1 minute read

Concept to Consumer

Next Article
public notices

public notices

A seminar designed exclusively for new food businesses and value-added production enterprises to equip them with the necessary tools to take their fledgling business concept all the way to the consumer with the highest chance of success. Virtual attendance is available.

Thursday, March 23rd

9am - 2pm

407 Main St. SW, Ronan, MT

Registration & More Information: https://missionwestcdp.org/concept-to-consumer/

Jane Gillette, R-Bozeman. As a budget bill, HB 430 is subject to the later transmittal deadline. It was heard by the House Taxation Committee Feb. 17 and remains pending.

— Senate Bill 467 would have barred cities and counties from banning short-term rentals or regulating their numbers.

Sponsored by Sen. Jeremy Trebas, R-Great Falls, the bill failed a Senate vote 18-32 March 2.

— Senate Bill 268 would put limitations on local governments’ ability to regulate short-term rentals by explicitly defining short-term rental as a residential use of property and forbidding local bans on property owners renting out their primary residences on a short-term basis. Sponsored by Sen. Greg Hertz, R-Polson, the bill passed the Senate on a 31-19 vote March 2.

US HIGHWAY 93 RONAN-NORTH ROADWORK BEGINS CAUSING MINOR TRAVEL DELAYS

The project starts at the Round Butte Road and US Highway 93 (US 93) intersection in Ronan and extends north for approximately 1.5 miles.

Construction will be completed in three phases, beginning with the widening of the west half of the road to include two southbound lanes, gravel placement, and drainage work. In phase two, this work will be repeated on the northbound lanes.

Traffic will continue to travel on the current highway during phase one and move to the two new southbound lanes in phase two when drivers will be traveling on a gravel surface. Traffic control will be in place, speeds reduced, and a motorcycle advisory will be in effect.

The final phase will involve paving, road marking installation, and finishing work. The project is expected to be completed this year; however, this schedule is subject to change due to weather and other unforeseen factors.

Stay In The Know

Signupforweeklyconstructionupdates:

EMAIL UPDATES: Sloane@bigskypublicrelations.com

TEXT UPDATE*: Text US93RONAN to 41411

PROJECT HOTLINE: 406-207-4484 during business hours

VISIT: https://bit.ly/Ronan-North

*Message frequency may vary. Message and data rates may apply. Text STOP to cancel. Texting alerts are not managed by MDT and may have different privacy and security policies. For more information visit https://smstc.us/t41411/.

Alternative accessible formats of this document will be provided on request. Persons who need an alternative format should contact the Office of Civil Rights, Department of Transportation, 2701 Prospect Avenue, PO Box 201001, Helena, MT 59620. Telephone 406-444-5416 or Montana Relay Service at 711.

This article is from: