Setting the pace of future construction, where quality is never compromised, but affordability is maximised... 1
Introduction
Modulek designs and builds commercial modular buildings that combines traditional building skills with modern modular construction methods providing a unique hybrid option. The founder Rodney Pester recognised an opportunity in the recession of the early 1990’s to develop a true value-added alternative to traditional build that is more cost-effective and quicker to deliver, without compromising quality. The Pester family upholds Rodney’s legacy by delivering bespoke, contemporary solutions that are built to last. Our customers benefit by having the use of their custom-made building months ahead of traditionally built alternatives.
Rodney Pester
Simon Pester
Adrian Pester
Brian Pester
Stephen Pester
Dan Pester
Founder
Managing Director
Estimating Director
Sales Director
Commercial Director
Sales Director
2
Our Vision “To be recognised as the trusted provider for genuinely tailor made sporting, working and learning environments, that perfectly fit our client’s aspirations.” 3
AFC Bournemouth Training Pavilion Location: Bournemouth, Dorset
Value: ÂŁ2,500,000.00
Timeframe: 18 Weeks from Conception to Handover / 8 Weeks on-site
Completed: 2015
Contemporary sports training facilities for teams and individuals aspiring to be the best! 4
5
Wolverhampton Wanderers FC Training Ground Extension Location: Wolverhampton, West Midlands
Value: ÂŁ1,200,000.00
Timeframe: 8 Weeks on-site
Completed: 2018
Modular extensions that blend perfectly with the existing structures. Modular methods speed up completion times without compromising the look and feel of the existing site. 6
Office, Canteen, Press Room and Break Out Spaces provided for the increased staffing levels and expectation of the Premier League. 7
Wolverhampton Wanderers FC Training Gymnasium Extension Location: Wolverhampton, West Midlands
Value: ÂŁ650,000.00
Timeframe: 8 Weeks on-site
Completed: 2018
A bespoke gymnasium extension delivered in a matter of weeks. The club had quicker access to Premier League level facilities. 8
A state-of-the-art gymnasium extension providing the optimum environment for the players to train and reach peak levels of fitness. 9
St Georges College Location: Weybridge, Surrey
Value: ÂŁ1,000,000.00
Timeframe: 10 Weeks on-site
Completed: 2017
A bespoke high specification sports pavilion ensuring students receive the best. Just what a prestigious college demands! 10
Robust finishes while maintaining an elegant look and feel.
11
Kingsleigh School Location: Bournemouth, Dorset
Value: ÂŁ4,500,000.00
Timeframe: 26 Weeks on-site
Completed: 2016
A large-scale primary school development for Bournemouth Borough Council. Designed and built to the clients’ demanding and complex requirements. 12
Seamless finishes with no visible joints to the walls. No need to compromise on the finish with a modular design. 13
Jewell Academy Location: Bournemouth, Dorset
Value: ÂŁ3,000,000.00
Timeframe: 24 Weeks on-site
Completed: 2016
Modulek can deliver whole primary school buildings to a specification equivalent to traditional construction but in a fraction of the time. 14
Bespoke finishes to satisfy our client’s demands that match or exceed traditional build . 15
Kent, Surrey, Sussex Air Ambulance Head Offices Location: Rochester Airport, Kent
Value: ÂŁ2,500,000.00
Timeframe: 20 Weeks on-site
Completed: 2018
A sophisticated operations centre tailor-made to accommodate the charity’s busy day to day activities. 16
Large modern open plan office spaces, enhanced by the modular concept. 17
Heatherlands Primary School Location: Bournemouth, Dorset
Value: ÂŁ1,500,000.00
Timeframe: 10 Weeks on-site
Completed: 2016
An attractive contrast of Norclad and render finishes to a primary school site. Installed during the school holiday period to minimise disruption. 18
Fully fitted science laboratories. All part of Modulek’s specialist turnkey service. 19
Springwood School Location: Bournemouth, Dorset
Value: ÂŁ1,500,000.00
Timeframe: 20 Weeks on-site
Completed: 2016
A bespoke building for a specialist school for pupils with learning difficulties. It has a 60-year design life, on a par with traditionally constructed buildings. 20
Modulek has the design and build capability to produce two storey open spaces. Ensuring rapid turnaround with minimal disruption. 21
Linwood School Location: Bournemouth, Dorset
Value: ÂŁ1,200,000.00
Timeframe: 10 Weeks on-site
Completed: 2017
A specialist building for a regional school with bespoke learning facilities for students on the autistic scale, incorporating many tailor-made features. 22
Curved feature walls providing calm, attractive and inspiring learning environments. 23
St James High School Location: Farnworth,Bolton
Value: ÂŁ2,000,000.00
Timeframe: 20 Weeks on-site
Completed: 2018
A bespoke two-storey Geography block providing state of the art learning facilities for a successful secondary school. 24
Contemporary IT Suites and data installations all included with the Turnkey Service. 25
Beech Hall School Location: Macclesfield, Cheshire
Value: £658,000.00
Timeframe: 15 Weeks on-site
Completed: 2019
Traditional finishes that defy the belief it’s modular – a truly stunning addition to any school site. 26
State of the art science laboratory demonstrating our flexible design capabilities. 27
Bloxham School Location: Banbury, Oxfordshire
Value: ÂŁ710,000.00
Timeframe: 14 Weeks on-site
Completed: 2019
Innovative design to make use of an otherwise unusable courtyard space. Accessed only by a 1.2m wide gateway making it near impossible for traditional construction. 28
Learning spaces with seamless decorated walls providing an easy to maintain finish. 29
West Kidlington Primary School Location: West Kidlington, Oxon
Value: ÂŁ1,000,000.00
Timeframe: 10 Weeks on-site
Completed: 2017
A bespoke new classroom block providing a rapid replacement of existing dilapidated buildings. The end result transformed the students learning experience. 30
Incorporating high quality washroom facilities, with a compact grade laminate cubicle system, warm air hand dryers and an easy clean floor system. 31
Sheffield Wednesday FC Location: Sheffield
Value: ÂŁ1,000,000.00
Timeframe: 6 Weeks on-site
Completed: 2017
New state of the art training facilities for a Championship club aiming for promotion to the Premier League. 32
Achieve peak performance with our specialist design, based on our experience helping other teams gain promotion to the Premier League! 33
JP Morgan Location: Bournemouth, Dorset
Value: ÂŁ1,000,000.00
Timeframe: 10 Weeks on-site
Completed: 2017
A high specification shower and changing block providing state of the art facilities that encouraged employees to cycle to work. An invigorating experience proven to increase productivity in the workplace. 34
Robust yet elegant finishes using compact grade laminate cubicle systems that really last. The staff were delighted. 35
Foundry Lane Primary School Location: Southampton, Hampshire
Value: ÂŁ500,000.00
Timeframe: 10 Weeks on-site
Completed: 2013
A contemporary kitchen extension for a 400-place primary school, providing state of the art facilities to prepare and cook quality hot meals for the pupils. 36
Full commercial kitchen design and fit out, included within our specialist turnkey service. 37
Rossett School Location: Harrogate, North Yorkshire
Value: ÂŁ350,000.00
Timeframe: 6 Weeks on-site
Completed: 2017
A contemporary sixth form extension, providing vital break out and additional teaching spaces, enhanced by a white through colour silicone spray rendered finish. 38
Achieve ceiling heights of up to 3.5m with our bespoke modular system. 39
Hamble Marina Location: Hamble, Hampshire
Value: ÂŁ1,000,000.00
Timeframe: 16 Weeks on-site
Completed: 2018
Modern construction designed to overcome even the harshest environments. Even by the sea. 40
Christ the King School Location: Bournemouth, Dorset
Value: ÂŁ950,000.00
Timeframe: 10 Weeks on-site
Completed: 2016
A bespoke two storey classroom block for a rapidly expanding primary school site, completed in a short space of time whilst retaining an attractive look and feel. 41
St. Edmunds Location: Hindhead, Surrey
Value: ÂŁ800,000.00
Timeframe: 16 Weeks on-site
Completed: 2019
Bespoke finishing to satisfy planners at a sensitive location using a Larch Waney edge timber cladding. 42
Portsmouth High School Location: Portsmouth, Hampshire
Value: ÂŁ650,000.00
Timeframe: 6 Weeks on-site
Completed: 2017
Two storey classroom block providing inspiring learning spaces for a successful secondary school. Designed for the long term within a limited budget and crucially delivered during the summer holidays. 43
Kinson Primary School Location: Bournemouth, Dorset
Value: ÂŁ650,000.00
Timeframe: 10 Weeks on-site
Completed: 2017
A traditional style kitchen and dining facility with a 60-year design life.
44
Bevendean School Location: Oxshott, Surrey
Value: ÂŁ600,000.00
Timeframe: 8 Weeks on-site
Completed: 2017
A high-quality classroom extension clad in a traditional brick outer skin. Another example of what modular can deliver. 45
John Bentley School Location: Calne, Wiltshire
Value: ÂŁ550,000.00
Timeframe: 8 Weeks on-site
Completed: 2017
A beautifully designed learning space, with a look and feel that illustrates the Modulek design finesse. 46
Alderbrook School, Classroom Block Location: Solihull, West Midlands
Value: ÂŁ500,000.00
Timeframe: 10 Weeks on-site
Completed: 2018
An attractive addition to the school site with a feature curved wall that enhances the site ambiance enhancing the students learning. 47
Bridgwater Hamp Junior School Location: Bridgwater, Somerset
Value: ÂŁ350,000.00
Timeframe: 6 Weeks on-site
Completed: 2017
An attractive contrast of external finishes illustrating Modulek’s innovative design capability. 48
Large spacious Design Technology Workshop with integrated IT suite. 49
35
Café Globe Location: Marlow, Bucks
Value: £250,000.00
Timeframe: 4 Weeks on-site
Completed: 2018
A bespoke café reinvigorating a busy commercial business park.
50
An attractive, fit for purpose interior demonstrating the versatility of modular design and construction. 51
Beckton Thames Water Location: London
Value: ÂŁ180,000.00
Timeframe: 10 Weeks on-site
Completed: 2019
Security Gatehouse constructed in a highly sensitive conservation area on the River Thames with sustainable eco design, including Solar PV, living garden wall and Thermawood cladding features. 52
A clean, light and airy staff welfare area providing a pleasant environment for a permanently manned high security gatehouse. 53
Royal Arthur Park Location: Devizes, Wiltshire
Value: ÂŁ120,000.00
Timeframe: 2 Weeks on-site
Completed: 2016
A Marketing Suite designed to demonstrate the capabilities of the Modulek system in a residential type application. 54
Stunning level of finishing demonstrating there are no concessions to going the Modulek route. 55
Fair Furlong School, Eco Classroom Location: Bristol
Value: ÂŁ150,000.00
Timeframe: 4 Weeks on-site
Completed: 2018
An Eco Classroom providing an escape for students to experience something different whilst learning how sustainability helps our planet. 56
Spacious classrooms filled with natural light providing an optimised learning environment. 57
Sir David English Leisure Centre Location: Bournemouth, Dorset
Value: ÂŁ80,000.00
Timeframe: 1 Week on-site
Completed: 2016
An outbuilding for a flexible space sports activity centre adjacent to the existing building. The brick finish made it look like an original part of the site. 58
Easy drop in spaces that provide a working atmosphere that is cost effective, robust and practical. 59
Ringwood School Location: Ringwood, Hampshire
Value: ÂŁ500,000.00
Timeframe: 8 Weeks on-site
Completed: 2016
An attractive learning centre addition to a secondary school site, with high end finishing inside and out to enhance the learning experience. 60
Security Gatehouse Location: Hamble, Hampshire
Value: £350,000.00
Timeframe: 3 Weeks on-site
Completed: 2016
This client understood ‘first impressions count’ when entering their site and had to look no further than Modulek for a bespoke modular solution to deliver on their aspirations. 61
Maiden Newton Children’s Centre Location: Maiden Newton, Dorset
Value: £300,000.00
Timeframe: 8 Weeks on-site
Completed: 2010
A Sure Start Children’s Centre with bespoke roof and wall finishes providing a sympathetic appearance with the rural surroundings. 62
Anglo-Continental College Location: Bournemouth, Dorset
Value: ÂŁ300,000.00
Timeframe: 5 Weeks on-site
Completed: 2016
Base line specification finishes to provide a canteen facility for a college on a tight budget—Modulek is flexible and can work with restricted budgets. 63
Walthamstow Academy Location: Walthamstow, London
Value: ÂŁ250,000.00
Timeframe: 6 Weeks on-site
Completed: 2016
A double classroom installed rapidly in the school summer holiday. It has contrasting thermowood timber cladding and plastic-coated steel external finishes. 64
Mountjoy School SEN Classroom Location: Beaminster, Dorset
Value: ÂŁ170,000.00
Timeframe: 4 Weeks on-site
Completed: 2018
SEN Classroom providing an outdoor practical space sympathetic with the surrounding environment. 65
Djanogly Academy Location: Nottingham
Value: ÂŁ180,000.00
Timeframe: 4 Weeks on-site
Completed: 2017
A bespoke outdoor SEN classroom with extra tall ceilings, and glazed openings to improve the learning environment. 66
Lavington School Location: Lavington, Devizes
Value: ÂŁ250,000.00
Timeframe: 6 Weeks on-site
Completed: 2017
An attractive double classroom delivered during the summer break to a site that needed space quickly. 67
Chelmsford Meeting Hall Location: Chelmsford, Essex
Value: ÂŁ150,000.00
Timeframe: 4 Weeks on-site
Completed: 2018
A place of public religious worship in a rural setting, creating a space for worship for the local congregation. 68
Christchurch School Location: Christchurch, Dorset
Value: ÂŁ150,000.00
Timeframe: 5 Weeks on-site
Completed: 2016
A primary school building providing a bright and cheerful environment, despite being built to an entry level specification and working with a restricted budget. 69
Queen Elizabeth Olympic Park Location: London
Value: ÂŁ120,000.00
Timeframe: 1 Week on-site
Completed: 2016
A high-quality building deployed rapidly for the Olympic Park in preparation for the Games, then relocated for use in another location. 70
Redhill Park Toilets Location: Bournemouth, Dorset
Value: ÂŁ100,000.00
Timeframe: 1 Day on-site
Completed: 2015
A robust, anti-vandal public toilet block manufactured 100% off-site installed in one day to a local authority specification and restricted budget. 71
Thornden Tennis Club Location: Southampton, Hampshire
Value: ÂŁ100,000.00
Timeframe: 1 Week on-site
Completed: 2010
A Tennis Pavilion designed to improve the coaching facilities. It was delivered in one piece to minimise disruption to the site delivering a cost-effective robust solution. 72
Springhill School Location: Southampton, Hampshire
Value: ÂŁ100,000.00
Timeframe: 3 Weeks on-site
Completed: 2017
Budget single classroom with entry level finishes to minimum building regulations. 73
CTD Training Location: Bournemouth Airport
Value: ÂŁ100,000.00
Timeframe: 2 Weeks on-site
Completed: 2016
The most cost-effective budget building available from Modulek providing a functional robust working environment. 74
Heatherlands School Location: Bournemouth, Dorset
Value: ÂŁ80,000.00
Timeframe: 1 Week on-site
Completed: 2016
An attractive, standalone SEN Classroom installed in to a confined space providing a rapid, cost-effective solution. 75
Contact Us
01202 813121 www.modulek.co.uk sales@modulek.co.uk Modulek Limited Modulek House 19 Bessember Close Ebblake Industrial Estate Verwood, Dorset BH31 6AZ
Modulek Limited is registered in England and Wales. Company registration number 07466165