ARCHITECTURE PORTFOLIO MOHAMMAD ALYAMANI DESIGN . RESEARCH . RENOVATION . DETAILS
MOHAMMAD ALYAMANI SELECTED WORK PROFILE 2014-2020 E-mail:arch.alyamani@gmail.com Mobile: +966555047100
Portfolio Online
TABLE OF CONTENT
01
CV
06
02
ACADEMIC WORK
08
03
PROFESSIONAL EXPERIENCE
56
04
ACHIEVEMENTS
120
Address: Jeddah-Al Sulaymaniyah
01 | RESUME
Mobile: +966555047100 Email: Arch.alyamani@gmail.com ARCHITECT
www.linkedin.com/in/mohammadalyamani-72842411b
Architect with an experience in Building Informa on Modeling (BIM), skilled in architecture so ware, Autodesk Revit and AutoCad. Professional in architecture rendering, graphic design and presenta ons. Interested in arts and sustainable architecture design. Looking for an opportunity to work in a leading company to u lize my experience, enhance skills and develop my knowledge. Achieving mutual success and maximizing benefits to improve my architectural experience and enhance scien fic and prac cal efficiency in work. PERSONAL INFORMATION Name
Mohammad Alyamani
Job tle
Architect
DOB
Nov7, 1994
Na onality
Saudi
SCE membership
424240 Arabic-Na ve
Language English-Intermediate
EDUCATION
ACHIEVEMENTS:
Bachelor of Architecture 2013-2018
Superior Cer ficate
-King Abdulaziz University (KAU) -Faculty of Architecture and Planning -Grade Point Average GPA of ( 4.33 ) -VERY GOOD-Second Honors
Master of Engineering Management 2020-Present -King Abdulaziz University (KAU) -Faculty of Engineering
Achieved a GPA "Excellent" grade in both successive semester of the academic years 2015-2016, 2017-2018, from Deanship of Student Affairs at (KAU)
Excellent Cer ficate Cer ficate of Excellent for studio design project in th academic year of 2017 and 2018f first semester, from Faculty of Architecture and Planning.
Comple on Cer ficate Training course in Revit architecture advanced, from Autodesk Authorized Training Center (ATC®)
Professional Accredita on Cer ficate Membership of the Saudi Council of Engineering
06 |
Academic Work
EXPERIENCE
Work Experience King AbdulAziz University - Vice presidency for projects. Oct,2018 - Jul,2020 -Architect, at Design and development studies department -Projects coordinator. -Projects and buildings designer. -Renova on projects redesign. -Graphic design and analyze.
Architectural trainee Saud Al Saadi & Partners Co - General Contrac ng & Trading Group. May,2017 - Jul,2017
SOFTWARE
Autodesk Revit
Autodesk CADt
Autodesk CFD
Lumoin Rendering
Coral Draw
Adobe Photoshop
Adobe Illustrator
Microso Office
SKILLS
-Supervising a construc on site for (five star hotel building), 15 floors in AL Tayseer district.
Architect, Freelance Raka Design - Design Studio by innovators Sep,2016 - Oct,2016 Design proposals for a project in Medina: -Proposal (1): Design a conceptual mall. -Proposal (2): Mix use project contain a hotel building, residen al building and commercial markets.
Self learning
Teamwork
Hard worker
Leadership
Model making
Research
G1
Graphic design
Time management
REFERENCES
Architectural trainee Saudi Airlines Real Estate Development Co. (SARED) May,2016 - Jul,2016
Dr. Ahmed Khan
Prof. Yasser Balila.
-Work and supervise on mul projects under construc on. -Architectural working drawings of jizan management building. -Study schedules of feasibility and bills of quan es (BQ). -Redesign the Tabuk management building.
-Chair of the Department of Architecture. -Faculty of Architecture and Planning. -E: Akhan2@kau.edu.sa. -T: +966504540087.
-Professor at the Department of Architecture. -Faculty of Architecture and Planning. -E: ybalila@kau.edu.sa. -T: +966505649313.
Architecture Por olio
| 07
02 | ACADEMIC WORK
zd a U n u il vA b e in g ysrtK i
KAUFED - KAUARCH KING ABDULAZIZ UNIVERSITY FACULTY OF ENVIRONMENTAL DESIGNS ARCHITECTURE DEPARTMENT 2013 - 2018
08
2.1
REIMAGINING KAU - THE SUSTAINABLE CAMPUS
10
2.2
REIMAGINING KAU - IMPROVE PREPARATORY YEAR
22
2.3
REIMAGINING KAU - SUSTAINABLE FED BUILDING
36
09
2.1 |
+
Educa on
Sustainability
10 |
Academic Work
THE SUSTAINABLE CAMPUS Reimaginingkau
The gradua on project was done in an en re year , divided into three main phases, the first phase is studies and analyzes at the campus. This project focuses on the university environment that affects on users directly. We have taken a consistent approach to working on the exis ng campus and turning it into a sustainable campus that serves the func onal purposes required of it efficiently without the need to build new facili es by high costs. Based on strategies for environmental sustainability with a focus on providing a comfortable work environment encourage to innova on and achievement. اﻟﻤﺮﺣﻠﺔ اﻷول، ﻣﻘﺴـﻢ ﻋﻠﻰ ﺛﻼﺛﺔ ﻣﺮاﺣﻞ رﺋﻴﺴــﻴﺔ،ﻣﺸـﺮوع اﻟﺘﺨﺮج ﺗﻢ اﻧﺠﺎزه ﻓﻲ ﺳﻨﺔ ﻛﺎﻣﻠﺔ وﻛﺎن،وﻫﻲ دراﺳﺎت وﺗﺤﺎﻟﻴﻞ ﻋﻠﻰ ﻣﺴﺘﻮى اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ ﻟﺠﺎﻣﻌﺔ اﻟﻤﻠﻚ ﻋﺒﺪاﻟﻌﺰﻳﺰ ﺑﺠﺪة ﻳﺮﻛﺰ ﻫﺬا اﻟﻤﺸﺮوع ﻋﻠﻰ اﻟﺒﻴﺌﺔ اﻟﺠﺎﻣﻌﻴﺔ اﻟﻤﺆﺛﺮة ﻋﻠﻰ اﻟﻤﺴـﺘﺨﺪﻣﻴﻦ،اﻟﻌﻤﻞ ﺑﺸﻜﻞ ﺟﻤﺎﻋﻲ ﻓﻘﺪ اﺗﺨﺬﻧﺎ ﻣﻨﻬﺠﻴﺔ ﺛﺎﺑﺘﺔ ﻟﻠﻌﻤﻞ ﻋﻠﻰ اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ اﻟﻤﻮﺟﻮد وﺗﺤﻮﻳﻠﻪ.ﺑﺸ ـ ـ ـ ـ ـ ــﻜﻞ ﻣﺒﺎﺷﺮ اﻟﻰ ﺣﺮم ﺟﺎﻣﻌﻲ ﻣﺴـ ـ ـ ـ ـ ـ ـ ـ ـ ــﺘﺪام ﻳﺨﺪم اﻷﻏﺮاض اﻟﻮﻇﻴﻔﻴﺔ اﻟﻤﻄﻠﻮﺑﺔ ﻣﻨﻪ ﺑﻜﻔﺎءة ﻋﺎﻟﻴﺔ دون ﻣﻊ ﻣﻌﺎﻟﺠﺔ اﻟﻤﺸــﺎﻛﻞ اﻟﻤﺘﻌﻠﻘﺔ ﺑﺎﻟﺘﺼ ــﻤﻴﻢ،اﻟﺤﺎﺟﺔ اﻟﻰ ﺑﻨﺎء ﻣﻨﺸــﺂت ﺟﺪﻳﺪة ﺑﺘﻜﺎﻟﻴﻒ ﻋﺎﻟﻴﺔ اﻟﺤﻀـ ـ ـ ـ ـ ـ ـ ـ ـ ــﺮي وﻓﻖ اﺳﺘﺮاﺗﻴﺠﻴﺎت ﺗﻬﺪف ﻟﻼﺳﺘﺪاﻣﺔ اﻟﺒﻴﺌﻴﺔ ﻣﻊ اﻟﺘﺮﻛﻴﺰ ﻋﻠﻰ ﺗﻮﻓﻴﺮ ﺑﻴﺌﺔ ﻋﻤﻞ .ﻣﺮﻳﺤﺔ ﺗﺴﺎﻋﺪ ﻋﻠﻰ اﻻﺑﺘﻜﺎر واﻻﻧﺠﺎز
GRADUATION PROJECT URBAN DESIGN - GROUP WORK Supervisor: Dr-Ing Mohannad Bayoumi Year: 2017 - 2018
Architecture Por olio
| 11
STRATEGIES Methods Proof of Concept Environmental transport
The vision of the Kingdom of Saudi Arabia 2030 focuses on the Kingdom's preparation for the post-oil phase. The vision focused on alternatives to renewable energy. Saudi Arabia will move towards 2030 towards clean energy through the use of natural gas and solar energy. In addition to its focus on the sustainability of the environment through the work to reduce pollution and investment of water wealth through rationalization, in addition to focus on the establishment of an integrated waste recycling project.
Produce energy on campus
CASE OVERVIEW - Literature review - Sta s cal analysis - Ques onnaire
Quality of indoor and outdoor spaces
Raise the eďŹƒciency of educa on
ANALYSIS
VISION Therefore, our vision to prepare King Abdulaziz University as an example of a sustainable learning environment , our vision serves to achieve the environmental and sustainable aspect of the Kingdom's vision to achieve this vision,
GOAL We set clear goals that lead us to studies and analyzes that facilitate our access to develop the university environment into a healthy and sustainable learning environment.
12 |
Academic Work
-SWOT analysis -HQE2R analysis -Space syntax analysis
Raise the eďŹƒciency of social communica on
Achieving sustainability principles
DESIGN -Manual design and sketches -Model making -BIM modeling
Loca on and Accessibility Alnasim dist
K i n g A b d u l a z i z U n i v e rs i t y campus is located in the southern side of Jeddah city, and is easily accessible from the main roads. Among the most important of these roads are AlHaramain Road, Prince Majed Road and King Abdullah Road.
Alsulaymania dist
G4 G2
ﻳﻘﻊ ﺣ ـ ــﺮم ﺟﺎﻣﻌﺔ اﻟﻤﻠﻚ ﻋﺒﺪ اﻟﻌ ـ ــﺰﻳ ـ ــﺰ ﻓ ـ ــﻲ وﻳﻤﻜﻦ، اﻟﺠﻬﺔ اﻟﺠ ــﻨﻮﺑ ــﻴﺔ ﻣﻦ ﻣﺪﻳـ ــﻨﺔ ﺟﺪة .اﻟﻮﺻﻮل إﻟﻴﻪ ﺑﺴــﻬﻮﻟﺔ ﻣﻦ اﻟﻄﺮق اﻟﺮﺋﻴﺴــﻴﺔ وﻣﻦ أﻫﻢ ﻫﺬه اﻟﻄ ـ ـ ــﺮق ﻃ ـ ـ ــﺮﻳﻖ اﻟﺤ ـ ـ ــﺮﻣﻴﻦ وﻃـ ــﺮﻳﻖ اﻷﻣﻴ ـ ــﺮ ﻣﺎﺟﺪ وﻃ ـ ــﺮﻳﻖ اﻟﻤﻠﻚ ﻋﺒﺪ .اﻟﻠﻪ
G5
G3
G1
Quiza dist
NEW DISTRICT
F2
Fayhaa dist
G6 F1 KING ABDULLAZIZ UNIVERSITY
Aljame’a dist
SPONTANEOUS URBAN FABRIC
Major Roead
G
General Gates
Main Street
F
Female Gates
Secondary Street
0
0.25
0.5 0.75
1
N
km
Closed Gates
Architecture Por olio
| 13
Sports Center
Land use and Landmark
PREPARATORY YEAR -MALE SECTION-
05 Academic Square
The campus is divided into eight zone, each zone separate from the other based on the func on of each zone, which is the academic square zone that contains the most important administra ve and educa onal buildings, the old campus zone for the female student’s, the sports facili es zone, the university hospital zone, the preparatory year zone for female students, the preparatory year zone for male students, the new and old university housing zone.
ﻛﻞ، ﻳﻨﻘﺴـﻢ اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ إﻟﻰ ﺛﻤﺎﻧﻲ ﻣﻨﺎﻃﻖ ﻣﻨﻄﻘﺔ ﻣﻨﻔﺼﻠﺔ ﻋﻦ اﻷﺧﺮى ﺣﺴﺐ وﻇﻴﻔﺔ ﻛﻞ وﻫ ـ ـ ــﻲ ﻣﻨﻄﻘﺔ اﻟﻤﻴﺪان اﻷﻛﺎدﻳﻤ ـ ـ ــﻲ، ﻣﻨﻄﻘﺔ اﻟﺬي ﻳﺤﺘﻮي ﻋﻠ ـ ـ ـ ـ ـ ــﻰ أﻫﻢ اﻟﻤﺒﺎﻧـ ـ ـ ـ ـ ـ ــﻲ اﻹدارﻳﺔ وﻣﻨﻄﻘﺔ اﻟﺤ ــﺮم اﻟﺠﺎﻣﻌ ــﻲ اﻟﻘﺪﻳﻢ، واﻟﺘﻌﻠﻴﻤﻴﺔ ﻣﻨﻄﻘﺔ، ﻣﻨﻄﻘﺔ اﻟﻤﻨﺸـﺌﺎت اﻟﺮﻳﺎﺿﻴﺔ،ﻟﻠﻄﺎﻟﺒﺎت ﻣﻨﻄﻘﺔ اﻟﺴـ ـ ـ ـ ــﻨﺔ، اﻟﻤﺴـ ـ ـ ـ ــﺘﺸـ ـ ـ ـ ــﻔﻰ اﻟﺠﺎﻣﻌﻲ ﻣﻨﻄﻘﺔ اﻟﺴﻨﺔ اﻟﺘﺤﻀـﻴﺮﻳﺔ، اﻟﺘﺤﻀﻴﺮﻳﺔ ﻟﻠﻄﺎﻟﺒﺎت ﻣﻨﻄﻘﺔ اﻟﺴ ـ ـ ـ ـ ـ ـ ــﻜﻦ اﻟﺠﺎﻣﻌﻲ اﻟﺠﺪﻳﺪ، ﻟﻠﻄﻼب .واﻟﺴﻜﻦ اﻟﺠﺎﻣﻌﻲ اﻟﻘﺪﻳﻢ
14 |
Academic Work
06
01
02
NEW FACULTY MEMBERS HOUSING
04
HOSPITAL
PREPARATORY YEAR -FEMALE SECTION-
03
OLD FACULTY MEMBERS HOUSING OLD CAMPUS
01
Academic Square
02
Hospital
03
Sports' Tent
04
King Faisal Conference Hall
05
Stadium
06
Eagle Gate
Context
PREPARATORY YEAR -MALE SECTIONAcademic Square
A NEW FACULTY MEMBERS HOUSING
B
The urban fabric of the old campus differs from the new campus, in many ways, connec on between buildings, pedestrian paths and green plaza.
Administration street
HOSPITAL
PREPARATORY YEAR -FEMALE SECTION-
alklyat street OLD CAMPUS FEMALE SECTION
A
parking
BUILDING
Building
street
parking
Green spaces for student gathering
Old Campus
There is no public and open spaces
B BUILDING
street
parking
Academic Square Building
street
parking
Pedestrian paths to connect the buildings
There is no pedestrian paths to the buildings
Architecture Por olio
| 15
0
100
300
N
500
m
Vehicular movement
Gate 4 7:30 AM - 10 AM
Gate 3
6:30 AM - 10 AM 12 PM - 4 PM
7:30 AM - 10 AM
Gate 5
Gate 2
The streets around the campus are usually crowded in the morning, as traffic is disrupted at the main gates due to the entry of students and university employees. Gate 1
ﺗﺰدﺣﻢ اﻟﺸـ ـ ـ ـ ـ ـ ـ ـ ــﻮارع اﻟﻤﺤﻴﻄﺔ ﺑﺎﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ ﺣﻴﺚ ﺗﺘﻌﻄﻞ اﻟﺤﺮﻛﺔ اﻟﻤﺮورﻳﺔ،ﻋﺎدة ﻓﻲ اﻟﺼﺒﺎح ﻓﻲ اﻟﺒﻮاﺑﺎت اﻟﺮﺋﻴﺴ ـ ـ ـ ـ ـ ــﻴﺔ ﻧﺘﻴﺠﺔ دﺧﻮل اﻟﻄﻼب .وﻣﻨﺴﻮﺑﻴﻦ اﻟﺠﺎﻣﻌﺔ
7 AM - 10 AM
12 PM - 4 PM
٦:٣٠AM - 10 AM
Legend
7:30 AM - 9 AM
Female Sec on 12 PM- 4 PM 7:30 AM - 9 AM 7:30 AM - 9 AM
Gate 6
Gate 8
Gates
Gate 1
Gate 3
Gate 5
Gate 6
The most crowded gate, due to the university hospital located near the gate.
The gate is crowded due to a crossroads at the gate and there is a primary school near it.
Al-Haramain Highway is the reason for the lack of conges on and traffic flow.
Difficulty entering the gate due to the presence of a primary school for girls near it
Entrace Crowded Semi-Crowded
30000
20000
Total Gates : Veh. per hour IN (all gates) OUT(all gates)
Exit Crowded Semi-Crowded Privte
15000 10000 5000 0 1:00
16 |
Academic Work
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00
18:00 19:00 20:00 21:00 22:00
23:00 0:00
Vehicular movement
1
3
We have taken some strategies to reduce the traffic conges on at the campus gates.
2
1
B 4
2
وﺿ ـ ـ ــﻊ ﺑﻌﺾ اﻻﺳ ـ ـ ــﺘﺮاﺗﻴﺠﻴﺎت ﻟﺘﻘﻠﻴﻞ اﻻزدﺣﺎم .اﻟﻤﺮوري ﻋﻨﺪ ﺑﻮاﺑﺎت اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ
A
3
3
2
1
C
Legend
Gate
Reducing the entry of cars to the campus by using alterna ve transporta on.
Buildings
Classifica on of the gates according to the buildings func on that near it.
Specific tracks
Diversity of movement tracks in university streets and redesigned by adding new specific tracks.
A
Medical users Administrators users Medical students
B
Preparatory year students Sports facili es visitors King Fahad library visitors
C
University housing users Academic square students Administrators users
Architecture Por olio
| 17
0
100
300
N
500
m
Pedestrian & Bus
In addi on to vehicle movement, there are two types of movement paths, which are pedestrian paths and bus track, as both of them are neglected and there is no interest in them, such as the vehicle movement. ﻫﻨﺎك ﻧﻮﻋﺎن، ﺑﺎﻹﺿـ ـ ـ ـ ـ ــﺎﻓﺔ إﻟﻰ ﺣﺮﻛﺔ اﻟﻤﺮﻛﺒﺎت وﻫﻤﺎ ﻣﻤﺮات اﻟﻤﺸ ـ ـ ــﺎة، ﻣﻦ ﻣﺴ ـ ـ ــﺎرات اﻟﺤﺮﻛﺔ ﻓﻜﻼﻫﻤﺎ ﻣﻬﻤﻞ وﻻ ﻳﻮﺟﺪ، وﻣﺴـ ـ ــﺎر اﻟﺤﺎﻓﻼت .اﻫﺘﻤﺎم ﺑﻬﻤﺎ ﻛﺤﺮﻛﺔ اﻟﺴﻴﺎرة
Legend Bus Path Walk Path Pool point
Parking Parking sta on
18 |
Academic Work
Pedestrian paths
Bus tracks
Public spaces
It is not prepared in the campus, although it is a main type of movement.
Only for university housing users and it is not available for public users.
Not ac vated as required, lack of services and ac vi es for public.
Alterna ves SERVICE SERVICE
Design an advanced pedestrian paths with shaded by trees.
Mo vate the pedestrian by adding a new experience for pedestrian paths
SERVICE
Adding a new services for pedestrian paths to create ac vi es for pedestrian
Adding alterna ves and strategies to develop the movement on campus, using incen ves, ac vi es and services for users to facilitate the movement on campus. اﺿـ ــﺎﻓﺔ ﺑﻌﺾ اﻟﺒﺪاﺋﻞ واﻻﺳ ـ ــﺘﺮاﺗﻴﺠﻴﺎت ﻟﺘﻄﻮﻳﺮ اﺳـ ــﺘﺨﺪام ﺣﻮاﻓﺰ،اﻟﺤﺮﻛﺔ داﺧﻞ اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ واﻧﺸ ـ ـ ــﻄﺔ وﺧﺪﻣﺎت ﻟﻠﻤﺴ ـ ـ ــﺘﺨﺪﻣﻴﻦ ﺗﺴ ـ ـ ــﻬﻞ .ﻋﻤﻠﻴﺔ اﻟﺤﺮﻛﺔ داﺧﻞ اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ
Legend Design a bus tracks for public users in university campus
Diversity of tracks in campus streets and adding a new specific tracks
Designing wai ng areas on campus streets to facilitate the movement for users
Suggested alterna ves
Available alterna ves
P Reducing the distance between parking and buildings
Using trees as alterna ves to u lize their shade for campus parking
Reducing the entry of cars into the campus by using other alterna ve
Architecture Por olio
| 19
PREPARATORY YEAR
Problem statement PREPARATORY YEAR -EXISTING-
Academic Square
A er the understanding and analysis of the university and the study of its areas where the problems became apparent .Three sites, the most influen al on the campus, were selected for each group to address the problem of their chosen area and to develop it. The development should address a medium-sized urban design problem and cover part of the campus with a maximum area of 100,000 square meters.
ﺑﻌﺪ ﻓﻬﻢ وﺗﺤﻠﻴﻞ اﻟﺠﺎﻣﻌﺔ ودراﺳ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ــﺔ ﻣﻨﺎﻃﻘﻬﺎ ﺣﻴﺚ اﺗﻀـﺤﺖ اﻟﻤﺸــﺎﻛﻞ ﺗﻢ اﺧﺘﻴﺎر اﻟﺘـﻲ ﺗﻌﺘﺒــﺮ ﻣﻦ اﻛﺜــﺮ اﻟﻤﻨﺎﻃﻖ،ﺛﻼث ﻣﻮاﻗﻊ ﻛﻞ ﻣﺠﻤﻮﻋﺔ،ﺗﺄﺛﻴﺮ ﻓ ـ ــﻲ اﻟﺤ ـ ــﺮم اﻟﺠﺎﻣﻌ ـ ــﻲ ً ﺳﻮف ﺗﺘﻨﺎول ﻣﺸـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ــﻜﻠﺔ اﻟﻤﻨﻄﻘﺔ اﻟﺘﻲ اﺧﺘﺎرﺗﻬﺎ وﺗﻘﻮم ﺑﺘﻄﻮﻳـ ـ ـ ـ ـ ـ ــﺮﻫﺎ ﺣﻴﺚ ﻳﺠﺐ ان ﻳﻌﺎﻟﺞ اﻟﺘﻄﻮﻳﺮ ﻣﺸـ ـ ــﻜﻠﺔ ﺗﺼـ ـ ــﻤﻴﻢ ﺣﻀـ ـ ــﺮي ﺟﺰء ﻣﻦ اﻟﺤﺮم ً ﻣﺘﻮﺳ ـ ـ ــﻂ اﻟﻨﻘﻄﺎق وﻳﻐﻄﻲ اﻟﺠﺎﻣﻌﻲ ﺑﻤﺴـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ــﺎﺣﺔ ﻗﻮى ﺗﺒﻠﻊ ﺣﻮاﻟﻲ . ﻣﺘﺮ ﻣﺮﺑﻊ١٠٠٫٠٠٠
20 |
Academic Work
Team A
Team B
Team C & D
The site is located in the northeast of the university campus, and it has three gates, there is currently empty land, which facilitates the crea on of a new sustainable educa onal environment.
This site is one of the most important sites on the campus because it is located near to importance gates and is considered a link between three main zone on the campus.
The academic square is the center of the university campus as it contains many colleges in addi on to the administra ve deanships, the library and the King Faisal Conference Hall
،ﻳﻘﻊ اﻟﻤﻮﻗﻊ ﻓﻲ اﻟﺸـﻤﺎل اﻟﺸـﺮﻗﻲ ﻟﻠﺤﺮم اﻟﺠﺎﻣﻌﻲ اﻟﻤﻮﻗﻊ ﺣﺎﻟﻴﺎ ارض ﺧﺎﻟﻴﺔ،ﻳﺘﻤﻴ ـ ــﺰ ﺑﻮﺟﻮد ﺛﻼﺛﺔ ﺑﻮاﺑﺎت .ﻣﻤﺎ ﻳﺴﻬﻞ اﻧﺸﺎء ﺑﻴﺌﺔ ﺗﻌﻠﻴﻤﻴﺔ ﺟﺪﻳﺪة وﻣﺴﺘﺪاﻣﺔ
ﻳﻌﺪ ﻫﺬا اﻟﻤﻮﻗﻊ ﻣﻦ اﻫﻢ اﻟﻤﻮاﻗﻊ ﻓ ـ ـ ـ ـ ــﻲ اﻟﺤ ـ ـ ـ ـ ــﺮم ﻳﻌﺘﺒــﺮ،اﻟﺠﺎﻣﻌــﻲ ﻟﻮﺟﻮده ﺑﺎﻟﻘــﺮب ﻣﻦ ﺑﻮاﺑﺎت ﻣﻬﻤﺔ .ﺣﻠﻘﺔ وﺻﻞ ﺑﻴﻦ ﺛﻼث ﻣﻮاﻗﻊ رﺋﻴﺴﻴﺔ ﻓﻲ اﻟﺠﺎﻣﻌﺔ
ﻳﺤﺘﻮي،اﻟﻤﻴﺪان اﻻﻛﺎدﻳﻤـﻲ ﺑﻤﺜﺎﺑﺔ اﻟﻤـﺮﻛــﺰ ﻟﻠﺠﺎﻣﻌﺔ ﻋﻠﻰ اﻟﻌﺪﻳﺪ ﻣﻦ اﻟﻜﻠﻴﺎت ﺑﺎﻻﺿ ـ ـ ـ ــﺎﻓﺔ اﻟﻰ اﻟﻌﻤﺎدات .واﻟﻤﻜﺘﺒﺔ وﻗﺎﻋﺔ اﻟﻤﻠﻚ ﻓﻴﺼﻞ ﻟﻠﻤﺆﺗﻤﺮات
THE SUSTAINABLE CAMPUS Reimaginingkau Architecture Por olio
| 21
2.2 |
IMPROVE PREPARATORY YEAR Reimaginingkau
alsulaymania district
interface
The second phase of the gradua on project is considered an extension of studies and analyzes on the campus where the group is divided into teams, and our team (Team A) focuses on the northern site of the campus, the site may help to design a sustainable campus for the preparatory year students is par ally separate from the campus to facilitate the process of movement and access for all users of the campus, where the site of the current preparatory year is one of the most important causes of conges on in the streets of the campus being In the heart of the university and contains more than 20% of the number of university students.
site
king abdulaziz university
22 |
Academic Work
اﻟﻤﺮﺣﻠﺔ اﻟﺜﺎﻧﻴﺔ ﻣﻦ ﻣﺸـ ــﺮوع اﻟﺘﺨﺮج ﺗﻌﺘﺒﺮ اﻣﺘﺪاد ًا ﻟﻠﺪراﺳﺎت واﻟﺘﺤﻠﻴﻼت ﻓﻲ اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ وﻳﺮﻛﺰ ﻓﺮﻳﻘﻨﺎ )ﻓﺮﻳﻖ أ( ﻋﻠﻰ اﻟﻤﻮﻗﻊ اﻟﺸ ـ ـ ـ ــﻤﺎﻟﻲ ﻟﻠﺤﺮم،ﺣﻴﺚ ﺗﻨﻘﺴ ـ ـ ـ ــﻢ اﻟﻤﺠﻤﻮﻋﺔ إﻟﻰ ﻓﺮق اﻟﻤﻮﻗﻊ ﻗﺪ ﻳﺴ ــﺎﻋﺪ ﻟﺘﺼـ ــﻤﻴﻢ ﺣﺮم ﺟﺎﻣﻌﻲ ﻣﺴـ ــﺘﺪام ﻟﻄﻼب اﻟﺴـ ــﻨﺔ اﻟﺘﺤﻀـ ــﺮﻳﺔ،اﻟﺠﺎﻣﻌﻲ ﻣﻨﻔﺼ ــﻞ ﺟﺰﺋﻴ ًﺎ ﻋﻦ اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ وﻟﺘﺴ ــﻬﻴﻞ ﻋﻤﻠﻴﺔ اﻟﺤﺮﻛﺔ واﻟﻮﺻﻮﻟﻴﺔ ﻟﻜﺎﻓﺔ ﻣﺴ ــﺘﺨﺪﻣﻲ ﺣﻴﺚ ان ﻣﻮﻗﻊ ﻣﺒﺎﻧﻲ اﻟﺴـ ـ ــﻨﺔ اﻟﺘﺤﻀـ ـ ــﻴﺮﻳﺔ اﻟﺤﺎﻟﻲ ﻳﻌﺪ ﻣﻦ اﻫﻢ ﻣﺴ ـ ـ ــﺒﺒﺎت،اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ %٢٠ اﻟﺰﺣﺎم داﺧﻞ ﺷ ـ ـ ـ ــﻮارع اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ ﻛﻮﻧﻬﺎ ﻓﻲ ﻗﻠﺐ اﻟﺠﺎﻣﻌﺔ وﺗﺤﻮي ﻋﻠﻰ اﻛﺜﺮ ﻣﻦ .ﻣﻦ ﻋﺪد ﻃﻼب اﻟﺠﺎﻣﻌﺔ
GRADUATION PROJECT URBAN DESIGN - TEAM WORK Supervisor: Dr-Ing Mohannad Bayoumi Year: 2017 - 2018
Architecture Por olio
| 23
Problem statement Opportuni es
Strengths
-Gate 4 -Gate 5 -Closed gate -Sports facili es
-Al Haramin Road -Intersec on of Al - Iskan Street with Al - Malab Stree -Abdul Quddous Al Ansari Street
Weakness
Threats
-Electric Sta on -Gas Sta on -School
-Al Sulaymania District -Abdullah Rida Street
Al
Al Sulaymania District
in
ram
Abdullah Rida ST
School
ha
Al Sulaymania District 2
Metro sta on
Electric Sta on
SITE
G5 Al-Malae'b St
sports facili es
St Al-Iskan
CURRENT SITUATION
24 |
Academic Work
d
G4
a Ro
Abdullah Rida ST
Faculty Housing
A Extension of Al Iskan Street to Abdullah Reda Street to become the main entrance to the project,From outside and inside the university.
B
C
D
Exploita on of closed gates on Abdullah Rida Street to be secondary entrance. Put a transporta on area linking the project with parking and sports facili es
Put a transporta on area linking the project with parking and sports facili es Exploita on, of the southern land of the site which it currently used for oďŹƒces of contractors and consultants to establish mul -story parking dedicated for the project
Remove the wall of the campus north of the site to resolve the threat of the AL Sulaymaniyah district by increasing the overlap between the community and the campus where the beneďŹ ts of economic and social development of the neighborhood.
d
St
A C
Al-Iskan
'b alae M l A
C
oa nR
Sports Facili es
B
D
mi
B
Abdullah Rida ST
ara
Al Sulaymania District
h Al
Al Sulaymania District
St
Faculty Housing
DESIGN RESPONSE Architecture Por olio
| 25
Spa al syntax N
Space
Building
Circulation Open space
Choices of space Represent
Map
Relative connectivity
Integration of spaces
ABDULQUDUS AL ANSARI ST.
The general idea is that spaces can be broken down into components, analyzed as networks of choices, then represented as maps and graphs that describe the rela ve connec vity and integra on of those spaces. It rests on three basic concep ons of space a visibility polygon, the ďŹ eld of view from any par cular point. axial space a straight sight-line and possible path. convex space an occupiable void where, if imagined as a wireframe diagram, no line between two of its points goes outside its perimeter: all points within the polygon are visible to all other points within the polygon.
MED
AM MOH
D
ZAHI
ST. ABDULLAH REDA
AL SULAYMANIA DIST.
REMOVE the FENCE
LOW
26 |
Academic Work
Visual conduc vity range
HIGH
A ST. ABDULLAH RED
H ED ZA
ID
A ST. ABDULLAH RED
NODE (A)
MOH
SECOND ALTERNATIVE
PATH GOING THROW DISTRICT
CLEAR SPINE THROW NEIGHBORHOOD
AMM
ED ZA
HID
A ST. ABDULLAH RED NODE (B)
FIRST ALTERNATIVE
DISTRICT EDGE
ID
H ED ZA
AMM
MOH
ABDULQUDUS AL ANSARI ST.
AMM
ABDULQUDUS AL ANSARI ST.
ABDULQUDUS AL ANSARI ST.
MOH
NODE (A)
NODE (B)
THIRD ALTERNATIVE
CREATING OPEN SPACES THROW BUILDINGS
COMBINE BETWEEN THE TWO PATHS
ACTIVATE THE SENSITIVE NODES
Architecture Por olio
| 27
pedestrian ALTERNATIVES
B A
NIA
A YM ULA RICT S T AL DIS
GENTLE SLOPE BRIDGE
STREET Bump
ZIZ E ULARFAC D AB INTE G KIN SITY ite R t s IVE ec UN j o pr
pedestrian SUBWAY
Sidewalk zone
Residential zone
2.2m
Street zone 10m
Sidewalk zone
Street zone
2m
10m
27.2m
Sidewalk zone 3m
Residential zone
Sidewalk zone
Street zone
Sidewalk zone
Street zone
Sidewalk zone
1.4m
5m
1.2m
5m
1.4m
Building zone
14m
CURRENT SITUATION
28 |
Academic Work
Building zone
Residential zone
Sidewalk zone
Street zone
2.2m
6m
Street zone 1.6m 16m
6m
Sidewalk zone 2.2m
Project site
buildings ALTERNATIVES B
IA
diversity
AN YM LA ICT U S R AL DIST
RESIDENTIAL
COMMERCIAL
STREET
WALKABLE ENVIRONMENT
ZIZ CE LA DU ERFA B A INT G KIN SITY ite R t s IVE c N e U oj pr
WIDE SIDEWALK STREET
place for every one
WIDE SIDEWALK
open public space STREET
Commercial
Sidewalk zone
Public park
2.2m
Commercial
Street zone 10m
Sidewalk zone
Street zone
2m
10m
27.2m
Sidewalk zone 3m
Water feature
Commercial
Sidewalk zone
Street zone
Sidewalk zone
Street zone
Sidewalk zone
1.4m
5m
1.2m
5m
1.4m
14m
Building zone
Building zone
Public space
Sidewalk
Street
2.2m
6m
Street 1.6m
6m
Sidewalk 2.2m
Project site
DESIGN RESPONSE Architecture Por olio
| 29
Strategies Concept
Al Sulaymaniah
Al Sulaymaniah
district
n
ia
District
District
am
kau avenue
r Ha
district
Al
KAU avenue
living
c
work spine commercial tape
educational space
metro station
Abdullah Rida St
space
work spine
b
res. bldg.
a
c edu. students center library bldg.
kau
admin.
Faculty
living spine
TO THE SPORTS FACILITIES
pedestrian SUBWAY
edu. bldg.
community center
trans. station
sulaymania district
ad
public space
b
Ro
a
Housing
TO ACADEMIC SQUARE
LEVELing
commercial cafe
district
PUBLIC GREEN HILLS
trans.
living park
students center
30 |
Academic Work
study
Node (A)
Node (b)
Library Cultural center Student housing Students Center Transport sta on
Main entrance Sea ng green hills and stairs Water feature Commercial tape English court
Node (c)
Educa onal area Reading area green sea ng area Administra on EL Ins tute
Strategies Concept link between buildings section
link between buildings plan
Link Private space Semi public space Public space
private space
coverage
link podium
building
building public space
connection
to sulaymania district
connection
building
Podium Coverage (top) Link podium (middle) Podium (ground) to kau
building
podium
private space
modular system section diagram
Imaginary perspective solar panels
outdoor classes link podium 3o m 3o m
private space
void
solid
Architecture Por olio
| 31
N
Master Plan
32 |
Academic Work
Eleva on & Sec on
Sec on
Eleva on Architecture Por olio
| 33
Perspec ve
34 |
Academic Work
Architecture Por olio
| 35
2.3 |
SUSTAINABLE FED BUILDING Reimaginingkau
The third phase of the gradua on project is an individual work, the project aims to improve the building of faculty of architecture ans planning one of the buildings of the academic square, in terms of architectural and environmental significantly. The building does not show that it is a college of architecture and planning in terms of design for the external facades and internal spaces, this project focuses on redesign of the building to reflected their func on, with reducing the running cost of the building using appropriate design methods to achieve this goal.
ﻳﻬﺪف اﻟﻤﺸ ــﺮوع اﻟﻰ ﺗﻄﻮﻳﺮ ﻣﺒﻨﻰ ﻛﻠﻴﺔ،اﻟﻤﺮﺣﻠﺔ اﻟﺜﺎﻟﺜﺔ ﻣﻦ ﻣﺸــﺮوع اﻟﺘﺨﺮج ﻫﻲ ﻋﻤﻞ ﻓﺮدي . ﻣﻦ اﻟﻨﺎﺣﻴﺔ اﻟﻤﻌﻤﺎﻳﺔ واﻟﺒﻴﺌﻴﺔ ﺑﺸـﻜﻞ ﻛﺒﻴﺮ،اﻟﻌﻤﺎرة واﻟﺘﺨﻄﻴﻂ اﺣﺪ ﻣﺒﺎﻧﻲ اﻟﻤﻴﺪان اﻻﻛﺎدﻳﻤﻲ اﻟﻤﺒﻨﻰ ﻻ ﻳﻮﺣﻲ ﻋﻠﻰ اﻧﻬﺎ ﻛﻠﻴﺔ ﻋﻤﺎرة وﺗﺨﻄﻴﻂ ﻣﻦ ﺗﺼـ ـ ـ ـ ــﻤﻴﻢ اﻟﻮاﺟﻬﺎت اﻟﺨﺎرﺟﻴﺔ واﻟﻔﺮاﻏﺎت ﻣﻊ ﺧﻔﺾ ﺗﻜﻠﻔﺔ، ﻳﺮﻛﺰ ﻫﺬا اﻟﻤﺸـﺮوع ﻋﻠﻰ اﻋﺎدة ﺗﺼــﻤﻴﻢ اﻟﻤﺒﻨﻰ ﻟﺘﻨﻌﻜﺲ وﻇﻴﻔﺘﻪ،اﻟﺪاﺧﻠﻴﺔ .ﺗﺸﻐﻴﻞ اﻟﻤﺒﻨﻰ ﺑﺎﺳﺘﺨﺪام اﺳﺎﻟﻴﺐ ﺗﺼﻤﻴﻢ ﻣﻨﺎﺳﺒﺔ ﺗﺴﺎﻋﺪ ﻋﻠﻰ ﺗﺤﻘﻴﻖ ﻫﺬا اﻟﻬﺪف
36 |
Academic Work
GRADUATION PROJECT ARCHITECTURAL DESIGN - INDIVIDUAL WORK Supervisor: Dr-Ing Mohannad Bayoumi Year: 2017 - 2018
Architecture Por olio
| 37
Site Loca on
KAU Sport Stadium Al-Malae'b St
ﻳﻌﺪ ﻣﺒﻨﻰ ﻛﻠﻴﺔ ﺗﺼ ـ ـ ـ ـ ـ ـ ـ ــﺎﻣﻴﻢ اﻟﺒﻴﺌﺔ ﺟﺰء ﻣﻦ اﻟﻤﻴﺪان اﻷﻛﺎدﻳﻤﻴﺔ اﻟﺠﺪﻳﺪ ﻓ ــﻲ ﻣ ــﺮﻛ ــﺰ ﺣـ ــﺮم ﺟﺎﻣﻌﺔ اﻟﻤﻠﻚ اﻟﻤﺒﻨﻰ ﻳﻘﻊ ﻋﻠﻰ ﺷـ ـ ـ ـ ـ ـ ـ ــﺎرع اﻟﻜﻠﻴﺎت ﻣﻦ.ﻋﺒﺪاﻟﻌﺰﻳﺰ ﻳﻌﺘﺒﺮ ﺷ ـ ـ ـ ــﺎرع.اﻟﺠﺎﻧﺐ اﻟﺠﻨﻮﺑﻲ ﻟﻠﻤﺪﻳﺎن اﻷﻛﺎدﻳﻤﻲ ﺣﻴﺚ ﻳﻤﺜﻞ ﻣﺤﻮر،اﻟﻜﻠﻴﺎت اﺣﺪ أﻫﻢ اﻟﺸـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ــﻮارع .ﻳﻔﺼﻞ ﺑﻴﻦ ﻗﺴﻢ اﻟﻄﻼب وﻗﺴﻢ اﻟﻄﺎﻟﺒﺎت
m St
Technolog y St
Faculty member housing King Faisal Conference Center
Faculties St
Female housing
HOSPITAL
Academic square
Female section
FACULTY MEMBERS HOUSING
Sport tent FEMALE HOUSING
38 |
FEMALE SECTION
Academic Work
Academic square
Idara St
Al-Olou
n St Al-Iska
The FED building is a part of the new academic square in the center of the campus of King Abdulaziz University. The building located on the facul es street from the southern side of the academic square. The colleges street is one of the most important streets, its considered as an Axis separa ng between the male sec on and female sec on.
