3 minute read

CAMPUS PLANNING

Next Article
ATHLETICS

ATHLETICS

The physical landscape of the MTSU campus continues to evolve and grow in positive ways.

Students began using MTSU’s new $40.1 million School of Concrete and Construction Management (CCM) Building on the west side of campus in October 2022, as they prepare for professional careers in a high-demand sector throughout the booming Nashville area and beyond.

I’m amazed at the many ways concrete was utilized in the design and construction. Students will see firsthand how the many forms of concrete can add value and creativity to a structure. The building is a true living laboratory, with examples of various construction techniques and operating systems in full view of students.

Along with a neighboring Applied Engineering Building, set for groundbreaking in spring 2023, which will serve as the home for the Engineering Technology and Mechatronics Engineering programs as well as provide space for future engineering programs, the CCM facility marks the latest expansion of MTSU’s Science Corridor of Innovation.

It was with great excitement that we announced in fall 2022 our success in securing $66 million to build a new Student-Athlete Performance Center as well as make stadium improvements. These advancements represent the first of a three-phase, $100 million-plus plan to upgrade our athletics facilities. The three-story structure will house training, strength and conditioning, and equipment centers. The first stage of the project is expected to be completed before the start of the 2024 Blue Raider football season.

We also preserved and updated our iconic Murphy Center in 2022, a year in which the “Glass House” marked its 50th birthday. The arena is undergoing a makeover that began in 2022 with a new glass exterior.

Construction also started on our new on-campus tennis facility at the corner of Middle Tennessee Boulevard and Greenland Drive. The outdoor complex will include eight tennis courts, seating for 250 fans, new locker rooms, and new coaches’ offices. Projected completion is fall 2023.

The state provided funding for the renovation of Kirksey Old Main and Rutledge Hall. The total project budget is $54.3 million, which includes $2.4 million in required matching funds.

MTSU also received state funding for an Aerospace campus totaling $62.2 million, which includes $5 million in University matching funds.

The CCM facility marks the latest expansion of MTSU’s Science Corridor of Innovation.

This article is from: