Infrastructure March 2020 Digital Edition

Page 68

RAIL EQUIPMENT

WORKING TO EQUIP RAIL PASSENGERS WITH

INDEPENDENCE

by Andrew Meier, Executive Director/Chief Executive Officer, Australasian Centre for Rail Innovation (ACRI) 66


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

SIGNALLING, TRACKING AND CONTROL SYSTEMS

5min
pages 72-76

RAIL EQUIPMENT

3min
pages 68-71

CONDITION MONITORING AND MAINTENANCE

5min
pages 64-67

CRITICAL INFRASTRUCTURE SUMMIT

4min
pages 62-63

SHAKING UP CONTINUING PROFESSIONAL DEVELOPMENT IN CONSTRUCTION

2min
pages 56-57

SPATIAL & GIS

4min
pages 60-61

TRAINING THE NEXT GENERATION OF RAIL PROFESSIONALS

7min
pages 54-55

EPIC OPPORTUNITIES IN RAIL FOR REFUGEE ENGINEERS

3min
pages 58-59

RAPID DEPLOYMENT CAMERAS ENABLE MONITORING OF REMOTE SITES

2min
pages 52-53

AUSTRALIA’S SMART CITIES AND COMMUNITIES LEADERS TO GATHER IN MELBOURNE

3min
pages 50-51

MAKING TICKETING TECH SMARTER

5min
pages 46-47

LEVERAGING DIGITAL TRANSFORMATION: INSIGHTS FROM CONSTRUCTION, ENGINEERING AND INDUSTRIAL

3min
pages 48-49

3D MODELLING OF HEADSTOCKS FOR ELEVATED FLINDERS LINK PROJECT

2min
pages 44-45

SOFTWARE, COMMUNICATIONS AND CONNECTIVITY

4min
pages 40-43

SELECTING THE RIGHT TRENCHING SOLUTION

4min
pages 34-35

GRADER MACHINE CONTROL TECHNOLOGY FOR THE FINAL TRIM

3min
pages 38-39

GLOBAL INFRASTRUCTURE SECTOR NEEDS A SHAKE UP

6min
pages 24-27

CHANGES TO WORKPLACE MANSLAUGHTER LEGISLATION IN VICTORIA

5min
pages 36-37

INFRASTRUCTURE OUTLOOK: 2020 AND BEYOND

7min
pages 30-33

IS CONGESTION CHARGING THE ANSWER TO PEAK HOUR?

5min
pages 20-23

HOW AIRPORT INFRASTRUCTURE IS SUPPORTING THE BUSHFIRE EFFORT

4min
pages 28-29

A WORD FROM INFRASTRUCTURE AUSTRALIA

5min
pages 18-19
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.