Mohamed Elsaid-BIM Architect (Vol 01)

Page 1

I MOHAMED ELSAID

IPORTFOLIO
VOL.01 I 2022.1 MU I ARCH UNDERGRADUATEE PORTFOLIO

PERSONAL

DATE OF BIRTH

NATIONALITY

RESIDENCY

CONTACT

EMAIL

MOHAMED EL-SAID MOSTAFA

ABOUT ME

Egypt

Mohamedelsaid5420@ gmail.com

+020100779165

LANGUAGE

I’m an Egyptian architect whose vision is to build a livablespace.During college,IHave been involved in continuouslearning and development,notonly because of my passion for architecture but also because ofidentifying what elements that architecture consists of.Ifind value in everything Ido For myselfand humanity.

EDUCATION

Since SEP.2018-JUN.2023

Bachelor of Ar chitecturalEngineering. Mansoura university,Egypt

Since MAY.2020-SEP.2023

Intern Site Architect.

Mansoura Consulting office,Egypt.

Practicing on site in different buildings Typologies Like ResidentialAnd office buildings Trained on the building process From excavation to curtain wallfixation.

Since MAY.2021-SEP.2022

Intern VisualArchitect. Vanilla Studio,Egypt.

Practicing online in different visualization scenarios Trained on the Visualization process From Modeling to the Final P roduct.

Since AUG.2022-JAN.2023

Intern BIM Architect. Kaitech,Egypt.

Practicing online in the integrated BIM process Trained on the process From Modeling to the FinalProduct

Since AUG.2022-JAN.2023

Intern ComputationalArchitect. EDIIT,Egypt.

Archstorming Competion in Senegal.

FINALISTTOP100

Practicing online in the comutational design methods Trained on the process From Modeling to the Final Product:3D Printing.

P-02 ©MS-2023
AWARDS SOFTWARE EMPLOYMENT
MOBILE ARABIC ENGLISH
RIHNO INDESIGN
3DS MAX VRAY NAVISWORK AUTOCAD LUMION SKETCHUP ADV INT INT ADV ADV INT ADV BEGG ADV INT NATIVE INTERMEDIATE APR.2000 Egytian
REVIT
PHOTOSHOP
Id Ps A N 3 max
P-03 ©MS-2023 CONTENTS BIM 01 02 03 P.40 P.22 P.04 New CapitalSchool " BIM P ROJECT INTERNSHIP" New CapitalAdministrative Office " COLLEGE WORKING PROJECT" MS VILLA " BIM P ROJECT INTERNSHIP"

New Capital School

Year :2022

Owner : K aitech

Role : Modeler & c oordinator & B XP AND BOQ .

Location :New Capital

Duration : 6 W eeks

Goal:BIM process training

Score :92%

Diploma Duration : 5 Months

Agenda

• V isualization video

• T eam chart

• P roject information

• EIR

• BXP

• BIM process MAP

• Work-sharing

• 4D

• 5D

• 6D

• 7D

• AR

• V

• SHOOTS

• CDE

• TEMPLATE and Ghost file

• 3D Modeling

• CLASH DETECTION

• SHOP DRAWINGS

• BOQ

• Dynamo

• Building (A)

Land Area = 2749.51m²

• Building (C)

Land Area = 858.7m²

• Building )(D

Land Area = 858.7 m²

• Building (F )

Land Area = 1178.4m²

• Building (I)

Land Area = 1811.5m²

P-04 ©MS-2023 01

SECTION A : BIM P ROJECT EXECUTION PLAN OVER-

VIEW

SECTION B : P ROJECT INFORMATION

SECTION C : KE Y PROJECT CONTACTS

SECTION D : P ROJECT GOALS /BIM USES

SECTION E : ORGANIZATIONAL ROLES / S TAFFING

SECTION F : BIM P ROCESS DESIGN

SECTION G : BIM INFORMATION EXCHANGES

SECTION H : BIM AND F ACILITY DATA REQUIREMENTS

SECTION I: C OLLABORATION PROCEDURES

SECTION J : QUALITY CONTROL

SECTION K : TECHNOLOGICAL INFRASTRUCTURE NEEDS

SECTION L : MODEL STRUCTURE

SECTION M : P ROJECT DELIVERABLES

SECTION N : DELIVERY STRATEGY /CONTRACT

SECTION O : A TTACHMENTS

SECTION F : BIM PROCESS DESIGN

SECTION I : COLLABORATION PROCEDURESSECTION I : COLLABORATION PROCEDURES

P-05 ©MS-2023 EIR
BXP

Worksharing

1- A ctivate Design Collaboration and Document Management

4-Work Flow:-

P-06 ©MS-2023
. 3-Upload CENRAL FILE T O Construction Cloud 6-Quality control 6-What BIM360 provide 2- Construct Folder Structure.

Modeling

P-07 ©MS-2023
1- T emplate Standards. 4- Title Block For Sheets. 2- Starting View5- Line w eight Style and P atters according to ACE(UK)BIM Standard For Autodesk Revit V 6- View Naming According To :ACE –BIM Protocol-V.2 7- Family Creation 3- Project Unit & Material

9-

CLASH DETECTION

Coordination Clash Detection

Coordination in-site Coordination

Work Flow

1. E xport NWC file for each discipline

2.Append NWC by Navisworks

3. Create clash matrix by XML language

4.Create Search Sets by XML language

5. Create Clash Tests.

6.solving Clashes by (Clash Point Method).

7.Make a report as HTM Tabular to show all the solvinglashc in one file.

3-Create clash tests using clash matrix3-Create Search Sets

Create Search Sets by XML language

P-08 ©MS-2023 8- Ghost File.
ARCH & MEP AND STR Model

• ADD TAGS

• ADD CONDUITS

• AND COONECTIONS

• ADD FILTERS

• sho w dimensions

P-09 ©MS-2023
SHOP DRAWING-ARCH AR Walls -TRS Columns (Clash)
P-10 ©MS-2023
P-11 ©MS-2023

CSI-MASTER FORMAT For Structure , Architecture and MEP works

Tools we used to build the BOQ

1. Choose the element and assign ( Mast er format number & description)

Some Sheets From Excel

- Use Revit otmake schedule f or e ach element

-Add master format description and number to the schedules

-Add Quantity,units,unit cost and Total amount for e ach

Summary Sheet

P-12 ©MS-2023 BOQ

Planning (Using E xcel):

2-Search Sets & Simulation Settings:

Creating Shared Parameter and Inserting T ask ID (Revit)

3- Simulation:

Navisworks :

C- Linking A ctivities with Elements:

1- A uto-Attach Using Rules

P-13 ©MS-2023 4D&5D

6D "SUSTAINABILITY"

Program Used:

Preparing for Analysis:

Shadow Analysis:

P-14 ©MS-2023

Wind Analysis:-

Solar Analysis:

Heating & Cooling:

P-15 ©MS-2023

7D "FACILITY MANAGEMENT"

What is F acility Management?

Facility management (FM)is a profession that encompasses multiple disciplines, and it’ s the tools and services that support the functionality, safety,and sustainability ofbuildings,grounds, infrastructure, and r ealestate.

Types offacilities management

There are two basic areas:

• Har d Facilities Management (Hard FM)

• Soft F acilities Management (Soft FM).

Create Rooms and Spaces and set up project to export (COBie)

The (FM) Before using BIM Loss ofinformation and waste time

Specify date for every Elements MEP And ARCH

Specify date for every room and space

P-16 ©MS-2023

Select what we want ot export in Spread sheet then export

Construction Operations Building Information Exchange (COBie)

Is a moder n data f ormat that is used to streamline the handover process to the operators or owners ofa building.

P-17 ©MS-2023

AR & VR

AR USING AYGIN

AR USING AYGIN , UNITY can be used too.

VR USING ENSCAPE WITH THE HEADSET HELPED FROM THE FIRST STAGE OF DESIGN TO THE LAST.

P-18 ©MS-2023
P-19 ©MS-2023
P-20 ©MS-2023 DYNAMO & ADD-INS
P-21 ©MS-2023
P-22 ©MS-2023
P-23 ©MS-2023

Basement Floor -Part2

P-24 ©MS-2023 UP UP UP -West 1 1 5 5 2 2 4 4 H E A G F B 3 3 I D C 230 ELEC. 13 BS MEP 14 SERVICE 15 BS SERVICE 16 BS SERVICE 17 BS SERVICE 18 BS 300 1030 1080 1080 1030 280 1000 1000 1000 1130 600 700 1020 1200 300 8230 1030 1080 700 370 1030 70 1010 70 1000 70 950 7 990 90 1030 450 380 750 210 790 200 930 210 790 70 1050 390 40 100 110 130 150 130 60 60 300 990 90 990 90 940 9 110 460 30 570 140 180 20100 320 20 100 330 290 430 SERVICE 19 BS SERVICE 20 BS 430 420 10 130 10 BS-27 BS-26 13 14 BS-17 BS-15 BS-16 BS-18 BS-20 BS-19 14* 30.00=420.00 420 700 500 270 520 340 720 60 170 520 690 1000 50 10 505050 930 100 270 340 1060 820 970 240 60 150 1310 1270 950 70 1230 70 1060 70 790 240 830 1470 690 260 300 770 240 60 670 520 650 340 560 500 40 500 640 580 790 7 14* 30.00=420.00 420 270 670 470 520 170 -290 -290 -290 -100 -290 -100 -290 1:8 530 -300 -300 BS-22 BS-23 BS-24 BS-9 BS-10 BS-11 BS-12 BS-1 BS-2 BS-3 BS-4 BS-41 BS-42 BS-43 BS-18 BS-19 BS-20 BS-21 BS-51 BS-52 BS-53 BS-29 BS-30 BS-31 BS-32 BS-5 BS-6 BS-7 BS-8 BS-81 BS-82 BS-83 BS-47 BS-48 BS-49 BS-50 BS-33 BS-34 BS-35 BS-36 BS-172 BS-171 BS-170 BS-112 BS-113 BS-114 BS-133 BS-134 BS-135 BS-13 BS-14 BS-15 BS-16 BS-25 BS-26 BS-27 BS-28 BS-44 BS-45 BS-46 BS-63 BS-64 BS-65 BS-17 BS-66 BS-67 BS-68 BS-84 BS-105 BS-106 BS-107 BS-94 BS-95 BS-96 BS-119 BS-120 BS-121 BS-85 BS-62 990 90 940 9 440 730 380 750 210 790 240 280 600 L2
: 200
1
1

DR-MOAMEN SODANY

P-25
5 5 H E A G F B I 6 6 D C 1090 1090 0 1010 1090 0 1000 90 0 1020 -290 BS-54 BS-37 BS-38 BS-39 BS-40 BS-77 BS-58 BS-59 BS-60 BS-61 BS-86 BS-69 BS-70 BS-71 BS-72 BS-122 BS-123 BS-90 BS-91 BS-92 BS-93 BS-124 BS-125 BS-150 BS-151 BS-152 BS-160 BS-161 BS-162 BS-108 BS-109 BS-110 BS-111 BS-136 BS-137 BS-138 BS-153 BS-154 BS-155 BS-181 BS-180 BS-179 BS-178 0 1000 90 Scale Checked by Drawn by Date Project number 1 : 200 18/12/2022 03:08:58 AM
01
©MS-2023
BS-Floorplan-Part2
MO-MU-CONS-CA-OFFICE-AR
15/12 Author Checker A106 Door Schedule -Basement Type Mark Classificati on.Master Format.De scription Classificat ion.Master Format.N umber DescriptionWidthHeight Hea d Heig ht Level Cou nt Cost DR-01Aluminum Doors 08 13 16Singel Allimium door with Glass Front provides maximum glass surfaces above 100.00220.00220. 00 Baseme nt Floor 1319500 .00 Wall Schedule Ty pe M ar k Classification.MasterFormat .Description Classifica tion.Mast erFormat. Number Base Constraint Widt h AreaVolumeCount Fire Ratin g L1Cast-in-Place Concrete Retaining Walls 32 32 13Basement Floor 30.0 0 1348 m² 397.76 m³213hr L2Cast-in-Place Concrete Retaining Walls 32 32 13Basement Floor 26.0 0 2563 m² 665.01 m³183hr L3Precast Concrete Retaining Walls 32 32 16Basement Floor 13.5 5 297 m² 40.11 m³253hr

Basement Floor -Part1

P-26 ©MS-2023 UP- South- North 8 8 10 10 11 11 H E A G F B 9 9 I 6 6 7 7 D A103 1 - Part1 South- Part2 C 1090 1090 1200 920 920 840 1000 1000 1000 280 560 590 1000 90 1110 90 830 90 830 90 5 1000 90 1000 90 1110 450 90 1000 1090 90 1110 90 830 90 830 90 750 90 5 240 30 100 100 130 140 130 70 140 240 710 140 330 490 560 SERVICE 21 BS BS-25 BS-21 620 510 500 16010 400 360 100 20 -100 -290 -290 -290 660 4120 BS-101 BS-102 BS-103 BS-104 BS-73 BS-74 BS-75 BS-76 BS-130 BS-131 BS-132 BS-147 BS-148 BS-149 BS-15 BS-54 BS-55 BS-56 BS-57 BS-40 BS-126 BS-127 BS-128 BS-129 BS-97 BS-98 BS-99 BS-100 BS-167 BS-168 BS-169 BS-173 BS-77 BS-78 BS-79 BS-80 BS-61 BS-163 BS-164 BS-165 BS-166 BS-143 BS-144 BS-145 BS-146 BS-182 BS-183 BS-184 BS-187 BS-188 BS-189 BS-190 BS-139 BS-140 BS-141 BS-142 BS-115 BS-116 BS-117 BS-118 BS-175 BS-176 BS-177 BS-185 BS-86 BS-87 BS-88 BS-89 BS-72 BS-122 BS-123 BS-93 BS-124 BS-125 BS-150 BS-151 BS-152 BS-160 BS-161 BS-162 BS-181 530 1090 1200 920 920 6140 750 90 5 90 1000 90 1000 90 1110 L1 1 : 200
1
P-27 ©MS-2023 -East 12 12 H E A G F B I D C 230 SERVICE 12 BS 1200 280 280 1000 1000 1000 1130 600 700 1020 1200 8230 30 1080 320 500 30 A303 1PART 1 304 prefixEastPART 1 suffix 12 460 500 1:9 520 -300 -290 6 BS-157 BS-158 BS-159 BS-174 BS-191 BS-186 1200 280 30 90 740 L1 Scale Checked by Drawn by Date Project number 1 : 200 18/12/2022 03:08:54 AM BS-Floorplan-Part1 01 MO-MU-CONS-CA-OFFICE-AR DR-MOAMEN SODANY 15/12 Mohamed Elsaid DR-MOAMEN SODANY A105 Door Schedule -Basement Type Mark Classificati on.Master Format.De scription Classificat ion.Master Format.N umber DescriptionWidthHeight Hea d Heig ht Level Cou nt Cost DR-01Aluminum Doors 08 13 16Singel Allimium door with Glass Front provides maximum glass surfaces above 100.00220.00220. 00 Baseme nt Floor 1319500 .00 Wall Schedule Ty pe M ar k Classification.MasterFormat .Description Classifica tion.Mast erFormat. Number Base Constraint Widt h AreaVolumeCount Fire Ratin g L1Cast-in-Place Concrete Retaining Walls 32 32 13Basement Floor 30.0 0 1348 m² 397.76 m³213hr L2Cast-in-Place Concrete Retaining Walls 32 32 13Basement Floor 26.0 0 2563 m² 665.01 m³183hr L3Precast Concrete Retaining Walls 32 32 16Basement Floor 13.5 5 297 m² 40.11 m³253hr
P-28 ©MS-2023 DN 1516171819202122232425262728 UP UP- South -West 1 1 5 5 2 2 4 4 8 8 H E A G F B 3 3 I 6 6 7 7 D A103 1 - Part1 South- Part2 120 160 100 160 110 160 100 C 90 -100 90 90 100 1000 1000 1000 1130 600 700 1020 1200 310 100 1030 1080 1080 1030 1090 1090 1090 12120 100 1030 1080 1080 1030 1090 1090 1090 12140 3720 880 1390 650 880 8* 27.00=216.00 220 30 220 530 10100 110 130 140 130 600 250 220 250 1420 30 220 20 30 470 360 30 70 100 170 470 300 320 470 420 270 14* 30.00=420.00 520 200 800 1270 1170 670 1740 1730 850 920 920 850 1130 3010100 80 160 120 160 60 250 220 250 30 290 160 880 10020 300 305030 340 470 1110 170 340 40 70 90 170 14* 30.00=420.00 420 30 170 30 270 250 30 310 190 90 160 230 210 130 540 220 370 1010 130 14* 30.00=420.00 420 310 160 6740 1220 90 1110 3140 630 120 120 120 120 120 120 120 80 180 100 160 80 180 80 870 450 8* 27.00=216.00 1220 490 120 110 110 120 110 120 110 120 110 210 2030 3510 930 1340 120 120 120 3700 120 120 22-D5 22-D6 22-D7 22-D8 22-D9 22-D10 22-D11 22-D12 22-D13 22-D19 22-D20 22-D21 22-D22 22-D23 22-D24 2410 2460 WN-74 WN-76 WN-93 WN-95 WN-98 WN-100 WN-103 WN-105 WN-108 WN-110 WN-113 WN-115 WN-118 120 120 120 120 120 120 100 1470 1470 740 670 1460 1470 770 640 8060 2510 2060 / - /1090 300 90 1 : 200 00_Ground Floor 1

DR-MOAMEN SODANY

MO-MU-CONS-CA-OFFICE-AR

P-29 ©MS-2023 DN DN UP -East- North 12 12 10 10 11 11 H E A G F B 9 9 I D C 90 110 90 WN-6 WN-7 WN-33 WN-34 STAIR 22 GF 1000 1000 1000 1130 600 700 1020 1200 310 1200 920 920 1200 300 1200 920 920 1200 A303 1PART 1 304 prefixEastPART 1 suffix 220 150 400 50 120 120 120 5620 120 120 120 120 120 120 120 120 120 GR-D1 GR-D2 FF-D1 GR-D3 22-D3 22-D4 FF-D16 FF-D17 FF-D18 230 180 330 160 330 180 210 1620 440 8* 27.00=216.00 1660 1550 540 220 370 250 1420 10100 120 130 150 130 60 250 220 250 130 14* 30.00=420.00 270 520 170 470 170 270 200 340 170 610 1290 400 150 400 400 200 110 200 600 400 340 400 130 3850 1620 1570 40 5690 1470 1640 1200 920 920 1200 300 3920 4800 890 5690 300 Scale Checked by Drawn by Date Project number 1 : 200 18/12/2022 03:32:08 AM FF-Floorplan 01
15/12 Author Checker A108 Wall Schedule Ty pe M ar k Classification.MasterFormat .Description Classifica tion.Mast erFormat. Number Base Constraint Widt h AreaVolumeCount Fire Ratin g Aluminum-Framed Storefronts08 43 1300_Groun d Floor 91 m² 0.00 m³13hr L1Cast-in-Place Concrete Retaining Walls 32 32 1300_Groun d Floor 30.0 0 7 m²2.16 m³53hr L3Glazed Aluminum Curtain Walls 08 44 1300_Groun d Floor 326 m² 0.00 m³32hr L6Aluminum-Framed Storefronts08 43 1300_Groun d Floor 997 m² 0.00 m³132hr Door Schedule -GR Type Mark Classificati on.Master Format.De scription Classificat ion.Master Format.N umber DescriptionWidthHeight Hea d Heig ht Level Cou nt Cost DR-02All-Glass Entrances 08 42 26Double glazed fire-resistant door and frameless 00_Grou nd Floor 630000 .00 DR-03Revolving Door Entrances 08 42 33Revolving glazed fire-resistant door and frameless 00_Grou nd Floor 315000 .00 Grand total: 9 45000 .00
P-30 ©MS-2023- South- North 8 8 10 10 11 11 H E A G F B 9 9 I 6 6 7 7 D A103 1 - Part1 South- Part2 C 60 40 2470 40 2840 40 420 1000 1000 420 40 40 420 1000 1000 420 40 40 270 1900 300 40 40 420 2470 40 300 1900 270 880 40 420 40 1050 40 220 40 260 40 GRANITE 1620 2550 270 300 1050 500 880 2920 1620 120 300 20 170 30 90 300 300 300 300 300 300 300 160 40 2350 40 20 170 30 2760 100 100 100 100 40 420 40 40 2840 40 40 420 1000 1000 420 40 1090 1090 1200 920 920 570 40 160 160 40 320 5940 40 560 1000 1000 1000 200 1620 -10 -10 20 20 -10 20 20 -10 -10 -10 20 210 290 1050 500 880 2550 970 930 2840 2610 224 1050 P1 1 : 200 Site -PART 1 1

Layout-Part1

P-31 ©MS-2023 DN -East 12 12 H E A G F B I D C A303 1PART 1 304 prefixEastPART 1 suffix 1000 1000 380 40 2800 1770 40 230 460 480 1060 940 1000 1130 600 700 1020 1200 310 CEMENT TILES GRASS CLAY PAVERS 2830 300 300 300 300 170 100 1:8 1180 880 500 1050 300 150 2510 1380 130 590 1000 1000 330 40 2750 40 1200 300 0 340 40 40 230 200 40 460 510 1350 4760 2790 20 -10 -30 -10 -10 0 2620 P2 P3 Scale Checked by Drawn by Date Project number 1 : 200 18/12/2022 12:16:07 AM
01 MO-MU-CONS-CA-OFFICE-AR DR-MOAMEN SODANY 15/12 MOHAMED EL-SAID DR-MOAMEN SODANY A110 Planting Schedule Classifica tion.UniF ormat.201 0.Descrip tion Classificati on.UniFor mat.2010.N umber NAME Type Mark HEIG HT Co unt Image PlantsG2080.30SCARLET OAK P1125019 PlantsG2080.30FOUNTAIN GRASS P2105102 PlantsG2080.30PALM TREE P375020
P-32 ©MS-2023 DN- South -West 1 1 5 5 2 2 4 4 8 8 H E A G F B 3 3 I 6 6 7 7 D A103 1 - Part1 South- Part2 C 40 220 40 60 60 40 2470 40 2840 40 420 1000 10 40 420 1000 10 40 270 1900 300 40 CLAY PAVERS ASPHALT-BITUMEN CEMENT TILES GRASS 270 300 1050 2920 90 300 300 300 300 3 40 2350 2760 100 100 1:8 40 2840 40 420 1000 10 300 1030 1080 1080 1030 1090 1090 1090 12320 1140 1000 1000 410 1370 410 1100 1100 1340 140 1000 1000 1000 430 120 320 40 800 40160 16040 790 40160 16040 2110 40 570 40 160 160 40 320 1990 3290 400 550 40 890 40 3650 2460 3140 890 460 480 40 40 560 1000 20 -10 -10 -10 20 -10 -30 -10 -10 20 20 -10 20 -10 20 210 290 1050 500 880 2550 2060 870 2060 40 220 40 40 100 300 300 300 300 300 300 80 40 50 170 80 600 1420 3130 270 80 300 300 300 300 300 300 180 870 50 170 80 2240 2610 2840 970 930 1050 970 970 930 930 970 2840 2610 2240 RB(0,0,0) P1 1 : 200 Site -PART 2 1

DR-MOAMEN SODANY

MO-MU-CONS-CA-OFFICE-AR

Layout-Part2

P-33 ©MS-2023 DN -East- North 12 12 10 10 11 11 H E A G F B 9 9 I D C A303 1PART 1 304 prefixEastPART 1 suffix 000 420 40 000 420 40 40 420 1000 1000 380 40 2800 2470 40 300 1900 270 880 40 420 40 1050 40 220 40 260 40 1770 40 230 460 480 340 1060 940 1000 1130 600 700 1020 1200 310 8290 GRANITE CEMENT TILES GRASS CLAY PAVERS 1620 2550 270 300 1050 500 880 1620 2830 120 300 300 300 300 300 170 20 170 30 00 300 300 160 40 20 170 30 100 100 100 1:8 1180 880 500 1050 300 150 2510 1380 130 590 40 420 1000 1000 330 40 40 2750 40 40 000 420 40 1200 920 920 1200 300 5940 1000 1000 2000 340 40 40 230 200 40 460 510 1350 4760 1620 2790 -10 -10 20 20 -10 20 -10 20 20 -10 -10 -30 -10 -10 2840 2610 2240 2620 P2 P3 Scale Checked by Drawn by Date Project number 1 : 200 18/12/2022 12:16:24 AM
01
15/12 Author Checker A111 Planting Schedule Classifica tion.UniF ormat.201 0.Descrip tion Classificati on.UniFor mat.2010.N umber NAME Type Mark HEIG HT Co unt Image PlantsG2080.30SCARLET OAK P1125019 PlantsG2080.30FOUNTAIN GRASS P2105102 PlantsG2080.30PALM TREE P375020
P-34 ©MS-2023
P-35 ©MS-2023
P-36 ©MS-2023
P-37 ©MS-2023
P-38 ©MS-2023
P-39 ©MS-2023
P-40 ©MS-2023
P-41 ©MS-2023
P-42 ©MS-2023
P-43 ©MS-2023
P-44 ©MS-2023
P-45 ©MS-2023
P-46 ©MS-2023

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.