Contents A.
Introduction ........................................................................................ 4
Background .............................................................................................................. 4 Objective & Scope .................................................................................................... 5 The Surveyor ............................................................................................................ 5
B.
The Property ....................................................................................... 6
Full Address .............................................................................................................. 6
C.
The Inspection ..................................................................................... 7
The Procedure utilized .............................................................................................. 7 Limitations ................................................................................................................ 7
D.
The Building......................................................................................... 8
Overview .................................................................................................................. 8 The as-built Specification & Price Index .................................................................... 9
E.
Assessment Value Summary ............................................................. 13
F.
The Apartments ................................................................................ 14 Guide: how to read the report................................................................................ 14 Section Number: A4 ............................................................................................. 16 Section Number: A5 ............................................................................................. 22 Section Number: A6 ............................................................................................. 29 Section Number: A7 ............................................................................................. 33 Section Number: B4 ............................................................................................. 40 Section Number: B5 ............................................................................................. 45 Section Number: B6 ............................................................................................. 54 Section Number: B7 ............................................................................................. 62 Section Number: B8 ............................................................................................. 74 Section Number: B9 ............................................................................................. 82 Section Number: B10 ........................................................................................... 94 Section Number: B11 ......................................................................................... 101 Section Number: B12 ......................................................................................... 117 Page |2
Section Number: B13 ......................................................................................... 125 Section Number: B14 ......................................................................................... 143 Section Number: B15 ......................................................................................... 153 Section Number: B16 ......................................................................................... 165 Section Number: B17 ......................................................................................... 174 Section Number: B18 & B20 ............................................................................... 186 Section Number: B19 ......................................................................................... 197 Section Number: B21 ......................................................................................... 206 Section Number: B22 ......................................................................................... 214 Section Number: B23 ......................................................................................... 226 Section Number: B24 ......................................................................................... 234 Section Number: B25 ......................................................................................... 241 Section Number: B26 ......................................................................................... 251 Section Number: B27 ......................................................................................... 262 Section Number: B28 ......................................................................................... 273 Section Number: B29 ......................................................................................... 281 Section Number: B30 ......................................................................................... 291 Section Number: B31 ......................................................................................... 301 Section Number: B32 ......................................................................................... 319 Section Number: B33 ......................................................................................... 326 Section Number: B34 ......................................................................................... 337 Section Number: B35 ......................................................................................... 345 Section Number: B36 ......................................................................................... 367 Section Number: B37 ......................................................................................... 378 Section Number: B38 ......................................................................................... 388 Section Number: B39 ......................................................................................... 399 Section Number: B40 ......................................................................................... 407 Section Number: B41 ......................................................................................... 417
Page |3
A. Introduction Background On 4 August 2020, a large amount of ammonium nitrate stored at the port of the city of Beirut, the capital of Lebanon, exploded, causing at least 207 deaths, 7,500 injuries, and US$15 billion in property damage, and leaving an estimated 300,000 people homeless. A cargo of 2,750 tons of the substance (equivalent to around 1.1 kilotons of TNT) had been stored in a warehouse without proper safety measures for the previous six years, after having been confiscated by the Lebanese authorities from the abandoned ship MV Rhosus. The explosion was preceded by a fire in the same warehouse, but as of February 2021, the exact cause of the detonation is still under investigation. The blast was also felt across Turkey, Syria, Israel, Palestine and parts of Europe, and was heard in Cyprus, more than 240 km (150 mi) away. It was detected by the United States Geological Survey as a seismic event of magnitude 3.3, and is considered one of the most powerful artificial non-nuclear explosions in history. The Lebanese government declared a two-week state of emergency in response to the disaster. In its aftermath, protests erupted across Lebanon against the government for their failure to prevent the disaster, joining a larger series of protests which have been taking place across the country since 2019 Source: Wikipedia
Page |4
Objective & Scope Objective: 3DA has been instructed by “Advanta” / http://www.advantaglobal.com to conduct a loss assessment survey for the material losses directly resulting from the Beirut port blast which occurred on the 4th of August 2020, in “Tilal de Beyrouth” Building in Achrafiyeh. As per the client’s instructions, we shall assess the damages to the apartments based on the original specification set by the promoter at the date of the construction completion Additional improvements by the apartment owners shall be disregarded.
Scope: The scope will be limited to the apartments’ closure, excluding the common areas and the exterior building skin, as follows:
The apartment floor lift’s lobby (including the fire rated staircase door) The complete interior of the apartment The skin limited to the windows, the balconies’ parapet and the balustrade The second skin including balconies walls, windows & doors
The Surveyor The team:
Architect Mohamed Chebaro Mr. Tony Abou Rizk Mrs. Rana Tabbara
Company name: 3rd DIMENSION Architects mohcheb@3da-lb.com www.3da-lb.com +961 1 750276
Page |5
B. The Property Full Address Coordinates
33°53'14.6"N, 35°31'00.7"E
District
Achrafieh/ Furn Elhayek
Street
Between George haymari street and Achrafieh street
Directions
Click on the map to access web google maps
Page |6
C. The Inspection The Procedure utilized 1. The survey visit: We have personally visited all the residential apartments and all the commercial sections in “Tilal de Beyrouth” building 2. The survey has been conducted visually, and photographs have been taken for all the damaged elements. 3. Although the normal procedures in such circumstances would have been to record and assess the damages before repairs, but due to the delay in our appointment very few apartments and offices remain not repaired to the date of our site survey, namely Apartment B13 and B35 only. Since the majority of the apartments and offices have already been restored back to their original state prior to the process of evaluating the losses was as follows: a. Where available, we gathered photographs and videos of the damages shot by the owners prior of initiating the repairs. b. Where available, we gathered invoices of the repairs as submitted by the apartments’ owners. c. We have surveyed the repaired items in the presence of the apartment’s owner or his delegate who assisted us by verbally describing the damages. Additionally, where possible, we have crosschecked during the survey the repairs with the available damage photographs and the invoices. 4. We have received a set of Architectural drawings in soft CAD format. These drawings were not as-built drawings; nevertheless, the general architectural layout was enough to assist us in taking all the required measurements. When the damaged item necessitated further on-site measurements, we have recorded such information during our survey visit.
Limitations 1. The photographs and videos shot by the owners were not intended at accurately documenting the damages at that time, but rather it was a general record of the apartment/ office state immediately after the blast. Therefore, the owner’s photographic document was assistive but not conclusive. 2. In most of the cases, the invoices were not detailed and ambiguous at times, since it did not accurately designate the nature and the location of the repairs undertaken. Add to that, most of the invoices included repaired items that are not included in the scope of our assessment, and/ or included improvement to the original state of the damaged item. Therefore, we have referred to this document cautiously as a means of further clarifying the extent and nature of the damages reported by the owners. In conclusion, the accuracy of the assessment was directly related to the accuracy and completeness of the proof of loss documents supplied by the owners, which varied extensively.
Page |7
According to all the above, we have extensively relied on our common sense, fair judgement and our expertise in the subject matter to reach a comprehensive assessment, which covers as accurately as possible the required repairs cost.
D. The Building Overview Number of Residential floors: Number of private apartment: Number of Offices: Number of Commercial space: Approximate year the building was completed:
22 38 3 1 2003
A (East) Floor Section #
B (West)
Owner's Name
Owner's Name
Section #
22
B41 André khalil Kamel
21
B40 Fady Karam
20
B39 Fouad Karam
19
B38
18
B37 Joelle Abou Jaoudé
Jacques Antoine Raphael - Rented to Vanda Barakat
B36
17
B35 Joseph Jreissati/ Byblos Bank SAL
Andree Emile Riachi
B34
16
B33 Paul Zahlan
Raymonde Sabbagh Ferneini
B32
15
B31 Ralda Maroun Boulos
Victor Gebara
B30
14
B29 Michel & Stephanie Philippe Chami
Fadi Nader
B28
13
B27 Pierre Chidiac
Rafic Mouawad
B26
12
B25 Rony Bridi
Sara Ghazi Shaker
B24
11
B23 Jihad Majid Saad
Ste Seaview SAL/ Fady Ziade
B22
10
B21 Alain Ibrahimcha
Nader Al Mously
B20
9
B19 Jacques Georges Sacy
Nader Al Mously
B18
8
B17 Georges Lorenz Real Estate Company SAL
Georges Lorenz Real Estate Company SAL
B16
7
B15 Ghassan Joseph Geagea
Fida Georges Boustany
B14
6
B13 Oussama Mandil
Fayez Najjar
B12
5
B11
Société Foncière du Mont-Liban SAL
Siham Eid Bekhazi
4
B9 Jacques Antoine Raphael
Kamal Zahlan
B10
3
B7 Claude Pierre Issa
Nabil Zahlan
B8
2
B5 Toufic Khoueiry
Laurice Rochdi Safadi
B6
1
B4
3
A7 Firm, T. L. L. SAL / El Khoury Law
2
A5
Hisham Jaroudi & Nadim Mounla
1
A4
Abella Delices SAL (Owner)/ Gray Mackenzie Retail Lebanon SAL – Rented to Spinneys
GF
A4
Abella Delices SAL (Owner)/ Gray Mackenzie Retail Lebanon SAL – Rented to Spinneys
-1
A4
Abella Delices SAL (Owner)/ Gray Mackenzie Retail Lebanon SAL – Rented to Spinneys
-2
A4
Abella Delices SAL (Owner)/ Gray Mackenzie Retail Lebanon SAL – Rented to Spinneys
Ste Tilal N. O /Mr. Michel & Randa Accad Block C: Commercial Ziad Chawki Fakhoury
A6
Page |8
The as-built Specification & Price Index Most of the owners have bought their apartments during the construction stage. Every owner had the opportunity to modify and improve his apartment layout and finishing specification as he wished. Therefore, each apartment is different with very few common items. The building committee could not provide us with an “original builder’s specification” document which was ultimately the basis of the insurance policy; therefore, we have established a benchmark specification chart based on the owners feedback. Note that wherever the sentence “Replace with similar” has been used, we are strictly referring to the original specifications for cost calculation, irrespective of the visible improvements by the owners. Improvements by owners that have been damaged shall not be included in the current assessment. Items that have been removed by the owners prior to the blast shall not be included. This matrix includes the relative cost gathered by our team based on current market prices as follows:
Contractor's OH Division
Item
Division 8 - Doors &
All Aluminum Doors & Windows,
Windows
except bathrooms and Kitchens
Division 8 - Doors & Windows
Aluminum Windows: Kitchens
& profits
Total Cost/ $
Cash $
Check $
Aluminum "TECHNAL GX", Sliding + Double Glazing Clear
m2
$
205.00
30%
$
267.00
80%
20%
m2
$
155.00
30%
m2
$
185.00
m2
$
(8mm)
$
202.00
80%
20%
Clear
30%
$
241.00
80%
20%
135.00
30%
$
176.00
80%
20%
Aluminum "TECHNAL FX", Hinged Leaf + Single Glazing Clear Aluminum Door: Bedroom
Division 8 - Doors & Windows
Cost/$
Aluminum "TECHNAL FX", Hinged Leaf + Double Glazing Aluminum Door: Bedroom
Division 8 - Doors & Windows
unit
Aluminum "TECHNAL GX", Sliding + single Glazing Clear
Division 8 - Doors & Windows
Specifications
(8mm) Aluminum "TECHNAL FX", Hinged Leaf + Single Glazing
Aluminum Windows: Bathrooms
(8mm) Translucent
m2
$
145.00
30%
$
189.00
80%
20%
Windows
Aluminum windows: Fixed
Aluminum "TECHNAL", Fixed + Double Glazing Clear
m2
$
100.00
30%
$
130.00
80%
20%
Division 8 - Doors &
Glass: All Fenestrations except
Windows
bathrooms and kitchens
Double Glazing, Clear
m2
$
65.00
30%
$
85.00
80%
20%
Division 8 - Doors &
Page |9
Division 8 - Doors & Windows
Glass: Bathrooms
Single Glazing (8mm), Translucent
m2
$
35.00
30%
$
46.00
80%
20%
Glass: Kitchen
Single Glazing (8mm), Clear
m2
$
25.00
30%
$
33.00
80%
20%
Glass: Balustrade
6mm Laminated (Triplex) Black tinted glass
m2
$
50.00
30%
$
65.00
80%
20%
columns
Lm
$
125.00
30%
$
163.00
80%
20%
Double Glazing, laminated & tempered (10+10mm)
m2
$
225.00
30%
$
293.00
80%
20%
Division 8 - Doors & Windows Division 8 - Doors & Windows
Aluminum & Glass: Including rectangular handgrip + 6mm Division 8 - Doors &
Laminated (Triplex) Black tinted glass + black steel support
Windows
Balustrade, Complete
Division 8 - Doors &
Commercial Section: Glass
Windows
skylight
Division 8 - Doors &
Commercial Section: Glass for
Windows
door
Clear tempered glass (10mm)
m2
$
70.00
30%
$
91.00
80%
20%
Rolling Shutter
Wood, "Clear" Including painting
m2
$
155.00
30%
$
202.00
80%
20%
Rolling Shutter
Extruded Aluminum
m2
$
55.00
30%
$
72.00
80%
20%
Unit
$ 1,258.20
30%
$
1,636.00
80%
20%
Division 8 - Doors & Windows Division 8 - Doors & Windows Division 8 - Doors & Windows
Wood, Oak Veneered with solid oak frame and Architrave Main Door
Division 8 - Doors & Windows
including accessories (120x233cm=2.8m2) Wood, Oak Veneered, leaf only including accessories
Main Door
(120x233cm=2.8m2)
Unit
$
978.60
30%
$
1,272.00
80%
20%
Main Door Lock
Multi-Point Lock
Unit
$
250.00
30%
$
325.00
80%
20%
Main Door Cylinder
Cylinder only
Unit
$
25.00
30%
$
33.00
80%
20%
Division 8 - Doors & Windows Division 8 - Doors & Windows Division 8 - Doors & Windows
Wood, Oak Veneered with solid oak frame and Architrave Interior Door
(93x233cm=2.17m2)
Unit
$
595.90
30%
$
775.00
80%
20%
Interior Door
Wood, Oak Veneered, Leaf only (93x233cm=2.17m2)
Unit
$
300.10
30%
$
390.00
80%
20%
Interior Door
Plywood or MDF hollow core including paint (92x233cm)
Unit
$
289.39
30%
$
376.00
80%
20%
Division 8 - Doors & Windows Division 8 - Doors & Windows
P a g e | 10
Division 8 - Doors & Windows
Plywood or MDF hollow core, Leaf only, including paint Interior Door
(92x233cm)
Unit
$
150.05
30%
$
195.00
80%
20%
Interior Door
Solid wood including spray paint, Leaf only (92x250cm)
Unit
$
299.00
30%
$
389.00
80%
20%
Closets
Veneered Wood Leaf
m2
$
85.00
30%
$
111.00
80%
20%
Closets
Veneered Wood, Shelves
m2
$
60.00
30%
$
78.00
80%
20%
Division 8 - Doors & Windows Division 6 - Wood and Plastics Division 6 - Wood and Plastics Division 6 - Wood
MDF wood with a solid lipping including accessories, Spray
and Plastics
Closets
painted
m2
$
55.00
30%
$
72.00
80%
20%
Division 9 - Finishes
Kitchen
Laminated wood leaf
m2
$
45.00
30%
$
59.00
80%
20%
Division 9 - Finishes
False Ceiling
MDF wood with a solid lipping, Spray painted
m2
$
45.00
30%
$
59.00
80%
20%
Division 9 - Finishes
False Ceiling
Wood veneered with solid lipping
m2
$
70.00
30%
$
91.00
80%
20%
Division 9 - Finishes
False Ceiling
Modular Gypsum panels, painted, including support tracks
m2
$
25.00
30%
$
33.00
80%
20%
Division 9 - Finishes
False Ceiling
Modular PVC panels, including support tracks
m2
$
17.00
30%
$
22.00
80%
20%
Division 9 - Finishes
False Ceiling
Gypsum Board including paint
m2
$
35.00
30%
$
46.00
80%
20%
135.00
30%
$
176.00
80%
20%
Wood strips: "Clear" including necessary reinforcement and Division 9 - Finishes
False Ceiling: Balconies
clear paint
m2
$
Division 9 - Finishes
Wall Plastering
Sand & Cement plaster
m2
$
8.00
30%
$
10.00
80%
20%
Division 9 - Finishes
Wall Cladding
Travertine tiles
m2
$
125.00
30%
$
163.00
80%
20%
Division 9 - Finishes
Wall Cladding
Ceramic tiles
m2
$
45.00
30%
$
59.00
80%
20%
Division 9 - Finishes
Threshold
Marble
m2
$
110.00
30%
$
143.00
80%
20%
Division 9 - Finishes
Paint
Eggshell acrylic emulsion
m2
$
12.00
30%
$
16.00
80%
20%
Division 9 - Finishes
Paint
Clear Lacquer on wood doors and leafs
m2
$
8.00
30%
$
10.00
80%
20%
Division 9 - Finishes
Paint
Clear Lacquer on wood false ceilings and rolling shutters
m2
$
11.00
30%
$
14.00
80%
20%
Division 9 - Finishes
Paint
Spray paint on wood
m2
$
13.00
30%
$
17.00
80%
20%
Division 9 - Finishes
Acrylic glass
translucent acrylic panels
m2
$
22.00
30%
$
29.00
80%
20%
Spot light
Interior LED Spot light, European
Unit
$
18.00
30%
$
23.00
70%
30%
Spot light
Exterior IP rated Spot light, European
Unit
$
28.00
30%
$
36.00
70%
30%
Division 16 Electrical Division 16 Electrical
P a g e | 11
Division 15 Mechanical
Water Cabinet
European WC with related accessories and installation
Unit
$
300.00
Bidet
European Bidet with related accessories and installation
Unit
$
225.00
Rolling shutter motor
Somfy motor
Unit
$
235.00
Restore to original condition (Labor Units)
Unit
$
20.00
$
390.00
70%
30%
30%
$
293.00
70%
30%
30%
$
306.00
70%
30%
$
26.00
50%
50%
30%
Division 15 Mechanical Division 15 Mechanical
Effort driven repairs (Labor Miscellaneous
Intensive)
30%
P a g e | 12
E. Assessment Value Summary Block Floor
Consolidated Data Column Labels Section Check $
C C C
A4 A5 A6
$3,570.40 $15,036.88 $18,607.28 $7,333.31 $30,884.53 $38,217.84 $1,017.49 $4,244.56 $5,262.05
A7
$5,255.12 $22,132.15 $27,387.27
B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15
$1,266.24 $1,858.90 $3,398.90 $2,796.72 $2,252.33 $2,710.95 $3,588.34 $6,568.09 $2,977.20 $5,350.14 $2,801.26 $2,941.24
B16
$2,928.57 $11,764.69 $14,693.26
B17 B18+B20 B19 B21 B22 B23 B24 B25 B26 B27 B28
$4,229.55 $3,718.15 $4,137.02 $4,635.24 $4,098.94 $1,573.99 $1,532.21 $3,502.59 $3,532.03 $4,093.09 $3,538.94
$17,487.73 $15,649.99 $17,341.92 $19,236.96 $17,069.81 $6,506.95 $6,452.94 $14,665.93 $14,631.13 $16,425.21 $13,893.63
$21,717.29 $19,368.13 $21,478.94 $23,872.20 $21,168.76 $8,080.94 $7,985.15 $18,168.52 $18,163.16 $20,518.30 $17,432.57
B29 B30 B31 B32 B33 B34 B35
$2,945.27 $3,377.45 $6,003.14 $1,841.78 $4,082.93 $2,185.67 $2,883.83
$11,509.81 $13,651.00 $22,536.25 $7,515.94 $16,879.59 $9,083.08 $10,934.20
$14,455.07 $17,028.45 $28,539.39 $9,357.72 $20,962.52 $11,268.75 $13,818.03
B36 B37
$2,865.63 $11,097.81 $13,963.44 $2,345.01 $9,453.98 $11,799.00
C A A B A B A B A+B B A B A B A B A A B A B A B A B A B A B A B A B A A A A A
Owner Abella Delices SAL (Owner)/ Gray Mackenzie Retail Lebanon SAL – GF Spinneys 2 Hisham Jaroudi 3 Fakhoury, Ziad Chawki Firm, T. L. L SAL / El Khoury Law/ 3 Société Independance sal Ste Tilal N. O /Mr. Michel &Randa 1 Accad 2 Toufic Khoueiry 2 Laurice Rochdi Safadi 3 Claude Pierre Issa 3 Nabil Zahlan 4 Jacques Antoine Raphael 4 Kamal Zahlan 5 Siham Eid Bekhazi 6 Fayez Najjar 6 Oussama Mandil 7 Fida Georges Boustany 7 Ghassan Joseph Geagea Georges Lorenz Real Estate 8 Company SAL Georges Lorenz Real Estate 8 Company SAL 10 & 11 Nader Al Mously 9 Jacques Georges Sacy 10 Alain Ibrahimcha 11 Ste Seaview SAL 11 Jihad Majid Saad 12 Sara Ghazi Shaker 12 Rony Bridi 13 Rafic Mouawad 13 Pierre Chidiac 14 Fadi Nader Michel & Stephanie Philippe 14 Chami 15 Victor Gebara 15 Ralda Maroun Boulos 16 Raymonde Sabbagh Ferneini 16 Paul Zahlan 17 Andree Emile Riachi 17 Joseph Jreissati/ Byblos Bank SAL Jacques Antoine Raphael/ Rented 18 by Vanda Barakat 18 Joelle Abou Jaoudé Société Foncière du Mont-Liban 19 SAL 20 Fouad Karam 21 Fady Karam 22 André khalil Kamel
B38 B39 B40 B41 Grand Total
$8,716.26 $2,482.70 $4,784.19 $2,885.55 $144,606.40
Fresh $
$4,519.83 $7,259.73 $14,091.03 $11,046.79 $9,021.44 $10,543.28 $15,162.15 $27,111.88 $12,538.61 $22,146.13 $9,683.82 $12,061.95
$36,221.06 $10,212.10 $20,047.18 $10,709.54 $588,463.19
Grand Total
$5,786.07 $9,118.63 $17,489.94 $13,843.50 $11,273.77 $13,254.22 $18,750.49 $33,679.98 $15,515.81 $27,496.26 $12,485.08 $15,003.19
$44,937.32 $12,694.80 $24,831.37 $13,595.09 $733,069.60
P a g e | 13
F. The Apartments Guide: how to read the report For each apartment/ office you shall find: a) A key plan: An architectural layout where the rooms have been selectively numbered (1, 2, 3…) On this Key plan all damages have been annotated at the approximate location using a color coded circle with a number as shown below
Room number
Damage number
Legend
Total Loss
Partial Loss
Repairable
Not Included
2. Attachments: Digital archive comprising a number of folders with the following content: a) Excel Sheets (Soft copy): Tables describing the damage: Location, type, category etc… as well as the required repairs and related costs b) Documents submitted by the owners: i. Invoices ii. damage photos and videos c) Architectural drawing: CAD format including all floors, sections and elevations of the building. These drawings have been provided by the building committee and have been compiled in one file for ease of reference.
P a g e | 14
3. A table which will describe the damage: Location, type, category etc… as well as the required repairs and related costs, as shown below Section Number
Room Number
Item Number
Referenced with colors on Key plan Section No. Room No.
B35.21b Item No. Photo a, b….
P a g e | 15
Section Number:
2
B14
Block
B (West)
Floor
Owner
Fida Georges Boustany
7
Key plan showing the location and the category of the damages 1
2
5
3 4
1
2
3
4
1
4
6’
2
2 1
1
6 2
3
3
2
3
1
10 1
1
4
1
1
3
2
7
4
1
11
1
8
9 2
Legend
Total Loss
Partial Loss
3 Repairable
Not Included
P a g e | 143
P a g e | 144
Section: B14
1/8/
Photographic Document
B14.11a
B14.21b
B14.21a
B14.22a
P a g e | 145
Section: B14
2/8
Photographic Document
B14.23a
B14.41a
B14.24a
B14.41b
P a g e | 146
Section: B14
3/8
Photographic Document
B14.42a
B14.43a
B14.51a
B14.52a
P a g e | 147
Section: B14
4/8
Photographic Document
B14.52b
B14.53a
B14.54a
B14.61a
P a g e | 148
Section: B14
5/8
Photographic Document
B14.62a
B14.6'1a
B14.71a
B14.72a
P a g e | 149
Section: B14
Photographic Document
6/8
B14.73a
B14.74a
B14.91a
B14.92a
P a g e | 150
Section: B14
7/8
Photographic Document
B14.101a
B14.102a
B14.103a
P a g e | 151
Section: B14
8/8
Photographic Document
B14.104a
B14.111a
P a g e | 152
Section Number:
B28
Block
B (West)
Floor
Owner
Fadi Nader
14
Key plan showing the location and the category of the damages
2
1
3
3 3
2
2
10 1 4
71
2
1
2
1
1 1
3
1
9
8
3 34
2
3 3
1
1
6
2
5
2
1
11
12
2 1
Legend
Total Loss
Partial Loss
Repairable
Not Included
P a g e | 273
P a g e | 274
Section: B28
1/2
Photographic Document
B28.11a
B28.12a
B28.31a
B28.32a
P a g e | 275
Section: B28
1/2
Photographic Document
B28.33a
B28.41a
B28.42a
B28.43a
P a g e | 276
Section: B28
Photographic Document
2/2
B28.51a
B28.52a
B28 61a
B28.71a
P a g e | 277
Section: B28
Photographic Document
2/2
B28.81a
B28.82a
B28.83a
B28.84a
P a g e | 278
Section: B28
Photographic Document
2/2
B28.92a
B28.93a
B28.94a
B28.101a
P a g e | 279
Section: B28
Photographic Document
2/2
B28.102a
B28.111a
B28.112a
B28.121a