Infrastructure March 2020 Digital Edition

Page 38

CIVIL CONSTRUCTION // PARTNER SOLUTIONS

GRADER

MACHINE CONTROL TECHNOLOGY

FOR THE FINAL TRIM

Topcon machine control technology provides the flexibility to mix and match your grader solution to suit different applications at different stages of the project you’re working on.

M

any of the new graders in Australia arrive from the factory or dealer with the option of an integrated system and basic machine control technology already installed. So it is now more important than ever to ensure you have the best solution on your grader that will not only suit your current needs but can also grow with your business. If you rely on a factory fitted system, you may be limited by the fact that these systems are often not upgradeable or transferable between machines. If you need a more sophisticated solution it can be difficult to proceed without starting again with a different option, and this can be needlessly expensive and time consuming. Ensuring you have the best machine control solution is arguably even more important on your grader because if fine tolerances are not achieved consistently across the site, it will result in rework and extra materials, increasing costs and decreasing efficiencies. Ideally, you need to get the grade right the first time and Topcon machine control can ensure you do. A CUSTOMISABLE SOLUTION IS ESSENTIAL “The machine control technology available from Topcon is compatible across all machine types, makes and models. This makes it a highly flexible and customisable solution,” Josh Allan, Construction Business Manager – Australia, Position Partners, said. “A GNSS machine control system can be adapted with a high precision laser transmitter that combined will deliver millimetre vertical precision for fine grading tasks – a technology unique to Topcon.” Topcon machine control technology is the most flexible on the market, so you can mix and match your solutions to suit whatever job you’re working on. All contractors can attest that every job is different and you often need more than one

36

March 2020 // Issue 14

machine control system configuration to complete the range of tasks you work on to the tolerance you require. For example, across one project, the best solution may need GNSS/GPS in open sky, fine tolerance achieved with mmGPS including a high precision laser transmission, LPS (total station) technology when working in built up areas or dense tree coverage, and have the ability to include a sonic tracker to follow the kerb. Topcon has the technology and the flexibility to ensure you’re working seamlessly across every application at every stage of the job.

LOOK FOR SCALABLE AND FLEXIBLE OPTIONS Topcon grader machine control gives you the option to: ♦ Easily swap machine control technology between machines – so you can stretch your machine control system across a range of machines ♦ Scale up or scale down to suit the job – for example, you might box out a subdivision with GPS/GNSS but then you can switch to a sonic tracker to follow the kerb. Topcon lets you work with 2D or 3D technology without having to install a whole new system ♦ Combine GPS/GNSS with other technology, including laser or prisms with a total station, to increase accuracy even further for final trim work “Topcon has the grader machine control technology you need for final trim, its flexibility and precision is second to none,” Mr Allan said. “Topcon machine control technology gives you the option to start with an entry level system, then upgrade and adapt that system by renting, purchasing or swapping components. This means that you can customise the solution to suit you and what you need on the project without having to go out and purchase a whole new system.”

www.infrastructuremagazine.com.au


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

SIGNALLING, TRACKING AND CONTROL SYSTEMS

5min
pages 72-76

RAIL EQUIPMENT

3min
pages 68-71

CONDITION MONITORING AND MAINTENANCE

5min
pages 64-67

CRITICAL INFRASTRUCTURE SUMMIT

4min
pages 62-63

SHAKING UP CONTINUING PROFESSIONAL DEVELOPMENT IN CONSTRUCTION

2min
pages 56-57

SPATIAL & GIS

4min
pages 60-61

TRAINING THE NEXT GENERATION OF RAIL PROFESSIONALS

7min
pages 54-55

EPIC OPPORTUNITIES IN RAIL FOR REFUGEE ENGINEERS

3min
pages 58-59

RAPID DEPLOYMENT CAMERAS ENABLE MONITORING OF REMOTE SITES

2min
pages 52-53

AUSTRALIA’S SMART CITIES AND COMMUNITIES LEADERS TO GATHER IN MELBOURNE

3min
pages 50-51

MAKING TICKETING TECH SMARTER

5min
pages 46-47

LEVERAGING DIGITAL TRANSFORMATION: INSIGHTS FROM CONSTRUCTION, ENGINEERING AND INDUSTRIAL

3min
pages 48-49

3D MODELLING OF HEADSTOCKS FOR ELEVATED FLINDERS LINK PROJECT

2min
pages 44-45

SOFTWARE, COMMUNICATIONS AND CONNECTIVITY

4min
pages 40-43

SELECTING THE RIGHT TRENCHING SOLUTION

4min
pages 34-35

GRADER MACHINE CONTROL TECHNOLOGY FOR THE FINAL TRIM

3min
pages 38-39

GLOBAL INFRASTRUCTURE SECTOR NEEDS A SHAKE UP

6min
pages 24-27

CHANGES TO WORKPLACE MANSLAUGHTER LEGISLATION IN VICTORIA

5min
pages 36-37

INFRASTRUCTURE OUTLOOK: 2020 AND BEYOND

7min
pages 30-33

IS CONGESTION CHARGING THE ANSWER TO PEAK HOUR?

5min
pages 20-23

HOW AIRPORT INFRASTRUCTURE IS SUPPORTING THE BUSHFIRE EFFORT

4min
pages 28-29

A WORD FROM INFRASTRUCTURE AUSTRALIA

5min
pages 18-19
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.