Energy September 2021 Digital Edition

Page 64

DRONES

POWERCOR TESTS NEW DRONE TECH FOR POWERLINE CHECKS The latest drone technology is being used to monitor the quality of network assets, in a recent trial conducted by Powercor in the Ballarat region.

62

September 2021 ISSUE 15

www.energymagazine.com.au


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Powercor tests new drone tech for powerline checks

2min
pages 64-65

How distribution businesses should embrace the transition

5min
pages 62-63

Deploying SPS for WA’s Cyclone Seroja recovery and beyond

5min
pages 60-61

Powering ahead with community batteries

5min
pages 54-57

Technology not taxes: the problem with technology-led energy futures

5min
pages 58-59

New technology transforms resiliency readiness

2min
pages 52-53

Mitigating the risks of remote workplaces

2min
pages 46-47

Black system or black swan: learnings from South Australia’s infamous 2016 blackout

10min
pages 48-51

Australia’s first green hydrogen plant in a remote power system

6min
pages 44-45

Why energy storage is an essential part of a smart electric grid

3min
pages 42-43

Room for improvement Australia and Germany swap notes on energy efficiency reform

4min
pages 40-41

The role of gas pipelines in Australia’s future

5min
pages 36-37

Delivering the future of gas through Australia’s most comprehensive green hydrogen demonstration

6min
pages 38-39

Enhance your turbine maintenance with the best service tools

4min
pages 34-35

Zenaji Aeon Battery passes all Australian tests

2min
pages 30-31

Gearing up for the energy storage era

6min
pages 28-29

Kaban Green Power Hub gives QLD's renewable efforts a second wind

3min
pages 32-33

National modelling data to help electricity sector plan around climate risk

4min
pages 26-27

It’s dark, it’s still – it’s dunkelflaute

5min
pages 24-25

And they’re off: the state race to network regions of renewables

10min
pages 16-19

Bioenergy investment to support Australia’s path to net zero

2min
pages 20-21

Victoria's gas infrastructure what does the future hold?

4min
pages 22-23

Australia’s largest gas and coal export partner slashes demand

1min
page 11

EnergyAustralia’s potential pumped hydro facility

1min
pages 6-7

Aurora Energy appoints new metering service provider

1min
page 10

Examining the Kurri Kurri gas plant controversy

10min
pages 12-15
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.