INSULATION
1" PARAPET
4" MIN. RIGID INSULATION
SBS MODIFIED BITUMEN MEMBRANE ROOF SYSTEM 4" MIN. RIGID INSULATION
158'-2 2
ALUM. COPING SLOPED 1/4" PER FT.
1" ROOF
156'-2 2
ACOUSTIC TILE CEILING (SEE RCP ACOUSTIC TILEDWG'S) CEILING (SEE RCP DWG'S) CONC. BM. & COLUMN (SEE STRUCT. CONC. BM. &DWG'S) COLUMN (SEE STRUCT. DWG'S)
ACOUSTIC TILE CEILING (SEE RCP DWG'S) CONC. BM. & COLUMN (SEE STRUCT. DWG'S)
ACOUSTIC TILE CEILING (SEE RCP DWG'S) CONC. BM. & COLUMN (SEE STRUCT. DWG'S)
Brick wall 5"
Brick wall 5"
Brick wall 5" Brick wall 5"
8" MOISTURE RESISTANT GWB
8" MOISTURE 5 RESISTANT GWB 8" MOISTURE RESISTANT GWB CEMENTITIOUS
5
5
CEMENTITIOUS TOPPING
5
8" MOISTURE RESISTANT GWB ALUM. STOREFRONT FRAMING SYSTEM w/ INSULATED GLASS
CEMENTITIOUS TOPPING CONCRETE PLANK FLOORING. (SEE STRUCT. DWGS)
CONCRETE PLANK FLOORING. (SEE STRUCT. DWGS)
TYPICAL MD. LV. FLR
TYPICAL MD. LV. FLR TYPICAL MD. LV. FLR
TYPICAL MD. LV. FLR
TYPICAL MD. LV. CEILING
TYPICAL MD. LV. CEILING
GWB SOFFIT TO CONC.BM.
GWB SOFFIT TO CONC.BM.
ALUM. STOREFRONT FRAMING MANUF. TO PROVIDE HEAD TRIM & SILL TO MATCH
CONCRETE PLANK FLOORING. SEE STRUCTURAL DWGS FLOOR FINISH(SEE FINISH SCHEDULE)
2ND FLR 2ND FLR
2ND FLR 2ND FLR
1ST FLR CEILING
1ST FLR CEILING
INSULATED GLASS
ALUM. STOREFRONT FRAMING MANUF. TO PROVIDE HEAD TRIM & SILL TO MATCH
ALUM. STOREFRONT FRAMING MANUF. TO PROVIDE HEAD TRIM & SILL TO MATCH
REFER TO FINISH SCHEDULE FOR BASE AND FLOOR FINISH, TYP
GEOTEXTILE FABRIC DRAINAGE FILL FOUNDATION DRAIN
6 MIL. VAPOR BARRIER 4" CRUSHED STONE BASE 2" RIGID INSULATION 8" CMU FOUNDATION WALL CONCRETE FOOTING SEE STRUCTURAL DWGS
REFER TO FINISH SCHEDULE FOR REFER TOBASE FINISH CEMENT PARGING OVER AND SCHEDULE FLOOR FINISH, FORTYP BASE CMU WALLS TYPICAL AND FLOOR FINISH, TYP 4"CONC. SLAB (SEE STRUCT. DWG'S.) 4"CONC. SLAB (SEE STRUCT. DWG'S.)
REFER TO FINISH SCHEDULE FOR BASE AND FLOOR FINISH, TYP
4"CONC. SLAB (SEE STRUCT. DWG'S.)
SHEET WATERPROOFING W/ FOUNDATION DRAINAGE SYTEM, TYP. AT RETAINING WALLS
ALUM. STOREFRONT FRAMING SYSTEM w/ ALUM. STOREFRONT INSULATED FRAMING GLASS SYSTEM w/ INSULATED GLASS ALUM. STOREFRONT FRAMING MANUF. TO ALUM. STOREFRONT PROVIDE HEAD TRIMTO FRAMING MANUF. & SILL TO MATCH PROVIDE HEAD TRIM & SILL TO MATCH
ALUM. STOREFRONT FRAMING SYSTEM w/ INSULATED GLASS
4"CONC. SLAB (SEE STRUCT. DWG'S.) 1ST FLR
ALUM. STOREFRONT FRAMING MANUF. TO ALUM. STOREFRONT PROVIDE HEAD TRIMTO FRAMING MANUF. & SILL TO MATCH PROVIDE HEAD TRIM & SILL TO MATCH
1ST FLR CEILING
1ST FLR CEILING
CEMENT PARGING OVER CMU WALLS TYPICAL
GWB SOFFIT TO CONC.BM. GWB SOFFIT TO CONC.BM.
CEMENTITIOUS TOPPING CEMENTITIOUS TOPPING CONCRETE PLANK FLOORING. SEE STRUCTURAL DWGS CONCRETE PLANK FLOORING. SEE FINISH(SEE STRUCTURAL DWGS FLOOR FINISH SCHEDULE) FLOOR FINISH(SEE FINISH SCHEDULE)
CEMENTITIOUS TOPPING CONCRETE PLANK FLOORING. SEE STRUCTURAL DWGS FLOOR FINISH(SEE FINISH SCHEDULE)
CEMENTITIOUS TOPPING
ALUM. STOREFRONT FRAMING SYSTEM w/ ALUM. STOREFRONT INSULATED FRAMING GLASS SYSTEM w/ INSULATED GLASS
TYPICAL MD. LV. CEILING
TYPICAL MD. LV. CEILING
ALUM. STOREFRONT FRAMING MANUF. TO PROVIDE HEAD TRIM & SILL TO MATCH
TOPPING CEMENTITIOUS TOPPING ALUM. STOREFRONT CONCRETE PLANK FLOORING. FRAMING SYSTEM w/ (SEE PLANK STRUCT. DWGS) CONCRETE FLOORING. INSULATED GLASS (SEE STRUCT. DWGS)
1ST FLR
1ST FLR
CEMENT PARGING OVER CMU WALLSPARGING TYPICAL OVER CEMENT CMU WALLS TYPICAL
1ST FLR
NOTE: ALL STRUCTURAL STEEL BEAMS & COLUMNS TO RECEIVE 1HR SPRAY-ON FIREPROOFING 6 MIL. VAPOR BARRIER 4" CRUSHED STONE BASE 2" RIGID INSULATION 8" CMU FOUNDATION WALL CONCRETE FOOTING SEE STRUCTURAL DWGS
NOTE: ALL STRUCTURAL STEEL BEAMS & NOTE: COLUMNS TO RECEIVE 1HR BEAMS SPRAY-ON ALL STRUCTURAL STEEL & FIREPROOFING COLUMNS TO RECEIVE 1HR SPRAY-ON FIREPROOFING GEOTEXTILE FABRIC DRAINAGE FILL FOUNDATION DRAIN
SHEET WATERPROOFING W/ FOUNDATION DRAINAGE SYTEM, TYP. ATVAPOR RETAINING WALLS 6 MIL. BARRIER 6 MIL. VAPOR BARRIER 4" CRUSHED STONE BASE 4" CRUSHED BASE 2" RIGIDSTONE INSULATION 2" FOUNDATION RIGID INSULATION 8" CMU WALL 8" CMUCONCRETE FOUNDATION WALL FOOTING
SEE STRUCTURAL DWGS CONCRETE FOOTING SEE STRUCTURAL DWGS
GEOTEXTILE FABRIC GEOTEXTILE FABRIC DRAINAGE FILL DRAINAGE FILL FOUNDATION DRAIN FOUNDATION DRAIN
SHEET WATERPROOFING W/ FOUNDATION DRAINAGE SYTEM, SHEET WATERPROOFING W/ TYP. AT RETAINING WALLS SYTEM, FOUNDATION DRAINAGE TYP. AT RETAINING WALLS
Professional Works Professional Works
II Row House
Project Status II Constructioned Supervisor Role:
II Henry Travor II Architectural Designer
Philadelphia, PA-19046
- PA UCC - 2009 INTERNATIONAL BUILDINGS CODE (TBC) - -2009 INTERNATIONAL ENERGY CONSERVATION CODE
USE AND OCCUPANCY CLASSIFICATION: -
R-2
CONSTRUCTION TYPE :
Seal:
-
VB ( WITH BUILDING HT. INCREASE FROM SPRINKLER)
PROJECT NOTES:
DEFERRED SUBMISSION: ALL MECHANICAL, ELECTRICAL, AND PLUMBING TO BE SUBMITTED ON SUBSEQUENT PERMITS, ENGEERING TO BE COORDINATED BETWEEN THE OWNER AND CONTRACTOR.
BUILDING OWNER :
DRAWING INDEX TO EXTERIOR.
S 20th Street
26' - 0"
DIVIDED
One Way Parking on Both Side
D & SHELF AT
Seal:
SHEET NAME Site Plan & Details Plans & Details Elevation, Section and Details Section & Details Wall section & Details
ACHINE. PROVIDE
10' - 0"
10' - 10"
Revisions No.
Date
Discription
wooden 19' - 6"
Roof Deck
- 6" Roof Deck@ New 3rd Floor 43' Rear
Pilot House
5' - 0" Setback
DE DETECTORS
Roof Deck
8' - 0" Setback
Allowed/ Required Lot Size
ED EQUAL. INSTALL
16'-0"x 43'-6"
No of Floor
3
3
Front Setback
-
-
Rear Setback
5 ft
16'-6"
Maximum Height
38'-0"
38'-0"
1. ALL WORK TO BE COMPLIANCE WITH ALL APPLICABLE, STATE, &LOCAL CODES 2. ALL CONTRACTOR(S) PERFORMING WORK SHALL HAVE APPLICABLE LICENCE. Design By:
MMH
3. CONTROCTOR(S) IS RESPONSIBLE FOR OBTAINING BUILDING PERMITS UNLESS NOTED OTHERWISE (U.N.O.)
Check By:
H. Travor
4. CONTRACTOR(S) IS RESPONSIBLE FOR OBTAINING MECHANICAL, ELECTRICAL, PLUMBING& SPRINKLER PERMITS U.N.O.
Drawn By:
MMH
5. CONTRACTOR(S) IS TO HAVE APPLICABLE INSURANCE AS REQUIRED BY THE BUILDING OWNER AND MUNICIPALITY. 6. CONTRACTOR(S) IS TO RESPONSIBLE FOR NOTIFYING THE BUILDING INSPECTOR A MINIMUM OF 24 HOURS PRIOR TO COMMENCING WORK. CONTRACTOR (S) IS RESPONSIBLE FOR CONTACTING THE BUILDING INSPECTOR FOR ANY/ALL REQUIRED INSPECTIONS FOR THE DURATION OF THE PROJECT.
Project Number: 02 05 2001 2023
7. CONTRACTOR(S) IS TO VERIFY EXISTING SITE CONDITION PRIOR TO COMMENCING WORK, NOTIFY ARCHITECT IMMEDIATELY REGARDING ANT DISCREPANCIES BETWEEN FIELD CONDITIONS AND ARCHITECTURAL DOCUMENTS. 8. DO NOT SCALE DRAWINGS.
1420 S 20th st, Philadelphia, PA-19146
Project Title:
Site 1/8" = 1'-0"
3RD STORY ADDITION w/3RD R. DECK at
16' - 6"
16' - 0"
1
Proposed
GENERAL NOTES:
PROVED EUQUAL. Rear Yard
16'-0"x 60'-0"
Issue Date : 4/19/2018 Sheet Name:
A. ALL PANTRY & LINEN CLOSETS SHALL, RECEIVE (5) EQUALLY DIVIDED SHELVES. B. ALL BATHROOMS TO RECEIVE 75 CFM EXHAUST FAN VENTED TO EXTERIOR.
D. PROVIDE PAN AND GRAY BOW CONNECTION AT WASHING MACHINE. PROVIDE RECESSED DRYER VENT AT DRYER AND VENT TO EXTERIOR.
B. SEE PLANS FOR LOCATIONS & CONSTRUCTION OF ALL RATED WALLS. C. G.C. TO INSTALL 3 1/2" SOUND DEADENING INSULATION IN ALL BATHROOM WALLS.
7. FIRE RATINGS:
D. TO SUBSTITUTE 1/2" CEMENTITIOUS BACKER BOARD FOR GWB AT ALL TILE LOCATIONS. INSTALL MOISTURE RESISTANT GWB AT ALL WET LOCATIONS. E. ALL WALLS TO BE TAPED, SPACKED,SANDED SMOOTH& PRIMED W/ LEVEL 4 FINISH.
B. FIRE STOP ALL PENETRATIONS THROUGH RATED ASSEMBLES.
9. CONTRACTOR(S) IS RESPONSIBLE FOR PROVIDING REQUIRED SITE FENCING AROUND PARAMETER OF JOB SITE AS PER OSHA AND MUNICIPALITY REQUIREMENTS AND GUIDELINES. 10.CONTRACTOR(S) IS RESPONSIBLE TO ACQUIRE ANY/ALL STREET & SIDEWALK CLOSURE PERMITS AS WELL AS ANY REQUIRED DUMPSTER PERMITS. 11.PROVIDE PORTABLE JOB TOILET AND TELEPHONE ON SITE FOR THE DURATION OF THE PROJECT(AS REQUIRED BY OWNER). 12.CONTRACTOR(S) TO PROVIDE DAILY CLEAN-UP TO SITE DUMPSTER. 13.THE ARCHITECT IS NOT RESPONSIBLE FOR THE CONTRACTOR(S) MEANS AND METHODS OF CONSTRUCTION.
A. WINDOWS SHALL BE DOUBLE PANE, LOW-E BY NORTHEST BUILDING PRODUCTS" OR APPROVED QUUAL Q/ U-VALUE OF 0.35. SEE PLANS & ELEVATION FOR SIZE . FINAL SELECTION BY OWNER. ALL CASEMENT WINDOWS TO HAVE SASH GUARD LIMITER SAFETY.
A. SEE PLANS & SECTIONS WALL PARTITION TYPES FOR FIRE SEPARATIONS.
8. SMOKE DETECTORS & CARBON MONOXIDE DETECTORS:
A. HARDWIRED SMOKE DETECTORS AND /OR CARBON MONOXIDE DETECTORS IN COMPLIANCE W/ IRC 2009.
9. INSULATION: -EXTERIOR WALL (2X6)
R-21
-EXTERIOR WALL (2X4)
R-15
C. WINDOW TRIM PACKAGE& HARDWARE TO ME SELECTED BY OWNER.
-KITCHEN ROOF & PILOT HOUSE R-38
A. ALL HARDWARE TO BE COORDINATED BETWEEN G.C.& HARDWARE VENDER. FINAL SELECTIONS TO MADE BY OWNER. G.C. TO PROVIDE SAMPLES. ALL EXTERIOR DOORS& SHALL HAVE THRESHOLDS, DOOR SWEEPS& WEATHER STRIPPING PACKAGES INCLUDING W/ THE HARDWARE PACKAGE FLASH ALL OPENING PER WINDOWS MANUF'S SPECIFICATIONS. B. ALL INTERIOR DOOR BY "MASONITE" OR APPROVED EQUAL SET 4" FROM CORNER (U.N.O.) ALL CLOSET DOORS TO BE CENTERED IN OPENINGS (U.N.O.).
One Way Par
Existing Concrete Foot Path
B. G.C. TO VERIFY ALL R.O.'S & M.O.'S BEFORE COMMENCING CONSTRUCTION & ORDERING WINDOWS. FLASH ALL OPENING PER WINDOW MANUF'S SPECIFICATIONS.
4. DOORS:
S 20th
C. ALL BEDROOM CLOSETS & COAT CLOSETS TO RECEIVED ROD & SHELF AT 6'-0" A.F.F.
A. EXTERIOR WALLS ARE 2X6 WOOD STUDS @16 O.C., DIMENSIONED FROM INSIDE FACE OF STUD TO OUTSIDE FACE OF SHEATHING (U.N.O.) REFER TO SECTIONS & DETAILS FOR FINISHES. OUTSIDE FACE OF SHEATHING TO ALIGN W/ FACE OF FOUNDATION U.N.O.
3. WINDOWS:
- RSA-5 ( Residential Single Family Attached-5)
EPARATIONS.
S.
6. SPECIALITIES
F. ALL STUCCO FINISH BY "STO" OR APPROVED EQUAL INSTALL MANUF. SPEC'S ,COLOR& TEXTURE TO BE SELECTED BY OWNER.
ZONNING INFORMATION
Existing Concrete Foot Path
A. ALL FIXTURE, FINISHES, & EQUIPMENT (INTERIOR & EXTERIOR) TO BE SELECTED BY OWNER & SUPPLIED & INSTALLED BY G.C. U.N.O. G.C. TO COORDINATE FINAL LOCATIONS, SELECTIONS, & CONNECTIONS W/ OWNER & APPROPRIATE TRADES. 2. WALL CONSTRUCTION:
1420 S 20th st, Philadelphia, PA-19146
SHEET NUMBER SP-1 A101 A102 A103 A104
1. FIXTURE , FINISHES, & EQUIPMENT
10' - 10"
Typology
Email: tranbar@msn.com Phone: 267.271.7766
II Philadelphia
Address: 1125 MASON AVENUE DREXEL HILL, PA 19026
Location
1420 S 20th Street
BUILDING CODE DATA:
Henry Building Services, LLC
9
Row House Renovation 1420 S 20th Street
10. ROOFING:
A. MAIN ROOF SHALL BE EPDM BY " FIRESTONE" OR APPROVED EQUAL. INSTALL PER MANUF'S SPEC'S. B. ROOF DECK SHALL BE FIBERGLASS BY " DURADEK" OR APPROVED EUQUAL. INSTALL PER MANUF'S. SPEC'S. 1420 S 20th Street Philadelphia, PA-19046
C. G.C. TO VERIFY ALL R.O.'S &M.O.'S BEFORE COMMENCING CONSTRUCTION & ORDERING DOORS. SEE PLANS FOR SIZES. D. EXTERIOR DOOR SHALL BE INSULATED FIBERGLASS BY "THERMA" OR APPROVED EQUAL W/ U-VALUE OF 0.60 . SEE PLANS FOR SIZE. FINAL SELECTIONS BY OWNER. ALL EXTERIOR DOORS TO INCLUDING STORM DOOR TO BE SELECTED BY OWNER.
1
E. UNDERCUT BATHROOM DOOR TO ALLOW FOR THRESHOLD. F. ALL DOOR TRIM TO BE SELECTED BY OWNER.
A. ALL INTERIOR STAIRS TO BE PINE BOX. PROVIDE (1) LAYED OF 1/2" TYPE GWB ON U.S. OF ALL COMMON STAIRS. B. 6'-8" HEADROOM TO BE PROVIDED AL ALL TIMES INCOMPLIANCE W/ IRC 2008. C. HANDRAILS MIN. HEIGHT ABOVE RISER 34", MAX. HEIGHT 38" IN COMPLIANCE W/ IRC 2009. D. GUARDS@ STAIR MIN. 36" IN HEIGHT IN COMPLIANCE W/ IRC 2009. GUARDS ARE REQUIRED TO MEET LATERAL LOAD REQUIREMENTS STATED IN STRUCTURAL NOTES.
2
Location Map 1" = 100'-0"
Henry Building Services, LL
2 A103
2
2
A103
A103
3 A103
21
21
21
21
wooden 19'-6"
Roof Deck@ New 3rd Floor Rear
9
21 21
5' - 0"
5' - 6"
M. Bed
12' - 0"
12' - 0"
M. Bed
Roof Deck New 2"x 6" Stud Wall@ 16" C/C
Set back
7' - 0"
New 2"x 6" Stud Wall@ 16" C/C
Roof Deck New 2"x 6" Stud Wall@ 16" C/C
wooden 19'-6"
3' - 4"
New 2"x 6" Stud Wall@ 16" C/C
1
Revisi No.
D
R
N
Design
D
CheckC
21
21
21
DrawnD
Rear Yard
Rear Yard
S
A103
Roof Deck@ New 3rd Floor Rear
1 A103
7
Bed Room 01
21
Party Wall New 2"x 6" Stud Wall @ 16" C.C.
A103
15
3' - 10"
3' - 0"
1
5' - 6"
13
New Closet
2' - 0" 1' - 4"
Pliot house roof 9'-10"
Pliot house roof 9'-10"
9'-8"
3 A103
5' - 0"
3' - 4"
8' - 0"
8' - 0"
9'-8" UP
Existing Party Wall New 2"x 6" Stud Wall @ 16" C.C. ExistingSeal:
Set back
7' - 0" 16
8' - 0"
8' - 0"
2' - 10" 6' - 2"
A103
DN
S
14
7
9
New Closet
Vent
5
Bed Room 01
10' - 10"
Dinning Area
16
Basement Plan 1/4" = 1'-0"
2
2
First Floor Plan 1/4" = 1'-0"
First Floor Plan 1/4" = 1'-0"
3
Second Floor Plan 1/4" = 1'-0"
3
Second Floor Plan 1/4" = 1'-0"
4
Third Floor Plan 1/4" = 1'-0"
4
5
Required dimensions to meet code on emergency
Required dimensions to meet code on emergency
Exist from basement window emerg. exit Window width window 20"
-4"p.6.
Height clear opening
24"
-Surface grate
Sill ht. interior window
37 sf
(Access below)
Wall size ladder req
44"
-Drain in gravell,conn
Exist from basement window emerg. exit Window width window 20"
-4"p.6.
Height clear opening
24"
-Surface grate
Sill ht. interior window
37 sf
(Access below)
44"
-Drain in gravell,conn
Wall size ladder req
9 sf
W/house drain
Floor
Base
Walls
1st
Conc
4" wd
2ct*
2ct*
2nd
wd/fl
4" wd
2ct*
2ct*
3dr
wd/fl
4" wd
2ct*
2ct*
wd/fl
4" wd
2ct*
2ct*
Bath
Cert.
cert.
2ct*
Wood
Lately Enamel Railing
2ct*
Deck
2ct*
Lately Enamel
Finish Schedule
Area
Floor
Base
Walls
1st
Conc
4" wd
2ct*
wd/fl
4" wd
2ct*
wd/fl
4" wd
2ct*
wd/fl
4" wd
2ct*
9 sf
W/house drain
44"
-Meet Current IBC 2nd & Phila code
3dr 4th
Finish Schedule
Area
4th
Velling
2ct* 2ct* 2ct*
Vomments
Lately Enamel -
Lately Enamel
Velling
-
Door Schedule
Door Schedule Mark
Mark
Third Floor Plan 1/4" = 1'-0"
Family
Width
Family Width Height 1 Internal_Door_-_openable_in_3D_13628 2' - 6" 2 Internal_Door_-_openable_in_3D_13628 2' - 6" 3 Internal_Door_-_openable_in_3D_13628 1 Internal_Door_-_openable_in_3D_13628 2' - 6" 6' - 6"2' - 6" 5 Internal_Door_-_openable_in_3D_13628 2 Internal_Door_-_openable_in_3D_13628 2' - 6" 6' - 6"2' - 6" 6 Internal_Door_-_openable_in_3D_13628 2' - 6" 3 Internal_Door_-_openable_in_3D_13628 2' - 6" 6' - 6" 7 Internal_Door_-_openable_in_3D_13628 2' - 6" 5 Internal_Door_-_openable_in_3D_13628 2' - 6" 6' - 6"2' - 6" 8 Internal_Door_-_openable_in_3D_13628 6 Internal_Door_-_openable_in_3D_13628 2' - 6" 6' - 6"4' - 0" 9 Sliding_Barn_Style_Double_Door_14548 7 Internal_Door_-_openable_in_3D_13628 2' - 6" 6' - 6"2' - 10" 13 Internal_Door_-_openable_in_3D_13628 8 Internal_Door_-_openable_in_3D_13628 2' - 6" 6' - 6"2' - 6" 14 Internal_Door_-_openable_in_3D_13628 15 Sliding_Barn_Style_Double_Door_14548 9 Sliding_Barn_Style_Double_Door_14548 4' - 0" 6' - 8"6' - 0" 16 Internal_Door_-_openable_in_3D_13628 13 Vomments Internal_Door_-_openable_in_3D_13628 2' - 10" 6' - 8"2' - 6" 17 Door-Exterior-Single-Entry-Half Flat 14 Lately EnamelInternal_Door_-_openable_in_3D_13628 2' - 6" 6' - 6"3' - 0" Glass-Wood_Clad Lately Enamel 15 Sliding_Barn_Style_Double_Door_14548 6' - 0" 7' - 0"2' - 10" 20 Internal_Door_-_openable_in_3D_13628 Lately Enamel 16 Internal_Door_-_openable_in_3D_13628 2' - 6" 6' - 6"2' - 10" 22 Internal_Door_-_openable_in_3D_13628 Lately Enamel 17 Door-Exterior-Single-Entry-Half Flat 3' - 0" 6' - 8"2' - 6" 23 Internal_Door_-_openable_in_3D_13628 Lately Semi gl. Glass-Wood_Clad 25 Sliding_Barn_Style_Double_Door_14548 4' - 0" 42" Rail
20 22
Internal_Door_-_openable_in_3D_13628 Internal_Door_-_openable_in_3D_13628
2' - 10" 2' - 10"
6' - 8" 6' - 8"
Roof Plan 1/4" = 1'-0"
Height 6' - 6"Mark 6' - 6" 6'6- 6" 6'10 - 6" 6' - 6" 11 6' - 6" 12 6' - 6" 6'13 - 8" 6'16 - 8" 6'17 - 6" 7'18 - 0" 6'19 - 6" 6'20 - 8" 6'21 - 8" 6'22 - 8" 6' - 6" 6' - 8"
5
Roof Plan 1/4" = 1'-0"
Window Schedule
Family Window Schedule Mark
Family 6 Window-Sliding-DoubleWidth 10 Window-Double-Hung 11 Window-Double-Hung Window-Sliding-Double 5' - 0" 12 Window-Double-Hung Window-Double-Hung 2' - 0" 13 Window-Double-Hung Window-Double-Hung 2' - 6" 16 Window-Double-Hung Window-Double-Hung 2' - 6" 17 Window-Double-Hung Window-Double-Hung 3' - 0" 18 Window-Double-Hung Window-Double-Hung 3' - 0" 19 Window-Double-Hung Window-Double-Hung 3' - 0" 20 Window-Double-Hung 21 Window-Double-Hung Window-Double-Hung 3' - 0" 22 Window-Double-Hung Window-Double-Hung 3' - 0" Window-Double-Hung Window-Double-Hung Window-Double-Hung
3' - 0" 3' - 0" 3' - 0"
Width
Height
5' - 0"Height5' - 0" 2' - 0" 3' - 6" 2' 5' - 6"- 0" 3' - 10" 2' 3' - 6"- 6" 3' - 10" 3' - 0" 4' - 6" 3' - 10" 3' - 0" 4' - 6" 3' - 10" 4' - 6" 3' - 0" 3' 4' - 0"- 6" 4' - 6" 3' 4' - 0"- 6" 4' - 6" 3' 4' - 0"- 6" 4' - 6" 3' 4' - 0"- 6" 4' - 6" 3' 4' - 0"- 6" 4' - 6"
4' - 6" 4' - 6" 4' - 6"
Project Title:
1
3
1
New 2"x 6" Stud Wall@ 16" C/C
10' - 10"
New 2"x 6" Studs Wall@ Dinning Area 16" C/C
3rd floor Roof Deck
DN
Existing Party Wall New 2"x 6" Stud Wall Existing @ 16" C.C. Party Wall
20
15
3' - 10"
New 2"x 6" Stud Wall@ 16" C/C
New 2"x 6" Stud Wall@ 16" C/C
4" Conc. slab on
4" 6" Gravel New 2"x Studs Wall@ 16" C/C
Vent
Basement Plan 1/4" = 1'-0"
UP
5' - 6"
8
3' - 0"
Kitchen
Existing Basement
New Finished 2"x 6" Stud Wall@ 16" C/C
2' - 0" 1' - 4"
13
6
1
8' - 3"
Kitchen
New Foundartion
New 2"x 6" Stud Wall@ 16" C/C
Party Wall Existing Party Wall New 2"x 6" Studs Wall @ 16" C.C. Existing Party Wall
14
New Foundartion
4" Conc. slab on 4" Gravel
10
A103
A103
5
Existing Party Wall New 2"x 6" Stud Wall Existing @ 16" C.C. Party Wall
Roof Deck
5' - 6"
8
Existing Party Foundation wall
Existing Basement Finished New 2"x 6" Stud Wall@ 16" C/C
Closet & Storage
1
8' - 3"
Existing Party Foundation wall
2
A103
1
Seal:
DN
6
A103
3rd floor Roof Deck
1' - 3"
Existing Party Foundation wall
A103
Parapet
16'-4"
23
4' - 6"
Existing Party Foundation wall
A103
A103
1
Roof Deck
10
5' - 6"
A103
3
3' - 0"
3
A103
1' - 3"
4' - 6"
Closet & Storage
1
1
2
3
2
A103
Closet
6' - 2"
6' - 2"
3 A103
2' - 8"
1
10' - 7 15/32"
A103
Existing Party Wall DN
4' - 6"
6' - 2"
4' - 6"
A103
3' - 0"
3
2
20
Studs Wall @ 16" C.C. Existing25 Party Wall
Party Wall
UP
A103
Party Wall Existing Party Wall
Bed Room 02New 2"x 6"
5' - 6"
6' - 2"
A103
7' - 3"
10' - 7 15/32"
10' - 6" 6' - 2"
Existing Party Wall
3
Closet 25
New 2"x 6" Studs Wall @ 16" C.C. 10' - 10"
3
0' - 6"
10' - 6"
Existing Party Wall
New Rebuild of Front wall
21
10' - 10"
UP
23
1
Living Area
18" Cont' FTR @New load bearing stud wall for FL#3
21
Bed Room 02
Party Wall
3
2' - 8"
New Rebuild of Front wall
17
0' - 6"
3' - 9"
A103
20
DN
New 2"x 6" Studs Wall @ 16" C.C.
UP
18" Cont' FTR @New load bearing stud wall for FL#3
3
Living Area
Existing Party Wall
New Foundation
UP
Removable Gate
18" Cont' FTR Exit @New Emergency load bearing stud wall for FL#3
21 A103
17
21
Parapet
New Rebuild of Front wall
2
21
16'-4"
Emergency Gate 20
New Foundation 18" Cont' FTR @New load bearing stud wall for FL#3
A103
2' - 4"
Emergency Exit
New Rebuild of Front wall
2
Gate
21
2' - 10"
DN
A103 Removable
7' - 3"
2
3' - 9"
2 A103
Emergency Gate
2' - 4"
1
2 A103
Is
S
Issue D
P
Sheet N
S
Plans
A
Sheet N
Floor finish (Per Owner)
6. In order to anchor braced wall panels to foundation wall install 'simpson" model "sstb16" anchor bolts (see 4/s-1.2) so that the anchors are cast in place during See detailwalls. sheet a-x for pouring conc. for foundation
1.
sheathing (Per Details)
MAX. Stair Raiser
Basement Slab Construction MIN. Stair Tread
foundation floor construction.
= 7 34" (IBC 2009) =8 1 4 " (PA UCC) = 10" (IBC 2009) =9" (PA UCC)
TO LANDING
Henry Building Services, LLC
7. Install "simpson" model "hdu4-sds2.5" hold-downs to 1st floor studs at same locations of "simpson" model 5 ' dia. extension rod & "cnw' coupler (see 4/s-1.20 2. Side carriages may be hug from header or attached to wall "sstb" anchors. connect hold-down to "sstb" anchors w/See 8 framing plans for lintel framing. 1.Max OnHeight all (3)38'-0" floor, install3.167 "Contractor o.s.b. sheathing & coil straps to the exterior side of entire front & rear walls (see may opt to install box Stair.House New 2"x6" stud wall Pilot House Pilot Typ. Footing Constr.@ Window Well With approval of owner. g.c.model to verify cs14. all heights in straps field before @16 c.c. framing plans for locations). install "simpson" coil (see3/s-1.2) in order to connect studs 38' - 0" 38' - 0" Cont. conc. footing ( as dimensioned) ordering box stairs or constructing stair. all stair to comply w/ of one floor level to the studs of the floor above or below. the coil strap is to extend 12" min. below to plate V.I.F. applicable codes. W/ 93) # s cont. re-bar & #4 re-bar at & 12" min. above floor sheathing. 1 21" min Removab;e protective mental grate 2'-0" Typ. to Handrail/ set on angles attached 5' - 0" foundation Gardrail Const. EQ
Foundation wall key
Front Setback
Parapet 2"x6" Stud wall @ 16" C.C. 2"x6" Stud wall @ 16" C.C. Existing Party Wall R-19 Insulation.
Min. net clear opening....................5.7 s.f.
-
Min. net clear opening height............24"
-
Min. net clear opening width .............20" See detail sheet a-103 for foundation wall construction.
New Deck
"Simpson" framing plate model "lTP4" @ 24" o.c. to attach rim board to top >
2 Layers of 5/8" GWB
Replacement Rotted 2x10 joists@ 16" C.C
New Rebuild insulated Brick Stud Wall
See detail sheet a-103 for window flashing. inter trim package by owner.
Roof Plan 29' - 6" Attach all plywood sheathing to top plate w/ 8d 3/4" C/D ply deck common nails @ 3" o.c. at panel edges
Pressure treated 2"x6" stud R-19 Insulation.
1/2" Proxy Anchor @16" C.C.
Ballisters to be spaced so not to Typ. Found. Wall constr. @ Window Well
3"
-
Third Floor Plan 20' - 6"
-
allow passage of a 4" dia sphere (typ) 5. 8" Poured conc. wall #5 bar vert. @ 2'-6" o.c. & 4 bar @3'-0" o.c. horz. New Floorwater 2" x10" @16 c.c. bituminous roofing applied per mfr. spec.
4"
Top plate
2
5/8" GWB
Detail-Handrail/ Gardrail 1" = 1'-0"
Clean free dawning stone at least 12" in width around all sides of well filled to depth of foundation footing
2 Layers of 5/8" GWB
W.W.F. In upper
New Floor 2" x10" @16 c.c.
Second Floor Plan 11' - 6"
(3) 2"x4" or 62 post
1'-6"
1 3
of slab depth
Replacement Rotted 2x10 joists@ 16" C.C
Third Floor Plan 20' - 6"
Pressure treated 2"x6" stud
R-19 Insulation.
3/4" C/D ply deck
1/2" Proxy Anchor @16" C.C. 2/2"X 10" 2/2"x6"
Attach to studs w/ 8d common nails @ 6" o.c. at intermediate
5/8" GWB 2 Layers of 5/8" GWB
Second Floor Plan 11' - 6"
1 21" min
5/8" GWB
2x6 Bearing wall @16'o.c./typ
Attach all plywood sheathing to top Section 2 plate w/ 8d common nails @ 2 3" o.c. 1/4"at=panel 1'-0" edges
0' - 8"
Replacement Rotted 2x10 joists@ 16" C.C
First Floor Plan 2' - 6"
Pressure treated 2"x6" stud R-19 Insulation.
3/4" C/D ply deck
6
Detail-Wall Bracing Panel
(3) 2"x4" or 62 post
2 Layers of 5/8" GWB
Grade 0' - 0"
4" Concrete slab
Basement Plan -6' - 6"
7
Top plate
Section 1 1/4" = 1'-0"
Provide minimum end dist~ances
Foundation Wall AnchorStucco BoltsW/ wire -
Scale: N.T.S.
1/2' Dia galv. steel hooked anchor bolt w/12" min. embedment 3'-0" O.C. MAX. (W Bolts per Plate 2"x6" Stud Wall Min.) 12" MAX. Distance from corners or end plate
Pqual number of specified nails in each end
3
Wall section Detail 01 3/4" = 1'-0"
C/D ply plate deck model "ltp4" @ "Simpson"3/4" framing 24" o.c. to attach rim board to bottom plate
1'-0"
5
Detail-Pilot house EAVE 1" = 1'-0"
9
Dropped beam (see framing plans) 6
Wall Section Detail 03 @ Stucco 1" = 1'-0"
8
1 3
Side carriages may be hug from header or attached framing. Contractor may opt to install box Stair. With approval of owner. g.c. to verify all heights in fie ordering box stairs or constructing stair. all stair to co Design applicable codes.
MIN. Stair Tread
Check
Drawn
of slab depth
Basement Slab Construction. Check By: H. Travor -
-
4" Conc. slab. w 1.4x w1.4 wwf
Sheet N
1 2" Perimeter expansion joint 10 mil. poly vapor barrier Drawn By: Author 4" crushed stone Provide 1" deep saw cut Control joint for ea. ft. of slab
Wall s Detail
9
Detail-Typical Basement Slab
Foundation Wall (See Details)
Multiple stud or column see plan
Detail-Wall Bracing Panel 1" = 1'-0"
Wall or beam see plans
7
Detail-Foundation Wall Anchor Bolts Detail-Window Frame
Scale: N.T.S. 10
3/4" = 1'-0"
Scale: N.T.S.
Use every other nail hole in a row to provide the code required minimum center to center spacing for nails
Cut length End length
End length
7 " 8
Pqual Foundation Wall Anchor Bolts Section & Details -
1/2' Dia galv. steel hooked anchor bolt w/12" min. embedment 3'-0" O.C. MAX. (W Bolts per Plate Sheet Min.) 12" MAX. Distance from corners or end plate
number of specified nails in each end
Number:
A103
8
"Simpson strong-tile" cs14 coiled strap
Detail-coil Strap Scale: N.T.S.
Sheet N
A
"s
Clear span
Provide minimum end dist~ances
Sheet Name:
-
Solid block all posts from above to bearing below
Detail-Foundation Hold Down
Issue Date : 4/19/2018
2x4 (minimum) "squash" blocks
Detail-Typical 1" = 1'-0"
Issue D
concrete foundation wall
Wall Section Detail 02 1" = 1'-0"
See Floor Construction
Detail-Door and Roof Deck 3/4" = 1'-0"
2.
4
4
Project Title:
Terminate fiberglass surface per manuf. specs
5/8" GWB
MAX. Stair Raiser
Ballisters to be spaced so not to No. Date Discription allow passage of a 4" dia sphere (typ)
1" = 1'-0"
Rimboard or blocking
-5/8" Type "X" GWB (level 4 finish) -Fiberglass batt insulation laid on top of gwb to extend to sheathing -Roof rafter@ 16" o.c. (see framing plan) -5/8" OSB sheathing -Ice & water shield over entire roof -Bituminous torch down roofing.
= 7 34" (IBC 2009) =8 1 " (PA UCC) = 10" (IBC 2009) =9" (PA UCC)
1.
"simpson" hdu4-sds2.5 studs hold down Revisions
"simpson" sstb16 anchorbolt min. 1,000 W.W.F. In upper lb. capacity
1/2" Ply. Tyver rail for sneer "Simpson strong-tile" cs14 coiled strap
Pilot roof house constr. "Simpson" H 2.5 hurricane tie typ. @ea. rafter. install per manuf. spec's.
#5 bar @ 24" o.c.
Required along all open-sided floor area and stairways All top rail shall have a perimeter Dimension of 4" min to exceed 6 41" w/ largest existing -wall not studs cross-section not exceed 2 14" "simpson" model Handrail gripping surface shall be cnw coupler Continuous, without interruption bt newel posts, or other structural elements or obstructions
R-19 Insulation
Provide & install flabshing per manuf. speces,
-Metal drip edge -5/4 x8 fascia w/ ex nailer -Cont. vented vinyl soffit
Notes: conc. haunch slab w/ (2) #5 bars cont.
2"x6" Stud Wall
Sill plate
7
D
Detail-Handrail/ Gardrail 1" = Clear span
2X 6" P.T. SILL Plate On Sill sealer
Pilot roof house constr.
see a4/5
Basement -6' - 6"
End length
7 " 8
R-19 Insulation
Basement Plan -6' - 6" Attach all plywood sheathing to top plate w/ 8d common nails @ 3" o.c. at panel edges
-
No.
Typ. Handrail/ Seal: Gardrail Const.
4" Concrete slab
Existing foundation wall
Revisi
basement slab construction.
Detail-coil Strap Intermediate stud 8 Scale: N.T.S. 2 Layers of 5/8" GWB 1 H.R. 2 Layers of 5/8" GWB 1 H.R.
Detail-Foundation Wall Anchor Bolts
Detail- Basement Slab Attach all plywood sheathing6to studs 8d 3/4" =w/ 1'-0" common nails @ 3" o.c. at panel edges
2 Layers of 5/8" GWB
8d nails see ( 2/
8" sawcut (1" deep) within 24 hours of pour ( do not interupt mesh) Design By: Designer
5 Detail-Pilot house rake 4 1" = 1'-0"
1" = 1'-0"
1
@ 12" C/C Transversally Attach plywood sheathing to studs w/ 8d common nails @ 6" o.c. at intermediate
-5/8" Type "x" gwb (level 4 finish) -Fiberglass batt insulation laid on top of gwb to extend to sheathing -Roof rafter@ 16" o.c. (see framing plan) -5/8" OSB sheathing -Ice & water shield over entire roof -Bituminous torch down roofing.
See no
5 8" dia. studs extension rod
End length
4" Gravel
1
3#5" AND #5
Existing foundation wall
New 2"x6" stud wall @16 c.c.
2
2" x 6" Pressure treated plate Existing Stone Foundation wall
-Metal drip edge -5/4 x8 fascia w/ ex nailer -Cont. vented vinyl soffit
R-19 Insulation.
Cut length
Use every other nail hole in a row to provide the code required minimum center to center spacing for nails
2x6 Bearing wall @16'o.c./Typ
Pilot roof house constr.
Grade 0' - 0"
2 Layers of 5/8" GWB
Pilot roof house constr.
5/8" GWB
First Floor Plan 2' - 6"
R-19 Insulatuion
1" = 1'-0"
1/2" Proxy Anchor @16" C.C. 2/2"X 10" 2/2"x6"
Basement Plan -6' - 6"
Foundation Wall (See Details)
"Simpson" framing plate model "ltp4" @ 24" o.c. to attach rim board to bottom plate
2 Layers of 5/8" GWB
3 12" Max Projection
New Floor 2" x10" @16 c.c.
Detail-Typical Basement Slab 1" = 1'-0"
2X 6" P.T. SILL Plate On Sill sealer
2 Layers of 5/8" GWB
2x6 Bearing wall @16'o.c./typ
5
Attach all plywood sheathing to top plate w/ 8d common nails @ 3" o.c. at panel edges
Second Floor Plan 11' - 6" 3/4" C/D ply deck
2/2"X 10" 2/2"x6"
"Simpson" framing plate model "lTP4" @ 24" o.c. to attach rim board to top > Sill plate
Replacement Rotted 2x10 joists@ 16" C.C
1/2" Proxy Anchor @16" C.C.
First Floor Plan 2' - 6"
EQ
GWB
-
Grade 0' - 0"
2 Layers of 5/8" GWB
Pressure treated 2"x6" stud R-19 Insulation.
Detail-Foured Concrete Exterior Wall 1" = 1'-0" Intermediate stud
Attach all plywood sheathing to studs w/ 8d common nails @ 3" o.c. at panel edges
2x6 Bearing wall @16'o.c./typ Existing Party Wall
1 New Floor 2" plywood x10" @16sheathing c.c.
8"
3.
- 1 " sawcut Cont. conc. footing ( as 24 dimensioned) (1" deep) within hours of 8 W/ Floor 93)pour # 2" s (cont. re-bar & #4mesh) re-bar at New x10" @16 c.c. do not interupt 2'-0"
4' Concrete slab w/ perimeter expansion - drain 4" Conc. slab. w 1.4x w1.4 wwf joints slope towards tied to storm water 1 management system. 2" Perimeter expansion joint 10 mil. poly vapor barrier 4" crushed stone 4" Perimeter drain tile to sump pump. Provide 1" deep saw cut see plans for location. Control joint for ea. ft. of slab
2 Layers of 5/8" GWB
5
Detail-Stair
3
Typ. Footing Constr.@ Window Well
37" At Gard Rail 34" at Hand rail
Existing Party Wall
(3) 2X12 Carriage Or Box Stair
All hardware in contract w/ pressure treated (p.t.) lumber to be galvanized if hardware is not galvanized , place a preservative-treated berried between p.t. lumber & hardware.
Basement Slab Construction.
2"x6" Stud wall @ 16" C.C.
below window
Detail-Typical Basement Haunch Slabof "simpson" model to 1st floor studs at same locations 7. Install "simpson" model "hdu4-sds2.5" hold-downs "sstb" anchors. connect hold-down to "sstb" 4anchors w/58' dia. extension rod & "cnw' coupler (see 4/s-1.20 1" = 1'-0"
Foundation wall key
Seal:EQ
Typical Stair Simpson Noising or equiv joist hanger profile
Floor sheathing Per Details
Third Floor Plan Seal: 20' - 6" 6. In order to anchor braced wall panels to foundation wall install 'simpson" model "sstb16" anchor bolts (see 4/s-1.2) so that the anchors are cast in place during pouring conc. for foundation walls.
3
1'
2/2"X 10" 2/2"x6"
Sill height....... not more than 44" a.f.f.
-
6"
New cap flashing @ wall
-
4"
2X Cont. Cleat
Address: 1125 MASON AVENUE DREXEL HILL, PA 19026
8' - 0"
37" At Gard Rail 34" at Hand rail
1" = 1'-0"
see elevation for window size
1
Rubber Flashing
v.i.f. 44" max.
5/8 EXT. Ply
3 12" Max Projection
MAX. 30° Locate floor header to intersect Angle from bottom of carriages Vertical 3
Project Number: 02 05 2001 2023
Egress windows shall have:
4" Perimeter drain tile to sump pump. see plans for location.
Detail-Foured Concrete Exterior Wall
New Roof 2" x10"sloped @16 c.c. sill w/ drip edge Required along all open-sided Parapet floor area and stairways 2. Install sheathing coil straps on the interior side of the studs @interior All top rail shall have a perimeter Stone cap adhered w/masonry New Deck Dimension of 4" min braced walls. (see framing plans for locations). adhesive 1 not to exceed 6 4 " w/ largest New Roof 2" x10"cross-section @16 c.c. Roof Plan Roof Plandoors,as well as above & not exceed 2 14" 3. Sheathing must be installed & fastened in all areas above Handrail gripping surface shall be 29' - 6" 29' - 6" openings. Continuous, without interruption bt newel posts, or Existing Party Wall Existing Party Wall other structural elements or obstructions Perm. affixed ladder w/ 12" min. width width 4. Nail sheathing edges to studs@ 3" o.c. w/ nails intermediate studs, nail at 6" o.c. w/ New 2"x6" stud(max.) wall vertically rungs o.c. (max.) 18" o.c. @16 c.c. s-1.2). see interior/exterior sheathing specification on sheet s-1.1.
Rear settback
4' Concrete slab w/ perimeter expansion joints slope towards drain tied to storm water New Deck management system.
-Metal drip edge -5/4 x8 fascia w/ ex nailer -Cont. vented vinyl soffit
10"
Pilot roof house constr.
1420 S 20th st, Philadelphia, PA-19146
1'-6"
Pilot House 38' - 0"
3RD STORY ADDITION w/3RD R. DECK at
0' - 8"
8"
1'
Max Height 38'-0"
Project Title:
4" Clean free dawning stone at least 12" in width around all sides of well filled to depth of foundation footing
Notes:
Email: tranbar@msn.com EQ Phone: 267.271.7766
6"
applied per mfr. spec. 3
v.i.f. 44" max.
See detail sheet a-103 for window flashing. inter trim package by owner.
5
e
"s an lb.
con
Clean free dawning stone at least 12" in width around all sides of well filled to depth of foundation footing
-
Min. net 'simpson" clear openingmodel height............24" "sstb16"
-
10" (IBC 2009)
Intermediate stud
EQ
EQ
EQ
EQ
W.W.F. In upper
or end plate
Scale: N.T.S.
Head flashing tie-in instruction
-
-
-
A102
1
install
self adhesive or equal
Removab;e protective "simpson" modelmental grate set on angles attached cnw couplerto foundation sloped sill w/ drip edge
*Install flashing in order by numbers.
Exterior sheathing **Install flashing and weather resistive barrier to End form water shedding laps. length Provide minimum 87" end dist~ances
Building wrap
Pqual number 1 of specified nails in each 1 end
"Simpson strong-tile" cs14 coiled strap
2
8
Detail-coil Strap
self-adhesive flash the Entire sill prior to window install
Scale: N.T.S.
Detail-Foured Concrete Exterior Wall
self 1 adhesive flashing by grace-vycor 1" = 1'-0" or equal
8"
9 cap adhered w/masonry Stone Scale: N.T.S. adhesive
dia. studs extension rod
Design By:
Wall Anchor Bolts Check By: Drawn By:
-
Designer
Provide minimum 87" end dist~ances
Pqual number of specified nails in each 1/2' Dia galv. steel hooked anchor bolt Perm. affixed ladder w/end 12" min. width width w/12" min. embedment rungs o.c. (max.) 18" o.c. (max.) vertically 3'-0" O.C. MAX. (W Bolts per Plate Min.) 12" MAX. Distance from corners or end plate
Inst brac
A
3. Shea open
4. Nail s-1.2
Detail-coil S
Typ. Found. Wall constr. @ Window8Well Scale: N.T.S. 5. All h 8" Poured conc. wall galva #5 bar vert. @ 2'-6" o.c. & 4 bar
H. Travor
"simpson" sstb16 anchorbolt min. 1,000 lb. capacity
2.
Foundation Wall Anchor Bolts
10"
8"
Sh
Detail-Foundation Hold Down
"simpson" hdu4-sds2.5 studs hold down
See detail sheet a-103 for Detail-Foundation foundation wall construction. flashing by building grace-vycor Fold up 7 wrap Clear Scale: N.T.S. span secure &temporarily See detail sheet a-103 for window as flashing. shown inter trim package by owner.
1. On a D frami Sh of on W & 12" D
Revisions Drawn By: Author No. wall Date existing studs Discription
3"
-
Author
@3'-0" o.c. horz. bituminous water roofing applied per mfr. spec.
3
4"
Clean free dawning stone at least 12" in width around all sides of well filled to depth of foundation footing
concrete wall Issue Datefoundation : 4/19/2018
6. In or 'simp pour
Is 7. Insta "sstb S Typ. Footing Constr.@ Window Well
Foundation wall key
Sheet Name:
Elevation, Section and Details
1'
sillopening prior width to window Entire Min. net clear .............20"
-
C Iss
See framing plans for lintel
5
D
Base
H. Travor
concrete foundation wall
Scale: N.T.S.
Sill height....... not more than 44" Cuta.f.f. Use every other nail hole in a row to length provide the code required - minimum Min. net clear opening....................5.7 s.f. center to center spacing for nails End Min. net clear opening height............24" length self-adhesive flash the
N
4" Conc. slab. w 1.4x w1.4 wwf see a4/5 1 2" Perimeter expansion joint 10 mil. poly vapor barrier 4" crushed stone Provide 1" deep saw cut Control joint for ea. ft. of slab
Use every other nail hole in a row to provide the code required minimum center to center spacing for nails
1'-6"
Sheet Number:
A102
ect Number: 02 05 2001 2023
Typical window Flashing detail 5 Detail-Foundation Wall Anchor Scale: N.T.SBolts
Check By:
1 2
R
Basement Slab Construction. basement slab construction.
See detail sheet a-x for foundation floor construction.
Project Number: 02 05 2001 2023
1" = 1'-0"
8
sawcut (1" deep) within 24 hours of "simpson" model
#5 bar @ 24" o.c.
1420 S 20th st, Philadelphia, PA-19146
Detail-Typical Basement Slab
8"
Dr
of slab depth
Detail-Stair
pour do not interupt mesh) 1" = (1'-0" cnw coupler
Seal:
S 20th st, delphia, PA-19146
5
1
1 3
Ch
GWB
conc. haunch slab w/ (2) #5 bars cont.
STORY ADDITION w/3RD R. DECK at
Sill plate
1
EQ
EQ
Address: See Notes 1125 MASON AVENUE DREXEL HILL, PA 19026 Email: tranbar@msn.com Phone: 267.271.7766
8"
1" = 1'-0" "simpson" sstb16 Detail-Typical Basement Slab anchorbolt min. 1,000 5 lb. capacity 1" = 1'-0" Design By: Designer
Clear span
of slab depth
1
Window
5
3
6"
1 3
S De
Simpson or equiv joist hanger
Detail-Typical Basement Haunch Slab
4 W.W.F. In upper
TO LANDING
(3) 2X12 Carriage Or Box Stair
5 8" dia. studs extension rod
End length
TYP. Roof Constuction Detail
24" o.c. to attach rim board to bottom plate Building Detail-Foundation Wall Anchorwrap Bolts
Sto finish (smooth or textured) 1 7 N.T.S. weep screed or flashing Scale: 1
7
Address: 1125 MASON AVENUE DREXEL HILL, PA 19026
1'
Cut length
S
#5 bar @ 24" o.c. Ballisters to be spaced so not to allow passage of a 4" dia sphere (typ) Locate floor header to intersect bottom of carriages V.I.F.
Seal:
Re
No
cross-section not exceed 2 14" Handrail gripping Floor surface shall be Owner) finish (Per Continuous, without interruption bt newel posts, or sheathing Details) other structural elements or (Per obstructions
conc. haunch slab w/ (2) #5 bars cont.
Discription
Use every other nail hole in a row to provide the code required minimum center to center spacing for nails
V.I.F.
Handrail/ 1" =Typ. 1'-0"
-
"simpson" hdu4-sds2.5 studs hold down No. Date Discription
allow passage of a 4" dia sphere (typ)
Date
Scale: N.T.S
Project Title:
Scale: N.T.S
existing wall studs
3RD STORY ADDITION w/3RD R. DECK at
6
a= Diameter of throat b= Width of flange Lap building overofcompleted sticky c= wrap Width head flashing and headofflash d= metal Height head
2" x 10" @16" c/c
5' - 0"
5
Typical window Flashing detail
See manuf. installation instruction/ specification for sealing flange edges
3
(3) 2X12 Carriage or Box Gardrail Const. stair Required along all open-sided Simpson OR Equiv floor area and stairways basement slab construction. Joist hanger All top rail shall have a perimeter 5 Dimension of 4" min see a4/5 8" GWB not to exceed 6 41" w/ largest
Haunch Slab
1" = 1'-0"
Project Title:
Detail-Typical Basement Slab
Roof Vent No.
1" = 1'-0"
2" x 10" @16"Sill c/c plate
Scale: N.T.S
Henry Building Services, LLC
-
Lap building wrap over completed sticky flashing and metal head flash Stud framing (see self-adhesive flash the Sheathing joint Sto details are illustrations of construction detail) Entire sill prior to window they are install Mechanically fasten as necessary in corners Sheathing guidelines,intended for use by the design Sto guard mesh sto 2X 6" P.T. SILL Plate through flashing (see detail) On Sill sealer construction professional, to assist,gold theyfill self adhesiveHead flashing by grace-vycor flashing tie-in instruction Sto emaraldcoat should be modified where Attach all plywood sheathing to top plate w/ necessary to equal Foundation Wallor (See Sto emeraldcoat accommodate individual Head flashing tie-in instruction 8d common nails @ 3" o.c. at panel edgesproject conditions. Expanded metal lath Details) 1.Cut,fold up & temporarily secure refer to appropriate sto specification for Building wrap lapsheader to allow for flashing weather resistive barrier above 1.Cut,fold up & temporarily secure Sto powerwall*scratch Install flashing in order as shown over design requirements. refer to local building installation. Detail-Wall Bracing Panel weather resistive barrier above header to allow for flashing coat by numbers. 3 Tape code. 6 2.Install head flashing under weather 1" = 1'-0" installation. "Simpson" framing plate model "ltp4" @ Sto powerwall**Install brawn coat flashing and weather Issue Date : 4/19/2018 resistiveresistive barrier. barrier to 2.Install head flashing under weather 24" o.c. to attach rim board to bottom plate Sto premer form water shedding laps. resistive barrier. 3. Metal head flashing with drip. provide 2 Sidewalk/ pavers Sheet Name: end dams unless installed at lap siding. Wall Foundation Anchor Bolts 3. Metal head flashing with drip. provide Sidewalk/ pavers Barrier membrane Elevation, Section Sto finish (smooth or textured) end dams unless installed at lap siding. 1/2' Dia galv. steel hooked anchor bolt 4. Folf weather resistive barrier -back Window and Details Barrier membrane Foundation weep screed or flashing over head flashing and seal with tape.w/12" min. embedment Stucco wall assembly detail 3'-0" O.C. MAX. (W Bolts per Plate 4. Folf weather resistive barrier back 4 Foundation Min.) 12" MAX. Distance from corners over head flashing and seal with tape. Scale: N.T.S Sheet Number:
Sto details are illustrations of construction they are guidelines,intended for use by the design construction professional, to assist, they should be modified where necessary to
2
All top have wwf a perimeter 4"- Conc. slab.rail w shall 1.4x w1.4 Dimension of 4" min 1 2" Perimeter expansion1 joint to vapor exceed 6 4 " w/ largest 10- mil.not poly barrier cross-section not exceed 2 14" 4" crushed stone Handrail Provide 1" deepgripping saw cutsurface shall be Control Continuous, joint for ea. without interruption bt newel posts, or other structural elements or obstructions ft. of slab
-
2
3 Locate Floor Header To Intersect Bottom of Carriages Detail-Stair
Detail-Handrail/ Gardrail
ect Title:
4
Top plate
Required along all open-sided
Revisions Ballisters to be spaced so not to
5
2" x 10" @16" c/c
2
Attach all plywood sheathing to studs w/ 8d common nails @ 3" o.c. at panel edges
-
8" sawcut (1" deep) within 24 hours of Stud framing (seeFoundation Wall (See Sill plate Details) pour ( do not interupt mesh) Attach all plywood sheathing to studs w/ 8d detail) e= Height of collar Design By: Designer common nails @ 3" o.c. at panel edges Mechanically asoverall necessary in corners Sheathing 2" x 10" @16" c/c f= fasten Total height 1 Basement Slab Construction. Fold up building wrap through flashing (see detail) 4"By: Conc. slab. w 1.4x w1.4 wwf &temporarily End secure 1 Check H. Travor Fold up building wrap length 1 Sto emaraldcoat 2" Perimeter expansion joint 2X 6" P.T. SILL Plate Provide minimum 87" &temporarily secure 10 mil. poly vapor barrier On Sill sealer end dist~ances Expanded metal lath 4" crushed stone Drawn By: Building Provide 1"Author deep saw cut Attach all plywood sheathing to top plate w/ wrap laps Pqual number of Foundation Wall (See Foundation Wall Anchor Sto powerwall scratch ControlBolts joint for ea. over common nails @ 3" o.c. at panel edges specified nails in each Roof Vent ft. of slab Exterior sheathing Details) Framing8d Plan "Simpson strong-tile" cs14 1/2' Dia galv. steel hooked anchor3 bolt coat end Tape 6 min. embedment 3 coiled strap w/12"Scale: N.T.S 1/8" = 1'-0" Exterior sheathing Sto powerwall brawn coat 3'-0" O.C. MAX. (W Bolts perBracing Plate 3 Detail-Wall Panel Intermediate stud Min.) 12" MAX. Distance from corners 6 Sto premer Detail-coil Strap or end plate 1" = 1'-0" 2 Building wrap Egress windows shall have: "Simpson" framing plate model "ltp4" @
2
Window
Seal:Gardrail Const.
1
(3) 2X12 Carriage Or Stair of "simpson"Box model
To Landing
Revisions
2X 6" P.T. SILL Plate On Sill sealer
Building wrap laps over Tape
Sto finish (smooth or textured) weep screed or flashing
Height of collar Total overall height
Seal:
Intermediate stud
Framing Plan 1/8" = 1'-0"
e= f=
Detail
Side carriages may be hug fromDetail-Typical header or attached to wall Basement framing. 4 box Stair. Contractor may opt to install 1" = 1'-0" With approval of owner. g.c. to verify all heights in field before ordering box stairs or constructing stair. all stair to comply w/ applicable codes.
Basement Slab Construction. floor area and stairways
Attach plywood sheathing to studs w/ 8d common nails @ 6" o.c. at intermediate Top plate Legend Detail-Handrail/ Gardrail 2 2" x 10" @16" c/c 1" = 1'-0"
First Floor Plan 2' - 6"
Expanded metal lath
Sto premer
Stucco wall assembly detail
Scale: N.T.S
Sto guard mesh sto Detail-Wall Bracing Panel 6 Mechanically fasten as necessary in corners 1" = 1'-0" gold fill through flashing Sto emeraldcoat
common nails @ 6" o.c. at intermediate Front Elevation Sto powerwall brawn coat 2 1/8" = 1'-0"
Sto details are illustrations of construction they are guidelines,intended for use by the design construction professional, to assist, they should be modified where necessary to accommodate individual project conditions. refer to appropriate sto specification for design requirements. refer to local building code.
3
Roof Vent
Width of flange Width of head Height of head
of slab depth
= 7 34" (IBC 2009) =8 1 4 " (PA UCC) = 10" (IBC 2009) =9" (PA UCC)
see elevation for window size
4' - 6"
6
Lap building wrap over completed sticky flashing and metal head flash
Sto powerwall scratch Attach plywood sheathing to studs w/ 8d coat
South Elevation 1/4" = 1'-0"
2" x 10" @16" c/c
2' - 0"
4' - 6"
Sheathing "Simpson" framing plate model "ltp4" @ (see detail)plate 24" o.c. to attach rim board to bottom First Floor Plan Sto emaraldcoat
Sheathing joint
2.
Seal:
v.i.f. 44" max.
1
detail)
2' - 6"
(3) 2"x4" or 62 post
b= c= d=
1 3
(1" deep) withinConstuction 24 hours of Roof 8" sawcutTYP. Handrail/ pourTyp. ( do not interupt mesh)
min
1420 S 20th st, Philadelphia, PA-19146
Sto emeraldcoat
2" x 10" @16" c/c
Second Floor Plan 11' - 6"
Attach all plywood sheathing to top plate w/ Double Hung 8d common nailsWindow @ 3" o.c. at panel edges (3) 2"x4" or 62 post Stud framing (see
3 12" Max Projection
2" x 10" @16" c/c
3' - 0"
4' - 6" 3' - 0"
gold fill
Height of collar Total overall height
common nails @ 3" o.c. at panel edges
3' - 0"
6' - 6" Exterior Door
Sto guard mesh sto
e= f=
W.W.F. In upper 1
to top plate w/Aura 8d ventilation diagram a= Diameter of throat common nails @ 3" o.c. at panel edges
2" x 10" @16" c/c 4" Perimeter drain tile to sump pump. see plans for location.
First Floor Plan Third2'Floor - 6" Plan 20' - 6"
Second Floor Plan 11' - 6"
Sheathing joint
Width of flange Width of head Height of head
to attach rim board to top > Framing Plan 3 1/8" = 1'-0" Front Elevation 2 Attach all plywood sheathing to studs 1/8" = 1'-0"w/ 8d common @ 3" sheathing o.c. at panel edges Attach allnails plywood to top plate w/ 8d
1
1 2"
MAX. Stair Raiser MIN. Stair Tread
3.
Legend
2" xRoof 10" @16" c/c TYP. Constuction Detail Stucco W/ Wire Attach all plywood sheathing 4' Concrete slab w/ perimeter expansion
2' - 0"
Attach plywood sheathing to studs w/ 8d common nails @ 6" o.c. at intermediate
1.
Top plate hold-downs 7. Install "simpson" model "hdu4-sds2.5" Detail-Handrail/ Gardrailto 1st floor studs at same locations of "simpson" model 2 hold-down to "sstb" anchors w/58' dia. extension rod & "cnw' coupler (see 4/s-1.20 "sstb" anchors. connect 1" = 1'-0"
W/ 93) # s cont. re-bar & #4 re-bar at 2'-0"
b= c= d=
1 21" min
Notes:
'simpson" model "sstb16" anchor bolts (see 4/s-1.2) so that the anchors are cast in place during pouring conc. for foundation walls.
N
Se
7. Install "simpson" model "hdu4-sds2.5" hold-downs to 1st floor studs at same locations 5 "sstb" anchors. connectSeehold-down to "sstb" anchors w/58' dia. extension rod & "cnw' coupler (see 4/s-1.20 8" GWB notes
specification for sealing flange edges
see plans for location.
specification for sealing flange 1" =6.1'-0" In order to anchor braced wall panels to foundation wall install Seal: edges
Project Number: 02 05 2001 2023
1" = 1'-0"
2' - 0"
South Elevation 1 1/4" = 1'-0" Front Elevation 2 1/8" = 1'-0"
1'
4' - 6"
Double Hung Window
2" x 10" @16" c/c Detail-Foured Concrete Exterior Wall
See manuf. installation instruction/ Detail-Foured Concrete Exterior Wall
Floor Finished(Per V.I.F. Owner)
Simpson or equiv joist 'simpson" model "sstb16" anchor bolts (see 4/s-1.2) so that the anchors are cast in place during Sheathing (Per Details) hanger pouring conc. EQ for foundation walls.
5. All hardware in contract w/ pressure treated (p.t.) lumber to be galvanized is not notto Ballistersiftohardware be spaced so See manuf. installation instruction/3 12" Max passage of a 4" dia (typ)drain tile to sump galvanized , place a preservative-treated berried between p.t. lumber & allow hardware. 4"sphere Perimeter pump. Projection
"Simpson" Typ. Footing Constr.@ Window Well framing plate model "lTP4" @ 24" o.c. 2" x (10" c/cattach rim board to top > to Cont. conc. footing as @16" dimensioned)
Second Floor Plan joints slope towards drain tied to storm water 11'Roof - 6" Plan management system. a= Diameter of29' throat - 6"
First Floor Plan Third2'Floor - 6" Plan 20' - 6" First Floor Plan 2' - 6" "Simpson" framing plate model "lTP4" @ 24" o.c.
Double Hung Window
Foundation wall key
applicable codes. profile
4' Concrete slab w/ perimeter expansion joints slope towards drain tied to storm water management system.
2" x 10" @16" c/c
3' - 0"
Legend 2" x 10" @16" c/c
2" x 10" @16" c/c
3' - 0"
3' - 0" 5' - 0"
1
3 4" Clean free dawning stone at least 12" in width around all sides of well filled to depth of foundation footing
1'-6"
(3) 2"x4" or 62 post
4' - 6"
4' - 6"
6' - 6" Exterior Door
Double Hung Window
6"
2" x 10" @16" c/c
Second Floor Plan 11'Roof - 6" Plan 29' - 6" Second Floor Plan 11' - 6"
Stucco W Wire
2" x 10" @16" c/c
2" x 10" @16" c/c
4' - 6" 4' - 6"
2" x 10" @16" c/c
3' - 0" 3' - 0"
42" A.F.D WD Railing
Third Floor Plan 20' - 6" Pilot House 38' - 0"
2" x 10" @16" c/c
v.i.f. 44" max.
flashing. 2" x 10" @16" c/c inter trim package by owner.
Third Floor Plan 20' - 6" Pilot House Attach all plywood sheathing to top plate w/ 8d Third Floor Plan 38' - 0" 20' - 6" common nails @ 3" o.c. at panel edges
Double Hung Window
-
8" Poured conc. wall 2" x 10" @16" c/c #5 bar vert. @ 2'-6" o.c. & 4 bar @3'-0" o.c. horz. bituminous water roofing applied per mfr. spec. 1 c/c 2" x 10" @16"
3RD STORY ADDITION w/3RD R. DECK at
3' - 0"
"Simpson" framing plate model "lTP4" @ 24" o.c. to attach rimSee board top a-103 > for window detailtosheet
-
3"
Clean free dawning stone at least 12" in
37" At Gard Rail 34" at Hand rail
Typ. Found. Wall constr. @ Window Well
2" x 10" @16" c/c
Stucco W Wire
37" At Gard Rail 34" at Hand rail
10"
29' - 6"
2" x 10" @16" c/c
4' - 6"
See detail sheet a-103 for foundation wall construction.
Aura ventilation diagram
4. Nail sheathing edges to studs@ 3" o.c. w/ nails intermediate studs, s-1.2). see interior/exterior sheathing specification on sheet s-1.1.
2" x 10" @16" c/c
Min. net clear opening width .............20"
Perm. affixed ladder w/ 12" min. width width
2" x 10" @16" c/c
-
Stucco W/ Wire
rungs o.c. (max.) 18" o.c. (max.) vertically AuraRoof ventilation Plan diagram
2" x 10" @16" c/c
Roof Plan 29' - 6"
4" Perimeter drain tile to sump pump. see plans for location.
5' - 0"
Stucco W Wire
see elevation for window size
Detail-Foured Concrete Exterior Wall 1- Min. net clear opening....................5.7 s.f. 1" = 1'-0" Roof Plan Stucco W/ Wire Min. net clear opening height............24" 29' - 6"
4"
All top rail shall have a perimeter Details Dimension of 4" min 1 Typ. Footing Constr.@ Window Well well astoabove window not exceed& 6 below 4 " w/ largest cross-section not exceed 2 14" Cont. conc. footing ( as dimensioned) Handrail gripping surface shall be W/ 93) # s cont. re-bar & #4 re-bar at Continuous, without interruption bt2'-0" newel posts, or 1'-6" nail at 6" structural o.c. w/ 8d nailsorsee ( 2/ other elements obstructions
Address: 1125 MASON AVENUE DREXEL HILL, PA 19026
1
2" x 10" @16" c/c
Sill height....... not more than 44" a.f.f.
3
-
3 2" Max 3. Sheathing must be installed & fastened in all areas above doors,as Projection openings.
2" x 10" @16" c/c
-
Henry Building Services, LLC
6"
4' Concrete slab w/ perimeter expansion joints slopecap towards drain tied to storm water Stone adhered w/masonry management adhesive system.
Egress windows shall have:
1 21" min
Typ. Handrail/ width around all sides of well filled to depth of foundation footing Gardrail Const. 2X Cont. Cleat 2. Install sheathing coil straps on the interior side of the studs @interior Required along all open-sided Foundation wall key floor area and stairways Floor sheathing Per braced walls. (see framing plans for locations).
8"
42" A.F.D WD Railing
flashing. inter trim package by owner.
v.i.f. 44" max.
Pilot House 38' - 0"
W/ 93)attached # s cont.to re-bar & #4 re-bar at set on angles 2'-0" foundation sloped sill w/ drip edge
House 38' - 0"
37" At Gard Rail 34" at Hand rail
1'-6" Pilot
Email: tranbar@msn.com Phone: 267.271.7766
MIN. Stair Tread Typ. Found. Wall constr. @ Window Well =9" (PA UCC) MAX. 30° Install "simpson" model model 7. See 5. All hardware in contract w/ pressure treated (p.t.) lumber to be galvanized if hardware is not detail sheet a-103 for "hdu4-sds2.5" hold-downs to 1st floor studs at same locations of "simpson" 8" Poured conc. wall 7 Angle from 5 1.foundation On all (3) floor, install " o.s.b. sheathing & coil straps to the exterior side of entire front & rear walls (see 2. Side carriages may be hug from header or attached to wall wall construction. "sstb" anchors. connect16hold-down to "sstb" anchors w/ 8' dia. extension rod & "cnw' coupler (see 4/s-1.20 galvanized , place a preservative-treated berried between p.t. lumber & hardware. #5 bar vert. @ 2'-6" o.c. & 4 bar Vertical framing. 3 4" Locate floor header to intersect framing plans for locations). install "simpson" model cs14. coil straps 3" (see3/s-1.2) in order to connect @3'-0"studs o.c. horz. 3. Contractor may opt to install box Stair. bottom of carriages bituminous Typ. Footing Constr.@ Window Well of one floor level to the studs of the floor above or below. the coil strap is to extend 12" min. below to platewater roofing With approval of owner. g.c. to verify all heights in field before applied per mfr. spec. EQ Cont. conc. footing ( as dimensioned) ordering box stairs or constructing stair. all stair to comply w/ Typical Stair Noising See detail sheet a-103 floor for window & 12" min. above sheathing. Removab;e protective mental grate 6. In order to anchor braced wall panels to foundation wall install
1'
Pilot House 38' - 0"
Floor finish (Per Owner)
Perm. affixed ladder w/ 12" min. width width Notes: 6. In order to anchor braced wall panels to foundation wall install (Per (Details) 4. Nail sheathing edges to studs@ 3" o.c. w/ nails intermediate studs, nail at 6" o.c. w/ 8dsheathing nails see 2/ rungs o.c. (max.) 18" o.c. (max.) vertically 3 anchor bolts (see 4/s-1.2) so that the anchors are cast in place during s-1.2). interior/exterior sheathing specification on sheet s-1.1. = 7 see 4" (IBC 2009) =8 1. MAX. Stair Raiser Basement Slab Construction 1 TO LANDING pouring conc. for foundation walls. " (PA UCC) = 4 Min. net clear opening width .............20"
See framing plans for lintel Foundation wall key
Stucco W Wire
Se
openings.
10"
Min. net clear opening....................5.7 s.f.
Email: tranbar@msn.com Phone: 267.271.7766
4"
Sill height....... not more than 44" a.f.f.
-
Henry Building Services, LLC
3
-
see elevation for window size
See detail sheet a-x for foundation floor construction.
v.i.f. 44" max.
See detail sheet a-103 for window flashing. inter trim package by owner.
@3'-0" o.c. horz. bituminous water roofing applied per mfr. spec.
-
6"
s
3"
Cont. conc. footing ( as dimensioned) W/ 93) # s cont. re-bar & #4 re-bar at 2'-0"
Hold Down 4' ConcreteDetail-Foundation slab w/ perimeter expansion joints9slope towards drain tied to storm water Scale: N.T.S. management system. 4" Perimeter drain tile to sump pump. see plans for location.
S
Architectural Portfolio Academic Works
Academic Works
NEXUS DESIGN CENTER
10 Role:
Nexus Design Center Philadelphia, PA
II Architect
Description: The nexus design center was design as a collaborative design studio project in the center city at 11 and chestnut with architecture, sustainable and interior design students. This building was design Introduction for Thomas university students, Thethe objective of Jefferson nexus design center is to inspireproa fessors, and delegates for collaboration studios, collaborative environment, where ideas may flow, research meeting presentations and where the outside and will interact with thegalleries inside, where nothing will be wasted, andis everything is valued. event space. This building design with WELL building standards. GUIDING PRINCIPE LS Experience- To create a welcoming vibrant spaces while having a co-relation with the interior and exterior spaces that will evoke inspiration and nurture collaboration. Culture- Creating a space where people can share ideas, belief, knowledge and culture. Systems- To create a building which focuses on reWELL building source efficiencystandards while achieving interrelation between Sevenand Concepts for Healthier building form function. Performance- WELL Platinum + Resource Efficiency (Water, Energy, Materials)
3d Diagram
View from the 1st floor Exhibition Space View from the 1st floor Exhibition Space
View from the 1st floor Stair
EUI of this Nexus design center
Exploded Axon
Study & Form
Academic Works
11 Location
Agro-Livestock Research Center II Marfa, TX
Description: Black Hills Ranch, a 12,000-acre ranch, will be the newest acquisition of Sul Ross University commitment to education. The ranch lies 28 miles south of Marfa, Texas in Presidio County. The acquisition comes at a time for Sul Ross University commitment to building a more sustainable future. The University’s Department of Agricultural and Natural Resources Sciences Department (ANRS) efforts in sustainability has led the Department to seek a working ranch with the mission of addressing the Agro-livestock industry’s shortsighted work practices. Efforts in ranching and farming will address water consumption and how to best maximize a limited resource.
Existing Water Cycle Diagram Site Location
Proposed Water Cycle Diagram
Bio-climatic Approach
Existing Site Problem
Required footprint
The site has many small cluster of hills that result in formation of creek during rainy weather & high evaporation rate which result to dry steams.
The building location was selected on top of creek to solve the problem of the site.
The building volume pushed down to earth to prevent from extreme hot climate. The
Structural Move
Water Capture
Site Response
The Building column response to heavy roof spanning over large surface and transfer load uniformly to the ground.
The roof collects water and transfer excess water to cistern below for reuse.
The roof collects water and transfer excess water to cistern below for reuse. The green roof bridge the building and connect to the existing hill with similar contextual Vegetation.
From the basic site analysis and precedents, schematic design was developed to align with site requirements and programs. Various component of buildings were introduced to address the problem on site such as louvres, light wells, earth shelter and marshlands. Also the building was fully sustained with on site energy harvest using all natural resources like geothermal, solar and water collection and reuse.
Mechinical Unit
3 4
6
Concepts
5
1
7
3
82
23 24 25
4
9
10 6
11
5
12
10
7
13
14 16
9
8
15
6
10
11
26
29 30 33 34
23
26
ASSEMBLY 24 DETAIL 01 1/2” 25 = 1’-0”
SCALE
1. Parapet Clipping Sheet metal clip 14Metal6Clipping 15 12 2. Sheet 13 10 3. Bitumen16Waterproofing 4. 2-poly 5. Clamping Bar 6. Rigid Foam Insulation 7. Loose Gravel 8. Planting 9. Substrate 10. Filter Fleece 11. Drainage layer 12. Extruded Polystyrene 13. XPS Board 14. Water proofing 15. Concrete wall slab 16. Waffle Slab 17. Timber board 18. Metal L-Clamp 19. Perforated Metal Panel 20. Hollow steel square Section 21. Concrete wall ( 4 inch) 22. Rigid insulation ( 2 Inch) 23. Steel studs ( 3 Inch) 24. Gypsum Board 25. Interior finish
Underfloor HVAC System 26. Concrete column 27. Metal hock/ Bolts 28. Clipping support 29. Steel studs support 30. Sealant Return Duct 31. Dip Cut 32. Drip Clip 33. Aluminum Curtain Mullion Section 34. Double Layer Curtain Glazing system 35. Joint Cut with weather Proofing ( with sealant) 36. Grill 37. Flex Duct 38. Supply Duct 39. Duck hanger Bracket 40. Floor Finish 41. Steel Deck 42. Pedestal 43. Concrete Floor 44. Viper Barrier 45. Rigid Insulation 46. Concrete foundation Wall 47. Top Soil 48. Planting 49. Crushed Stone
Entry Level
29
25' - 0" Sefaira Initial Daylight Analysis
30 33
Firstly, the building was analyzed with full glazing system. The result was extreme with huge amount of glare and heat gain.
33 34
36
37
38
40
39
Underfloor HVAC Layout
41
50
42
Roof Detail 0”
3”
1’-0”
6”
1”
55
54 51
53 52
56
33
45
Groung Level 15' - 0" 43
44
36
37
SEMBLY DETAIL 02
ALE 1/2” = 1’-0”
38
45 44
40
39
ASSEMBLY DETAILExisting 03 @ LOUVER Site Problem 41
SCALE 3/4” = 1’-0”
Ronaldo de Luna
The building location was selected on top of creek to solve the problem of the site.
Sefaira Final Daylight Analysis
42 50. Metal Louver Perforated 51.Hollow Square section 52.Levelling Mortar 53. C- Section bracket 54.Steel Screw fixings with sleeves on side to allow movement 55. L- Section bracket 56. Structural concrete wall
The use of louver facade in front of curtain wall reduced the amount of glare significantly. The louver shades most of the southern heat and prevent heat gain inside the building by reflecting it off the louver surface. The lighting problem at the core of the buildStructural Move Water Capture usewater of light wells that The Building column response to ing was resolved The by roofthe collects and transfer heavy roof spanning over large surexcess water to cistern below for reto the underground floor and face and transfer load uniformly to goes deep down use. the ground. illuminate floor surfaces. UG Level
43
Ashesh Sapkota
e: Meshkath Mohammad Hossain
Required footprint
The site has many small cluster of hills that result in formation of creek during rainy weather & high evaporation rate which result to dry steams.
Design 8 | Fall 2018 | Jefferson CABE
2
0' - 0"
Floor Detail 0”
3”
1”
1’-0”
6”
View from the courtyard
First Floor Plan
Underground Floor Plan
Bio-climatic Approach The building volume pushed down to earth to prevent from extreme hot climate. The
Site Response The roof collects water and transfer excess water to cistern below for reuse. The green roof bridge the building and connect to the existing hill with similar contextual Vegetation.
5
Green Roof
Louver Facade
Waffle Slab Supply Duct
Public & Private space Green Roof 1 7
3
82
23 24 25
4
9
10 6
11
5
12
10
7
13
14 16
9
8
15
6
10
11
26
29 30 Underfloor HVAC System 33 23 26 ASSEMBLY 24 DETAIL 34 25 SCALE 1/2” = 1’-0” Return Duct 29
30
on Section azing system 33 ( with roofing
01
36
37
39
38
41
42
50
0”
3”
1
2
6”
55
54 51
53 52
2
36
12 17
56
18 19
Entry Level
43
44
20
SeeFirstly, Detail 01 the
38
12 17 18
EntryDETAIL Level ASSEMBLY 03 @ LOUVER
25' 40 - 0" SCALE 3/4” =25' 1’-0” - 0" Sefaira 39Initial 41Daylight Analysis
37
Underfloor HVAC Layout
42 50. Metal Louver Perforated 51.Hollow Square section 52.Levelling Mortar
building was analyzed with full glaz-
Axon
Public & Private space
Axon
Earth Shelter
Axon
19 27
20
Longitudinal section
Firstly, the building was analyzed with full glazing system. The result was extreme with huge amount of glare and heat gain.
1 3
1’-0”
33
45
Waffle Slab
Sefaira Initial Daylight Analysis
Roof Detail 1”
all
Earth Shelter
Entry Level 25' - 0"
34 40
Louver Facade
Underfloor HVAC System 1. Parapet Clipping Sheet metal clip 26. Concrete column 14Metal6Clipping 27. Metal hock/ Bolts 2. Sheet 15 12 13 10 28. Clipping support 3. Bitumen16Waterproofing 29. Steel studs support 4. 2-poly 30. Sealant 5. Clamping Bar Return Duct 31. Dip Cut 6. Rigid Foam Insulation 32. Drip Clip 7. Loose Gravel 33. Aluminum Curtain Mullion Section 8. Planting 34. Double Layer Curtain Glazing system 9. Substrate 35. Joint Cut with weather Proofing ( with 10. Filter Fleece sealant) 11. Drainage layer 36. Grill 12. Extruded SupplyPolystyrene Duct 37. Flex Duct 13. XPS Board 38. Supply 14. Water proofing Mechinical Unit Duct 39. Duck hanger Bracket 15. Concrete wall slab 40. Floor Finish 16. Waffle Slab 41. Steel Deck 17. Timber board 42. Pedestal 18. Metal L-Clamp 43. Concrete Floor 19. Perforated Metal Panel 44. Viper Barrier 20. Hollow steel square Section 45. Rigid Insulation 21. Concrete wall ( 4 inch) 22. Rigid insulation ( 2 Inch) 46. Concrete foundation Wall 47. Top Soil 23. Steel studs ( 3 Inch) 24. Gypsum Board 48. Planting 49. Crushed Stone 25. Interior finish
Underfloor HVAC Layout
33
Mechinical Unit
4
6
5
1 7
82
3 4
9
10 6
11
5
10
7
12
8
13
14 16
9
Axon
Mechinical Unit
15
6
10
Supply Duct
11
1. Parapet Clipping Sheet metal clip 14Metal6Clipping 15 12 2. Sheet 13 10 3. Bitumen16Waterproofing Level 4.Groung 2-poly 5. Clamping Bar15' - 0" 6. Rigid Foam Insulation 7. Loose Gravel 8. Planting 9. Substrate 10. Filter Fleece 11. Drainage layer 12. Extruded Polystyrene
Sefaira Final Daylight Analysis
Underfloor HVAC System 26. Concrete column 27. Metal hock/ Bolts 28. Clipping support 29. Steel studs support 30. Sealant Return Duct 31. Dip Cut 32. Drip Clip 33. Aluminum Curtain Mullion Section 34. Double Layer Curtain Glazing system 35. Joint Cut with weather Proofing ( with sealant) 36. Grill
Underfloor HVAC Layout
WALL SECTION DETAILS 1 3 2 1 3
12 17
1
2
4
18 12 17
1
See Louver Detail 03
Entry Level 25' - 0"
See Louver Detail 03 3
3
19
18
2
4
See Detail 01
Entry Level 25' - 0"
19
2012 17
20
18 27
2
4
19 21
27
2220
See Detail 01 21
5
5
22
27
6
31
21
8
6
7 8 7
28
32
31
Groung Level 15' - 0"
32
28
4
22
Groung Level 15' - 0"
31
6
5
1 7
4
5
1
3
36
49 35
12
12 11 10
6
11 13
10 13
49
47
48
SCALE 3/16” = 1’-0”
PICAL SECTION picalWALL Section Detail
ALE 3/16” = 1’-0”
47
48
13
14
15
6
16
5 14 7 13
33
36
44 46
34
37
38
38
34
40
39
40
39
41
41
50
42
Roof Detail Roof Detail 0”
3”
1’-0”
6”
1”
0”
3”
1’-0”
55
54
51
53 52
56
6”
1”
44 46
Fir in
50
42
33
55
54 51
53 52
56
See Detail 02 33
UG Level 0' - 0"
See Detail 02
45
1. Green Roof 7. Underfloor HVAC System 2. Waffle Slab 8. Raised floor 3.Perforated Metal Panel 9.Light Shelves insulat- 10.Retaining Wall Anchor 1. Green Roof4. Non-load bearing 7. Underfloor HVAC System 11.Concrete Retaining Wall 2. Waffle Slabed Concrete wall8. Raised floor 5.Curtain Wall glazing 12. White paint 3.Perforated Metal Panel 9.Light Shelves 6. Curtain wall windows 13.Plant 4. Non-load bearing insulat10.Retaining Wall Anchor ed Concrete wall 11.Concrete Retaining Wall 5.Curtain Wall glazing 12. White paint 6. Curtain wall windows 13.Plant
43
44
36
UG Level 0' - 0"
45
35
49
TYPICAL WALL SECTION Typical Section Detail
37
35
6
12
10
33
5
5
11
30
32
9
10 6
29
33
33
9
9
Unde 1. Parapet Clipping Sheet metal clip 26. Concrete column 7 14Metal6Clipping 159 27. Metal hock/ Bolts 15 11 12 82 49 12 11 12 2. Sheet 13 86 10 10 10 10 28. Clipping support 3. Bitumen16Waterproofing 16 17 6 Underfloor HVAC 29. Steel studs support 4. 2-poly 5 26. Concrete column 1. Parapet Clipping Sheet metal clip 18 30. Sealant 5. Clamping Bar 7 14 27. Metal hock/ Bolts Metal6Clipping 15 9 11 12 2. Sheet 13 8 31. Dip Cut 6. Rigid Foam Insulation28. Clipping support 10 10 3. Bitumen16Waterproofing 7. Loose Gravel 32.support Drip Clip 4. 2-poly 29. Steel studs 19 8. Planting 5. Clamping Bar 30. Sealant 33. Aluminum Curtain Mullion Section Retu Substrate 6. Rigid Foam9.Insulation 31. Dip Cut 34. Double Layer Curtain Glazing syste 35. Joint Cut with weather Proofing (w 10. Filter Fleece 7. Loose Gravel 32. Drip Clip 20 8. Planting 11. Drainage layer 33. Aluminumsealant) Curtain Mullion Section 36. Grill 9. Substrate 12. Extruded Polystyrene 34. Double Layer Curtain Glazing system Duct Proofing ( with 13. XPS Board 10. Filter Fleece 35. Joint Cut 37. withFlex weather 38. Supply Duct 14. Water proofing 11. Drainage layer sealant) 27 39. Duck hanger Bracket 15. Concrete wall slab 36. Grill 12. Extruded Polystyrene 23 26 13. XPS Board16. Waffle Slab 37. Flex Duct40. Floor Finish 24 41. Steel Deck 17. Timber board 14. Water proofing 38. Supply Duct 25 42. Pedestal 18. Metal L-Clamp 15. Concrete wall slab 39. Duck hanger Bracket 21 23 43. Concrete Floor 19. Perforated Metal Panel 29 16. Waffle Slab 40. Floor Finish 26 20. Hollow steel square41. Section 22 24 17. Timber board Steel Deck44. Viper Barrier 30 25 21. Concrete wall ( 4 inch) 18. Metal L-Clamp 42. Pedestal 45. Rigid Insulation Concrete foundation Wall RigidPanel insulation ( 2 Inch) 33 19. Perforated22. Metal 43. Concrete46. Floor 29 23 47. Top Soil 23. square Steel studs ( 3 Inch) 44. Viper Barrier 20. Hollow steel Section 26 30 48. Planting 24. Gypsum Board ASSEMBLY 45. Rigid Insulation 24 DETAIL 0121. Concrete wall ( 4 inch) 34 49. CrushedWall Stone 25. Interior finish 25 22. Rigid insulation ( 2 Inch) 46. Concrete foundation 33 SCALE 1/2” = 1’-0” 23 23. Steel studs ( 3 Inch) 47. Top Soil 26 28 29 24. Gypsum Board 48. Planting ASSEMBLY 24 DETAIL 01 34 25. Interior finish 49. Crushed Stone 30 SCALE 1/2” 25 = 1’-0” 32 6
28 31
3
82
47
48
3547 49 44 46
48
38
43
44
36
44 46
37
37
38
39
40
ASSEMBLY DETAIL 03 @ LOUVER SCALE 3/4” = 1’-0” 41 42
ASSEMBLY DETAIL @ LOUVER 50. Metal Louver 03 Perforated
51.Hollow 40 SCALE 3/4” = 1’-0”Square section 41 52.Levelling Mortar 42 53. CSection bracket 50. Metal Louver Perforated 54.Steel Screw fixings with sleeves on side to allow movement 51.Hollow Square section 55. L- Section bracket 52.Levelling Mortar Structural concrete wall 53. C- Section56. bracket
39
54.Steel Screw fixings with sleeves on side to allow movement 55. L- Section bracket 56. Structural concrete wall
ASSEMBLY DETAIL 02 SCALE 1/2” = 1’-0”
ASSEMBLY DETAIL 02
45 44 Ashesh Sapkota SCALE 1/2” = 1’-0” Students Name: Meshkath Mohammad Hossain
Ronaldo de Luna Ashesh Sapkota Students Name: Meshkath Mohammad Hossain Ronaldo de Luna
45 44
43
T in go 2
43
Design 8 | Fall 2018 | Jefferson CABE Design 8 | Fall 2018 | Jefferson CABE
The re lo pre
2
12
Academic Works
United Housing (Unity Complex)
Location
II Dhaka, Bangladesh
Description: The site was the biggest factor that inspired our concept. The lack of care towards the environment led us to question,“What makes us care so little about our surrounding?” We realized it was the absence of “Sense of Belonging” and identity in living spaces. So the housing complex was designed with one goal only, to give identifiable individual homes rather than just putting up apartments.
Site Elevation
Site Elevation
Thank You Meshkath@ymail.com Phone 267 271 7766 Email: meshkath@ymail.com