Mohamed Hassan | BIM In Practice Portfolio

Page 1

MOHAMED HASSAN ALI BIM PROJECT ARCHITECT

IN PRACTICE


MOHAMED HASSAN ALI

8 Othman ebn affan St., Nozha, Cairo, Egypt +20 11 2357 5731 Eng.mohamedhassan.94@gmail.com linkedin.com/in/mohamed-hassan-bimarchitect

BIM PROJECT ARCHITECT

EDUCATION

ABOUT ME -A construction professional with about five years of experience in undertaking BIM-driven projects. -Engaged with different BIM uses like design authoring, 3D coordination, 4D simulation with cost estimation, existing condition modeling and construction documentation. -Leading an architecture team and coordinating internal tasks. -Creating 2D & 3D parametric families and producing LOD 300-400-500 construction documents. -A proactive, problem-solver and detail-oriented with high quality deliverables, accuracy, and accountability.

Navisworks Dynamo BIM 360 AutoCAD Enscape, Photoshop

WORK EXPERIENCE Wassef Design Group

BIM PROJECT ARCHITECT

Cairo, Egypt Jul 2021 - Present

SKILLS Technical Tools Revit

B.Sc. in Architectural Engineering, Ain-Shams University from 2012 to 2017

Key Expertise BIM Content Creation Model-Based Shop Drawings Design Validation Model-Based Quantification Cross-Trade Coordination Project Templates Creation 4D Construction Simulation

Languages Arabic: Native

English: Fluent

Consultancy Group CG

ARCHITECTURAL BIM ENGINEER

Cairo, Egypt Jun 2020 – Jul 2021

RAKA Design Cairo, Egypt May 2019 – Jun 2020

ARCHITECTURAL BIM ENGINEER


CONTENT PROJECTS

Fit-Out (Contractor) Mentor Graphics, CFC, Cairo, Egypt Saudi Payments, King Abdallah Financial District, KSA Security Forces Medical City Project, Riyadh, KSA

Fit-Out (Consultant) Amazon CAI10 LT, Maadi, Cairo, Egypt

Construction & Fit-out (Contractor) The Podium, CFC, Cairo, Egypt



Mentor Graphics •

Location: CFC, Cairo, Egypt

Type: Office Building (FIT-OUT)

Designer: ARCHIMID

Contractor: SECTORS Construction

BIM Contractor: RAKA Design

Software: RVT2019, NAVISWORKS, Dynamo

Scope of work •

Existing condition modeling

Design Review (Life and safety) with local codes

Interior Design Implementation

MEP Coordination

Deliverables •

Full Coordinated BIM model LOD 500

Detailed Shop Drawing Package

Bill of quantities

FF&E


Existing condition •

Core & Shell administration building

Project consist of 4 floor ( 2nd, 3rd, 4th and 5th )

GFA 1750 m2 per each floor

Scope of work •

Coordinate As-Built Drawings

Core & shell Modeling (Architecture & Structure)

Acquire project location coordinates


Setting Out Plans Sample •

Gypsum board partitions installation (Fire & Non-fire rated) with dimensions

All partitions typology with material, thickness, fire rating and Height

enhancement from design

Rooms for all spaces including open and closed spaces

All wall finishes and claddings (Wood, Stone & Brick) modeling

Doors and windows typology

Glass partitions for open offices with black tinted glass at gypsum connections


Reflected Ceiling Plans Samples •

Architectural distribution for all ceiling fixtures to be a conceptual for Mechanical and electrical

Coordinate ducting works, drainage and fire fighting system with all types of ceiling like gypsum ceilings, pendant baffles or exposed

Fixtures coordination after receiving calculated fixtures design from MEP team

Enhance ceiling fixtures such as Diffusers, Lighting fixtures, All sensors and smoke detectors and Access panels for maintenance


3D Views Sample 3D Floor Plan

3D Ceiling Plan


Coordinated Plans Samples •

Contains all wall fixtures and outlets to be architecturally coordinated with standard heights and in-plan accurate dimensions

Power sockets, Data outlets, Card readers, Touch control panels and fire alarm etc.

Special requirement from client to be presented in plan view with each fixture height from F.F.L

It was a challenge how to coordinate every fixture and work with Electrical and Mechanical RVT Links in parallel with Architecture

How to display fixtures with same vertical placement and different height in plans and not to be conflicted in drawings


Enlarged Space Samples •

Presenting a detailed drawings for each space individually to show a flooring plan with all fixtures like floor boxes, raised floor and cable trunk path and ceiling plan

Detailed wall elevations showing all materials, ceiling fixation, ceiling fixtures and partitions and claddings fixation


Model Shots Samples •

Initiative Clash Detection ARC vs STR for any architectural element clashes with existing structural elements

A Clash Matrix to manage and under control coordination stage with all team disciplines


Site Photos



Saudi Payments •

Location: King Abdallah Financial District, KSA

Type: Office Building (FIT-OUT)

Designer: FBS

Contractor: FBS

BIM Contractor: RAKA Design

Software: RVT2019, NAVISWORKS, Dynamo

Existing condition •

Core & Shell administration building

Scope of work

Project consist of 4 floor (1st ,2nd, 3rd, 4th and 5th )

Existing condition modeling

GFA 1220 m2 per each floor

Demolition Plan

Design Review (Life and safety) with SBC

Interior Design Implementation

Deliverables

MEP Coordination

Full Coordinated BIM model LOD 500

Detailed Shop Drawing Package

Bill of quantities

FF&E


Reflected Ceiling Plans Samples •

Architectural distribution for all ceiling fixtures to be a conceptual for Mechanical and electrical

Coordinate ducting works, drainage and fire fighting system with all types of ceiling like gypsum ceilings, pendant baffles or exposed

Fixtures coordination after receiving calculated fixtures design from MEP team

Enhance ceiling fixtures such as Diffusers, Lighting fixtures, All sensors and smoke detectors and Access panels for maintenance


Coordinated Plans Samples •

Contains all wall fixtures and outlets to be architecturally coordinated with standard heights and in-plan accurate dimensions

Power sockets, Data outlets, Card readers, Touch control panels and fire alarm etc.

Special requirement from client to be presented in plan view with each fixture height from F.F.L

It was a challenge how to coordinate every fixture and work with Electrical and Mechanical RVT Links in parallel with Architecture

How to display fixtures with same vertical placement and different height in plans and not to be conflicted in drawings


Floor Pattern Plans Samples •

Contains all flooring design pattern with material code tagging.

Starting point for each floor pattern with know dimensions.

Legend for Tagged Codes and material description.


Joineries Details Samples •

Shop Drawings for all project joineries including all fixed benches, Pantries and all Built-in equipment like vendor machine and water coolers.


Joineries Details Samples •

Shop Drawings for all project joineries including all fixed benches, Pantries and all Built-in equipment like vendor machine and water coolers and all unique walls with variant finishing materials and specific design.


BIM Model / Renders Samples


BIM Model / Site Samples



THE PODIUM •

Location: CFC, Cairo, Egypt

Type: Office Building (FIT-OUT)

Designer: Raafat Miller Consulting RMC

Contractor: Arabian Construction Co. ACC

BIM Contractor: RAKA Design

Software: RVT2019, NAVISWORKS, Dynamo

Scope of work •

Core & Shell Construction

Structure Modeling for Podium and buildings

Landscape / Structure Coordination

MEP Coordination

Deliverables •

Full Coordinated Structure BIM model

Detailed Shop Drawing Package (By Structure Team)

Coordinated Landscape Package

Construction 4D Simulation


Structure Stage •

The project consists of six typical buildings connected with one podium

It was a big challenge coordinating ground slab slopes for drainage and Landscape elements with an underground basement parking area

Coordinating entry ramps for basement and hardscape levels for pedestrians

RVT model for one building linked six times with different locations and rotation


Architecture Stage •

For architecture scope, Coordinating facades columns with glass and marble claddings contractors for accurate dimensions for construction stage by Shop Drawings.


MEP Stage •

MEP / Structure coordination for shear wall openings for infrastructure and all MEP elements

Drainage system for ground slab and Landscape planters in ground slab above basement


Landscape Stage •

Hardscape and Softscape Leveling coordination with design drawings, Structure Corbels for transition slabs and ramps


Construction 4D Simulation Stage •

Applying time frame schedule by adding Activity ID for every structure element with time schedule received from management team and applying it with NAVISWORKS

Video screenshots show construction progress Vs time frame starting from shoring (Piles) to completion of project



Amazon Egypt •

Location: Maadi, Cairo, Egypt

Type: Office Building (FIT-OUT)

Designer: IA London

Local Consultant: Wassef Design Group

Software: RVT2021, NAVISWORKS, Dynamo

Scope of work •

Existing condition modeling

Design Review (Life and safety) with local codes

Interior Design Implementation

MEP Coordination

Deliverables •

Full Coordinated BIM model LOD 350

Detailed Design Package

Bill of quantities

FF&E


Existing condition •

Core & Shell administration building

Project consist of 4 floor ( 2nd, 3rd, 4th and 5th )

GFA 1750 m2 per each floor

Stage Scope of work •

Coordinate As-Built Drawings

Core & shell Modeling (Architecture & Structure)

Acquire project location coordinates


Setting Out Plans Sample •

Gypsum board partitions installation (Fire & Non-fire rated) with dimensions

All partitions typology with material, thickness, fire rating and Height

enhancement from design

Rooms for all spaces including open and closed spaces

All wall finishes and claddings (Wood, Stone & Brick) modeling

Doors and windows typology

Glass partitions for open offices with black tinted glass at gypsum connections


Reflected Ceiling Plans Samples •

Architectural distribution for all ceiling fixtures to be a conceptual for Mechanical and electrical

Coordinate ducting works, drainage and fire fighting system with all types of ceiling like gypsum ceilings, pendant baffles or exposed

Fixtures coordination after receiving calculated fixtures design from MEP team

Enhance ceiling fixtures such as Diffusers, Lighting fixtures, All sensors and smoke detectors and Access panels for maintenance


Enlarged Space Samples •

Presenting a detailed drawings for each space individually to show a flooring plan with all fixtures like floor boxes, raised floor and cable trunk path and ceiling plan

Detailed wall elevations showing all materials, ceiling fixation, ceiling fixtures and partitions and claddings fixation


Joineries Details Samples •

Shop Drawings for all project joineries including all fixed benches, Pantries and all Built-in equipment like vendor machine and water coolers and all unique walls with variant finishing materials and specific design.



Security Forces Medical City Project •

Location: Riyadh, KSA

Type: Medical

BIM Contractor/Coordinator: RAKA Design

Software: RVT2019, NAVISWORKS, Dynamo

Scope of work •

Architectural BIM Model LOD 200

Equipment Coordination as per Medical team order

Medical / MEP Coordination

Deliverables •

Room Layout Sheets for Clinical/ Non-Clinical

Coordinated BIM Model LOD 400

Equipment Schedule for each room


Security Forces Medical City Project •

Room Layout Sheet (RLS) Sample


Security Forces Medical City Project •

Room Layout Sheet (RLS) Sample


Security Forces Medical City Project •

Room Layout Sheet (RLS) Sample



SAAF Project •

Location: Jeddah, KSA

Type: Mixed Use – (Hotel Tower, Administrative Tower, Mall, Museum, Mosque, Yacht Club, Cinema)

BIM Contractor: RAKA Design

Software: RVT2019, NAVISWORKS

Scope of work •

Architectural BIM Model LOD 200

Interior Design Implementation


SAAF Project


SAAF Project


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.