Muhammad Amirul Najmi Razali - Design Portfolio

Page 1

ARCHITECTURE /PORT FOLIO



ARCHITECTURAL PORTFOLIO MUHAMMAD AMIRUL NAJMI BSc (ARCHITECTURE) UNIVERSITI TEKNOLOGI MARA



email : amirul.nj@gmail.com mobile: +6016 209 6021


CONTENTS 01

02

03

04


05

06


01

STUDIO OFFICE


STUDIO OFFICE - BI / HOUSE


IDEATION

DICHOTOMY MODULES SITE BUILDABLE AREA SEMI PRIVATE PRIVATE SETBACK CIRCULATION

CONCEPTUAL DIAGRAM


UTILITIES GARAGE

CONSULTATION ROOM

KITCHEN

TOILET

LOBBY

LIVING ROOM

OFFICE

GROUND FLOOR

WEST ELEVATION

FIRST FLOOR

EAST ELEVATION


PERSPECTIVE BATHROOM 2

BATHROOM 1 BEDROOM 2

MASTER BEDROOM

COMMON AREA

BEDROOM 3

BEDROOM 4

SECOND FLOOR

BEDROOM 1

BATHROOM 1

KITCHEN

MASTER BEDROOM

CONSULTATION ROOM

UTILITIES

SOUTH ELEVATION

BATHROOM 2

SECTIONAL

GARAGE


BI / HOUSE 3-D PERSPECTIVE ROOF

SECOND FLOOR

FIRST FLOOR

GROUND FLOOR


02

URBAN IN-FILL


URBAN IN-FILL

- HOUSE OF DIMSUM / HDS


ADJACENT BUILDING

ADJACENT BUILDING

ROOF PLAN

PEDESTALWALKWAY

ADJACENT BUILDING

WAITING AREA RECEPTION

BOOTHS

WET KITCHEN

OPEN KITCHEN BAR STORE

ADJACENT BUILDING

GROUND FLOOR


CONCEPTUAL DIAGRAM

CK BLO G N LDI BUI

OR FLO T S FIR

R OO L DF UN O GR

CONCEPT BLOCKS ARE CREATED TO SEPARATE SPACES FOR PUBLIC & PRIVATE USE. THE INTEGRATED PART SERVES AS PRIVATE CIRCULATION AREA THAT CONNECTS WORKERS WORKING ENVIRONMENT & CUSTOMERS.

PUBLIC PRIVATE SEMI-PRIVATE SEMI-PUBLIC

ADJACENT BUILDING FOOD BAR

SERVERS

SMOKING SECTION

BOOTHS

T1 T2

FOOR BAR ADJACENT BUILDING

FIRST FLOOR


B

A

FRONT FACADE

SMOKING AREA

WAITING AREA

SECTIONAL ELEVATION A

FOOR BAR

RECEPTION

OPEN KITCHEN BAR

BOOTHS

BOOTHS

STORAGE


STAIRCASE WET KITCHEN

DUMB WAITER

TOILET

BOOTHS

FOOD BAR STAIRCASE

BOOTHS

OPEN KITCHEN BAR

SECTIONAL ELEVATION B


03

STUDENT CO-HOUSING


STUDENT CO-HOUSING - CEMPAKA


SITE LOCATION

SITE ANALYSIS

THIS PARTICULAR DESIGN TASK IS BEING ALLOWING STUDENTS TO EXPLORE AND DESIGN HOUSING TYPOLOGIES AND SHARED FACILITIES WITH THE CONSIDERATION OF SITE FORCES AND THE USERS’ NEEDS. IT CONSISTS OF BACKGROUND STUDIES ON HOUSING ISSUES AND PROJECTS ON HOUSING LAYOUT AND DESIGN.

