Pump Industry Spring 2021 Digital Edition

Page 16

The future PIA MEMBER NEWS | PARTNER SOLUTIONS

of booster set technology

“When we started to think about Esybox Max, we asked ourselves how to manage the evolution of the Esybox range. It was clear from the very beginning, it could not just be something bigger. We felt we had to bring forward the path of evolution, completely changing the rules of the game for booster sets in residential and commercial buildings. Esybox Max is the outcome of listening to and communicating with many different people who will be in direct contact with the product.”

I

ntroducing a new concept and industry-first in the booster set industry, Esybox Max is an integrated pumping system for pressurisation in commercial building services. Available in two power sizes, it consists of modular elements that allow different configurations to cover the needs of medium/large apartment blocks and high buildings (even over 14 floors). Each unit consists of the single, double or triple connection base and the pumping units – a four-pump system is available with the additional kit to connect two double bases. Large energy savings are achieved with the DAB inverter combined with a brand new permanent magnet motor. DAB also designed completely new hydraulics, making it leaps ahead in terms of energy efficiency. But it is not just energy efficiency that is at the forefront of this new technology. Esybox Max will improve the storage efficiency in the warehouse. Where there was once one booster occupying space, you can now fit three twin pump booster sets in its place. This allows people to store the full range on one pallet, meaning a customer can pick up an off-the-shelf booster solution of up to four pumps, the same day.

1 Display 2 Inverter 3 Module Wifi/Bluetooth 4 Pressure sensor (delivery side) 5 Pressure sensor (suction side) 6 Non-return valve

14

Keeping it flexible, DAB has the on-site assembly concept. So if you have difficulties getting to the pump's location, due to narrow stairways and corridors etc., you can choose to assemble your booster on-site which will only require moving smaller, lighter boxes into the location then carrying out a quick and easy assembly.

DConnect

Performance, data storage and remote monitoring support users, and facility managers can control their pumps from anywhere, making sure that the running parameters of the pumps follow project specifications exactly and avoiding any possible site issues for complete peace of mind.

The Esybox Max also offers full connectivity and control using DAB’s DConnect technology, which is built into the pump and offers many more advantages than typical BMS systems.

7 Two Litre expansion tank 8 Impellers 9 Hydraulic connections 10 Fast connection tool 11 Water cooled permanent magnet motor 12 Handles

pump industry | Spring 2021 | Issue 37

www.pumpindustry.com.au


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Magnet Drive Pumps

1min
pages 56-57

and its influence on the pump industry

4min
pages 54-55

Flexible coupling selection for improved pump and motor efficiency and operation

8min
pages 46-49

ESCO flexible gear couplings with Multicrown tooth form for longer life from Drive Systems

1min
pages 44-45

Flow prediction tool for variable speed pump stations

5min
pages 38-41

Pump Genius

1min
pages 42-43

AllightSykes’ recipe to the smart pump

2min
pages 36-37

Temporary solution for a wastewater plant

2min
pages 28-29

Major acquisition creates Australia’s largest pump rental company

1min
pages 26-27

Austworld advancing Australian-based facilities

3min
pages 24-25

What to look for when purchasing positive displacement pumps

3min
pages 30-31

Flexidrag® – the premium drag hose for your broad acreage irrigation

2min
pages 22-23

and capability to a new level

2min
pages 18-19

Hydroforming Process: world-first technology

2min
pages 20-21

$20 million federal funding to improve TAS water security

3min
pages 11-13

$77 million for Rockhampton water and sewerage infrastructure

2min
page 9

New pump station to be constructed for $3.5 million project

1min
page 10

Mitiamo pipeline project reaches completion

2min
page 8

The future of booster set technology

2min
pages 16-17

vital resources for pump professionals

3min
pages 14-15
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.