Strategies Concept Interior spaces The FED building design contains many issues related to the problems of interior spaces and exterior facades, the most important of these issues are:
Building entrance
Building entrance Students enter the building through the main entrance at a low level and then use the ver cal connec on to move up into the building's lobby.
Studios depth Lack of natural ligh ng in the studios due to the depth of the studio and the length of the distance between the window and the opposite side. Building entrance
Third floor
Offices without daylight The lack of daylight in most of faculty members offices because there is no windows that allow the entry of daylight or fresh air
Building atrium The interior courtyard of the building occupies a large area that requires expensive cost to cool the air in it. Studios depth
Sec on A-A
Architecture Por olio
| 39
Site Loca on
Academic square courtyard
Deanship of Community Services and continuing education
Neighborhoods The FED building is located in the south of the academic square, The college is surrounded from the north by classrooms (31), from the west by Faculty of economics and administra on, from the east by deanship of community services and con nuing educa on and from the south by Facul es St and old university restaurant
Classrooms building (31B)
Classrooms building (31a)
Faculty of Economics and Administration
Faculties St
ﻣﺠﺎورات اﻟﻤﻮﻗﻊ ﻳﻘﻊ ﻣﺒﻨﻰ ﻛﻠﻴﺔ ﺗﺼ ـ ــﺎﻣﻴﻢ اﻟﺒﻴﺌﻴﺔ ﻓﻲ ﺟﻨﻮب وﻣﻦ اﻫﻢ اﻟﻤﺒﺎﻧـ ـ ـ ــﻲ،اﻟﻤﻴﺪان اﻷﻛﺎدﻳﻤـ ـ ـ ــﻲ اﻟﻤﺠﺎورة ﻟﻤﺒﻨﻰ اﻟﻜﻠﻴﺔ ﻣﻦ اﻟﺸ ـ ــﻤﺎل ﻣﺒﺎﻧﻲ وﻣﻦ اﻟﻐﺮب ﻛﻠﻴﺔ،(٣١) ﻓﺼ ـ ـ ـ ـ ـ ــﻮل اﻟﺪراﺳﻴﺔ ﻣﻦ اﻟﺸـ ـ ـ ـ ــﺮق ﻋﻤﺎدة،اﻻﻗﺘﺼ ـ ـ ـ ــﺎد واﻹدارة اﻟﺨﺪﻣﺎت اﻟﻤﺠﺘﻤﻌﻴﺔ واﻟﺘﻌﻠﻴﻢ اﻟﻤﺴ ـ ـ ـ ـ ــﺘﻤﺮ وﻣﻦ اﻟﺠﻨﻮب ﺷ ـ ـ ـ ـ ـ ـ ـ ـ ـ ــﺎرع اﻟﻜﻠﻴﺎت وﻣﻄﻌﻢ .اﻟﺠﺎﻣﻌﺔ اﻟﻘﺪﻳﻢ
40 |
Academic Work
Old University Restaurant
soakaway Female student housing
Accessibility
Views from inside to outside
Academic square courtyard
deanship of student affairs
deanship of student affairs
theater ( deanship of student affairs)
Views from outside to inside
Academic square courtyard
Academic square courtyard
deanship of student affairs
theater ( deanship of student affairs)
theater ( deanship of student affairs) Classrooms building (26)
Classrooms building (26)
Classrooms building (26)
Classrooms building (11a)
Classrooms building (11a)
Classrooms building (11a)
Classrooms building (31B)
Classrooms building (31B)
Classrooms building (31B)
Classrooms building (31a)
Classrooms building (31a) Deanship of Community Services
_
Faculty of Economics and Administration
Faculty of Economics and Administration
Classrooms building (31a)
Faculty of Economics and Administration
_ +
DN
DN
DN
+
38.0 m
soakaway
soakaway
soakaway
Deanship of Community Services
Deanship of Community Services
34.6 m 32.8 m
Fa
cu
t s S ltie
cu
Fa
t s S
ltie
Old University Restaurant
Old University Restaurant
Design response
Design response
t s S
ltie
cu
Fa
Old University Restaurant
Design response
DN
Fabrication lab
Architecture Por olio
| 41
Daylight Factor 3D plan - Second floor Daylight Factor (DF), is a ra o that represents the amount of illumina on available indoors rela ve to the illumina on present outdoors at the same me under overcast skies. Daylight Factor is typically calculated by dividing the horizontal work plane illumina on indoors by the horizontal illumina on on the roof of the building being tested and then mul plying by 100. DF is a useful metric to inform design decisions
963 lx
The daylight factor is defined as.
73960 lx
DF= (Ei/Eo) x 100% Ei = illuminance due to daylight at a point on the indoor’s working plane Eo = simultaneous outdoor illuminance on a horizontal plane from an unobstructed hemisphere of overcast sky
Recommended Daylight Factors are as follows: Loca on General Office
42 |
Academic Work
Average Daylight Factor (%) 5
Minimum Daylight Factor (%) 2
Working Plane desks
Classroom
5
2
desks
Entrance Hall
2
0.6
working plane
Drawing Office
5
2.5
boards
The results show that the day me light factor in the studio is lower than recommended by the studies below, as the recommended day me level is not less than A. in the drawing studios Ei = 963 lx Eo = 73960 lx (DF) = (963 / 73.960) x 100 = 1.3%
Second Simula on
Current Situa on
Light Analysis
Glass walls to increase transparency
Windows without louver
The results of daylight penetra on of the current situa on of the building show a lack of daylight in the western part of the building, especially in the studios of drawing because of the design of the sunbreakers that do not allow the entry of daylight into the interior spaces. It is a ma er of balancing daylight admission with glare control, as well as providing uniform light distribu on.
Outdoor courtyard
First Simula on
Third Simula on
Outdoor courtyard
In the recent experiment added the openings of the building to allow the light to penetrate more space to increase light in the dark areas, the result showed improved penetra on of daylight compared to the current situa on
Light analysis results (LUX)
0
108
324
216
432
540
648
756
1000
3000
2000
Removing the windows louver
6000
overcast sky 12pm
Adding a glazing sha
Architecture Por olio
| 43
Indoor Air Quality
The quality of the environment at the indoor spaces (thermal comfort - indoor air quality - ligh ng) affects On the focus, health and produc vity of students. So, this study aims to iden fy and determine the range of this effect and how to improve the quality of the indoor environment to reflect posi vely on the students.
ﺗﺆﺛـ ـ ـ ــﺮ ﺟﻮدة ﺑﻴﺌﺔ اﻟﻔـ ـ ـ ــﺮاﻏﺎت اﻟﺪاﺧﻠﻴﺔ)اﻟـ ـ ـ ــﺮاﺣﺔ اﻹﺿــﺎءة( ﻋﻠﻰ- ﺟﻮدة اﻟﻬﻮاءاﻟﺪاﺧﻠﻲ- اﻟﺤﺮارﻳﺔ ﺗﺮﻛﻴﺰ وﺻـ ـ ـ ـ ـ ــﺤﺔ إﻧﺘﺎﺟﻴﺔ اﻟﻄﻼب ﻟﺬا ﻳﻬﺪف ﻫﺬا اﻟﺘﺤﻠﻴﻞ اﻟ ــﻰ ﻣﻌ ــﺮﻓﺔ وﺗﺤﺪﻳﺪ ﻣﺪى ﻫﺬا اﻟﺘﺎﺛﻴـ ــﺮ وﻛﻴﻔﻴﺔ ﺗﺤﺴ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ــﻴﻴﻦ ﺟﻮدة اﻟﺒﻴﺌﺔ اﻟﺪاﺧﻠﻴﺔ .ﻟﺘﻨﻌﻜﺲ اﻳﺠﺎﺑ ًﺎ ﻋﻠﻰ اﻟﻄﻼب
1
2
Faculty member office without window !!
Effects of carbon dioxide levels in air on students Concentration
HOBO onset data logger U10-003
(ppm)
44 |
Academic Work
Effects
1200 1100
Concentrations typical of occupied indoor spaces with good air exchange
1000
1,000-2,000
Complaints of drowsiness and poor air
800
2,000-5,000
Headaches, sleepiness and stagnant, poor concentration, loss of attention
5,000
Workplace exposure limit (as 8-hour TWA) in most jurisdictions.
40,000
May lead to serious oxygen deprivation resulting in permanent brain damage, coma, even death.
250-350
Specific for measure Co2 concentra on in air, temperature and rela ve humidity
(CO ) concentration result
900 [ppm]
These tools were relied upon during this analysis
700 600 500 400 300 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 [h] CO2 Co2 Safe level
Case Study
Architecture Por olio
| 45
Concept Classrooms building (31B)
The current situa on, shows the difficulty of movement to reach the building entrance, the students must enter the basement floor first and then go up to the upper floors.
Classrooms building (31a)
Faculty of Economics and Administration
Faculties St
The sec on shows the depth of the building causing the lack of natural light. There is no movement of air from the outside to the inside due to the absence of windows that allow the air permeability
Old University Restaurant
current situation
Zoning
Administra on Studio
corridor
corridor
Studio
Studio
corridor
corridor
Studio
Studio
corridor
corridor
Studio
Studio Studio Classrooms Studio
multi purpose hall
Studio
Studio
Basement
46 |
Academic Work
Concept Develop open the skylight
Remove the first floor
The ďŹ rst oor transfer to a plaza connec ng the external courtyard of the building and the academic square,Redesigning the southern courtyard of the building to be the same level of Colleges Street, this solu on will facilitate the movement from street to the building and academic square.
Ea
sy
to
exploi ng the space under the southern courtyard to be fabrica on labs and workshops that help students to produce their projects
ac ce s
s
Zoning
open the skylight Additional atria
Administra on Studio Studio
Outdoor courtyard
Classrooms to academic square
plaza Easy to access
Labs
Remove the first floor Basement
Fabrication lab
Architecture Por olio
| 47
Second Floor Plan
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
DN
2.87 m
A DN
UP
UP
A
B
6.40 m
B
C
4
9.60 m
C
7 3
2
D
D
1
E
E
DN
UP
UP
DN
9.60 m
(1) Faculty office
9.60 m
PLAN KEY
(2) Mee ng room
F
(3) Staff lounge
8
8
8
8
4.80 m
F
G
G
1
6
1
H
H 4.80 m
(5) AR-Studio
5
9.60 m
(4) LA-Studio
I
I
9
9.60 m
(6) URB-Studio
9
(7) GEOM-studio J
J
(8) Storage
9.60 m
DN
5
6
K
K
8
8
1.80 m
(10) Gallery
7.20 m
(9) Student lounge
UP
DN
L
1.80 m 1
48 |
Academic Work
7.20 m
9.60 m 2
4.80 m 3
3.60 m 1.20 m 4
5
6
4.80 m
1.80 m 7
8
6.00 m
1.80 m 9
10
4.80 m
1.20 m 3.60 m 11
12
4.80 m 13
9.60 m 14
7.20 m 15
1.80 m 16
L
Daylight Factor
Architecture Por olio
| 49
Sec on A-A
Stair house 30.600 m
Roof 30.600 m
5th FLR 25.600 m
4th FLR 20.600 m
3rd FLR 15.600 m
2nd FLR 10.600 m
1st FLR 5.200 m Street level 3.200 m
50 |
Academic Work
Top of solar light
Solar Light Pipe Details structure
Fabric cover
Solar pipe
Sec on
C 1
C 3
C 2
Callout (3)
Callout (2)
Callout (1)
Plan
Architecture Por olio
| 51
Front Eleva on
Stair house 30.600 m
Roof 30.600 m
5th FLR 25.600 m
4th FLR 20.600 m
3rd FLR 15.600 m
2nd FLR 10.600 m
1st FLR 5.200 m Street level 3.200 m
52 |
Academic Work
Facade Details
Facade Structure
Callout (1)
Callout (2)
Callout (3)
Callout (4)
C 2
C 2
C 2
C 2
Architecture Por olio
| 53
Wall Sec on Details
Wall Section
Callout (1)
Callout (2)
Callout (3)
Callout (4)
C 4 C 3
C 2
C 1
54 |
Academic Work
Main Perspec ve
Architecture Por olio
| 55
03 | PROFESSIONAL EXPERIENCE
i zu a U n d vA b e inli g ysrtK
KAU - VPP - RDD KING ABDULAZIZ UNIVERSITY VICE PRESIDENCY FOR PROJECTS RESEARCH AND DEVELOPMENT DIVISION 2018 - 2020
56
3.1 3.2 3.3
WIND TUNNEL LABORATORIES
58
KAU ROYAL GALLERY
72
KING FAISAL CONFERENCE HALL
82
3.4
RABIGH COLLEGES
98
3.5
UNIVERSITY SIGNAGE STANDARDS
108
3.6
FEMALE ADMINISTRATIVE BUILDING
112
3.7
ALMADINAH MIXED USE
114
57
3.1 |
WIND TUNNEL LABORATORIES Architectural - Individual work
The project is laboratories and workshops for the Faculty of Engineering (Department of Aeronau cal Engineering and the Department of Civil Engineering). In one building divided into two sec ons, the first sec on is for the Aeronau cal Engineering Department, contains: educa onal spaces, office spaces, workshops, and the main space is the wind tunnel laboratory, and the second one for Civil Engineering Department, contains hydraulic laboratory. The building is designed with a character that follows its func on, where the structural elements were highlighted in a way that suits the architectural design of the building, and the use of raw materials in the design to give the industrial style. اﻟﻤﺸ ـ ـ ـ ـ ـ ــﺮوع ﻫﻮ ﻋﺒﺎرة ﻋﻦ ﻣﺒﻨﻰ ﻟﻤﻌﺎﻣﻞ وورش ﻟﻜﻠﻴﺔ اﻟﻬﻨﺪﺳﺔ )ﻗﺴ ـ ـ ـ ـ ـ ــﻢ ﻓﻲ ﻣﺒﻨﻰ واﺣﺪ ﻣﻘﺴـ ـ ــﻢ إﻟﻰ,(ﻫﻨﺪﺳﺔ اﻟﻄﻴﺮان وﻗﺴـ ـ ــﻢ اﻟﻬﻨﺪﺳﺔ اﻟﻤﺪﻧﻴﺔ اﻟﻘﺴـ ــﻢ اﻷول ﺗﺎﺑﻊ ﻟﻘﺴـ ــﻢ ﻫﻨﺪﺳﺔ اﻟﻄﻴﺮان ﻳﺤﺘﻮي ﻋﻠﻰ ﻓﺮاﻏﺎت، ﻗﺴ ــﻤﻴﻦ واﻟﻔﺮاغ اﻟﺮﺋﻴﺴـ ــﻲ وﻫﻮ ﻣﻌﻤﻞ اﻟﻨﻔﻖ، ورش ﻋﻤﻞ، ﻓﺮاﻏﺎت ﻣﻜﺘﺒﻴﺔ،ﺗﻌﻠﻴﻤﻴﺔ واﻟﻘﺴ ـ ـ ـ ـ ــﻢ اﻟﺜﺎﻧﻲ ﺗﺎﺑﻊ ﻟﺘﺨﺼ ـ ـ ـ ـ ــﺺ اﻟﻬﻨﺪﺳﺔ اﻟﻤﺪﻧﻴﺔ ﻳﺤﺘﻮي ﻋﻠﻰ،اﻟﻬﻮاﺋﻲ ﺣﻴﺚ ﺗﻢ إﺑﺮاز، ﺗﻢ ﺗﺼ ـ ـ ـ ـ ــﻤﻴﻢ اﻟﻤﺒﻨﻰ ﺑﻄﺎﺑﻊ ﻳﺘﺒﻊ وﻇﻴﻔﺘﻪ.ﻣﻌﻤﻞ اﻟﻬﻴﺪروﻟﻴﻚ واﺳﺘﺨﺪام، اﻟﻌﻨﺎﺻﺮ اﻻﻧﺸ ــﺎﺋﻴﺔ ﺑﻄﺮﻳﻘﺔ ﺗﻨﺎﺳﺐ اﻟﺘﺼ ــﻤﻴﻢ اﻟﻤﻌﻤﺎري ﻟﻠﻤﺒﻨﻰ . ﻹﻋﻄﺎء اﻟﻨﻤﻂ اﻟﺼﻨﺎﻋﻲ، ﻣﻮاد ﺧﺎم ﻓﻲ اﻟﺘﺼﻤﻴﻢ
58 |
Work Experience
Site Loca on
The determined area is located in the northeast of the campus, has chosen to be for the future laboratories buildings, and its contains the faculty of Engineering laboratories as a part of it. The project area is 19,860 m² and the built-up area is 9,100 m².
Site Location
0
00.25 0.50.5 1 0.751.5 1
2
N
kmkm
N
Area and Dimension
114.00 m
Built-up area 9050 m²
82.50 m
Campus border
ﺗﻢ اﺧﺘﻴﺎر ﻣﻨﻄﻘﺔ ﻓﻲ ﺷـ ـ ـ ـ ـ ــﻤﺎل ﺷـ ـ ـ ـ ـ ــﺮق اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ ﻟﺘﻜﻮن ﻣﻨﻄﻘﺔ ﻣﺨﺼ ـ ـ ـ ـﺼ ـ ـ ـ ــﺔ ﻟﻤﺒﺎﻧﻲ ﺣﻴﺚ ﺳﺘﻜﻮن اﻟﻤﻌﺎﻣﻞ، اﻟﻤﻌﺎﻣﻞ اﻟﻤﺴـ ــﺘﻘﺒﻠﻴﺔ اﻟﺠﺪﻳﺪة ﻟﻜﻠﻴﺔ اﻟﻬﻨﺪﺳـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ــﺔ ﻓﻲ ﻫﺬه 19860m² ﺗﺒﻠﻎ ﻣﺴـ ــﺎﺣﺔ اﻟﻤﺸ ـ ــﺮوع.اﻟﻤﻨﻄﻘﺔ . 9050m² واﻟﻤﺴﺎﺣﺔ اﻟﻤﺒﻨﻴﺔ
Site area= 19860 m²
Architecture Por olio
| 59
Site Analysis
ALSULAYMANIYAH DISTRICT
The project is designed in the middle of the future area for laboratories to facilitate servicing the building from all sides by crea ng accessible subservice streets surrounding the building. ﺗﻢ ﺗﺼـﻤﻴﻢ اﻟﻤﺸــﺮوع ﻓﻲ ﻣﻨﺘﺼــﻒ اﻟﻤﻨﻄﻘﺔ اﻟﻤﺴﺘﻘﺒﻠﻴﺔ ﻟﻠﻤﻌﺎﻣﻞ ﻟﺘﺴﻬﻴﻞ ﺗﺨﺪﻳﻢ اﻟﻤﺒﻨﻰ ﻣﻦ ﺟﻤﻴﻊ اﻟﺠﻬﺎت ﻋﻦ ﻃﺮﻳﻖ اﻧﺸ ـ ـ ـ ـ ــﺎء ﺷﻮارع .ﺧﺪﻣﺔ ﻓﺮﻋﻴﺔ ﺗﺤﻴﻂ اﻟﻤﺒﻨﻰ
WADI JEDDAH INVES
RECOMMENDED SITE FOR NEW LABS
Crea ng a services street that connects the project to Al Iskan Street to reduce the traffic. اﻧﺸ ـ ــﺎء ﺷﺎرع ﺧﺪﻣﺔ ﻳﺮﺑﻂ اﻟﻤﺸـ ـ ــﺮوع ﺑﺸـ ـ ــﺎرع .اﻻﺳﻜﺎن ﻟﺘﺨﻔﻴﻒ اﻟﺤﺮﻛﺔ اﻟﻤﺮورﻳﺔ
RECOMMENDED SITE FOR NEW LABS
TMENT AREA
HYDRAULICS LAB
WIND TUNNEL LAB
Section
LOADING DOCK
60 |
Work Experience
LOADING DOCK
NEW FACULTY MEMBERS HOUSING
ELECT.
ELECTRICAL SUBSTATION
RECOMMENDED SITE FOR NEW LABS
N
ALSULAYMANIYAH DISTRICT
ME WADI JEDDAH INVEST
GATE 4
DRIVING SCHOOL SQUARE
NT AREA
ELECT.
RECOMMENDED SITE FOR NEW LABS
ALMALAE'B St
The project is located on AlMala'b St in the north-east of the campus, and the site is surrounded by many facilities: from the western side by the women driving school, from the northern side by investment area for the Wadi Jeddah, from the northern-east by the electric station, and from the south by the faculty members housing.
TEMPORARY CONSULTANT'S & CONTRACTOR'S OFFICES
NEW FACULTY MEMBERS HOUSING
ACADEMIC SQUARE PARKING ACADEMIC SQUARE
ﻳﻘﻊ اﻟﻤﺸـــــﺮوع ﻋﻠﻰ ﺷﺎرع اﻟﻤﻼﻋﺐ ﻓﻲ ،اﻟﺸـــــــــﻤﺎل اﻟﺸــــــــــﺮﻗﻲ ﻟﻠﺤﺮم اﻟﺠﺎﻣﻌﻲ وﻳﺤﻴﻂ ﺑﺎﻟﻤﻮﻗﻊ اﻟﻌﺪﻳﺪ ﻣﻦ اﻟﻤﻨﺸـــــﺌﺎت : وﻣﻦ اﻫﻤﻬﺎ ﻣﻦ اﻟﺠﻬﺔ اﻟﻐﺮﺑﻴﺔ ﻣﺪرﺳ ـ ـ ـ ــﺔ ﺗﻌﻠﻴﻢ اﻟﻘﻴﺎدة ﻣﻦ اﻟﺠﻬﺔ اﻟﺸﻤﺎﻟﻴﺔ ارض اﺳﺘﺜﻤﺎرﻳﺔ،ﻟﻠﻨﺴﺎء ﻣﻦ ﺟﻬﺔ اﻟﺸـﻤﺎل،ﺧﺎﺻﺔ ﺑﺸﺮﻛﺔ وادي ﺟﺪة ﻣﻦ ﺟﻬﺔ اﻟﺠﻨﻮب،اﻟﺸــﺮﻗﻲ ﻣﺤﻄﺔ اﻟﻜﻬﺮﺑﺎء .ﺳﻜﻦ اﻋﻀﺎء ﻫﻴﺌﺔ اﻟﺘﺪرﻳﺲ
Architecture Por olio
| 61
Concept Phase 1
Phase 2
Phase 3
Phase 4
WADI JEDDAH INVESTMENT AREA Services
Service St
Services
Haydraulics lab
Main entrance
Haydraulics lab roof
Haydraulics lab Services
new lab
Services
HYDRAULICS LAB
new lab
Service St
Service St
Wind tunnel lab area
Wind tunnel lab area
Wind tunnel lab area
new lab Units
Main zone for labs and office space
WIND TUNNEL LAB
Core
Core
Units Core
Core
Core
Units Core
Atrium
Units
Units
Core
Core Units
Terrace
Main entrance
almalaeb st
Wind tunnel lab area LOADING DOCK
Labs and workshops
Wind tunnel lab area
LOADING DOCK
The site analysis summarizes the design of the hydraulic lab and the wind tunnel lab on the services streets to facilitate loading for inserting the machines and equipment for laboratories. ﻳﻠﺨﺺ ﺗﺤﻠﻴﻞ اﻟﻤﻮﻗﻊ ﺑﻮﺿـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ـ ــﻊ ﻣﻌﻤﻞ اﻟﻬﻴﺪروﻟﻴﻜﻲ وﻣﻌﻤﻞ اﻟﻨﻔﻖ اﻟﻬﻮاﺋﻲ ﻋﻠﻰ ﺷﻮارع اﻟﺨﺪﻣﺔ ﻟﺘﺴ ـ ـ ـ ـ ــﻬﻴﻞ .اﻟﺘﺤﻤﻴﻞ ﻹدﺧﺎل اﻵﻻت واﻟﻤﻌﺪات ﻟﻠﻤﺨﺘﺒﺮات
Work Experience
Office
Office spaces
Haydraulics lab
1.Site layout
62 |
Specific area to hide mechanical equipment
Main facade
Section
Haydraulics lab
Labs
Office
Office
Labs
Wind tunnel lab area
Labs
Office
Labs
Wind tunnel lab area
Haydraulics lab
1.Functional Zoning
2. Core and Services
3. Atrium and Terrace
The building was divided according to the functional zoning, where educational and office spaces were placed on the main facade, while the large workshops were placed at the back.
Design the service spaces such as, toilets, shafts, emergency stairs and stores to provide more space for workshops. On the roofs, Specific space is designed to hide mechanical equipment.
Design a terrace in first floor withe green area, to create a beautiful communication with the surrounding and to filteration the inside air.
، ﺗﻢ ﺗﻘﺴﻴﻢ اﻟﻤﺒﻨﻰ ﺣﺴﺐ اﻟﻤﻨﺎﻃﻖ اﻟﻮﻇﻴﻔﻴﺔ ﺣﻴﺚ ﺗﻢ وﺿﻊ اﻟﻤﺴﺎﺣﺎت اﻟﺘﻌﻠﻴﻤﻴﺔ واﻟﻤﻜﺘﺒﻴﺔ ﻓﻲ ﺣﻴﻦ ﺗﻢ وﺿﻊ، ﻋﻠﻰ اﻟﻮاﺟﻬﺔ اﻟﺮﺋﻴﺴﻴﺔ .ورش اﻟﻌﻤﻞ اﻟﻜﺒﻴﺮة ﻓﻲ ﻋﻠﻰ اﻟﻮاﺟﻬﺔ اﻟﺨﻠﻔﻴﺔ
,ﺗﻢ ﺗﺼﻤﻴﻢ ﻓﺮاﻏﺎت اﻟﺨﺪﻣﺔ ﻣﺜﻞ اﻟﺤﻤﺎﻣﺎت واﻟﻤﺨﺎزن ودرج اﻟﻄﻮاريء ﻟﺘﻮﻓﻴﺮ ﻣﺴﺎﺣﺔ اﻛﺒﺮ ﺗﻢ, اﻣﺎ ﻓﻲ اﻻﺳﻄﺢ.ﻟﻠﻤﻌﺎﻣﻞ واﻟﻮورش ﺗﺨﺼﻴﺺ ﻣﺴﺎﺣﺔ ﻣﺨﺼﺼﺔ ﻻﺧﻔﺎء اﺟﻬﺰة .اﻟﺘﻜﻴﻒ اﻟﻤﻴﻜﺎﻧﻴﻜﻴﺔ
ﺗﺼﻤﻴﻢ ﻣﻨﻄﻘﺔ ﺧﺎرﺟﻴﺔ ﻓﻲ اﻟﺪور اﻻول ﻣﻊ ﻟﺨﻠﻖ اﺗﺼﺎل ﺟﻤﻴﻞ ﻣﻊ، ﻣﻨﻄﻘﺔ ﺧﻀﺮاء .اﻟﻤﺤﻴﻂ اﻟﺨﺎرﺟﻲ وﺗﺼﻔﻴﺔ اﻟﻬﻮاء اﻟﺪاﺧﻠﻲ
Flexible Modular System Workshop
Modular System
A
11.40 m
B
11.40 m
C 1
7.50 m
7.20 m
1
2
3.90 m
3.90 m
2
3
3
A
11.40 m
B
11.40 m
C
Laboratories - Digital lab A
11.40 m
B
11.40 m
C 1
7.50 m
7.20 m
1
2
3.90 m
3.90 m
2
3
3
A
11.40 m
B
11.40 m
C
Conference room - Classroom A
11.40 m
B
11.40 m
C 1
7.50 m
7.20 m
1
2
3.90 m
3.90 m
2
Terrace
3
3
A
11.40 m
B
11.40 m
C
OfďŹ ce Spaces - Meeting room A
11.40 m
B
11.40 m
C 1
7.50 m
7.20 m
1
2
Terrace
3
Services
Corridor
Function
3.90 m
3.90 m
2
A
11.40 m
B
3
11.40 m
Architecture Por olio
C
| 63
Exterior Mood Board
64 |
Work Experience
Interior Mood Board
Architecture Por olio
| 65
Ground Floor Plan
MAIN ENTRANCE
STORAGE
LOADING
HYDRAULICS LAB
OFFICES
COMMUNICATION ROOM
FIRE PUMP ROOM
HYDRAULICS LAB
LOADING
ELECTRICAL ROOM
GENERATOR ROOM
LOADING
TEST SECTION SERVICE
LOADING
MAIN ELECTRICAL ROOM
VAC ROOM
LUDWIG TUBE
WORKSHOP AREA SITING AREA
COMPRESSOR ROOM
ELECTRICAL ROOM
AUTOCLAVE LAB
SUBSTATION ROOM
MAINLOBBY COMMUNICATION ROOM
LOW SPEED TUNNEL
COMMUNICATION ROOM
CONTROL LAB
UAV LAB
MAIN ENTRANCE
Work Experience
ETS ROOM
ELECTRICAL ROOM
SUBSTATION ROOM
66 |
MECH. ROOM
CONTROL ROOM
F. W. LAB
First Floor Plan
HAYDRAULICS LAB ROOF
HAYDRAULICS LAB ROOF
MECHANICAL EQUIPMENT AREA
OXIDIZER
CELL ROOM
ANALYSIS AND CONTROL LAB
CALIBRATION ROOM
COMBUSTION LAB
OFFICES
OFFICES
OFFICE
MEETING ROOM
MECH. ROOM
CFD
SUBSTATION ROOM
FUEL ROOM
ELECTRICAL ROOM
OFFICES COMMUNICATION ROOM
OFFICES
OFFICE
CLASSROOM
MULTIPURPOSE ROOM
CONFERENCE ROOM
MULTIPURPOSE ROOM
OFFICES
LOUNGE
MEETEING
MEETEING
MEETEING
OFFICE
ELECTRICAL ROOM
COMMUNICATION ROOM
OFFICES
MECHANICAL TESTING ROOM
MECHANICAL TESTING ROOM
Architecture Por olio
| 67
Main Perspec ve
68 |
Work Experience
Perspec ve
Architecture Por olio
| 69
Perspec ve
70 |
Work Experience
Perspec ve
Educational spaces, OfďŹ ces spaces and Work shops
SpeciďŹ c area to hide mechanical equipment
Wind tunnel laboratory
Hydraulics laboratory
Architecture Por olio
| 71
3.2 |
KAU ROYAL GALLERY Architectural - Team work
The project is an extension of the King Faisal Conference Center in the northern region behind the theater which is located on the main axis that connects the main entrance of the university with the Higher management of the university. The project focuses on designing a recep on hall to welcome the higher guests . The project will include a recep on hall,royal arcade, a mul purpose showroom and a royal wai ng room.
EXISTING SITUATION:
NATIONAL ANTHEM BAND
ROYAL ENTRANCE
ROYAL EXHIBITION HALL
DROP-OFF AREA
ROYAL SALON
BACK STAGE
VIP
DISPLAY SCREEN FRONT STAGE
72 |
Work Experience
VIP
اﻟﻤﺸـ ــﺮوع ﻳﻌﺘﺒﺮ اﻣﺘﺪاد ﻟﻤﺮﻛﺰ اﻟﻤﻠﻚ ﻓﻴﺼ ـ ــﻞ ﻟﻠﻤﺆﺗﻤﺮات ﻓﻲ اﻟﻤﻨﻄﻘﺔ اﻟﺸـ ـ ـ ــﻤﺎﻟﻴﺔ ﺧﻠﻒ اﻟﻤﺴـ ـ ـ ــﺮح اﻟﺬي ﻳﻘﻊ ﻋﻠﻰ اﻟﻤﺤﻮر اﻟﺬي ﻳﺮﺑﻂ ﺑﻴﻦ اﻟﻤﺪﺧﻞ اﻟﺮﺋﻴﺴـ ـ ـ ـ ــﻲ ﻟﻠﺠﺎﻣﻌﺔ ﻣﻊ اﻹدارة اﻟﻌﻠﻴﺎ وﻳﺮﻛﺰ اﻟﻤﺸـ ــﺮوع ﻋﻠﻰ ﺗﺼـ ــﻤﻴﻢ ﻗﺎﻋﺔ اﺳﺘﻘﺒﺎل ﺧﺎدم.ﻟﻠﺠﺎﻣﻌﺔ اﻟﺤﺮﻣﻴﻦ اﻟﺸـ ــﺮﻳﻔﻴﻦ وﻛﺒﺎر اﻟﺰوار ﺑﺤﻴﺚ ﻳﺤﺘﻮي اﻟﻤﺸـ ــﺮوع ﻋﻠﻰ ﻗﺎﻋﺔ اﺳ ــﺘﻘﺒﺎل ﻣﻠﻜﻴﺔ وﺻ ــﺎﻟﺔ ﻋﺮض ﻣﺘﻌﺪدة اﻻﺳ ــﺘﺨﺪاﻣﺎت .وﻗﺎﻋﺔ اﻧﺘﻈﺎر ﻣﻠﻜﻴﺔ
Architecture Por olio
| 73
N
Loca on
UNIVERSITY MAIN GATE
ALIDARA STREET
KING ABDULAZIZ UNIVERSITY HOSPITAL
EET
STR
AL-ISK
AEB
AL ALM
AN ST
REET
STADIUM
CAMPUS
ALEHTIF ALAT ST
REET
MOSQUE
DIRECTOR OFFICE
TRE
SS
IE ULT FAC
ET
AL-ISKAN
STREET
KFCC
EET
FA STR
THAQA
GIRLS CAMPUS
74 |
Work Experience
OOMS
CLASSR
Exis ng Elements
Structural element outside the building
Use vertical lines
skylight provides natural ligh ng for the space
relationship between the column and the roof Precast
Marble
Architecture Por olio
| 75
35.2m
Concept 9.6m
The organiza on of the main spaces of the project consists of three main spaces: the internal exhibi on area and the service area, such as elevators, etc. and the outer envelope area.
3.2m
9.6m 3.2m
3.2m 9.6m
Free Plan
9.6m
Free Plan
Tp Stage
76 |
Work Experience
3.2m
Green Belt & Structure & Services Green Belt & Structure & Services
35.2m
Public Entrance
9.6m
It has been distributed to ensure the eďŹƒciency of the space and to ensure access to the largest indoor space is open for display as follows: The outer cover contains the aoresta on area, the plants as well as the structural load area, the medium cover contents services, the toilets, the ver cal movement, and the inner space as the main open exhibi on area without internal columns.
9.6m
Flexibility Scenario #01
Scenario #02
Scenario #03
Reaching to a fully integrated func onal and structural module thats allow high flexibility in use Gallery
Public Path
Royal Path
Lobby
King Faisal Conferance Center
KAU Gallery
Gallery 2
Gallery 1
Royal Path
Lobby
King Faisal Conferance Center
KAU Gallery
Lobby
Scenario #01 option (a)
King Faisal Conferance Center
KAU Gallery
King Faisal Center
King Faisal Center
Scenario #03 option (b)
Scenario #03 option (c)
Gallery 02
Gallery
Lobby
Lobby
Lobby
King Faisal Center
Gallery
Public Path
There are many proposals for distribu on and movement within the exhibi on, where the division of the exhibi on can be fully and several different exhibi ons and different forms of movement. It can be used as a space for events and lectures if there are no exhibits or even combining those func ons.
Gallery 01
Gallery 02
Gallery 01 Gallery 02
Salon
Lobby Salon
King Faisal Conferance Center
Using 1 module as extension for salon.
Gallery 03
Lobby
Lobby
Salon
King Faisal Conferance Center
Explanation of the free plan to organize three separate galleries with equal areas.
King Faisal Conferance Center
Explanation of the free plan to organize three separate galleries with different areas.
Architecture Por olio
| 77
Main Perspec ve
6 7
1
Pedestrian connection between public parking and the gallery
6
Green Roof
2
Alehtifalat street
7
KFCC
3
Step ramp
8
VIP
4
Drop o
9
Gallery Entrance
5
Skylight
1 5
8 9
4
2 3
78 |
Work Experience
PROPOSAL:
NATIONAL ANTHEM BAND
EXHIBITION
ROYAL ARCADE END POINT
ROYAL SALON
DROP-OFF AREA
ROYAL OFFICE
PRIVATE
BACK STAGE VIP
DISPLAY SCREEN FRONT STAGE
Architecture Por olio
| 79
Perspec ve
80 |
Work Experience
Perspec ve
Architecture Por olio
| 81
3.3 |
KING FAISAL CONFERENCE HALL Renova on and Furniture Selec on - Team work
The project is a re-design of the interior space of the VIP Hall of the King Faisal Conferences center located in the east side. It includes recep on rooms and a royal council with all services and is connected to the King Faisal Hall Theater. The project focuses on redesigning the centeral area and revisi ng the walls, floors, ceilings and even furniture to respond to the modern style.
اﻟﻤﺸﺮوع ﻫﻮ إﻋﺎدة ﺗﺼﻤﻴﻢ اﻟﻔﺮاغ اﻟﺪاﺧﻠﻲ ﻟﻘﺎﻋﺔ ﻛﺒﺎر اﻟﺰوار اﻟﺘﺎﺑﻌﺔ ﻟﻘﺎﻋﺔ اﻟﻤﻠﻚ ﻓﻴﺼ ـ ـ ـ ـ ـ ـ ـ ـ ـ ــﻞ ﻟﻠﻤﻮﺗﻤﺮات اﻟﺘﻲ ﺗﻘﻊ ﻓﻲ ﺷﺮق اﻟﻤﺮﻛﺰ وﺗﺤﺘﻮي ﻋﻠﻰ ﻏﺮف اﺳﺘﻘﺒﺎل وﻳﺮﻛﺰ. وﻣﺠﻠﺲ ﻣﻠﻜﻲ ﺑﻜﺎﻓﺔ اﻟﺨﺪﻣﺎت وﻣﺮﺗﺒﻂ ﺑﻤﺴ ـ ـ ــﺮح ﻗﺎﻋﺔ اﻟﻤﻠﻚ ﻓﻴﺼـ ـ ـ ــﻞ اﻟﻤﺸ ـ ـ ــﺮوع اﻟﻰ اﻋﺎدة ﺗﺼـ ـ ـ ــﻤﻴﻢ اﻟﻤﺠﻠﺲ اﻟﺬي ﻳﺘﻮﺳﻂ اﻟﻜﺘﻠﺔ ﺑﺈﻋﺎدة اﻟﻨﻈﺮ ﻓﻲ .اﻟﺠﺪران واﻻرﺿﻴﺎت واﻻﺳﻘﻒ وﺣﺘﻰ اﻻﺛﺎث ﻟﻼﺳﺘﺠﺎﺑﺔ ﻟﻠﻄﺮاز اﻟﺤﺪﻳﺚ
82 |
Work Experience
Main VehIcular Path
PHASE -A (ROYAL SALON)
Storge elecom Room Mechanical Room
T
Ramp
Storge Mechanical Room
PHASE -B (ROYAL OFFICE)
Electrical Room
National Anthem Band South Structure Parking
Gallery
Public Entrance
٨٢٩٫٤٤ msq
PHASE -C (THEATER)
E
PHASE - D (VIP LOUNGE)
Storge Mechanical Room
End Point
PHASE - E (ROYAL GALLERY) WC
Storge
Ser Droop Off
vices
Ramp
A
WC Storge
B
Royal Room
Royal Saloon
Lobby
Back Stage
C
Services Entrance
Ptivate Suite
D
Stage
Architecture Por olio
| 83
Furniture Example
THE ROYAL FAMILY ON MODERN, CONTEMPORARY AND NEW CLASSIC FURNITURE IN THE PAST FEW YEARS
84 |
Work Experience
Exis ng Elements
Architecture Por olio
| 85
Phase A
ENTRANCE
TOILET STORAGE STR.
ROYAL SALON
LOBBY
ROYAL OFFICE
PRIVATE SUITE
86 |
Work Experience
Exis ng Elements
87 |
Work Experience
This Area will be transformed into a VIP lounge with sofas and armchairs.
Architecture Por olio
| 87
Furniture Selec ons
اﻟﺴﺎﻣﻴﺔ ALSAMYA
DO_ARMCHAIR | DIM. W 115. D 103. H 65. HS 45. HA 65 cm
HOP_COFFEE TABLE | DIM. W 160. D 82. H 45. cm
HOP_COFFEE TABLE | DIM. W 126. D 162. H 45. cm
88 |
Work Experience
HOP_SIDE TABLE | DIM. W 160. D 45. H 75-83 cm
GR_ARMCHAIR | DIM. W 115. D 103. H 67. HS 42. HA 67 cm
GR_2P_SOFA | DIM. W 230. D 103. H 67. HS 42. HA 67 cm
GRA_LH CINSOLE | Wooden structure. Metal legs with verity of colors
GODWIN | DIM. Dia 40 x 68 cm
Perspec ve
Architecture Por olio
| 89
Phase B
ENTRANCE
TOILET STORAGE STR.
ROYAL SALON
LOBBY
ROYAL OFFICE
PRIVATE SUITE
90 |
Work Experience
Exis ng Elements
This room will be an oďŹƒce for The King Salman , just in case if he had to make a conďŹ den al call.
Architecture Por olio
| 91
Furniture Selec ons
اﻟﺴﺎﻣﻴﺔ ALSAMYA
MB_5160_OFFICE | DIM. W 77. D 76. H 121-131 cm
ITT_OFFICE DECK | DIM. W 272. D 100. H 77 cm
MB_SOFA_OFFICE | DIM. W 215. D 100. H 79 cm
SIDE TABLR | DIM. W 64. D 64. H 50 cm
92 |
Work Experience
SIDE DRAWER | DIM. W 114. D 45. H 66 cm
ARM CHAIR | DIM. W 114. D 45. H 66 cm
NIMCT | DIM. W 74. D 44. H 205 cm
ST_COFFEE TBLE | DIM. W 154. D 70. H 37 cm
Perspec ve
Architecture Por olio
| 93
Phase D
TOILET
LOBBY LOBBY
DROP-OFF AREA KITCHEN ROYAL RECEPTION
FOYER TO KING FAISAL CEREMONIAL CENTER
TOILET
OPEN TO GARDEN
94 |
Work Experience
PRIVATE SALON
Exis ng Elements
Around 15+ year old furniture. This area will be renovated in rugs, artworks and furniture.
Architecture Por olio
| 95
Furniture Selec ons
FURNITURE SELECTION
OCTET END TABLE | DIM. W 60 H 49.3 D 60 CM
LATITUDE 3 SEAT SOFA | DIM. W 234 H 79 D 97
MANDALA MIRROR
LATITUDE 2 SEAT SOFA | DIM. W 174 H 79 D 97
QUINTET TABLE | DIM. W 119 H 38.5 D 84 LATITUDE ARMCHAIR | DIM. W 116 H 79 D 97
BRIQUEVILLE VASE
96 |
Work Experience
DIM. W 119 H 28.5 D 84
LIBRETTO FLOOR AND TABLE LAMP
SOCOA RUG
Perspec ve
Architecture Por olio
| 97
RABIGH COLLEGES Architectural - Team work
A set of classroom buildings to be built in The project is a classroom buildings on the campus of King the King Abdulaziz University – Rabigh Abdulaziz University in Rabigh, in a way to meet modern Campus. The inten ons is to efficiently technical standards. The project contains colleges and classroom meet current demands of educa onal buildings, which are divided into six different loca on (Faculty of facili es with minimum technical Engineering, Faculty of Science and Human Arts, Faculty of complexity. The project contains colleges Computer Science, Faculty of Medicine, Faculty of Applied and classroom buildings, which are Medical Sciences, Faculty of Business Administra on). distributed over six different loca on (Faculty of Engineering, Faculty of Science and Human Arts, Faculty of Computer Science, Faculty of Medicine, Faculty of Applied Medical Sciences, Faculty of Business Administra on Torrent stream
ﺗﺼ ـ ـ ــﻤﻴﻢ ﻣﺒﺎﻧﻲ وﻣﻨﺸ ـ ـ ــﺂت ﺗﻌﻠﻴﻤﻴﺔ ﺑﻔﺮع ﺟﺎﻣﻌﺔ اﻟﻤﻠﻚ ﻋﺒﺪاﻟﻌ ـ ــﺰﻳـ ـ ــﺰ ﺑـ ـ ــﺮاﺑﻎ ﺑﻬﺪف ﺗﻮﻓﻴـ ـ ــﺮ أﻋﻠـ ـ ــﻰ .اﻟﻤﺘﻄﻠﺒﺎت اﻟﻮﻇﻴﻔﻴﺔ ﺑﺄﻗﻞ ﺗﻘﻴﺪات ﺗﻘﻨﻴﺔ ﻣﻤﻜـﻨﺔ ﻳﺤﺘﻮي اﻟﻤﺸ ـ ــﺮوع ﻋﻠﻰ ﻣﺒﺎﻧﻲ ﻛﻠﻴﺎت واﻟﻔﺼـ ـ ــﻮل اﻟﺪراﺳـﻴﺔ وﻫﻲ ﻣﻮزﻋﺔ ﻋﻠﻰ ﺳــﺘﺔ ﻣﻮاﻗﻊ ﻣﺨﺘﻠﻔﺔ ، ﻛﻠﻴﺔ اﻟﻄﺐ، ﻛﻠﻴﺔ اﻟﺤﺎﺳـ ـ ـ ــﺒﺎت،)ﻛﻠﻴﺔ اﻟﻬﻨﺪﺳ ـ ـ ــﺔ ﻛﻠﻴﺔ، ﻛﻠﻴﺔ اﻟﻌﻠﻮم اﻟﻄﺒﻴﺔ اﻟﺘﻄﺒﻴﻘﻴﺔ،ﻛﻠﻴﺔ اﻟﻌﻠﻮم (اﻻﻋﻤﺎل
98 |
Work Experience
LTY OF FACU ERING ENGINE
FACULTY OF COMPUTER SCIENCE
FACULTY OF SCIEN CE AND HUMAN ARTS
FACULTY OF BUSIN ESS ADMINIS TRATION
3.4 |
N
D IE PL ES AP NC OF IE Y SC LT AL CU IC A F ED M Y E LT IN CU IC FA ED M OF
G1 Main Gate
Concept
10.3 m
30 m
Corridor
Core
Core Core
Corridor
Units
Corridor
Core and Services
Atrium
60 m
Units
Atrium
7.2 m
7.2 m
Entrnce
60 m
Units
Corridor
Units Entrnce
60 m
7.2 m
7.2 m
Units
7.2 m
99
Corridor
7.2 m
7.2 m
Core and Services
7.2 m
7.2 m
Corridor
10.3 m 3m
7.2 m
Units
6.3 m 3m
7.2 m
Core
7.2 m
ﺟﺎﻣﻌﺔ اﻟﻤﻠﻚ ﻋﺒﺪ اﻟﻌﺰﻳﺰ-ﻣﺸﺎرﻳﻊ ﻛﻠﻴﺎت اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ ﺑﺮاﺑﻎ
30 m
King Abdulziz University - Faculties project at Rabigh campus
30 m
Corridor
3m
Core
10.3 m
30X60 m
Clear Entrance
Atrium and Services
7.2 m
7.2 m
Core
Corridor
Units
Corridor
Corridor
7.2 m
7.2 m
Corridor
7.2 m
7.2 m 7.2 m
3m 6.3 m
Structural system
Units
Corridor
Corridor
Units
Units
Corridor
Corridor
Units
Units
Corridor
Corridor
Units
Units
Corridor
Corridor
Units
Corridor
Corridor
Units
Units
Corridor
Corridor
Units
Units
Corridor
Corridor
Units
Units
Corridor
Corridor
Units
Corridor
Corridor
Units
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
Units
Corridor
Corridor
Units
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
Units
Entance
Units
Units
Entance
Entance
Units
Units
Entance
7.2 m 10.3 m
Entance
Units Units Units
Architecture Por olio
Entance
| 99
Flexibility Modular System 60M
7.2 m
7.2 m
7.2 m
7.2 m
7.2 m
7.2 m
7.2 m
3m 6.3 m
Atrium
Core
Core
10.3 m
7.2 m
7.2 m
7.2 m
7.2 m
7.2 m
7.2 m
7.2 m
7.2 m
10.3 m
7.2 m
3m
3m
Core
6.3 m
30M
3m
ﻓﻜﺮة اﻟﻤﺸ ـ ــﺮوع ﺗﺠﺴـ ـ ــﺪ ﻧﺘﻴﺠﺔ اﻟﺘﻜﺎﻣﻞ ﺑﻴﻦ اﻟﻌﻨﺎﺻﺮ اﻟﻤﻌﻤﺎرﻳﺔ واﻹﻧﺸـ ـ ــﺎﺋﻴﺔ ﺗﺘﻤﺎﺷﻰ ﻣﻊ اﻟﻤﺘﻄﻠﺒﺎت اﻟﻤﺴ ـ ـ ــﺘﻤﺮة ﻟﻠﻤﺮوﻧﺔ ﻓﻲ م ﻳﻤﻜﻦ أن٣٠x٦٠ اﻟﻤﺒﺎﻧﻲ واﻟﺘﻲ ﺗﺘﻤﻴﺰ ﺑﺄﺑﻌﺎد.اﻻﺳ ـ ـ ـ ـ ـ ـ ــﺘﺨﺪام ﺗﺤﺘﻮي ﻋﻠﻰ ﻛﻠﻴﺎت وﻓﺼـﻮل دراﺳﻴﺔ وﻣﻜﺎﺗﺐ وﻣﻌﺎﻣﻞ وﻏﻴﺮﻫﺎ ، ﻳﺴ ـ ـ ـ ـ ــﻤﺢ ﺗﺼ ـ ـ ـ ـ ــﻤﻴﻢ اﻟﻤﺒﺎﻧﻲ ﺑﺎﻟﺘﻤﺪد.ﻣﻦ اﻟﻮﻇﺎﺋﻒ اﻟﺘﻌﻠﻴﻤﻴﺔ .اﻟﺘﻘﻠﺺ أو اﻟﺘﻐﻴﻴﺮ ﺣﺴﺐ ﺣﺎﺟﺔ اﻟﻤﺴﺘﺨﺪﻣﻴﻦ
7.2 m
7.2 m
10.3 m
7.2 m
10.3 m
The design aims at achieving a high level of integra on between the architectural and construc on elements, considering the constant demand for space flexibility. The modular 60x30m each can accommodate buildings of classrooms facili es, laboratories as well as other func ons and easily enable future changes, extension or shrinking with extremely low technical complexity.
7.2 m
7.2 m 3.6 m 1.8 m
اﻟﻤﺴﺎﺣﺔ اﻟﻜﺎﻓﺔ ﻟﻠﻤﻮﻇﻒ اﻟﻮاﺣﺪ
7.2 m
7.2 m
7.2 m
7.2 m
7.2 m
7.2 m
7.2 m 3.6 m
3.6 m
100 | Work Experience
اﻟﻔﺼﻮل اﻟﺪراﺳﻴﺔ
7.2 m
7.2 m
ﻧﻈﺎم اﻟﻮﺣﺪات
ﻗﺎﻋﺔ اﺟﺘﻤﺎﻋﺎت- ﻣﻜﺎﺗﺐ اﻟﺘﻨﻔﻴﺬﻳﻦ
(ﻣﺴﺎﺣﺎت ﻋﻤﻞ )اﻟﻤﻜﺎت ﺑﺎﻻدارﻳﺔ
7.2 m
3.6 m
7.2 m
Core and Services 3D section
Skylight ﻓﺘﺤﺔ ﺳﻘﻒ
Loading dock ﻣﻨﻄﻘﺔ اﻟﺘﺤﻤﻴﻞ واﻟﺘﻨﺰﻳﻞ
16
Comm. room ﻏﺮﻓﺔ اﻻﺗﺼﺎﻻت
15
17
14
18
13
19
12
20
11
21
10
22
09
23
08
24
07
25
06
26
05
27
04
28
03
29
02
30
01
31
Escape stairs ﺳﻠﻢ اﻟﻄﻮارئ
Elec. room ﻏﺮﻓﺔ اﻟﻜﻬﺮﺑﺎء Jan.
H.C
Toilet دورات اﻟﻤﻴﺎه Elevators اﻟﻤﺼﺎﻋﺪ
20
21
22
23
24
25
26
15
14
13
12 11 10
27
28
29
30
31
9
8
7
6
5
EL.+4.15 EL.+0.90
19
1 2
18
3
17 16
EL.+3.50 4
Main stairs اﻟﺴﻠﻢ اﻟﺮﺋﻴﺴﻲ
EL.+1.55
Main lobby اﻟﺒﻬﻮ اﻟﺮﺋﻴﺴﻲ
Elevators اﻟﻤﺼﺎﻋﺪ Toilet دورات اﻟﻤﻴﺎه H.C
Jan.
Elec. room ﻏﺮﻓﺔ اﻟﻜﻬﺮﺑﺎء
BMS room ﻏﺮﻓﺔ ﺗﺤﻜﻢ
Comm. room ﻏﺮﻓﺔ اﻻﺗﺼﺎﻻت Escape stairs ﺳﻠﻢ اﻟﻄﻮارئ
01
31
02
30
03
29
04
28
05
Service area ﻣﻨﻄﻘﺔ ﺗﺨﺪﻳﻢ
27
06
26
07
25
08
24
09
23
10
22 21
11
20
12
19
13
18
14
17
15
16
D12
Services elevator ﻣﺼﻌﺪ اﻟﺨﺪﻣﺔ
Loading dock ﻣﻨﻄﻘﺔ اﻟﺘﺤﻤﻴﻞ واﻟﺘﻨﺰﻳﻞ
Escape stairs ﺳﻠﻢ اﻟﻄﻮارئ
Elevators اﻟﻤﺼﺎﻋﺪ
Main lobby اﻟﺒﻬﻮ اﻟﺮﺋﻴﺴﻲ
Elevators اﻟﻤﺼﺎﻋﺪ
Architecture Por olio
| 101
Buildings types Two models have been developed to provide each faculty with an administra ve building and two educa onal facili es. It was essen al to provide a spa al link between the buildings as well as a homogenous character for each faculty to maintain an interes ng user experience.
Type A
Type B
Educa onal building (type A): A classroom building, containing classrooms, educa onal spaces , student breaks , laboratories, laboratories, and department oďŹƒces of the college. Administra ve building (type B): The administra ve building contains the administra ve oďŹƒces, the library, the theater, and the units of the college. 60 m
60 m
Entrnce
Entrnce
Units
Units
Units
Units
Corridor
Core Corridor
Units
Units Entrnce
102 | Work Experience
Core
Atrium
Core Corridor
Core
Core Corridor
Units Entrnce
Auditorium
30 m
Corridor
30 m
Atrium
Core
Corridor
Windows System
Sec on
Eleva on
3D Window
Plan
0.90m 0.90m
0.90m
Shading depth
0.90m
0.90m
0.90m
3.60m Sliding window
0.90m
0.90m
0.90m
0.15
0.15
0.90
Architecture Por olio
| 103
Perspec ve
104 | Work Experience
Perspec ve
Architecture Por olio
| 105
Perspec ve
106 | Work Experience
Perspec ve
Architecture Por olio
| 107
3.5 |
UNIVERSITY SIGNAGE STANDARDS Reference of Standards and Guidelines for Signage - Individual work
The signange on campus changed many mes, and this was a main reason for the difference in the designs of the signange panels, so this project focuses on create new standards that enable unifica on of designs for these panels, we used flexibility and simplicity in design to reduce the cost of manufacturing and maintenance.
108 | Work Experience
ﺗﻐﻴﺮت اﻟﻠﻮﺣﺎت ﻓﻲ اﻻرﺷـ ـ ـ ـ ــﺎدﻳﺔ ﻓﻲ اﻟﺤﺮم اﻟﺠﺎﻣﻌﻲ ﻋﺪة ﻣﺮات وﻛﺎن ﻫﺬا ﺳـ ـ ـ ـ ــﺒﺐ ﻟﺬا ﻳﺮﻛﺰ ﻫﺬا اﻟﻤﺸ ــﺮوع ﻋﻠﻰ وﺿﻊ،رﺋﻴﺴــﻲ ﻓﻲ اﺧﺘﻼف ﺗﺼــﺎﻣﻴﻢ اﻟﻠﻮﺣﺎت اﻻرﺷﺎدﻳﺔ اﺳﺘﺨﺪﻣﻨﺎ،ﻣﻌﺎﻳﻴﺮ ﺑﺘﺼـ ـ ـ ـ ـ ــﺎﻣﻴﻢ ﺟﺪﻳﺪة ﺗﻤﻜﻦ ﻣﻦ ﺗﻮﺣﻴﺪ اﻟﺘﺼـ ـ ـ ـ ـ ــﺎﻣﻴﻢ ﻟﻬﺬه اﻟﻠﻮﺣﺎت اﻟﻤﺮوﻧﺔ واﻟﺒﺴﺎﻃﺔ ﻓﻲ اﻟﺘﺼﻤﻴﻢ ﻟﺘﻘﻠﻴﻞ ﺗﻜﻠﻔﺔ اﻧﺸﺎﺋﻬﺎ
Signage Typs
VEHICULAR WAYFINDING,
ﺟﺎﻣﻌﺔ اﻟﻤﻠﻚ ﻋﺒﺪاﻟﻌﺰﻳﺰ Abdulaziz University King
King Abdulaziz University
ﺷﻄﺮ اﻟﻄﺎﻟﺒﺎت Medical Center
ﺷﻄﺮ اﻟﻄﺎﻟﺒﺎت Girl's Campus
اﻟﻤﻴﺪان اﻷﻛﺎدﻳﻤﻲ
STREET NAME
Academic Square
ﻗﺎﻋﺔ اﻟﻤﻠﻚ ﻓﻴﺼﻞ ﻟﻠﻤﺆﺗﻤﺮات
Abdulaziz University King
ﺟﺎﻣﻌﺔ اﻟﻤﻠﻚ ﻋﺒﺪاﻟﻌﺰﻳﺰ King Abdulaziz University
King Faisal Convention Center
BUILDING EXTERIOR SIGNS
ﺷﺎرع اﻻﺣﺘﻔﺎﻻت Al-ihtifalat St. ٢٤٠ ﺷﺎرع رﻗﻢ
1234
ﺟﺎﻣﻌﺔ اﻟﻤﻠﻚ ﻋﺒﺪاﻟﻌﺰﻳﺰ Abdulaziz University King
KING ABDULAZIZ UNIVERSITY
ﻃﺎﻟﺒﺎت- اﻟﻤﺒﺎﻧﻲ اﻷﻛﺎدﻳﻤﻴﺔ اﻟﻄﺒﻴﺔ Women’s medical campus
Architecture Por olio
| 109
Fabrica on Specifica ons SIDE VIEW
120 cm
Vehicular Wayfinding: 30 cm
FRONT VIEW
Aluminum Structure
Industrial Magnetic
TOP VIEW
4
Prole
Allen key bolt
10MM THICK STEEL PLATE
31 cm
9 cm- Diameter Aluminum Prole
ALLEN KEY BOLT
DETAIL A
Section- A
300 cm
Section- A
5MM THICK ALUMINUM PLATE POUDER PAINTED POTH SIDES
RECTANGLE VIEW DETAIL A
121 cm
RAL 9006
123 cm
30 x 30 mm Aluminum Sq. tube
Bolt
2 mm Thick Aluminum Sheet
Po stDia. 8 cm Powder Painted
Breakaway Plate 26 x 26 cm & 1.5 cm Thickness Galvanized Steel Base Plate
110 | Work Experience
Side Elevation
Magnet System
Architecture Por olio
| 111
3.6 |
FEMALE ADMINISTRATIVE BUILDING Renova on - Individual work
The facades of the female students' buildings, especially the 44th building, which currently houses the director office of the female sec on, are characterized by a harmonious pa ern in the facades of exis ng buildings. The facades of the building are composed of a repea ng unit and each unit contains equal parts in dimensions and eleva ons, all of which are made up of easy-to-install concrete pieces, which gave the facade a special harmonious character.
اﻟﺬي ﻳﺄﻫﻞ ﺣﺎﻟﻴﺎ ﻟﻴﻜﻮن ﻣﻜﺘﺐ٤٤ ﺗﺘﻤﻴﺰ واﺟﻬﺎت ﻣﺒﺎﻧﻲ ﺷﻄﺮ اﻟﻄﺎﻟﺒﺎت وﺧﺼ ـ ـ ـ ـ ـ ـ ـ ـ ــﻮﺻﺎ ﻣﺒﻨﻰ ﺣﻴﺚ.اﻹدارة اﻟﻌﻠﻴﺎ اﻟﺨﺎص ﺑﺸﻄﺮ اﻟﻄﺎﻟﺒﺎت ﺑﻮﺟﻮد ﻧﻤﻂ ﻣﺘﻨﺎﻏﻢ ﻓﻲ واﺟﻬﺎت اﻟﻤﺒﺎﻧﻲ اﻟﺤﺎﻟﻴﺔ أن واﺟﻬﺎت اﻟﻤﺒﻨﻰ ﻣﻜﻮﻧﺔ ﻣﻦ وﺣﺪة ﻣﻜﺮرة وﻛﻞ وﺣﺪة ﺗﺤﺘﻮي ﻋﻠﻰ ﻗﻄﻊ ﻣﺘﺴ ـ ـ ـ ـ ـ ــﺎوﻳﺔ ﻓﻲ ﻣﻤﺎ أﻋﻄﻰ،اﺑﻌﺎد واﻹرﺗﻔﺎﻋﺎت وﺟﻤﻴﻌﻬﺎ ﻣﻜﻮﻧﺔ ﻣﻦ ﻗﻄﻊ ﺧﺮﺳ ــﺎﻧﻴﺔ ﺳـ ــﻬﻠﺔ اﻟﻔﻚ واﻟﺘﺮﻛﻴﺐ .ﻟﺘﻠﻚ اﻟﻮاﺟﻬﺔ ﻃﺎﺑﻊ ﻣﺘﻨﺎﻏﻢ ﺧﺎص
Exis ng Building Complete Unit Roof
First Floor
8.85 m
Ground Floor
4.80 m
0.25 m
112 | Work Experience
Main Unit
Main Perspec ve
As part of the rehabilita on plan of the building requires a rearrangement of the facade to contain a new element of the movement of a new glass facade and the rehabilita on of concrete pieces in a simpliďŹ ed manner.
Architecture Por olio
| 113
3.7 |
ALMADINAH MIXED USE Architectural - Freelancer
The project is designed tow alterna ve concept for SEDCO Development Company in Al Medina city, the first alterna ve is a commercial stores with parking area, the second alterna ve is a residen al building, a hotel and commercial stores.
First Alterna ve
اﻟﻤﺸﺮوع ﻋﺒﺎرة ﻋﻦ ﺗﺼـﻤﻴﻢ ﻣﻘﺘﺮﺣﺎت اﻓﻜﺎر ﻷرض ﻓﻲ اﻟﻤﺪﻳﻨﺔ اﻟﻤﻨﻮرة اﻟﻤﻘﺘﺮح اﻻول ﻫﻮ ﻣﺤﻼت ﺗﺠﺎرﻳﺔ،ﺗﻤﻠﻜﻬﺎ ﺷ ـ ـ ـ ــﻜﺮة ﺳ ـ ـ ـ ــﻴﺪﻛﻮ ﻟﻠﺘﻄﻮﻳﺮ اﻟﻤﻘﺘﺮح اﻟﺜﺎﻧﻲ ﻣﺒﻨﻰ ﺳﻜﻨﻲ وﻓﻨﺪق،ﺑﺎﻻﺿﺎﻓﺔ اﻟﻰ ﻣﻮاﻗﻒ اﻟﺴــﻴﺎرات وﻣﺤﻼت ﺗﺠﺎرﻳﺔ
Second Alterna ve HOTEL
SHOPS: 50-60% PARKING
114 | Work Experience
RESIDENTIAL
First Alterna ve
SHOPS
PARKING
SITTING AREA
Architecture Por olio
| 115
First Alterna ve Perspec ve
116 | Work Experience
First Alterna ve Perspec ve
Architecture Por olio
| 117
Second Alterna ve
118 | Work Experience
Second Alterna ve Perspec ve
Architecture Por olio
| 119
04 | ACHIEVEMENTS
120
4.1
GRADUATION CERTIFICATE - BACHELOR'S DEGREE
4.2
PROFESSIONAL ACCREDITATION CERTIFICATE
4.3
CERTIFICATES OF SUPERIOR
4.4
CERTIFICATE OF EXCELLENCE
4.5
CERTIFICATE OF COMPLETION
4.6
APPRECIATION LETTER 121
122 | Achievements
Architecture Por olio
| 123
424240
424240
MOHAMMAD ABDULLAH M. ALYAMANI
ﻣﺤﻤﺪ ﻋﺒﺪاﻟﻠﻪ ﺑﻦ ﻣﺤﻤﺪ اﻟﻴﻤﺎﻧﻲ
Classification: Architecture
ﻣﻌﻤﺎري: اﻟﺘﺼﻨﻴﻒ
Specialization : Architecture
07 October 2022
wÛ;!:Y Ûêì s sÛ4 .r
124 | Achievements
ﻋﻤﺎرة: اﻟﺘﺨﺼﺺ
1444 رﺑﻴﻊ اﻷول12
au;:Y Û;. s rì=YÛY .r
Architecture Por olio
| 125
Certificate of Completion Congratulations!
Mohammad Al-yamani
The Autodesk® Authorized Training Center (ATC®) course you have completed was designed to meet your learning needs with professional instructors, relevant content, authorized courseware, and ongoing evaluation by Autodesk.
Name
The ATC network helps professionals achieve excellence in using our software products.
Revit architecture advanced
Autodesk Revit Architecture
Course Title
Product
Emad Aref Mostafa
2016-02-27 25 hours
Instructor
Date
Certificate No. 1HOJK283H5
Engosoft Training & Education Autodesk Authorized Training Center.
Autodesk and ATC are registered trademarks of Autodesk, Inc. in the USA and/or other countries. All other trade names, product names, or trademarks belong to their respective holders. © 2009 Autodesk, Inc. All rights reserved.
126 | Achievements
Carl Bass President, Chief Executive Ocer
Course Duration
Architecture Por olio
| 127
128 | Achievements
MOHAMMAD ALYAMANI SELECTED WORK PROFILE 2014-2020 E-mail:arch.alyamani@gmail.com Mobile: +966555047100
Portfolio Online
Architecture Por olio
| 129
ARCHITECT