ARCHITECTURE
PORTFOLIO
ARCHITECTURE & STRUCTURE BIM MODEL
AKADEMI BINAAN MALAYSIA
WILAYAH SABAH
00
00 SITE LOCATION
00 SITE ACCESS
00 CONTEXTUAL STUDIES SCALE 1 : 100 3
STUDIES
00 SUN ORIENTATION & PREVAILING WIND
SITE
00
PHOTOS
IDEOLOGY + PRINCIPLES
00
00 PLANNING + CONCEPT
00 SITE PERSPECTIVE VIEW A. Administration Building B. Academic Building C1. Assesment Building C2. Oil & Gas Workshop E. Multipurpose Hall F. IBS Show Gallery G. Mosque H. Hostel, Visitors Lecturer Lodgin J1. Bungalow J2. Terrace J3. ApartCment K. Sports Centre C3. Building 1 C4&C5. Building 2 C6. Heavy Machinaries Garage D. Simulation Building L. Confiscation & Store Centre M. Guard House A B C1 C2 C3 C4 C6 C5 D E F G H J3 K L M J1 J1 J2
SITE PERSPECTIVE VIEW
00
Prevailing Wind from SouthWest Direction
CLOSED AREA OPEN AREA AIR FLOW LEGEND S: NTSSCALE SITE PLAN N KIBLAT 290°40'37" Prevailing Wind from North-East Direction
00 SITE PLAN
STUDENT HOSTEL
00
OPEN PLAN DESIGN
HOSTEL
Open Plan
The Student Hostels, is a curved form building, that maximizes its performace to passively catch wild particularly from the North-East and South-West prevailing wind through louvre openings. Facade that is facing the West and East direction is designed to reduce direct sun penetration while bringing natural lighting into the building's space.
wind from SouthWest Direction
Openings provided particularly at the prevailing wind directions that is coming from the North East and SouthWest direction
Sectional Open Plan to provides ventilation.
N E S W ENTRANC E FOYERPrevailing
00
STUDENT
N KIBLAT 290°4037"
STUDENT HOSTEL
Orientation of Building Layout and Major Openings:
The Student Hostels, located 25m from the Mosque (North direction). 30m from the Academic Building (Soulh-West direction), 35m from the Staff Residence (South direction) and 30m from the Assesment Buildina (West direction). Prevailing wind from the North-East and South-east direction will not have any major obsiruction for the Student Hostels with the allavance of surrounding open space
Orientation of Building Layout and Major Openings:
Illustrated above is the Wind rose diagram of Papar. Sabah District, superimposed on the Student Hostels layout plan
00 BUILDING ORIENTATION
N KIBLAT 290°40'37"
OCCUPIED AREA
DIAGRAM OF CONCEPTUAL AIRFLOW INGRESS & EGRESS AT DORMITORIES.
LEGEND: INGRESS WIND EGRESS WIND
OCCUPIED AREAS
Transitional & Common Areas
DIAGRAM OF CONCEPTUAL AIRFLOW INGRESS & EGRESS THROUGH OCCUPIED AREA
8-BED FEMALE DORMITORY 3 8-BED MALE DORMITORY 6 8-BED MALE DORMITORY 3 STUDY ROOM (FEMALE) 8-BED MALE DORMITORY 16 8-BED MALE DORMITORY 13 8-BED MALE DORMITORY 36 8-BED MALE DORMITORY 33 SERVICES AREA Prevailing wind from SouthWest Direction 00 NATURAL VENTILATION LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4
Above 70% of occupied areas have operables windows for natural ventilation
TRANSITIONAL & COMMON AREAS
Opening are provided at opposite ends of all transitional / common areas located sufficiently at normal human height to achieve thermal comfort.
LEGEND: INGRESS WIND EGRESS WIND OCCUPIED AREAS
Transitional & Common Areas
3
1
DIAGRAM OF CONCEPTUAL AIRFLOW INGRESS & EGRESS AT HOSTEL MAIN ENTRANCE FOYER.
DIAGRAM OF CONCEPTUAL AIRFLOW INGRESS & EGRESS THROUGH TRANSITIONAL & COMMON AREAS
4
2
CORRIDO R CORRIDO R SHARED BATH 1 (M) SHARED BATH 1 (M) SHARED BATH 1 (M) SHARED BATH 1 (M) ENTRANC E FOYERPrevailing wind from SouthWest Direction 00 NATURAL VENTILATION LEVEL
LEVEL
LEVEL
LEVEL
SUN SHADING STUDY
SUN PATH SUN POSITION LEGEN D:
SHADED AREA
10:00 AM EAST VIEW
12:00 PM WEST VIEW
10:00 AM WEST VIEW 12:00 PM EAST VIEW
3:00 PM EAST VIEW
3:00 PM WEST VIEW
10:00 AM EAST VIEW
12:00 PM WEST VIEW
10:00 AM WEST VIEW 12:00 PM EAST VIEW
3:00 PM EAST VIEW
3:00 PM WEST VIEW
Diagram of Sun & Shaded area study for the month of June
Diagram of Sun & Shaded area study for the month of January
Diagram of sun light direction for one day
00
(a) 3.0 Meter Roof Overhang (b) Facade Louvers to allow light and breeze through into the Building
(a) (a) (b)
MODELLING ARCHITECTURE
ADMIN BUILDING
ACADEMIC BUILDING
WORKSHOP
MULTIPURPOSE HALL
STUDENT HOSTEL BUILDING SIMULATION BUILDING
IBS SHOW GALLERY MOSQUE
01 08 02 03 04 05 06 07
BIM
MODELLING
H G A C1 B P EC2 C3 C5 C4 C1
BUILDING : ADMINISTRATION BUILDING AREA : 999 SQM STORIES : 2 STORIES FRONT PERSPECTIVE VIEW REAR PERSPECTIVE VIEW
MODELLING
LEVEL 01 FLOOR PLAN
LEVEL 02 FLOOR PLAN
H G A C1 B P EC2 C3 C5 C4 C1
WC UP WBWB WB W W W 11 10 7 5 22 21 20 19 18 17 16 15 14 13 12 UP 11 10 22 21 20 19 18 17 16 15 14 13 12 EL EL ELEL EL EL EL EL EL K K K K ABCCO2 ABC AB C AB C EL EL EL EL EL EL EL W WC WC WC DN WB WB WB WB 22 21 20 19 18 17 16 15 14 13 12 22 21 20 19 18 17 16 15 14 13 12 11 10 11 10 K K K K K KK EL EL EL EL EL EL EL EL EL EL EL EL EL AB C AB C ABC EL EL KK EL WC WC 2 B 1 J A H F E D C B G K A PERSONNEL ROOM 1 CAP A/C STATIONERY PC EP M/V A.01.007 FILE ROOM PC EP M/V A.01.006 SSB ROOM CR EP A.01.018 ALUMNI ROOM CP CAP AS1 A/C A.01.003 AHT1 MANAGER OFFICE 1 CP ACT AS1 A/C A.01.004 GENERAL OFFICE AREA CP AS1 A.01.005 PERSONNEL ROOM 2 CP CAP SS A/C A.01.010 RECEPTION PC SS A.01.002 WAITING AREA PC AS N/V A.01.020 CLEANER'S ROOM CR A.01.017 D D D 2 D D D FD 1 D D 2 410023003700 D 1 4760 FD LOBBY/GALLERY PC AS SS N/V A.01.001 HALLWAY EP N/V W PANTRY PC MP A/C A.01.011 SERVER ROOM CR EP A.01.019 FFL +3.50 300030004000 STAIRCASE 2 PC A.01.023 DG T G T M H W P 50dp MH Discharge to manhole MH (Refer to Site Plan) D ot t ed l i ne i nd i cati n g f l oo ab ov e Dotted line indicating floor above Adjustable Glass Louvres w/ natural aluminum frame to Manuf.'s detail SD W W 3 Line indicating floor above 270 FFL +3.50 TOILET (M) CMP M/V TOILET (F) CMP M/V TOILET (OKU) FFL +3.50 MINI DISCUSSION ROOM CAP A/C Sc Tee o Fa Screed T Fa TScreed oFa S eed To Fa TScreed oFal 35303530 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 G R A D E N T 1 1 2 a p p W RWD SUM P PSUM TO ACADEM BC U LD NG Di nhageto eaes d n (Refe PtoSie lan) 1250 C 09 Discharge to manhole MH (Refer to Site Plan) Discharge to nearest drain (Refer to Site Plan) 12 ANTE ROOM (F) CMP SW EP SW EP EP2 SW GPT SW GP SW SW CB EP2 EP2 CW1 SW SW DW2 SW SWP SWEP2 EP2 SW EP2 EP2 SW SW EP2 EP SW SW C SW W CB EP2 EP2 SW EP EP2 SW CW1 CW1 SW EP2CT3 W 4 W W 4 D FFL +3.45 FFL +3.45 DW2 EE 2 RC EP2EP2 FFL +3.50 FFL +3.50 FFL +3.50 FFL +3.50 FFL +3.50 FFL +3.50FFL +3.50 FFL +3.50 FFL +3.50 RWD DW2 SW G W WG SW WP3 GPT2 D D SW EP2 SW 7603350 2050 R= 8240 200 6510 3000 3530 3530 15 62° 1859° 2 B 1 J A H F E D C B G K A BOARD MEETING ROOM CP SS A.02.001 MANAGER OFFICE CP ACT SS A/C A.02.002 MANAGER OFFICE 3 CP SS A.02.003 CONFERENCE ROOM CP ACT SS A/C A.02.005MANAGER OFFICE CP ACT SS A/C CEO OFFICE CP ACT SS A/C A.02.006 PA OFFICE 2 CGP A/C A.02.009 PRE-FUNCTION AREA VF MP SS N/V WAITING AREA PC AS SS N/V PA OFFICE 1 CP SS A.02.008 DB ROOM CR CGP A.02.014 D D 1 D 1 D D 5 p D D 1 D 1 D Powder-coated Perforated Galvanised Steel Railing to Arch.'s detail D 3 W 4 W 4 STAIRCASE 2 PC A.02.019 HALLWAY PC SS A.02.017 W W 2 W 1 D 2SD FFL +7.18 VOI D VOI D SD 8mm thk. Fixed Low-E Glass Curtain Wall to Manuf.'s detail Dashlne ndca ng oofeavesabove FFL +7.18 FFL +7.18 Pedestrian bridge connecting to Academic Building to Engr's detail FFL +7.18 TO ACADEM BC UILD NG D W 6 W 6 R W STAIRSCAS E 1 TOILET (F) AHT1 A.02.012 TOILET (M) AHT1 A.02.013 ENSUITE1 1 AMV 020 ENSUTE2 MP M A 2 1 Dashlne ndcatngsunlouversabove 8mm thk. Low E fixed Glass with Aluminium Frame panel to Manuf.'s detail RWD RWD RWD RWD KPO OFFICE CP ACT SS A/C A.02.007 35303530 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 4200 7000 Steel Structure Staircase finished with anti-rust coating and weatherproof steel paint with concrete tread c/w grooved nosing and powder-coated galvanised steel perforated railing to Arch's & Engr's detail & specs Tread: 280mm Riser: 160mm C 09 12 D 4 D SW MLEP2 SW GPT2EP2 SW GPT SW GPT SW EP2 MC SW DW2 EP2 E SW SW EP2ML SW EP2EP2 SW MCML SW WP3 GPT2 DW2 P EP2 SW EP SW M EP2 SW GPT2 SW C SW MCML SW E SW FB MC SW EP2 EP2 SW SW CW1 CW 1 CW1 CW CW1 CW1 EL CW1 R= 13000 R= R=6500 8240 FFL +7.18 FFL +7.18 FFL +7.13 FFL +7.13 FFL +7.18 FFL +7.18 FFL +7.18 FFL +7.18 RWD H G A C1 B P EC2 C3 C5 C4 C1 DOCUMENTATION FLOOR PLAN SCALE 1 : 100 LEVEL 1 FLOOR PLAN SCALE 1 100 LEVEL 2 FLOOR PLAN
ROOF PLAN
EL EL EL EL EL EL EL K EL EL EL EL EL EL EL EL EL EL K K K K KK EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL KK EL 2 B 1 J A H F E D C B G K A all 10° UPPER ROOF 0.60mm TCT (0.55mm BMT) tapered standing seam roofing system in G300 AZ200 steel, a layer of 1.5mm thk. self adhesive bituminous felt, a layer of 50mm 80kg/m3 rockwool insulation, aluminium foil and Aluminium Strip ceiling by specialist as bottom layer Powder-coated aluminium horizontal louvres to Arch's & Manuf's detail a 8° al 8° ROOF RWD P RWD RWD 300 C Dash line indicating gutter below Dash line indicating structural beam below Dash line indicating Perforated Aluminium Security & Insectproof Screen at service level below RWD RWD P 0.54mm TCT (0.48mm BMT) custom made concealed gutter in G300 AZ200 steel supported by 2.5mm thk. galvanized gutter bracket Low-E Glass Skylight to Arch's & Manuf.'s detail R= 16220 R= 17760 ACOUT OORUNT COUDOO U I 2 B 1 J A H F E D C B G K A PERSONNEL ROOM 1 MINI DISCUSSION ROOM STATIONERY FILE ROOM SSB ROOM 2.70 ALUMNI ROOM CAP TOILET (M) CMP TOILET (F) CMP 2.40 TOILET (OKU) 2.70 MANAGER OFFICE 1 ACT 2.70 GENERAL OFFICE AREA MP PERSONNEL ROOM 2 PANTRY RECEPTION LOBBY/GALLERY WAITING AREA CLEANER S ROOM SERVER ROOM2.70 ANTE ROOM (F) HALLWAY Pedestrian bridge connecting to Academic Building to Engr's detail TO ACADEM BC U LDING 3.40 EP VOI D 2.70 MP 2.70 MP 2.70 2.70 2.70 MP 2.70 MP 2.70 09 12 2.70 CAP 2 B 1 J A H F E D C B G K A 3.60 BOARD MEETING ROOM 3.50 CONFERENCE ROOM ACT 2.70 MANAGER OFFICE 2 ACT 2.70 MANAGER OFFICE 3 ACT 2.40 TOILET (M) CMP 2.40 TOILET (F) CMP MANAGER OFFICE 4 2.70 CEO OFFICE ACT 2.40 ENSUITE 2 CMP 2.70 PA OFFICE 2 CGPPRE-FUNCTION AREA WAITING AREA 2.70 PA OFFICE 1 CGP DB ROOM 2.40 ENSUITE 1 CMP STAIRCASE 2 5.30 HALLWAY AS CGP 8.90 8.90 3.50 CAP 3.60 CGP 3.60 CGP 3.60 CGP 3.60 CGP CAP CAP 3.60 MP C 09 Water tank Water tank 4.00 KPO OFFICE ACT 2.70 ACT H G A C1 B P EC2 C3 C5 C4 C1 DOCUMENTATION CEILING PLAN & ROOF SCALE 1 200
SCALE 1 : 100 LEVEL 1 REFLECTED CEILING PLAN SCALE 1 100 LEVEL 2 REFLECTED CEILING PLAN
SOUTH SOUTH WEST ELEVATION
NORTH EAST
NORTH NORTH WEST ELEVATION
EAST EAST
E W W 4 W W 4 W D LEVEL FFL+3.50 LEVEL FFL+7.18 NATURAL GROUND LEVEL+3.35 ROOF LOWER LEVEL+12.48 ROOF UPPER LEVEL+14.58 SERVICE LEVEL FFL+10.98 K 2100 1500 3800 3680 150 11230 W 4 D W W G D 5 LEVEL FFL+3.50 LEVEL FFL+7.18 NATURAL GROUND LEVEL+3.35 ROOF LOWER LEVEL+12.48 ROOF UPPER LEVEL+14.58 SERVICE LEVEL FFL+10.98 A 2100 1500 3800 3680 150 11230 D 5 D 5 H G A C1 B P EC2 C3 C5 C4 C1 DOCUMENTATION ELEVATION SCALE 1 100 SOUTH
ELEVATION SCALE 1 100
NTSSCALE WEST ELEVATION SCALE 1 100
NTSSCALE
ELEVATION MATCHLINE 01 MATCHLINE 02 MATCHLINE 01 MATCHLINE 05 MATCHLINE 02 MATCHLINE 03 MATCHLINE 04 MATCHLINE 05MATCHLINE 03 MATCHLINE 04 KEYPL AN D N E NN W W SS W SE E KEYPL AN E N E NN W W SS W SE E KEYPL AN C N E NN W W SS W SE E KEYPL AN B N E NN W W SS W SE E KEYPL AN A N E NN W W SS W SE E
MODELLING
BUILDING
H G A C1 B P C2E C3 C5 C4 C1
: ACADEMIC BUILDING AREA : 5360 SQM STORIES : 3 STORIES
MODELLING
LEVEL 01 FLOOR PLAN
LEVEL 02 FLOOR PLAN
LEVEL 03 FLOOR PLAN
H G A C1 B P C2E C3 C5 C4 C1
STUDENT TOLET& CHANGING ROOM(M)
PERISHABLE
(WET)
STUDENT TOILET& CHANGING
NONPERISHABLE STORAGE (DRY)
ASSESSORS TOLET(M)
ASSESSORS ROOM
FT T F T SH UP 13 12 11 10 24 23 22 21 20 19 18 17 16 15 14 UP WC W FT FT W FT SH SH FT 12 11 10 5 4 3 2 24 23 22 21 20 19 18 17 16 15 13 WC W F Q T T F SQ SD SD SD SD SD SD SD S HD HD EL EL EL EL EL EL EL EL EL EL EL E EL E E EL KK ABC ABC ABC AB C ABC AB C HR K K K K K EL EL EL EL EL EL EL FT FT SD SD SD SD EL HD HD HR W WC C Q FT WC W B WB WB B H WC UR UR UR WB WC T F WB WC W FT 2 1 4 B D 8 7 6 5 B1 1A A 3 E C E1 A BP(B)/10 A BP(B)/10 7200 7200 6000 5400
AC C
AH 1 MV 01
AHT M 0 155 m
ROOM(F) 1 SSB ROOM CR EP4 B
C
STORAGE
AHT1VT A B 1 0 KITCHEN HT1VT V B SELF SERVICE COUNTER AHT1VT MV B 1 7 INDOOR DINING H 1 MP C B TOILET2 (F) M 0 0 TOILET2 (M) MV FD 1 D 6 D D 6 5 d p 50d p 5 dp 50 p CLEANERS ROOM2 7200 PRE FUNCT ON 1 PC M N D B 5000 2200 3000 STAFF WC B D 4 FD 1 FD 5 3800 2400 3600 7200 25800 7200 7200 7200 HALLWAY1 PC EP V 22500 D 3 GP1 CB CT3 C CB W CT1 CB CT CB C T CB 1 CT CB CT 1 CB C CT1 CB CTEP3 CB LANDSCAP E/PLANTING CB C B E CB WP 1 CB W EP CB T2 CBC2 T RC FC FC CB CP CB 1850 RS 1 U P U P 1.5MWIDEWALKWAY Gampup radient 1:20 Grampup radient 1 20 Gampup dient1 20 MH MH MH Discharge to manhole (Refer to Site Plan) RWD RW D 10 Do ed neindica ngsun shadingabove 0dp 5dp W W W W 3W 3 W 3 D 3 C C 2 p 50d dp 0 5660 5090 5090 5090 3 9M WIDE CORRIDOR S e o a MH G 4 Decorative PVC form panel with lightweight aluminium support ties to Arch.'s and Engr.'s detail Decorative PVC form panel with lightweight aluminium support ties to Arch.'s and Engr.'s detail Sub-soil drain to Engr's detail Grease Trap G 2380 1200 1700 CB EP2 CBP T CB EP2 EP CBP PCBP T CB CT CB CT Gease Tap CB CT1 CB CB CT3 CT1 CBCP T CB EP3 CT1 CB EP3 C CB CEP T2 Turfin g RW P W PWD WD RWP CB CT CT Sub-soil drain to Engr's detail p 5d p 2 5dp 5dp 25 dp 17000 5500 3300 G G 0 CAG S 0.9M WIDE APRON B BP(B)/10 B BP(B)/10 C BP(B)/10 C BP(B)/10 AHT1VT V ASSESSORS TOILET(F) AH 1 EP4 V 0 OUTDOOR DINING AREA A NV 0 0 FFL+350FFL+343 FFL 345 FFL 350 FFL+350 FFL+345 FFL+35 F 3 5 F L + 5 FFL 345 FFL +345 FFL+345 FFL +350 LadTo Fal LaidTo Fa M A T C H L I N E 2 Dschag to manh e (Refer StePan) MH EQ EQ D 4 2200 1200 1400 1400 1800 560 TOIL ET LOCKER CHANG N G AHT M 3604 5 3600 3600 1000 3000 1000 3000 D D M A T C H L I N 2E CAFETERIA 1800 2070 RS 1 TURFING 2200 6000 1400 1200 2780 2780 1580 5 1200 1200 2780 WD P RW 3730 p 50 dp D D B D B W 7 D W 7 W W W W PERPARAT ONAREA COOKNG AREA R2490 R4450 R5450 CB CT LANDSCAP E PLANTNG M A T C H L I N E 2 M A T C H L N E 2 MATCHLINE 1 MATCH LINE 1 MATCHLINE 1 MATCH LINE 1 1 2 0 0 1 2 0 0 STAIRCASE 4 FF 3 4 5 5 d 05 Dottedline ndcatngsun shadngabove 2190 W Steel Structure Staircase finished with anti-rust coating and weatherproof steel paint with concrete tread c/w grooved nosing and powder-coated galvanised steel perforated railing to Arch's & Engr's detail & specs Tread: 280mm Riser: 160mm STAIRCASE 3 P4 1 5 STAFFTOILETAHTEP W 3 RC ramp with gradient 1:20 to Engr's. detail Steel Structure Staircase finished with anti-rust coating and weatherproof steel paint with concrete tread c/w grooved nosing and powder-coated galvanised steel perforated railing to Arch's & Engr's detail & specs Tread: 280mm Riser: 160mm 11200 900 1200 RC ramp with gradient 1:20 to Engr's. detail RC ramp with gradient 1:20 to Engr's. detail 3730 H G A C1 B P EC2 C3 C5 C4 C1DOCUMENTATION SCALE 1 100 LEVEL 1 FLOOR PLAN
FT FT 17 16 15 14 13 12 11 10 6 UP 24 23 22 21 20 19 18 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 WC W F U U T T W C WB T SQ FT SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD EL E EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL KK AB C AB C CAB CAB FAP HR HR K K K K K K K K K K K K K EL EL EL EL L FT F F SD SD TC F WB Q W 17 16 10 B D 11 12 13 14 15 9 8 B1 A E C RSEMINAR OOM1C P C LIBRARY VF C RSEMINAR OOM3CP PATS C 1 0 1TOILET (M)A ET P M/ B 10 TSTAFF OILET(F)B0 0 4 TSTAFF OILET(M)B 10 5 INFORMATION CENTRE CAP VS C 00 RLECTURE OOM2CA TS /C B0 9 D 2 D 6 D 5 d 6000 8400 GALLERY C V B PRE-FUNCTION 2 MC P NV B0 9 LOBBY PC N 0 D B D B RCLEANERS OOM1PAHT HT B 0 0 3 7200 7200 7200 7200 7200 7200 7200 Metal framing with metal cladding to Engr.'s, Arch.'s & Manuf.'s detail 5 d p 0 0 p 0 p 5 d 5 p 0d 50d D D 9 CB CB E G P 1 GP1 CB CBE EP CBEP2 3 DW2 P AP DW2 P AP CB E 2 EP CB W E2 2 CBP P CB 3860 0 dp 0 d 10d U P U P WD amp up Grad ent 1 23 T 0 Discha ge omanholeMH(Ref r toSitePlan) MH HR W RWD P P R PD D 10 ESTAIRCAS 1 39MWIDECORRIDOR W 4 W W W W 1 1 0M AWIDE PRON 5090 5090 5090 5090 5090 5090 5090 tScreed ofall S ed o a A19MWIDE PRON Discha g to nearest drai n (Refer to Ste Plan) 3500 Metal framing with metal cladding to Engr.'s, Arch.'s & Manuf.'s detail tScreed ofal G 1 5940 CB FB2 CB EP2 A ET 4 A/ ET1 P4 Sub-soil drain to Engr's detail 15MWIDE WALKWAY Denoesaircase andngabove S pum Dotted line indicati n g link Bridge above Propriatory Foldable & sliding partition to manuf's detail 5dp 2 dp RCFC EP RCEFC 50 D BP(B)/10 D BP(B)/10 F BP(B)/11 F BP(B)/11 24001200 E BP(B)/11 E BP(B)/11 06 DD/CD(B)/01 D F L + 5 FFL+3 5 FFL+350 FFL+350 FFL+355 FFL+3.55 FFL+350 FFL+355 FFL 345 M A T C H L N E 2 M A T C H L N E 2 AV1 AHT A/C B STOREC1 MP B 1 07 AV2CHT GP A B 100 AV3A CT1 GP AC 04 AV4A CT G AC 10 8 D D 2 DBROOM 1 NV B 1 16 D 2 D 2 D D D W 3000 1500 5330 1500 3000 D D D 3000 3000 RANTE OOM NV RANTE OOM V 0 0 2180 W 4 W 4 2500 RW CB EP2 P3 CB EP EP CB EP CBEP E FFL +345 2 0 5 p D D D D D W W W W 7 WW 7 W 7 W W 7 W 7 W W 7 M A T C H L N E 2 M A T C H L I N E 2 MATCHLINE3 MATCHLINE3 MATCHLINE 3 MATCHLINE 3 1800 G BP(B)/11 G BP(B)/11 COUNTE R p 5 5 p 0 p 1 dp 00 1 p 7200 1200 2400 2400 3800 17000 04 HALLWAY2EPC P B 1 4 ESTAIRCAS 2 Scoeed S ed a Sub-soil drain to Engr's detail Sub-soil drain to Engr's detail FFL 350 Steel Structure Staircase finished with anti-rust coating and weatherproof steel paint with concrete tread c/w grooved nosing and powder-coated galvanised steel perforated railing to Arch's & Engr's detail & specs Tread: 280mm Riser: 160mm Steel Structure Staircase finished with anti-rust coating and weatherproof steel paint with concrete tread c/w grooved nosing and powder-coated galvanised steel perforated railing to Arch's & Engr's detail & specs Tread: 280mm Riser: 160mm 2220 1TOILET (F)PHT M 0 0 2 FFL+345 A19MWIDE PRON FFL +345 5dp 4000 1600 1600 CB EP H G A C1 B P EC2 C3 C5 C4 C1DOCUMENTATION SCALE 1 100 LEVEL 1 FLOOR PLAN
UR FT F T FT Q FT WB WB DN FT F T DN UR 13 12 11 10 1 23 21 20 19 18 17 16 15 14 24 23 22 21 20 19 18 17 16 15 SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S D EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL EL AB C HR CO2 12 11 10 9 20 14 13 KK KKK K K K K K WC WC WC WB WC WC W FF UP UP 2 1 4 B D 8 7 6 5 B1 1A A 3 E C E1 A BP(B)/10 A BP(B)/10 VO D LECTURER S AREA C FILE ROOM VF EP4 C 00 OFFICE 3 V A 02 14400 6000 5400 25800 WAITING AREA 1 PC M N B STAFF TOILET2 (M) B 6 MYBIM STUDIO CR CAP C B MYBIMLAB CR CAP C 0 MYBIM SEMINAR ROOM CP AC RECEPTION &SHOW CASEAREA C MP SS A B 2 21 D 7200 7200 7200 7200 D SERVER ROOM B DBROOM 2 B 3800 2400 3600 7200 CLEANERS ROOM2 B 0 STAFF TOILET2 (F) B 7 Anodised Aluminium sunshading to Arch.'s & manuf.'s detail 50 22500 D 3 D D D 8 D FD FD D 3 D 5 D DISCUSS ON ROOM 1 A B DISCUSS ON ROOM 2 C D 3 D 3 D D OFFICE2 ACT C 02 3 OFFICE1 VS C 02 2 C 1 CT CB CT1 CB W E CB EP2 EP CB EP2 CB DW2 DW EP2 EP2 DW P CB EP DW2 EP2 EP3 1 CT1 CB CT DW2 PDW PEP2 CR EP4 C W W W W W W 5 W 5660 5090 5090 5090 TOILET2 (F) 0 02 1 MV 1 7M WIDECORRIDOR 0.60mm TCT (0.55mm BMT) tapered standing seam roofing system in G300 AZ200 steel, a layer of 1.5mm thk. self adhesive bituminous felt, a layer of 50mm 80kg/m3 rockwool insulation, aluminium foil and Aluminium Strip ceiling by specialist as bottom layer or equivalent to Manuf.'s detail fall3 WD P WD W 1200 DW2 EPEP2 AHTEP M AHTEP4 MV CB C EP2 5 p 5 d p CB P EP CB EP2 CR EP N DW2 EP2 STAIRCASE 3 CB C 1 25 25 25 2 p 0.54mm TCT (0.48mm BMT) custom made concealed gutter in G300 AZ200 steel supported by 2.5mm thk. galvanized gutter bracket or equivalent to Manuf.'s detail RW PWD RWD RWP WD K 17000 5500 TOILET2 (M) AHT1EP4 MV B BP(B)/10 B BP(B)/10 C BP(B)/10 C BP(B)/10 08 DD/CD(B)/01 10 DD/CD(B)/01 11 DD/CD(B)/01 FFL+734 FFL+734 FFL+734 FFL+734 FFL+729 FFL 729 FFL+734 FFL +734 FF 734 F L + 4 FFL + 4 F L +7 4 FFL 7 34 50 STARCASE 4 1400 W W W 8 W 8 W W W 8 W 8 W W W W 8 W W 8 W 8 W W W W 8 FD 1 FD 1 M A T C H L N E 2 M A T C H L N 2E M A T C H L I N E 2 M A T C H L I N E 2 MATCHLINE 1 MATCH LINE 1 MATCHLINE 1 MATCH LINE 1 Anodised Aluminium sunshading to Arch.'s & manuf.'s detail RC FC FC CB FC PRE FUNCTON 1 C N 02 07 1910 3390 Powder-coated Aluminium louvres to Arch.'s & manuf.'s detail fall3° fall 3° ROO F Steel Structure Staircase finished with anti-rust coating and weatherproof steel paint with concrete tread c/w grooved nosing and powder-coated galvanised steel perforated railing to Arch's & Engr's detail & specs Tread: 280mm Riser: 160mm Steel Structure Staircase finished with anti-rust coating and weatherproof steel paint with concrete tread c/w grooved nosing and powder-coated galvanised steel perforated railing to Arch's & Engr's detail & specs Tread: 280mm Riser: 160mm VB1WP2 E 2 VB1P EP2 CB EPWP2 CB1CT 2A 2A B 2A B 2A B 2A B 2A 2A 2A 2A B 2A B 2A B 2A B 2A B 2A 2A H G A C1 B P EC2 C3 C5 C4 C1DOCUMENTATION SCALE 1 100 LEVEL 2 FLOOR PLAN
WC WC FT T T FT T WC W R R WWB W DN UP B F W W 17 16 15 14 13 12 11 10 6 23 22 21 20 19 18 SQ D SD SD SD D SD SD SD SD SD SD SD SD SD SD SD SD SD E EL EL E EL L EL EL EL EL EL EL EL EL EL EL EL EL CAB CAB AB C AB C HR HR F K K K K K KK KK 17 16 10 B D 11 12 13 14 15 9 8 B1 A E C D BP(B)/10 D BP(B)/10 F BP(B)/11 F BP(B)/11 DVOI 4 1M W DE CORR DOR C47MWIDE ORRIDOR OFFICE 6 VF B OFFICE 4 C VO D DVOI STOREER P4 EF B0 02 D D U P 7200 7200 7200 7200 7200 7200 7200 6000 8400 HALLWAY EP B FD CBEP EP3 DVOI D 3 TO BADMINISTRATION UILDING Perforated Galvanised Steel Railing to Arch.'s detail 5 d p 5 d p 0 5 dp D D 1 D D 1 OFFICE 5 C B 0 D D D W 2 P C EP DW1 P2 EP SWEP 2 CB EP2 EP2 CB 2 EP CBEP2 3 T C 1 DW2 EP T BD W 5 W W STAIRCASE 1PC B 0 0 5 5090 5090 5090 5090 5090 5090 5090 5940 AWAITING REA2MP NV B020 Powder-coated Perforated Galvanised Steel Railing to Arch.'s detail P RWD P RWD P W PRWD RWD (TOILET1 M)EHT1 4 V 2.01 (TOILET1 F)H E1 4 MV 2 1 TSTAFF(OILET1 F) TSTAFF(OILET1 M) RCLEANER OOM1ECR P4 B 2 1 A PT AM PT1 M CB CB EP2 CT CB EP2 CT1 DW 2 E 5 Dashed line denoteslink bridge roof eave above 2 p 5 5 p 3860 50d dp 2 p 240024001200 E BP(B)/11 E BP(B)/11 D N FFL + 4 FFL 7 34 FFL+7 3 FFL+734 FFL+734 FFL+734 FFL+7.34 FFL 734 RWSTAIRCASE 2 PC 036 RW P RW P RWD PRW D D 1500 1492 2 0 5 p COMPUTER(AREA 22PAX) AVF CT S A B. 2 11 RMODELING OOMAVF CT /S B0 1 LECTURERS AREA 0 W W W W 8 WW 8 W 8 W W W W W 8 W 8 W W W W 8 W 8 W W 8 W 8 W 8 W W 8 W W 8 W 8 W D 10 M A T C H L N 2E M A T C H L I N E 2 M A T C H L I N E 2 M A T C H L N E 2 MATCHLINE3 MATCHLINE3 MATCHLINE 3 MATCHLINE 3 G BP(B)/11 G BP(B)/11 1 1 ° 1 1° Powder-coated Aluminium louvres to Arch.'s & manuf.'s detail PREFUNCTION 2 MPC P N/ B.2. 7 7200 1200 2400 2400 3800 17000 06 PRE FUNCTION 1 PC V H G A C1 B P EC2 C3 C5 C4 C1DOCUMENTATION SCALE 1 : 100 LEVEL 2 FLOOR PLAN (ZONE B) KEYPL AN C D W EN E WS W E ES E ES SS E N E WN W WN
A BP(B)/10
TUTORIAL ROOM15
TUTORIAL ROOM14 EP2 A B 3 14
LECTURE ROOM1
TUTORIAL ROOM12
TUTORIAL ROOM13 PC C
7 6 5 B1 1A A 3
LECTURE ROOM2
TUTORIAL ROOM11
STAFF TOILET(F) D D 3 D 3 D D D 3 D D D 3 D D D 3 D 3 D 3 D FD 0d 7200 7200 7200
Prefunction
LECTURE ROOM 4 P C B LECTURE ROOM3 A BSSBROOM CR VT B 3 3
UR UR SQ WC W WC WB SQ 13 12 11 10 9 7 235 22 21 20 19 18 17 16 15 14 WB WB FT FT FT DNSD SD SD SD SD SD SD SD D SD HR HR EL EL EL EL EL EL EL L L EL EL EL EL EL EL EL EL EL EL E SD SD SSD D SD SD SD SD SD SD ABC AB C AB C KK KK EL DN 23 22 21 20 19 18 17 16 15 14 13 12 11 10 8 7 6 EL EL WW WC WC WC 2 1 4
BP(B)/10 3 5M W DE CORR DOR
LECTURE
STAFF TOILET(M) CLEANERS ROOM D 5 D 4 EP CT EP2 C 1 C CB EP C 1 CB EP2 CB EP2 WP CB WP2 CB EP2 CB EP3 EP CB EP2 CB EDW2 P2EP2 DW2 PEP DW DW2 TUTORIAL ROOM 9 PC ATUTORIAL ROOM 10 PC A
B D 8
E C E1
A
PC EP2 C 03
EP A B 3
ROOM 5
PC EP4 C B CT1 P CT CB CT1 CB EP3 Dashedlinedenoteroof eaveabove Dashedlinedenote roof eave above W
EP A B 3 15
PC AC 0 0 D 3 D D 3 D D 1 7M WIDE CORRIDOR R D R D P R D RWP TOILET (F) 1 MV B TOILET (M)0302 HT1VT V CR MV AHTV M CB EP CB EP2 CB CT DW2 EP2 DW2 E CB P EP CB EP2 CB CB DW DW DW2 CB EP2EP2 CB EP3 CB EP2 B D 25 25 2 dp 5660 5090 5090 5090 7200 7200 6000 5400 7200 25800 7200 3600 2400 3800 17000 5500 2400 1200 22500 CAG S B BP(B)/10 B BP(B)/10 C BP(B)/10 C BP(B)/10 09 DD/CD(B)/01 FFL 1102 FFL+1102 FFL 1102 FFL+1102 FFL 1102 FFL 1102 FFL 1102 FFL+110 FFL +1 2 F L + 1 0 FFL+1102 FFL+1097FFL+1097 1500 2200 1400 1400 2200 78m STAIRCASE 3 0 84m² STAIRCASE 4 B03 40 F L + 1 02 5 d p 900 9000 M A T C H L I N E 2 M A T C H L I N 2E M A T C H L N E 2 M A T C H L I N E 2 MATCHLINE 1 MATCH LINE 1 MATCHLINE 1 MATCH LINE 1 W W W 8 W W W W W 8 W W WW 8 W W 8 W W W W W W W 8 W W W 8 W 8 WW 8 W W W 8 W W 8 W 8
Area1 09 Das e de o es s gh ab ve Dash inedenoesskygh abo e Dash n d noesskyightabove 1860 1740 FFL +1 2 FFL +1 2 1 MV H G A C1 B P EC2 C3 C5 C4 C1DOCUMENTATION SCALE 1 100 LEVEL 3 FLOOR PLAN KEYPL AN A B W EN E WS W E ES E ES SS E N E WN W WN
TUTORIAL ROOM6
RTUTORIAL OOM5
RTUTORIAL OOM4
RTUTORIAL OOM3
OOM2
RTUTORIAL OOM1
T T DN 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 3 23 22 21 20 19 18 17 16 15 14 13 12 11 10 4 3 D SD SD SD SD SD SD SD SD HR HR E EL EL EL EL EL EL EL EL EL EL EL EL E E EL E EL EL EL EL EL EL EL SD SD SD SD SD SD SD SD SD SD SD SD SD AB C CAB KK KK K 17 16 10 B D 11 12 13 14 15 9 8 B1 A E C D BP(B)/10 D BP(B)/10 F BP(B)/11 F BP(B)/11
PCEP /V 0 4 LECTURE ROOM 7 C C B D 3 D 3 D 3 D D 3 D D 3 D 3 D 3 D 3 D 3 D 3 D 3 D D D 3 D 3 D D 7200 7200 7200 7200 7200 7200 7200 6000 8400 DVOI C35MWIDE ORRIDOR DVOI DVOI HALLWAY1 AS V B
PPC NV B0 0 1 DW2EP2 E 2 DW2 EP2 EP2 DW2 P2 P2 DW2 2 EP CB E CB DW2 DW2 D D D 3 RTUTORIAL
P P NV B 30 2
EPC NV B0 0
V B0 0
EPC P N 0 TUTORIAL ROOM7 E C TUTOR AL ROOM 8 C RLECTURE OOM12EC 4 N 03 3 RLECTURE OOM11P P4 NV 30 RLECTURE OOM10P4 NV B030 RLECTURE OOM9EPC P4 N B 30 RLECTURE OOM8EPC P4 V B03 29 LECTURE ROOM 6 C D N 10 Dottedline denoteroo eaveabove Doted ne denoteroofeaveabove Dottedline denote roof eave above Dottedlinedenoteroofeaveabove W W 5090 3860 PRWD RWD P RW W CB EP2 CB CB CB EP2 DW2 P P2 DW E DW2 DW2 EP2 EP2 DW2 EP EP DW2 EP E 2 DW2 2 E 2 CB P E 3 CB CB 1FFL+ 090 Dottedline denotelink bridge roof eave above D 3 R PD 2500 1550 5090 5090 5090 5090 5090 5090 5940 5 E BP(B)/11 E BP(B)/11 3 BP(B)/12 Composite concrete slab to Engr.'s detail 115mm thk. 1 hr. fire-rated drywall system c/w sound insulation VB1E E3 3 VB1 E E3 3 VB1E E3 P VB1E 3 VB1 EP3 EP3 VB1 EP VB1 EP VB1 VB1EP3 P VB1EP3 3 VB1PP3 3 F L + 1 02 F L + 02 FFL +11 0 FFL +1 2 FFL+ 102 FFL+1102 FFL+1102 FFL+1102 FFL+1102 FFL+1102 FFL+1102 FFL+11.02 FFL+1102 FFL+1102 FFL+1102 FFL +1102 2380 105 m²STAIRCASE 13 3 311m STAIRCASE 2 0 SW P WP EP3 E 3 DVO DVO M A T C H L I N 2E M A T C H L N E 2 M A T C H L N E 2 M A T C H L N E 2 MATCHLINE3 MATCHLINE3 MATCHLINE 3 MATCHLINE 3 W W 8 W W W W 8 W 8 W W 8 W W W W 8 W W W W 8 W 8 W W 8 W W W W 8 W W W W W 8 W W W W W 8 W 8 W W W W W W 8 W W G BP(B)/11 G BP(B)/11 Decorative PVC form panel with lightweight aluminium support ties to Arch.'s and Engr.'s detail D Link rbridge oof3400 Prefunction Area2 08 7200 1200 2400 2400 3820 17000 Da ne n ky h b e Dashlnedenotesskyightabo Dashlnedenotesskylghtabove H G A C1 B P EC2 C3 C5 C4 C1DOCUMENTATION SCALE 1 100 LEVEL 3 FLOOR PLAN KEYPL AN C D W EN E WS W E ES E ES SS E N E WN W WN
EAST ELEVATION
SOUTH-EAST ELEVATION
NORTH-NORTH WEST ELEVATION
WEST ELEVATION
MATCH LINE 1 W 8 B 2A B 2A B 2A W 8 B 2A W B 2A2A W Decorative PVC form panel with lightweight aluminium support ties to Arch.'s and Engr.'s detail Powder-coated Perforated Galvanised Steel Railing to Arch.'s detail Ventilation concrete block M A T C H L N 1E MATCH LINE 2 W D W W W 3 W 3 W W 8 W A 2A A 2A A 2A W A 2A 2A A 2A W 8 A 2A2A A 2A W 8 W 8 W D 3 11 MATCH LINE 3MATCH LINE 3 D D W 8 W W 8 W W 8 W W 8 W 8 W 8 W 8 WW W 8 W W 8 W 8 W 8 W 8 WW W 7 W W 7 W 7 W 7 W 7 WW W WWW 8 W 8 W W 8 W W WWW 8 B 2A B 2A A 2A B 2B 2A B 2A B 2A B 2B 2B A 2A A A 11A B 2B B 2A2A B 2A B 2B 2A B 2B2A A 2A Rain Chain to Manuf's detail 11 D 2W W 2A WW 8 B 2A W 8 2A W 2A W W B 2A W B 2A W B 2B W 8 W 8 A 2B W 8 W 2A A 2A W 8 W 8 B 2A W 2A WW 8 B 2A W 8 WW W B 2A W W A W 8 W 8 B 2A W 8 W A 1 W W 7B 1A W 7 MATCH LINE 3 Natural Anodised Aluminium louvres to Arch.'s & manuf.'s detail H G A C1 B P EC2 C3 C5 C4 C1DOCUMENTATION SCALE 1 : 100
SCALE 1 100
KEYPL AN A W EN E WS W E ES E ES SS E N E WN W WN KEYPL AN B W EN E WS W E ES E ES SS E N E WN W WN SCALE 1 100
SCALE 1 : 100
KEYPL AN D W EN E WS W E ES E ES SS E N E WN W WN KEYPL AN C W EN E WS W E ES E ES SS E N E WN W WN
D W 8 W W 3 W W W W WW 8 W 8 W 8 W W W W WW 8 W 8 B 2A B 2A B 2A 2A 2A B 2A2A B 2A B 2A B 2A B 2A B 2A B 2A 2A 2A B 2A2A B 2A B 2A B 2A MATCH LINE 1MATCH LINE 1 D 3 WW 7 W 7 WW 7 W 8 B B B 2B A B 2A 2A A 2A B 2B 2A B 2B A 2B B 2B B 2A B 2A B 2A 2A W B 2B W 8 W 8 B 2B WW 8 A W 8 W B 2A WW 8 W 8 W W 8 W W 8 W 8 W W W 8 W 8 W W 8 W 8 W W 8 W W Ventilation concrete block Natural Anodised Aluminium louvres to Arch.'s & manuf.'s detail W 10 MATCH LINE 2 MATCH LINE 3 W 4 WW D 8 D 6 D WWW 8 WWWWW A 2A 2A A 2A A 2A A 2A A 2A 2A A 2A 2A A 2A A 2A 2400 Powder-coated Aluminium louvres to Arch.'s & manuf.'s detail 10 MATCH LINE 3 D D FD 2 W W 8 W W W W 8 A 2A2A2A A 2A A 2A A 2A2A A 2A A 2A D 6 H G A C1 B P EC2 C3 C5 C4 C1DOCUMENTATION SCALE 1 : 100 SOUTH-WEST ELEVATION SCALE 1 100 WEST SOUTH-WEST ELEVATION KEYPL AN B W EN E WS W E ES E ES SS E N E WN W WN KEYPL AN A W EN E WS W E ES E ES SS E N E WN W WN SCALE 1 : 100 SOUTH-SOUTH EAST ELEVATION SCALE 1 100 SOUTH ELEVATION KEYPL AN C W EN E WS W E ES E ES SS E N E WN W WN KEYPL AN D W EN E WS W E ES E ES SS E N E WN W WN
BUILDING :
AREA :
STORIES :
MODELLING
H G A C1 B P C2E C3 C5 C4 C1
WORKSHOP BUILDING
5818 SQM
1 STORIES
MODELLING
H G A C1 B P C2E C3 C5 C4 C1
MODELLING
H G A C1 B P EC2 C3 C5 C4 C1
MODELLING
BUILDING : MULTIPURPOSE HALL
AREA : 1942 SQM
STORIES : 2 STORIES
H G A C1 B P EC2 C3 C5 C4 C1
MODELLING
H G A C1 B P EC2 C3 C5 C4 C1
WCWC WCWC WC WCWC WC WCWC WCWC WC UR URUR SQ SQ SQ WC 87654321 UP UP 13 12 11 10 13 12 11 10 UP WBWB WB WBWBWBWB WB WB WBWB WB FT FT FTFT FT FTFT FT FTFTFTFT FT FTFTFTFTFT FT FT FT FT FT FT FT UP UP UP UP 242322212019181716151413121110987654321 242322212019181716151413121110987654321 272625242322212019181716151413121110987654321 272625242322212019181716151413121110987654321 HR EL EL EL EL EL AB AB C AB C CO2 KK KK KK KK KK KK EL EL EL EL 1 2 7 983 4 5 6 A B D E H C F G G1 A1 F1 F2 B2 B1 7a 1200 4300 1830 1550 1120 4700 3600 4700 1120 1550 1830 3470 2030 33000 760039003900540039003900155023503300 35800 150dp TOILET (M) AHT1 CMP M/V E.01.014 PORTABLE STAGE ATO ODMINISTRATI NBUILDING BACKSTAGE PC EP4 A/C E.01.022 LOCKER/ CHANGING ROOM (F) AHT1 CMP M/V E.01.020 STORE ROOM 2 CR E.01.012 CLEANER'S ROOM W 2 W 3 TOILET (OKU) AHT1 CMP M/V E.01.004 D 5a D 1a D D D 2a D ANTE ROOM 1 (M) AHT1 CMP HT E.01.013 ANTE ROOM 1 (F) AHT1 CMP HT E.01.008 W 1 D 2a 2a HALL CAP A/C E.01.002 ANTE ROOM 2 (F) ENTRANCE 2 FD W W FFL +3.350 ENTRANCE 3 CST FB1 E.01.016 VIP HOLDING ROOM CP TS E.01.010 150dp 150dp FD 2 FFL +3.500 Dotted line indicating pedestrian link bridge above Steel Structure Staircase finished with anti-rust coating and weatherproof steel paint c/w grooved nosing concrete tread and powder-coated galvanised steel perforated railing to Arch's & Engr's detail & specs Tread: 260mm Riser: 150mm D 1 W 6 W W W 6 STORE ROOM 5 CR E.01.019 FD 2 W W W D 4 D 4a W 1200 W 6 WWW D 7 D 7 150dp FD 890890 2230 D 5 1200 Discharge to nearest drain (Refer to Site Plan) D 2a 1200 6550 1200 25dp25dp25dp25dp 175up 25dp25dp 50dp 50dp 25dp25dp25dp25dp25dp 50dp FFL +3.500 FFL +3.500 FFL +3.350 FFL +3.500 150dp 1.5m Wide Corridor 1.4m Wide Corridor 1.8m Wide Corridor FFL +3.350 2.0m Wide Corridor screed SPECTATOR STAND 1150 25dp25dp25dp 50dp 25dp25dp25dp 50dp FFL +3.500TOILET (F) AHT1 CMP M/V E.01.005 VIP TOILET 1 STORE ROOM 1 CR E.01.009 K FFL +3.500 VIP TOILET 3 AHT1 CMP M/V E.01.017 120065501200 FFL +3.450 DB ROOM EP4 M/V FFL +3.500 CW1 W 6 W W W 6 W 6 WWW 150dp D 7 D 7 CARRIAGEWAY 1.5m Wide Walkway screed to fall W IBS SHOW GALLER WALKWAY TO ACADEMIC BUILDING UP RL +3.20 M H GT GT Discharge to nearest manhole (Refer to Site Plan) GT GT M H GT GT M H M H M H M H GT GT SPECTATOR STAND FFL +3.500 SP WP4CT1 CST FB1 CR screed fall screed to fall ENTRANCE 1 FB1 E.01.001 screed to fall screed to fall AHT1 CMP STORE ROOM 4 CR EP4 E.01.023 FFL +3.500 D 2a FD 2 25dp25dp 50dp VIP TOILET 2 AHT1 E.01.026 W W W LOCKER/ CHANGING ROOM (M) AHT1 CMP M/V E.01.024 FFL +3.500 SP WP4CT1 CW1 GS1 SP SP EP2 WP4 SP SP EP2 WP4 SP SP ML EP2 SPSP SP EP2 FB2 SP MLEP2 SP ML ML D 5a FD 2 STORE ROOM 3 CR EP4 M/V E.01.015 FFL +3.500 SP WP4 EP2 SP SP EP2 W 3 W 3 2a ANTE ROOM 2 (M) AHT1 D 1a D 4 screed fall screed fall CT WP SP WP4CT1 SP MLCT1 SP SP CT1EP2 SP WP4CT1 SP EP2ML SP EP2ML SP EP2EP2 SP SP WP4 CT1 SP WP4CT1 SP CT1 SP CT1EP2 SP CT1CT1 SP SP CT1 CT1 SP EP2 EP2 SP WP4CT1 SP MLCT1 SP WP4CT1 SP CT1CT1 SP MLEP2 SP CT1EP2 SP TO STUDENT PLAZA 1.5m Wide Walkway Precast concrete spectator stand w/ timber seating on steel frame to Arch's, Engr's & Manuf's detail Tread: 900mm Riser: 456mm CW1 FFL +3.350 SUMP SUMP SUMP SUMP GT Discharge to nearest manhole (Refer to Site Plan) AHT1 CMP M/V Dotted line indicating roof eave above RWDRWD RWDRWD 1800 SP SP ML EP2 990990 SP CT1 EP2 SP ML CT1 Sub-soil drain to Engr's detail STAIRCASE PC E.01.027 STAIRCASE 2 PC E.01.028 10301030103010301030 A BP(E)/04 B BP(E)/04 02 DD/CD(E)/03 1200 HOSEREEL ROOM CR EP4 E.01.032 SP CT1EP2 SP SP CT1EP2 SP EP2EP3 175up 175up 50dp 175up FFL +3.450 FFL +3.450 2250 1200 1200 1200 6550 1200 1200 1940 1200 600 1150 1400 200 200 1790 2170111021502550 1560 1600 1560 1600 1200 1200 600 1200 12001150 4010 27406501380 1200 600 39101790150450 23005250550 150 5040 3640 200 200 2005200240015015021505050200 250 200 3640 5190 2510 2250 1580 3160 2800 H G A C1 B P EC2 C3 C5 C4 C1DOCUMENTATION N K I B L A T 29 0 4 0 3 7 SCALE 1 : 100 LEVEL 1 FLOOR PLAN
D
FFL
STORE
N/V E.02.002 D 5a FD 2
2100 50dp 50dp FFL +7.100
to
&
detail & specs with steel structure to Engr's detail W 5a W 4 W 5a W 4 W
7654321 7654321 13 12 11 10 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 25 24 23 22 21 20 19 18 17 16 15 14 DN DN FT DN DN DN DN 242322212019181716151413121110987654321 242322212019181716151413121110987654321 272625242322212019181716151413121110987654321 272625242322212019181716151413121110987654321 EL EL EL EL KK KK KK KK EL EL 1 2 7 983 4 5 6 A B D E H C F G G1 A1 F1 F2 B2 B1 7a VOID (UPPER PART OF HALL) AV ROOM AHT1 ACT HT2 A/C E.02.006 1200 6550 1200 TABLE TENNIS ROOM 1 EW TS A/C E.02.004 SPECTATOR STAND 1 CAP SPECTATOR STEPS Pedestrian link bridge connecting from Administration Building to Academic Building to Arch's & Engr's detail 1200 4300 1830 1550 1120 4700 3600 4700 1120 1550 1830 3470 2030 33000 760039003900540039003900155023503300 35800 25dp 25dp 25dp FFL +7.150 GYM ROOM 2 MP A/C E.02.003 SPECTATOR STAND 2 CAP E.02.007 SPECTATOR STEPS SPECTATOR STEPS SPECTATOR STEPS 900 600
ROOM 6 CR
1a 1a 1200 VOID VOID 120065501200 FFL +7.125
+7.150
FFL +7.125 Translucent polycarbonate screen
Arch's
Manuf's
5a 2580 STAIRCASE 1 FFL +7.100 GYM ROOM 1 EW MP TS A/C E.02.001 FFL +7.150 TABLE TENNIS ROOM 2 MP A/C E.02.008 FFL +7.125 LS FB1 AP SP EP2 ML CW1 SP ML ML SP EP2 ML SP SP SP MC EP2 SP EP2WP4 SP SP EP2 EP2 SP EP2EP2 SP MCEP2 SP FB2EP2 SP WP4EP2 SP EP2 AP SP WP2EP2 SP MC EP2 SP EP2 WP2 SP EP2 MC CW1 SP AP EP2 SP EP2 MC SP LS AP MC SP FB2EP2 SP MCEP2 CW1 SP EP2 EP2 SP ML SP WP2EP2 D 5a FD 2 SP EP2MC SP SP SP Dotted line indicating roof eave above Entrance drop-off canopy to Arch's & Engr's detail & specs TO ACADEMIC BUILDING TO ADMINISTRATI ON BUILDING Mild steel ladder coated with antirust steel paint to Engrs' detail fall 1° STAIRCASE 2 fall 1° fall 1° A BP(E)/04 B BP(E)/04 02 DD/CD(E)/03 CW1 FFL +7.150 AP W W 5a W 5a W W W 7 W W W W 1700 3010 1780 7600200 4780 4820 4140 6360 11002490 200 1150 290 1200 1200 1560 1560920 730 3240 1560 1560 1200730 1507200500 1120 5007600150 1800 1770 2660 3480 2340 950 240 500500 500 500 200 3110 3500 HALL EW CAP TS A/C E.01.002 H G A C1 B P EC2 C3 C5 C4 C1DOCUMENTATION SCALE 1 100 LEVEL 2 FLOOR PLAN
TABLE TENNIS ROOM
ROOM
TENNIS
LEVEL 1 FFL+3.50 LEVEL 2 FFL+7.15 CEILING LEVEL+13.45 ROOF LEVEL+14.45 SERVICE LEVEL+10.95 1279 8 3456 NATURAL GROUND LEVEL+3.35 7a 109501503650380025001000 26003300235015503900390054003900390076001700 35800 GYM
2 STORE ROOM 4 LOCKER/ CHANGING ROOM (M) HALL W W 6 W 6 W FD STORE ROOM 1 VIP HOLDING ROOM RWH/ WATER TANK A/C BLOWE R A/C BLOWE R W W 6 W W 6 FD 3 D D a 2 a 2 A/C OUTDOOR UNIT W 2 450mm wide RC drain with precast concrete cover laid to fall to Engr's detail Entrance drop-off canopy to Arch's & Engr's detail & specs 01 DD/CD(E)/01 06 DD/CD(E)/01 01 DD/CD(E)/02 9000 WP4 CT1 SP CT1 EP2 SP SP ML EP2 SP ML EP2 SP SP SP MC EP2 CAP MP CMP CR PC EW CST AHT1 CR EW CR CST PC Precast concrete spectator stand w/ timber seating on steel frame to Arch's, Engr's & Manuf's detail Tread: 900mm Riser: 456mm R.C. slab to Engr.'s detail Composite concrete slab to Engr.'s detail ACT AP EP2 DW2DW2 EP2 AP 2910 LEVEL 1 FFL+3.50 LEVEL 2 FFL+7.15 CEILING LEVEL+13.45 ROOF LEVEL+14.45 SERVICE LEVEL+10.95 ABDEH CFG NATURAL GROUND LEVEL+3.35 G1 A1F1F2 B2 B1 18002030347018301550112047003600470011201550183043001200670 33000 ANTE ROOM 1 (M)
1 TABLE
ROOM 2 ANTE ROOM 1 (F) TOILET (OKU) SPECTATOR STAND 1 STORE ROOM 2 SPECTATOR STAND 2 TOILET (M) W W 1 D 2a D FD STORE ROOM 1 RWH/ WATER TANK W 2 D 5 RWH/ WATER TANK A/C OUTDOOR UNIT A/C OUTDOOR UNIT a 3 a 3 a 2 2 06 DD/CD(E)/02 1000 2500 3800 3650 150 11100 CT1WP4 SP SP SP MLEP2 ML ML ML EP2 EP2 EP2 SP SP CT1 WP4 CMPCMPCMPCMP AHT1 AHT1 CR EW CR AHT1 CSTAHT1 APEP2 SP SP SP MCEP2EP2MC SP SP CAP MP CR EW MP EW CR W W 4 W 4 W 5a CAP R.C. slab to Engr.'s detail Composite concrete slab to Engr.'s detail Subsoil drain to Engr.'s detail LEVEL 1 FFL+3.50 LEVEL 2 FFL+7.15 CEILING LEVEL+13.45 ROOF LEVEL+14.45 SERVICE LEVEL+10.95 ABDEH CFG NATURAL GROUND LEVEL+3.35 G1 A1F1F2 B2 B1 33000 18002030347018301550112047003600470011201550183043001200650 D 1 W W 5a W 5a W D 1 D 5a W W 2 W 2 W 2 a 3 a 3° 08 DD/FC(E)/02 1000 2500 3800 3650 150 10950 01 DD/FC(E)/04 H G A C1 B P EC2 C3 C5 C4 C1DOCUMENTATION SCALE 1 100 SECTION A-A SCALE 1 100 SECTION B-B SCALE 1 100 NORTH NORTH-EAST ELEVATION
LEVEL 1 FFL+3.50 LEVEL 2 FFL+7.15 CEILING LEVEL+13.45 ROOF LEVEL+14.45 SERVICE LEVEL+10.95 1 2 7 983 4 5 6 NATURAL GROUND LEVEL+3.35 7a 109501503650380025001000 35800 16807600390039005400390039001550235033002580 W W W 6 W 6 W WW WW 6 W 6 W 6 D D Fibre cement board cladding to Arch's & Manuf.'s detail & specs Translucent polycarbonate screen to Arch's & Manuf's detail & specs with steel structure to Engr's detail 07 DD/FC(E)/02 04 DD/FC(E)/02 8 DD/FC(E)/04 LEVEL 1 FFL+3.50 LEVEL 2 FFL+7.15 CEILING LEVEL+13.45 ROOF LEVEL+14.45 SERVICE LEVEL+10.95 A B D E HC F G NATURAL GROUND LEVEL+3.35 G1A1 F1 F2B2B1 109501503650380025001000 33000 65012004300183015501120470036004700112015501830347020301780 WW W D 5 a a° 3 9 DD/FC(E)/04 02 DD/FC(E)/03 06 DD/FC(E)/03 W 5a W W 5 W W 5a LEVEL FFL+3.50 LEVEL FFL+7.15 CEILING LEVEL+13.45 ROOF LEVEL+14.45 SERVICE LEVEL+10.95 1279 8 3456 NATURAL GROUND LEVEL+3.35 7a 25803300235015503900390054003900390076001680 35800 W 2 W 3 W D 7 D 7 W W W W 6 W 6 W W W 6 Metal cladding cut to pattern finish to Arch's & Manuf's detail 1000 2500 3800 3650 150 10950 02 DD/FC(E)/04 07 DD/FC(E)/03 H G A C1 B P EC2 C3 C5 C4 C1DOCUMENTATION SCALE 1 : 100 EAST SOUTH-EAST ELEVATION SCALE 1 : 100 SOUTH SOUTH-WEST ELEVATION SCALE 1 : 100 WEST NORTH-WEST ELEVATION
MODELLING
BUILDING : STUDENT HOSTEL BUILDING
AREA : 6990 SQM
STORIES : 4 STORIES
H G A C1 B P C2E C3 C5 C4 C1 05
MODELLING
LEVEL
LEVEL 2
PLAN
LEVEL 3 FLOOR PLAN
H G A C1 B P C2E C3 C5 C4 C1 05
1 FLOOR PLAN
FLOOR
DOCUMENTATION
H G A C1 B P C2E C3 C5 C4 C1
Checker
H G A C1 B P C2E C3 C5 C4 C1
Checker
H G A C1 B P C2E C3 C5 C4 C1
Checker
H G A C1 B P C2E C3 C5 C4 C1
MODELLING
BUILDING
LEVEL 01 FLOOR PLAN
LEVEL 02 FLOOR PLAN
H G A C1 B P EC2 C3 C5 C4 C1 D
: SIMULATION BUILDING AREA : 613 SQM STORIES : 2 STORIES
A F B E C D A B fall 3° fall 3° fall 3°
1 2 3 4 5 6 7 8 9
WCWC UR UP UP 24 23 22 21 19 18 16 15 1413121110987654321 121110987654321 242322212019181716151413 WBFT FTFTFT ELEL AB C EL DN DN 242322212019181716151413 121110987654321 1413121110987654321 24 23 22 21 20 19 18 17 16 15 KK KK AB AB C AB C EL ELEL EL EL EL EL EL ELEL EL KK KK EL ELEL EL EL 1 2 3 4 5 6 7 8 9 A F B E A B C D 1100380038003800380038002300520039001100 ACTUAL SIZE SIMULATION EPX ACT A/C D.01.001 WAITING AREA EP2 D.01.005 12701270 30400 D D 2 RS 1 D 50dp 4650 3840 11050 RC EP1FC RC FCEP1 FFL +3.55 FFL +3.50 FFL +3.55 RC RC FCEP1 RC EP1 FC RC EP1FC RC EP1 FC RC FC CT1 RC RC CT1CT1 RC CT1 FC UTILITY CR VT D.01.002 MH ramp up gradient 1:12 50dp screed fall screed fall Dotted line indicating slab above D TOILET (M) AHT1 CMP M/V D.01.003 TOILET (F) CMP M/V D.01.004 Discharge to nearest manhole (Refer to Site Plan) RC CT1FC 50dp STAIRCASE 1 STAIRCASE 60015003000205030001500600391025001400 screed fall screed fall Metal staircase with precast concrete tread and powder coated perforated metal railing to Arch's & Engr's detail & specs Tread: 260mm Riser: 150mm Metal staircase with precast concrete tread and powder coated perforated metal railing to Arch's & Engr's detail & specs Tread: 260mm Riser: 150mm W W 1 W W 1 W W W W 50dp W W W 2 W W 2 W 2 700700 Discharge to nearest drain (Refer to Site Plan) Discharge to nearest drain (Refer to Site Plan) RC FC EP1 2540 RWDP concealed within G.I. RHS column with paint finish to Arch.'s & Engr.'s detailDotted line indicating louvre above 10501220 3860 25dp SUMP SUMP 1 1 2 3 4 5 6 7 8 9 A F B E C D DESKTOP COMPUTER SIMULATION AHT1 ACT A/C D.02.001 LECTURER'S ROOM AHT1 D.02.002 38003800380038003800230052003900 30400 D D15003000205030001500 50dp FFL +7.10 FFL +7.05 FFL +7.10 Anodized aluminium louvres to Arch's detail SP WP4 EP2 SP EP2 WP4 SP EP2WP4 SP SP WP4 EP2 SP EP2 WP4 SP SP EP2WP4 Dotted line indicating roof eave above VOI D VOI D VOI D 50dp STAIRCASE 1 D.02.003 CORRIDOR CR D.02.005 STAIRCASE 2 D.02.004 2000 Dotted line indicating roof eave above W 1 W W 1 W 1 W 1 W 1 W W W W W W WWWWWWW 1 W 1 W 1 W 1 WW 1 W 1 W 1 W 1 W 1 11050 2360 A B RWDRWDRWD P RWD MD PC 440 50dp
fall 3° 2100380038003800380038002300520039002100 21001500300020503000150021000.54mm TCT (0.48mm BMT) ribbed steel roof panel in G550 AZ200 steel, a layer of 1.5mm thk. self adhesive bituminous felt, a layer of 50mm 40kg/m3 rockwool insulation, aluminium foil and ceiling by specialist as bottom layer or equivalent to Manuf.'s detail 0.54mm TCT (0.48mm BMT) custom made concealed gutter in G300 AZ200 steel supported by 2.5mm thk. galvanized gutter bracket or equivalent to Manuf.'s detail 30400 11050 1 1 2 3 4 5 6 7 8 9 A F B E C D A B 3.00 ACT WAITING AREA UTILITY VT 2.40 TOILET (M) CMP 2.40 TOILET (F) 3.40 EP2 ACTUAL SIZE SIMULATION 3.40 EP2 1 1 2 3 4 5 6 7 8 9 A F B E C D A B 3.00 DESKTOP COMPUTER SIMULATION ACT LECTURER'S ROOM ACT RWDRWDRWDRWD 1 H G A C1 B P EC2 C3 C5 C4 C1 D DOCUMENTATION NAKIBL T 290 4037 SCALE 1 : 100 LEVEL 1 FLOOR PLAN SCALE 1 : 100 LEVEL 2 FLOOR PLAN SCALE 1 : 200 ROOF PLAN SCALE 1 : 200 LEVEL 1 REFLECTED CEILING PLAN SCALE 1 : 200 LEVEL 2 REFLECTED CEILING PLAN
MODELLING
LEVEL
H G A C1 B P EC2 C3 C5 C4 C1 D
1 FLOOR PLAN LEVEL 2 FLOOR PLAN BUILDING : IBS SHOW GALLERY AREA : 926 SQM STORIES : 2 STORIES
1413121110987654321 2827262524232221201918171615 14 13 12 11 10 28 27 26 25 24 23 22 21 20 19 18 17 16 15 2827262524232221201918171615 1413121110987654321
FLOOR
14 13 12 11 10 28 27 26 25 24 23 22 21 20 19 18 17 16 15
UP UP
DN DN A B C D E OUTDOOR EXHIBITION AREA MD N/V F.01.001 STOREROOM CR F.01.003 LOADING & UNLOADING BAY EP M/V F.01.004 INDOOR EXHIBITION AREA PC F.01.002 TOILET (F) AHT1 F.01.009 TOILET (M) AHT1 CGP M/V 5200 2600 6700 2400 16900 50dp 50dp TO MULTIPURPOS E HALL FD 1 FD 1 D 1 RS 1 RS 1 W 1 W D 2 W W W 2 RC RC Aluminium Box Louvres to Manuf's detail & Arch's Approval EP1 ?? EP2 EP1 RC RC RC EP2EP1 RC CT1 EP1 RC FCGB2 RC FC CT1 RC EP1FC EP1 FC RC RC RC FB2 FB2 FFL +3.45 FFL +3.50 FT FT MS MS MS MCMC MS MCMC Connected to nearest manhole (Refer to Site Plan) MH GT U P ramp up gradient 1:12 ST 2 ST 1 K K K K K Connected to nearest drain (Refer to Site Plan) EL EL EL EL CLEANER'S ROOM EP F.01.005 DB ROOM CR F.01.006 ANTE ROOM AHT1 CGP WC WB WC FFL +3.50 D 2 D 2 150 mm dia.G.I. Round Hollow Section Steel Column with Paint Finish FFL +3.50 FFL +3.50 50dp 50dp 12201.22m WIDE CORRIDOR 3.05m WIDE CORRIDOR Dotted line indicating roof eave above 3600 RWD P RWD RWD 1.8m WIDE PAVEMENT RL + 3.20 50dp D 5 1.8m WIDE PAVEMEN 300mm wide RC drain with precast concrete cover laid to fall to Engr. Detail. Dotted line indicating floor above H Steel Column 450mm wide RC drain with precast concrete cover laid to fall to Engr. Detail. 1500 3380 1500 3380 EL EL EL EL CO2 AA 5 5 1 3 4 5 A B C D E 72 6 PRODUCTS BRIEFING ROOM LT CAP F.02.003 TOILET (M) AHT1 CMP TOILET (F) AHT1 CMP F.02.005 5200 2600 6700 2400 70005800830076008100 36800 16900 VOI D ST 1 50dp 50dp DISCUSSION ROOM CAP F.02.002 OFFICES ACT F.02.001 D D DD 4 D 4 W 1 W 2a W 2a RCDW2 DW2 FFL +8.00 RC EP2 FC GB2FC GB2GB2 GB2GB2 FCGB2 GB2 GB2GB2 EP2 FC RC RC RC RCRCRC RC FCCT1 FC CT1 RC CT1FC RC FFL +8.00 FFL +8.00 FFL +8.00 MSMS MS FB2 FB2 FB2FB2 MCMC CW1 AHT2 CAP A/C MCMC MS GB2 RC D 2.5M WIDE CORRIDOR 27204480265031501190600150060060060021006002700600180060090060027006006006009003003300 EL EL EL ST Dotted line indicating roof eave above RWDRWDRWD WW W W 1 W W W W 1 W ELEL EL EL EL EL AA 5 5 H G A C1 B P EC2 C3 C5 C4 C1 D DOCUMENTATION N KIBL AT 29040 37 SCALE 1 100 LEVEL 1 FLOOR PLAN SCALE 1 100 LEVEL 2
PLAN
MODELLING
BUILDING : MOSQUE
AREA : 570
STORIES :
STORIES
LEVEL 01 FLOOR PLAN
SECTIONAL PERSPECTIVE
H G A C1 B P EC2 C3 C5 C4 C1 D
SQM
1
Dottedlineindicatingroof
Powder-coated Perforated Galvanised Steel Railing to Arch.'s and Engr.'s
RC Step with ProcelainTIle finish c/w Anti-Slip Curved Stainless
Nosing to Arch.'s
Tread: 280mm Riser:
Circular
section column to Engr.'s
Wall
handrail
W WC WC WC WC DN DN DN DN WB WB WB W WB FTFTFT FT FT FT FTFTFT EL EL ELAB C AB C CAB KK KK KKKK KK EL EL EL KK KK E E F F D D C C B B 1 A A 2 F1 F2 STORE ROOM AHT1 G.01.004 IMAM'S ROOM VF VS G.01.008 ENSUITE MALE PRAYING AREA (140PAX) GPT AS2 G.01.002 FEMALE PRAYING AREA (14PAX) MEHRAB GPT EP1 G.01.001 7100 7100 7 1 0 0 7100 7100 7100 7100 7100 7 1 0 0 7100 7100 100 W W W W 1 SD D D 1 D W D 1 W W 1 Aluminium decorative screen panel to Arch.’s & Manuf.’s detail & spec. Aluminium box louvres with fibrecement board cladding laid in pattern to Arch.’s detail. FFL +4.30 D D D D RC CT1 CT1 RC G RC GRC RC RC G RCWP GRC RC RC W G EP EP 5 dp RCEP GRC RC RCGRCRC GRGPT RC RC EP RC CW RC W G RC G RCGRC EP1 RC GRCWP1 RC GRC RC QIBLA T 0d SD ENTRANCE LOBBY RCG EP1 M S 2FB 2FB
steel
detail
160mm
detail
mounted
to Arch.'s detail
hollow
detail W EL ELEL D 3 50dp 50d SAVTORAGEAHT B1 MV 0 0 ABLUTION & TOILET (F) AHT1 CMP M/V G.01.005 ABLUTION & TOILET (M) CMP M/V RWD Discharge to nearest drain (Refer to Site Plan) MH 29 MH Discharge to mainhole MH 33 (Refer to Site Plan) Discharge to mainhole MH 30 (Refer to Site Plan) MH 28 7500 13700
eaveabove 1 2 3 2 GRADIENT 1:12RampUp Powder-coated Perforated Galvanised Steel Railing to Arch.'s and Engr.'s detail Aluminium composite cladding to Arch.'s & manuf.'s detail. Steel structure to Engr.'s detail TG G T G T RWD P RW RW P P WD Subsoil drainage to Engr's detail R= R= Turfin g RC GRCEP1 AD RC T1 V RC EP1 GPT1 EL SUM P PSUM A A B B 1 DD/BP(G)/03 5820 2420 2020 1500 1400 1400 1700 1420 1800 1700 1470 3850 RC G 1 RCE EPT RC GRCEP1 1300 FFL +3.50 Turfin E F D C B 1 A 2 F1 F2 3.00 STORE ROOM FB1 ABLUTION & TOILET (F) CMP IMAM'S ROOM AV STORAGE ENSUITE 3.00 ABLUTION & TOILET (M) MEHRAB 8.00 AS2 3.00 FB1 CMP 3.00 FB1 5.70 EP1 5.70 P A A B B E F D C B 1 A 2 F1 F2 PWRWD WDWD R D RWD A A B B A layer of 50mm 80kg rockwool, aluminium foil, Lysaght Spandek 0.47mm TCT (0.42mm BMT) hi-ten in Zincalumn steel (G550 AZ150) or equivalent AS bottom layer, followed by layer of 12mm cement board, bituminous felt, 100mm width 1.0mm BMT hi ten Truecore steel (G550 AZ150) strip or equivalent as spacer and Lysaght 360 Seam 0.7mm thk Lysaght360 Seam 25 in CCB XAL (Aluminium) or equivalent Concealed G.I gutter to Manuf.'s detail Aluiminium Composiite cladding to Arch.'s & Manuf.'s detail Rc. roof to engr's detail c/w waterproofing membrane H G A C1 B P EC2 C3 C5 C4 C1 D DOCUMENTATION N K I B L A T 2 9 0 4 0 SCALE 1 : 100 LEVEL 1 FLOOR PLAN SCALE 1 100 LEVEL 1 REFLECTED CEILING PLAN SCALE 1 200 ROOF PLAN
SMK KOTA WARISAN SEPANG SELANGOR
STRUCTURE MODELLING DIVISION
ADMIN BUILDING
LABORATORY BUILDING 1
LABORATORY BUILDING 2
ACADEMIC BUILDING 1
ACADEMIC BUILDING 2
MULTIPURPOSE HALL
CAFETERIA
MOSQUE
01 08 02 03 04 05 06 07
COLUMN BEAM ROOF STRUCTURE SLAB PILING LEGEND: 01 MODELLING
A 1 2 3 4 5 6 1b 2a 3b 5a 4A 4B 4d 6a 6b 7 7a 8 8a A2'A1 A1' A3 A4A6 A7A9 BC D E E F F G H I I3 I4 I5 I4a J J2 J3 J1 D1 F1 A2A5 A8 D1A 5b 9 01 DOCUMENTATION LEVEL 1
A 1 2 3 4 5 6 1b 2a 3b 5a 4A 4B 4d 6a 6b 7 7a 8 8a A2'A1 A1' A3 A4A6 A7A9 BC D E E F F G H I I3 I4 I5 I4a J J2 J3 J1 D1 F1 A2A5 A8 D1A 5b 9 01 DOCUMENTATION LEVEL 2
COLUMN BEAM ROOF STRUCTURE SLAB LEGEND:
02 MODELLING
A 1 A2'A1' A1 A2 B C D E GF B1H B2 D1 E1E2E3E4 F1 F2 2 3 4 5 6 1a 1b 1c 1d 1e 1f 3a 5h 5a 5b 5c 5d 5e 5f 5g 02 DOCUMENTATION LEVEL 1
A 1 A2'A1' A1 A2 B C D E GF B1H B2 D1 E1E2E3E4 F1 F2 2 3 4 5 6 1a 1b 1c 1d 1e 1f 3a 5h 5a 5b 5c 5d 5e 5f 5g 02 DOCUMENTATION LEVEL 2
03 MODELLING COLUMN BEAM ROOF STRUCTURE SLAB PILING LEGEND:
A 1 A2'A1' A2 B C D E F C2G C3 F1 G1 G2 2 3 4 5 6 3a 3b c8 A2" A1A5A3 A4 C1 C4 H D1 E1 G3 G4 1b 7 1c 1d 1e 1f 3c 8 c10 c3 c4 e c2 c6 c7 03 DOCUMENTATION LEVEL 1
A 1 A2'A1' A2 B C D E F C2G C3 F1 G1 G2 2 3 4 5 6 3a 3b c8 A2" A1A5A3 A4 C1 C4 H D1 E1 G3 G4 1b 7 1c 1d 1e 1f 3c 8 c10 c3 c4 e c2 c6 c7 03 DOCUMENTATION LEVEL 2
MODELLING
COLUMN BEAM ROOF STRUCTURE SLAB LEGEND:
04
A 1 A1A2 A3 A4 B B1 C C1 C2 C3 D D2 D3 E E1E2E3 E5E6E8 F 2 3 4 5 6 7 8 3a 7a 7b 7c 7d 7e 7f 7g 7h 5a 04 DOCUMENTATION LEVEL 1
A 1 A1A2 A3 A4 B B1 C C1 C2 C3 D D2D3 E E1E2E3 E5E6E8 F 2 3 4 5 6 7 8 3a 7a 7b 7c 7d 7e 7f 7g 7h 5a 04 DOCUMENTATION LEVEL 1
ROOF
PILING
05 MODELLING COLUMN BEAM
STRUCTURE SLAB
LEGEND:
A 1 A1A2A3A4 B B1 C C1 D D2 EE1 E3E4E5E6 E9 F 2 3 4 5 6 3a 5a A5A6 E7 3b 3c 3d 5b 5d 05 DOCUMENTATION LEVEL 1
A 1 A1A2A3A4 B B1 C C1 D D2 EE1 E3E4E5E6 E9 F 2 3 4 5 6 3a 5a A5A6 E7 3b 3c 3d 5b 5d 05 DOCUMENTATION LEVEL 2
A 1 A1A2A3A4 B B1 C C1 D D2 EE1 E3E4E5E6 E9 F 2 3 4 5 6 3a 5a A5A6 E7 3b 3c 3d 5b 5d 05 DOCUMENTATION LEVEL 3
COLUMN BEAM SLAB PAD FOOTING LEGEND:
06 MODELLING
A A 1 2c 2c 2a 2a 1a 1b 2 2d 2d 2b 2b 3 3 4 4 5 5 6 6 3a 3a 4a 4a 4b 4b 4c 4c 4d 4d 5a 5a 5b 5b B B B1 B1 C C D D E E F F G G H H G1 G1 G2 G2 G3 G3 G4 G4 H1 H1 J J 06 DOCUMENTATION
LEGEND:
COLUMN BEAM ROOF STRUCTURE SLAB PAD FOOTING
07 MODELLING
A 1 A1 B C D E 2 3 4 5 A2 A3 3a 07 DOCUMENTATION
COLUMN BEAM SLAB PAD FOOTING LEGEND:
A 1 A1 B C D E F F1G 2 3 4 5 6 7 8 4b 4a 08 DOCUMENTATION 08 MODELLING