1 minute read
GALLERIA HOTEL
from 3DA profile
Touristic
Lead Architect
Advertisement
Galleria hotel, previously operated by Marriott has been in the touristic sector since 1995.
the owner currently wishes to keep the existing concrete skeleton and to renovate and redevelop the hotel by:
Converting around 7000 m2 of the commercial existing areas to supporting services and public halls.
Erecting an additional floor to house suites and a roof swimming pool deck.
Modifying the interior architecture of all the existing internal public areas, rooms and suites.
Modifying The external facades and volumetric to reflect the same spirit of the new architectural approach