Selkirk and selkirk double spread advert

Page 1

Increasing Lettable/Usable area

Modernization of mechanical & electrical services

BMS and security systems while Atlas Fire & Security (Pty) Ltd completed

One of the key drivers of this project was the need for more

The main priority of operating a modern data center is to maximize uptime.

the fire protection system enhancing.

lettable space to accommodate expanding MTN Business

It is therefore essential to ensure all systems are continuously monitored for

The electrical systems presented their own challenges as work on these

customer requirements.

performance to maximize reliability and efficiency.

systems directly & immediately impact on operations.

The spaces created for Collocate 1 plus Collocate 3, 4 and 5 were

The refreshment and extensions to the air-conditioning plant was planned by Harry Schuurmans & Associates (Consulting Mechanical Engineers) with the work on site completed by Southern Air Conditioning.

already close to fully let and the possibility of providing growth

MTN Business (Gallo Manor)

were limited. MTN Business initiated an RFP to refresh and renew their premier Collocation Data Centre in Sandton in 2010. The RFP was driven by a number of goals, including:

“Wet-mode coolers were replaced

“The electrical works all completed in active/live data center environment, with every aspect enhanced, extended, added and

with hybrid air-cooled coolers fitted

· increase available footprint lettable/usable area · modernization of mechanical and electrical systems · improve power capabilities · provide Uptime Institute™ rated Tier-III services · provide real-time carbon-consumption information for facility and all users · update the facility in keeping with MTNs corporate image

with mist sprays – major electricity & water savings resulted”

New cooling Towers The mechanical cooling plant uses a condenser water cooling system. The legacy wet-mode cooling towers on the roof presented an ideal opportunity for renewal with modern hybrid air-cooled units, using water mist sprays only when atmospheric conditions are not favorable, generally when the temperature is greater than 25°C. These air-cooled units use about 10% less electricity and at least 80% less water – both highly advantageous and green friendly. Furthermore, it is possible to run the units to precisely match loads further enhancing savings.

All of these goals had to be implemented in a live environment without impacting dayto-day Gallo Manor background MTN Businesses Gallo Manor Data Center was originally developed in the late 1980's in response to requirements for a high quality environment to be established close to the

improved” Capacity changes were made on the electrical systems including the addition of a third 1600-kVA generator set plus the addition of a fourth 300kVA UPS System on Feeder-B. Other major changes incorporated included: · extensive and comprehensive on-line metering to monitor and manage power, · extensions and improvements to A-Feed and B-Feed systems to ensure concurrent maintainability · updating of generator controls to allow for no-break load transfers

Sandton financial heartland. Originally, the site started life as a facility for a single major Use with the development of the Collocate-1 space with associated plant-rooms. Throughout the 90s IT boom years and into the 21st century, the growth in need for quality IT space close to the financial heartland for a variety of customers resulted in a number of extensions, including Collocate 3, 4 and 5.The exponential growth and use of the facility was leading to a difficult to sustain model using equipment near “end-oflife” causing a situation where further growth endangered high reliability operations. The R60M contract for the work was awarded to Boron Facilities Management as a turnkey project to be completed during 2011. BoronFM took on this project employing specialist Professionals and Service Contractors all thoroughly experienced in data center operations.

New Colocate DC area

· Modernizing of Building-Management-Systems (BMS) including new security and CCTV systems plus total integration management.

Collocate 2 had previously been used for storage and some field services operations support but had always been intended for data center services. The air-conditioning services piping had been constructed as an extension to Collocate 1 and the close proximity to plant-rooms made this an economical choice.

· Fitting Vesda Active Detection throughout the data center and new ProInert IG 55 Gas Suppression Systems Rigorous acceptance testing to validate all systems ensures reliable highuptime performance

A further consideration was the availability of a third generator room, included but unused from the original building fit-out. perspective as the floor slab was easily strengthened to suit high-

Colocate Passage The data center CRAC Units (computer-room-air-conditioning) were also

load server racks.

fitted with modern controls, allowing for enhanced zone controls and the auto

Lastly, this space was ideal from an equipment loading

BoronFM completed the works with close liaison and cooperation with MTN Business with strict management and supervision.

stopping/starting of units to match loads. This further enhances efficiencies and reduces electricity consumption.

Colocate service passage The refreshment and extensions to the electrical plant was planned by Selkirk & Selkirk Consulting Engineers. Electrical Distribution Company New Reception

New BMS CCTV and Access control room

Upgrade to the interior of the Data centre

Dual piping and Hybrid coolers installed on the roof

Colocate entrance

(Pty) Ltd completed the electrical installation using MTU Generator Systems provided by Industrial Machinery Suppliers (ltd) and UPS Systems provided by Compu-Power (Pty) Ltd. IntellePark (Pty) Ltd completed the

Tel:+27 21 852 5095 Fax: +27 21 852 5070

Email: info@selkirkandselkerk.co.za Website: www.selkerkandselkerk.co.za


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.