1 minute read

Restoration of Roads, Footpaths Etc

Next Article
GIS Charges

GIS Charges

Temporary Road Closures

Application Fees per day (2 weeks minimum notice required) $911.00 $0.00 $911.00

Restorations (Road and Footpath)

Please note: While Restoration fees are generally GST free they become taxable if Council excavates road, footpath or gutter as part of private work at another party’s request. GST will be added in those circumstances.

Minimum charge: Minimum restoration charge shall be either 1 Square Metre or 1 lin. Metre Cost of restoration work in excess of 50 square metres may be subject to negotiation with the Director of Environment and Planning.

Road Opening Permit Fee

Road opening fee including 1 inspection Additional Inspection Fee (per inspection) Additional fee payable where road opening made without permit, unless due to emergency, and permit fee and restoration charge paid within 2 working days $283.00 $0.00 $283.00 $183.00 $0.00 $183.00 $321.00 $0.00 $321.00

Roads - per Square Metre:

Asphaltic concrete/hot mix or sprayed bitumen on all types of bases Concrete/brick paving Concrete with asphalt overlay Unsealed/earth/gravel

Footpaths - per Square Metre:

Asphaltic concrete / hot mix footpath Concrete footpath Block/brick paving footpath Earth/gravel footpath

Driveways and Pram Ramps - per Square Metre

Concrete residential driveway Concrete commercial driveway Pram ramp (1 unit) as per Council Standard

Kerb and Gutter - per Metre

Cement concrete kerbing and guttering (including layback) Cement concrete kerbing only Cement concrete guttering only

Dish Crossing - per Metre

Cement concrete dish crossing at intersection $413.00 $0.00 $413.00 $482.00 $0.00 $482.00 $643.00 $0.00 $643.00 $97.00 $0.00 $97.00

$283.00 $0.00 $283.00 $234.00 $0.00 $234.00 $431.00 $0.00 $431.00 $97.00 $0.00 $97.00

$321.00 $0.00 $321.00 $385.00 $0.00 $385.00 $2,734.00 $0.00 $2,734.00

$365.00 $0.00 $365.00 $321.00 $0.00 $321.00 $321.00 $0.00 $321.00

$428.00 $0.00 $428.00

This article is from: