[mahsa montazerolghaem] Architectural Portfolio 2014
mahsa montazerolghaem
[EXPERIENCE] MAY-AUG 2013
Spagnolo Gisness & Associates, Inc. Interior Design Intern. Boston, MA Assisted in creating construction documents using Revit.
MAY-AUG 2012
BNY Mellon. Real Estate and Facilities Intern. Boston, MA
NOV-AUG 2011
GENSLER. Architectural Intern. Minneapolis, MN
MAY-AUG 2010
McCarthy Builders. Intern. Minneapolis, MN
[EDUCATION] Northeastern University. Boston, MA
University of Minnesota. Minneapolis, MN
[LEADERSHIP + AWARDS]
[SKILLS]
DIGITAL
LANGUAGE
AutoCAD. Revit.
[graduate works] Northeastern University 2012-2014
[thesis design and research studio] Hvar, Croatia. Resilient Coastal Leisure Environments Workshop. Northeastern University
Tourism growth relies on proper infrastructure to thrive. The ease and that Hvar Island is proposing. The proposed airport for Hvar connects the Island to Northern Europe and the growing tourism markets, strengthening the Island’s tourism potential The environmental, social, and economic impacts of the airport have been strategically considered into its design.
Vehicular Approach.
[thesis design and research studio] Hvar, Croatia. Resilient Coastal Leisure Environments Workshop. Northeastern University
The airport sits on the ridge of the island
Site Plan
Jelsa
HVAR ISLAND PROPOSED PARCEL
1000 ft
[thesis design and research studio] Hvar, Croatia. Resilient Coastal Leisure Environments Workshop. Northeastern University
18 78 Seats
15
14
16
17
77 inches
13
12
80.0 in. 2.03 m
LOW IMPACT RUNWAY
RUNWAY
TAXIWAY
BOARDING PROCESS
SECURITY CHECK
DROP OFF AND PARK
WIND PROTECTION
APRON
24’ 12’ 00’
24’ 12’ 00’
24’ 12’ 00’
40 FEET
KARST
PACKED GRAVEL DRAINAGE ZONE
PACKED GRAVEL
VEGETATIVE WIND BREAK
4
6
11
10
9 8
3
7
5
2
1
40 feet
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Baggage Claim Customs Arrivals Lounge Car Rental Information Ticketing Administration Baggage Sort Gift Shop Security Customs and Immigration Gate 1 Gate 2 Coffee Shop Cafe Retail 1 Retail 2 Parking and Car Rental
Ticketing and Check in.
[thesis design and research studio] Hvar, Croatia. Resilient Coastal Leisure Environments Workshop. Northeastern University
Caters to ‘mass-tourist’ charter
HVAR
AIRPORT
[thesis design and research studio] Hvar, Croatia. Resilient Coastal Leisure Environments Workshop. Northeastern University
Hvar Airport. Departure Gate. The airport sites on the top of the ridge creating spectacular views.
[comprehensive design studio] Red Hook Residences and Technology Center Northeastern University
Red Hook is a rapidly growing residential and industrial neighborhood on of active industrial sites, residential buildings and a limited number of new commercial projects. The proposal for this city block uses timber in a innovative way, focusing on way the project can be low-cost and highly effective. The proposed wall system, Performative Poche, integrates light wood framing panels with active systems, passive systems and program, up construction.
The wood shop facilities and urban housing tower are separated to provide urban connectivity and provide privacy for the dwellers.
Site Strategy
Bisect the Block
Shift Volumes
Create Urban Edges
Housing Tower
Rotate in Response to Solar
Bisect with Bike Ramp
Wall System Prototype
Solid
Wall Panel Flexibility
Panel A 144” x 48” x 30”
Panel B 144” x 72” x 30”
Panel C 144” x 84” x 30”
Panel D 144” x 96” x 30”
Separated
Custom
Separated
Housing Units
Custom
Solid
[comprehensive design studio] Red Hook Residences and Technology Center Northeastern University
7
8
9
10
12
1
2
3 4
5 6
Wall Panel Assembly: Performative Poche
Wall Panel Assembly Key 1 2 3 4 5 6 7 8 9 10 11 12
Perfomative Poche Plan Typologies
4x6 Light Wood Framing 5/8” Plywood Sheathing 2” Rigid Insulation Waterproof Membrane Steel C-Channels Aluminum Rainscreen Cladding Vertical Duct Horizontal Distribution Prefab Wall System CLT Floor Panel 4” x 10” LVL Beam Window Frame
11
Variety of Plan Typologies using the Performative Poche System
[housing design studio] Dudley Square, Boston Northeastern University
unit plans
As the Dudley Square neighborhood revitalizes and grows, the opportunity for new housing typologies becomes clear. Located just outside of Boston, this multi-family complex offers a high-end living solutions for young professionals and growing families, providing one, two and three bedrooms. Ground level retail engages the street and holds the street edge, while an underground parking platform transforms into a raised courtyard for residents to share. Units are lofted with views extending through the terraces providing ample light and views. The design utilizes Type V construction techniques with a concrete foundation and base level.
1/4� scale model
[housing design studio] Dudley Square, Boston Northeastern University
Washington Street. Rendering
Masterplan: Housing Block
Site Strategy: Circulation
Site Strategy: Parking Plinth
Site Strategy: Hold the ‘Street Edge’
[professional experience] Spagnolo Gisness and Associates Summer 2013
[windrose advisors] SGA, Boston Role: Aid in Construction Documents, Material
FCP Conference
FCP Office
FCP Office
FCP Office
FCP Office
631
630
628
627
CPT1
CPT1
CPT1
CPT1
WB1
WB1
WB1
WB1
P1
P1
P1
P1
FCP Office
626 CPT1 WB1 P1
Visitor Office
625
624
CPT1
CPT1
WB1
WB1
P1
P1
Pantry
Closet
MultiPurpose
WR Office
WR Office
621
620
619
622
PT1
CPT1
CPT1
PT1
TB1
WB1
WB1
TB1
P1
P1
P1
WR Conference 618 CPT1 WB1 P1
P1
1' - 5"
623 PT1
Corridor
FCP Phone
RB1
635
638
P1
CPT1
FCP Office
P1
634
FCP Copy
635A
636
CPT1
P1
CPT1 WB1
VCT1
P1
RB1
RB1
WR Storage
P1
Visitor Office
Visitor Office
641
642
643
PT1
CPT1
CPT1
WB1
WB1
P1
P1
FCP Storage 637
WB1 P1
VCT2 RB1 P1
WB1
RB1
P1
644
Corridor
FCP Office 633
CPT1
VCT1
SB1 P1
TYP.
FINISH PLAN KEYNOTE LEGEND
WB1 P1
Server
1
645
CPT1
615
WB1
CPT1
616
P1
WB1
CPT1
P1
WB1
PROVIDE SUBMITTAL OF SPECIFIED SCHLUTER STRIP.
WB1
606
P1
CPT1
Open Area 2 TA5.1
CPT1
PT1
CPT1
SB1
WB1
CPT1
WR Office
P1
612
607 PT1
2
613
WB1
ETR
P1
ETR ETR
P1
Reception
Balcony
601
608
PT1
ETR
SB1
ETR
P1
ETR
CPT 1
CPT1 CARPET TILE MFR:INTERFACE STYLE:UR102 COLOR: GRANITE INSTALLATION: TBD NOTE: INSTALL USING TAC-TILE METHOD; NO ADHESIVE CONTACT: ALAN SHEEHAN 617-834-0438
CPT 2
ROOM FINISH NOTES
EQ. B
EQ. C
CPT 2
1. REFER TO GENERAL CONDITIONS, SPECIFICATIONS AND SCHEDULES FOR ALL WORK. EQ. A
2. DRAWINGS LISTED UNDER 'DRAWING INDEX' ON G0.1 MUST BE READ IN CONJUNCTION WITH THIS DRAWING FOR COMPLETE INFORMATION.
EQ. A
3. CONFIRM WITH ARCHITECT THAT THESE DRAWINGS ARE THE MOST CURRENT ISSUE BEFORE BEGINNING LAYOUT AND CONSTRUCTION. 4. EXCEPTIONS TO SPECIFICATIONS WILL BE NOTED IN LEGENDS OR DRAWINGS. FULL TILE
5. REFER TO DRAWINGS FOR EXACT LOCATIONS, STOPS, STARTS AND PATTERNS OF MATERIALS. 6. P1 ON ALL WALLS UNLESS OTHERWISE NOTED. 7. P2 IS TYPICAL FOR ALL METAL DOORS AND FRAMES UNLESS OTHERWISE NOTED. 8. ALL GWB CEILINGS TO BE BENJAMIN MOORE; CEILING WHITE, FLAT FINISH, UNLESS OTHERWISE NOTED. 9. ALL GWB SOFFITS TO BE PAINTED P1, UNLESS OTHERWISE NOTED. 10. ALL BASE TO BE PAINTED WOOD BASE UNLESS OTHERWISE NOTED. 11. ALL BASE TO BE STRAIGHT AT CARPET. 12. ALL BASE TO BE COVED AT VCT FLOORING. 13. FLOORING MATERIAL CHANGES TO OCCUR BENEATH DOOR LEAF WHEN CLOSED.
7/26/2013 2:55:26 PM
15. FOR MILLWORK FINISHES REFER TO ARCHITECTS' SAMPLES.
EQ. B
C:\Revit\3452 Windrose Central_agiroux.rvt
14. START FLOORING MATERIALS WITH PATTERNS, GRID OR REPEATS CENTER OF ROOM, UNLESS OTHERWISE NOTED.
EQ. C
16. THE DESCRIPTIONS OF FINISHES CONTAIN THE FOLLOWING INFORMATION: ABBREVIATIONS, MATERIAL, MFR. STYLE AND COLOR (QUICK REF. COLOR).
2
Enlarged Plan - Rooms 605 and 606 1/4" = 1'-0"
CPT2 ACCENT CARPET TILE MFR:INTERFACE STYLE: UR101 COLOR:GRANITE/LICHEN INSTALLATION: TBD NOTE: INSTALL USING TAC-TILE METHOD; NO ADHESIVE CONTACT: ALAN SHEEHAN 617-834-0438 PT1 PORCELAIN TILE MFR: FLORIM USA STYLE: GALAXY SIZE: TBD COLOR: NUTMEG INSTALLATION: TBD CONTACT: TONY BUTLIN DIVISION 9 COLLABORATIVE 617-592-2200 VCT1 COPY/PRINT MRF: MANNINGTON STYLE: SOLIDPOINT SIZE: 12" X 12" COLOR: PERSIMMON 303 VCT2 MFR: ARMSTRONG STYLE: STANDARD EXCELON COLOR: 51908 PEWTER SDT1 STATIC DISSIPATIVE TILE MFR: ARMSTRONG SIZE: 12" X 12" COLOR: 51951 ARMOR GRAY
17. ALL ACCESS/ELECTRICAL PANELS TO BE PAINTED OUT (WITH APPROPRIATE PAINT PRODUCT) TO MATCH THE WALL IT IS MOUNTED ON.
BASE:
18. SEE ELEVATIONS FOR FURTHER INFORMATION AND DETAILS.
RB1 RUBBER BASE MFR: JOHNSONITE HEIGHT: 4" COLOR:
19. INTERIOR FINISHES ARE KEYED TO THE DRAWINGS AT TYPICAL LOCATIONS. THE FINISHES APPLY TO ALL LOCATIONS THAT ARE NOT KEYED - IN AND ARE OF THE SAME CONSTRUCTION AND SCOPE OF WORK. THE CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE TO COORDINATE THE LOCATION OF ALL TYPICAL FINISH MATERIALS AND INSTALL THE WORK INDICATED. IF DISCREPANCIES EXIST OR QUALIFICATION IS REQUIRED THE CONTRACTOR IS TO NOTIFY THE ARCHITECT TO OBTAIN CLARIFICATION. 20. FINISHES CONTINUE INTO CLOSETS WITHIN ROOMS/SPACES SHARING ROOM NUMBERS.
200 high street | boston, ma 02110
ROOM FINISH SPECIFICATIONS FLOORING:
CPT 1
ROOM NUMBER FLOOR FINISH WALL BASE WALL FINISH
Balcony
CPT1
SB1
P1
ACCENT WALL FINISH XX
XXXX XXXX XXXX XXXX
609 WB1
Corridor
602
PROVIDE NEW WINDOW SHADES (WS1) AT ALL EXTERIOR WINDOWS WITHIN SCOPE.
P1
CPT1
ALIGN FLOORING TRANSITION AT WALL
PT1
By
WB1 WOOD BASE (WB2)
Corridor
P1
2
RB1
4
614
P1 610
Coats
Description
WR Office
WB1
Library
P1
CPT1
Main Entry
EXISTING WINDOW SILLS TO BE PATCHED AND REPAIRED AS REQUIRED, SNADED SMOOTH AND REPAINTED P1 SEMIGLOSS FINISH, TYPICAL THROUGHOUT PROJECT.
ROOM FINISH LEGEND
611
WB1
ELEVATOR LOBBY
3
WOOD BASE (WB2)
Executive Conference
603
P1
Revisions No. Date
Phone
P1
Refresh
PROVIDE STAINLESS SCHLUTER STRIP AT CPT1/PT1 TRANSITION. MFR: SCHLUTER SYSTEMS STYLE: SCHIENE FINISH: STAINLESS STEEL 304 THICKNESS: 1/4" E60/V4A
P1
Conference 605
2
RB1
604
CPT1
PROVIDE WC3. PREPARE WALL AND INSTALL ACCORDING TO MANUFACTURER'S INSTRUCTIONS
CPT1
Corridor
PT1 P1
1
WR Coats 616A
SDT1
646
Corridor
SB1
Waltham, MA
CPT1
P1 2
4
617
P1
Corridor 2
3
P1
P1
RB1
P1
WB1
Open Area
RB1
639 CPT1
WB1
649
648
P1
VCT2
Conference
CPT1
WR Copy
WB1
CPT1
2
P1
1
P1
CPT1
WR Breakout
647
WB1
800 South Street Floor 6
650
Corridor
CPT1
FCP Coats
WB1
Corridor
WOOD BASE (WB2)
640
RB1
P1
Open Area
Corridor
CPT1
WB1
632 CPT1
WOOD BASE (WB2) 2
WB1 WOOD BASE PAINTED FINISH SPECIES: HEIGHT: 4" COLOR: TBD
BASE CONTINUED: WB2 WOOD BASE STAINED FINISH SPECIES: HEIGHT: 4" COLOR: TBD SB1 STAINLESS BASE GAUGE: NO 304, 16 GA HEIGHT: 4" FINISH: NO 6, BRUSHED TB1 TILE BASE MFR: FLORIM USA COLOR: NUTMEG SIZE: 3" X 12" BULLNOSE
MISC WS1 MECHO SHADES MFR: MECHO STYLE: MANUAL COLOR: SILVER BIRCH OPENNESS FACTOR: 5% RP1 RESIN PANEL MFR: LUMICOR STYLE: RAIN EMBOSSED COLOR: BLUE ICE GAUGE: .472" FINISH: UV CAP ON WINDOW SIDE OF PANELS HARDWARE: LUMICOR SUSPENDED WALL HARDWARE TRACK WITH BRUSHED STAINLESS FINISH
t.617.443.0680 | f.617.443.0689 | www.sga-arch.com
WALL FINISHES:
CASEWORK:
WC1 WALLCOVERING (REFRESH) MFR: WOLF GORDON PRODUCT ID: G8808807 DESCRIPTION: VIRTUOSO SATIN BA PRODUCT #: AZ52256VR
WD1 WOOD VENEER (RECEPTION DESK) SPECIES:TBD FINISH: TBD NOTE: MATCH ARCHITECTS SAMPLE
WC2 WALLCOVERING (EXEC CONF) MFR: MAHARAM STYLE: TEK-WALL PARABLE 398650 COLOR: 111SYLVAN 2
WD2 WOOD VENEER SPECIES:TBD FINISH: TBD NOTE: MATCH ARCHITECTS SAMPLE
WC3 WALLCOVERING (PHONE RM) MFR.: KNOLL STYLE: MERGE WC 1034/4 COLOR: FRENCH GREY
SS1 SOLID SURFACE (REFRESH/RECEPTION DESK) MFR: CAMBRIA COLOR: MINERA GAUGE:
WC4 CUSTOM WALLCOVERING MFR: ASTEK PRODUCT: SILVER MYLAR TYPE II WIDTH: 54" CUSTOM IMAGE: COORDINATE WITH OWNER WT1 WALL TILE RECEPTION WALL MFR: MUTINA STYLE: FOLDED COLOR: BIANCO SIZE: 24" X 24" CONTACT: STONE SOURCE 617-641-0900 GROUT: 1/16" GROUT COLOR TBD BY ARCHITECT. WALL FINISHES (PAINT):
GL1 FCP BRANDING WALL BACKPAINTED METALLIC GLASS MFR: BENDHEIM SPEC: SPAG 544 GAUGE:
P1 GENERAL WALL PAINT MFR: BENJAMIN MOORE FINISH: EGGSHELL COLOR: TBD
GL2 WINDROSE BRANDING WALL MFR: BENDHEIM SPEC: SPAG 197 GAUGE:
P2 TRIM PAINT MFR: BENJAMIN MOORE FINISH: SEMI-GLOSS COLOR: TBD
SIGNAGE ALLOW $3000 FOR CUSTOM OFFICE, WORKSTATION AND CONFERENCE SIGNAGE
P3 ACCENT PAINT MFR: BENJAMIN MOORE FINISH: EGGSHELL COLOR: TBD P4 ACCENT PAINT MFR: BENJAMIN MOORE FINISH: EGGSHELL COLOR: TBD
SS2 SOLID SURFACE (EXECUTIVE. CONFERENCE) MFR: CAMBRIA COLOR: DEVON GAUGE:
Title
FINISH PLAN
SS3 SOLID SURFACE (PANTRY) MFR: CORIAN COLOR: GLACIER WHITE PL1 PLASTIC LAMINATE MFR: LAMINART COLOR: SHADOW 2451-G FINISH: GLOSS PL2 PLASTIC LAMINATE (PANTRY) MFR: ARBORITE COLOR: WHITE PEARL WOOD 1403GL FINISH: GLOSS PL3 PLASTIC LAMINATE (COPY/PRINT VERTICAL) MFR: LAMINART COLOR: GRAPHITE 2418-G FINISH: GLOSS PL4 PLASTIC LAMINATE (COPY/PRINT HORIZONTAL) MFR: WILSONART COLOR: GREY PAMPAS 4168-60 FINISH: MATTE PL5 PLASTIC LAMINATE MFR: TBD COLOR: TBD FINISH: TBD
0
Scale 1/8" = 1'-0"
Date 07/26/13
Drawn ALF
Checked Checker
Job No.
Sheet
3452.00
TA5.1 2013 Spagnolo Gisness & Associates, Inc.
Finish Plans
C A
G
Pantry
A
F
621
FCP Office
FCP Office
Visitor Office
626
625
624
G E
WR Office
WR Office
WR Conference
D
620
619
618
MultiPurpose FEC
622
Corridor 650
Closet 623
Corridor Corridor
FCP Coats
WR Breakout
647
WR Copy
640
649
648
FEC
Open Area 617
Visitor Office
Visitor Office
WR Storage
642
643
644
Corridor
Server
Phone
WR Coats
641
645
616
616A
Conference 639
FEC
Corridor
Corridor
646
615
FEC
Corridor 604
Open Area
Library
611
610
Refresh 603
Conference
L
WR Office
605
614
Executive Conference
Corridor
606
609
WR Office 612
Corridor 607
Coats
Windrose Entrance
Balcony 613 Balcony
602
Reception 601
Balcony 608
Main Entry
FURNITURE IS N.I.C. SHOWN FOR INFORMATIONAL PURPOSES ONLY.
Furniture and Equipment Plan
[beacon consulting group] SGA, Boston Role: Aid in Construction Documents, Material
Beacon Consulting Group 1
125 High Street, 25th Floor
2
Boston, MA
EXISTING TENANT
3
Revisions 4
No. Date
Description
By
EXISTING CORRIDOR
CORR 117
5
STAIR 2
IT EXISTING
116
EXISTING
CORR
HUDDLE
115
113
6 9
CLOSET 102
7
EXISTING MEN'S TOILET
COPY
EXISTING WOMEN'S TOILET
7
114
OPEN OFFICE 112
CORR 100
3
EXISTING VACANT TENANT
PANTRY 108
10
9
9
HUDDLE
HUDDLE
106
107
8
4 5 1
2
200 high street | boston, ma 02110 t.617.443.0680 | f.617.443.0689 | www.sga-arch.com
FEC
RECEPTION 101
OPEN OFFICE 105
HUDDLE 103
CONFERENCE
CONFERENCE
104
111
9 1
9
9 1
PROJECT NORTH
10 7
CONFERENCE 109 EXISTING ROOF TO REMAIN
TRUE NORTH
OPEN OFFICE 1
11
110 EXISTING ROOF TO REMAIN
8 1
Title
G
F
E
D
C
B
Furniture and Equipment
A
EQUIPMENT SCHEDULE
7/15/2013 10:57:45 AM
C:\Revit\3419 - 125 High Street - 25th Floor_CD_jabbott.rvt
EQUIPMENT
SIZE
MANUF.
MODEL #
MEP REQUIRED
SUPPLIED BY
INSTALLED BY
1
LCD/TV
46"
TBD
POWER, DATA PORTS & TV HDMI
TENANT
GC
2
REFRIGERATOR
TBD
TBD
ELEC./ PLUMBING
TENANT
GC
3
MICROWAVE
30" X 16" X 18" MAX TBD
ELEC.
TENANT
TENANT
4
COFFEE
10 X 14 X 14"
KEURIG
ELEC.
TENANT
TENANT
5
WATER FILTRATION SYSTEM
12 X 12 48"
QUENCH
6
B & W PRINTER
23 X 21 X 22
HP
7
COPIER/ SCANNER/ PRINTER
50 X 34 X 47
KONICA BIZ HUB
8 9 10
TENANT
0 2 4
8
16
GC
Scale
ELEC.
TENANT
TENANT
ELEC.
TENANT
TENANT
Date
ELEC.
TENANT
GC
Drawn
N/A
GC
GC
Checked
PLUMBING
GC
GC
1/8" = 1'-0" 07/15/13
VIDEO CONFERENCING CAMERA
TBD
GLASS MARKER BOARD
96" X 48"
MCGRORY GLASS
SINK
33" x 22" x 8 1/4"
KHOLER
FEC FIRE EQUIPMENT CABINET
ELEC. /PLUMBING HP LASERJET 8100
TBD
JA VERSE K-3373
CN
Job No.
Sheet
3419.00
TA8.25 2013 Spagnolo Gisness & Associates, Inc.
Furniture and Equipment Plan
DROPPED ACOUSTICAL TILE CEILING DECORATIVE PENDANT LIGHT, SEE TA3.25 FOR SPECIFICATION. TYP.
COVER
TA9.25
PANTRY BEYOND OPEN OFFICE BEYOND
PARTITION BEYOND, SEE PARTITION PLAN FOR WALL TYPE
ALIGN
6'-5"
9 TA9.25
10 TA9.25 4'-6"
8' - 11"
9
3'-6"
PLASTIC LAMINATE ON ALL EXPOSED SURFACES
11
FINISHED FLOOR. SEE FINISH PLANS.
TA9.25
6
PANTRY ISLAND ELEVATION 3/8" = 1'-0"
7
PANTRY ISLAND ELEVATION 3/8" = 1'-0"
PT1
PLAM1
PLAM2
PT2
[undergraduate works] University of Minnesota 2008-2011
[senior design studio] Rocinha Strategic Planning and Transit Center University of Minnesota
Topography, urban density, and connectivity
Walkable conditions before strategic planning
Walkable conditions with proposed infrastructure
200 m walking distance current bus stops
Pedestrian Circulation
200 m walking distance from proposed bus stops
Vehicular Circulation
Lowest Income
Topography
[senior design studio] Rocinha Strategic Planning and Transit Center University of Minnesota
Third Level (Funicular Connection)
Proposed Road
[programming studio] Incognito Black Box Theater University of Minnesota
Hand Drawn Sections with Photoshop Collage
Hand Drawn Plans and Section with Photoshop Collage
[programming studio] Minneapolis-live Plaza University of Minnesota
Site Model and Collage
Design Sketches and Study Models
[travel sketches] Istanbul University of Minnesota
Drawing Symposium. University of Minnesota.
[photo montage and hybrid drawing] Rapson Hall, Minneapolis University of Minnesota
Photos taken with 35mm Camera.
Hybrid Drawing. Graphite - 4x 24� x 36� pages assembled. Drawing in collaboration with M. Vanness