Infrastructure March 2020 Digital Edition

Page 18

A WORD FROM INFRASTRUCTURE AUSTRALIA

RESILIENCE AND RESPONDING TO CHANGE:

ADAPTING TO UNCERTAINTY by Romilly Madew AO, CEO, Infrastructure Australia

The year 2020 marked the dawning of a new decade, a new year, and with it perhaps the makings of a new normal amongst a veil of smoke across Australia.

T

his summer has seen Australia combat one of the worst bushfire seasons many in this country have ever faced. Given the scale of this disaster and the increased intensity and frequency of extreme weather events, we face a period of growing uncertainty. The widespread devastation has pushed the resilience of our infrastructure into the spotlight. Throughout the ongoing recovery effort and long-term rebuild, we should all be asking questions of our planning, regulation, building standards, zoning and community education programs.

16

March 2020 // Issue 14

www.infrastructuremagazine.com.au


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

SIGNALLING, TRACKING AND CONTROL SYSTEMS

5min
pages 72-76

RAIL EQUIPMENT

3min
pages 68-71

CONDITION MONITORING AND MAINTENANCE

5min
pages 64-67

CRITICAL INFRASTRUCTURE SUMMIT

4min
pages 62-63

SHAKING UP CONTINUING PROFESSIONAL DEVELOPMENT IN CONSTRUCTION

2min
pages 56-57

SPATIAL & GIS

4min
pages 60-61

TRAINING THE NEXT GENERATION OF RAIL PROFESSIONALS

7min
pages 54-55

EPIC OPPORTUNITIES IN RAIL FOR REFUGEE ENGINEERS

3min
pages 58-59

RAPID DEPLOYMENT CAMERAS ENABLE MONITORING OF REMOTE SITES

2min
pages 52-53

AUSTRALIA’S SMART CITIES AND COMMUNITIES LEADERS TO GATHER IN MELBOURNE

3min
pages 50-51

MAKING TICKETING TECH SMARTER

5min
pages 46-47

LEVERAGING DIGITAL TRANSFORMATION: INSIGHTS FROM CONSTRUCTION, ENGINEERING AND INDUSTRIAL

3min
pages 48-49

3D MODELLING OF HEADSTOCKS FOR ELEVATED FLINDERS LINK PROJECT

2min
pages 44-45

SOFTWARE, COMMUNICATIONS AND CONNECTIVITY

4min
pages 40-43

SELECTING THE RIGHT TRENCHING SOLUTION

4min
pages 34-35

GRADER MACHINE CONTROL TECHNOLOGY FOR THE FINAL TRIM

3min
pages 38-39

GLOBAL INFRASTRUCTURE SECTOR NEEDS A SHAKE UP

6min
pages 24-27

CHANGES TO WORKPLACE MANSLAUGHTER LEGISLATION IN VICTORIA

5min
pages 36-37

INFRASTRUCTURE OUTLOOK: 2020 AND BEYOND

7min
pages 30-33

IS CONGESTION CHARGING THE ANSWER TO PEAK HOUR?

5min
pages 20-23

HOW AIRPORT INFRASTRUCTURE IS SUPPORTING THE BUSHFIRE EFFORT

4min
pages 28-29

A WORD FROM INFRASTRUCTURE AUSTRALIA

5min
pages 18-19
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.