TARGET USER

+*. ).$ ' 0$ 1 4*)$)" ¥ -+ .$ '

CONDUCTED WITH THE MAIN OBJECTIVE OF

/$' $)" * $ ). .$*)

UI TM

BO UN DA RY

$ /' .$*)

PROJECT BRIEF

CONCEPT


UNIT TYPES UNIT A FOR 4 PERSON

JAL AN BIJ AK

CENTRAL PIAZZA

P O DR

REFUSE CHAMBER

FF O

TOTAL UNIT(S) : 60 APP. OCCUPANTS : 240

UNIT B

FOR 2 PERSON

TOTAL UNIT(S) : 100 APP. OCCUPANTS : 200

TYPICAL FLOOR PLAN

DRO P OF F

GROUND FLOOR PLAN

ROOF PLAN

JAL AN BIJ AK

CENTRAL PIAZZA

P O DR

REFUSE CHAMBER

FF O

DRO P OF F

SITE SECTION


NORTH ELEVATION

EAST ELEVATION


SOUTH ELEVATION

WEST ELEVATION


CONSTRUCTION SEQUENCES

CONSTRUCTION DETAILS

STRIP FOUNDATION IS USED FOR 4 ENDS

TYPICAL FLOOR PLAN 2ND - 5TH FLOOR

PRECAST BOX UNIT IS USED FOR TYPE A UNIT

PRECAST UNIT B & COMMON AREA UNIT C

FIRST FLOOR PLAN

PRE-ASSEMBLED STEEL ROOF & ROOF SLAB

BLOCK PLANS


RESIDENTIAL COLLEGE

STUDENTS’ FACILITIES

CENTRAL PIAZZA


04

AUTOMOTIVE CENTRE OF EXCELLENCE


AUTOMOTIVE CENTRE OF EXCELLENCE


PROJECT BRIEF


VORSPRUNG DURCH TECHNIK (ADVANCEMENT THROUGH TECHNOLOGY)

($)$( '$-.$ ยก-. ('$) #$. ./

(/# (( ($ /' ) %($ $) 4 '$ =;;D@@;=>D

-.# .$

. #)$ '

$)$.$ ' *(+*-$.$*)

' 0 '$)" !* 4*)$)"

-#*1 **(

- 0$ -

$)$$.$ ' ( --$)"


SITE PLAN

GROUND FLOOR PLAN

DIAGRAMMATIC ANALYSIS

FIRST FLOOR PLAN

NOTE: ALL PLANS ARE NOT TO ACTUAL SCALE

BASEMENT PLAN


WATER SUPPLY

ELECTRICAL LAYOUT

ELEC. ROOM

FIRST FLOOR PLAN

WATER TANKS ON THE ROOFTOP

MECHANICAL VENTILATION SYSTEM

SECONDARY ELEC. LAYOUT

AHU ROOM

SECONDARY DISTRIBUTION PIPES

PRIMARY DUCTING

BASEMENT FLOOR PLAN

GROUND FLOOR PLAN

PRIMARY DISTRIBUTION PIPES

BOOSTER PUMP TO WATER TANK

FROM THE MAIN PIPE ALONG MAIN ROAD

TNB SUBSTATION (SINGLE CHAMBER)

PRIMARY PIPES DIRECTLY TO THE BASEMENT LEVEL

SECONDARY ELEC. LAYOUT TO WIRING DETAILS


PURPOSE OF GROUP

TRAVEL DISTANCE

FIRE RATED DOORS

IV - OFFICE V - SHOP

FIRE FIGHTING PROVISION

STAIRCASE WIDTH AND NUMBER IN ACCORDANCE TO UBBL, THERE ARE 8 FIRE-RATED DOORS (SINGLE LEAF) 1HR TO ACCOMMODATE EACH FIRE STAIRCASES

CATEGORY OF TOP MOST FLOOR

IN ACCORDANCE TO UBBL, BASED ON THE SCHEDULE OF ACCOMMODATION, THE FIRST FLOOR OF THIS BUILDING IS CONSIDERED AS THE TOP MOST FLOOR BECAUSE IT HAS THE MOST OCCUPANCY AND THE MOST VOLUME OF THE OVERALL TOTAL OF SOA. THE FIRST FLOOR CONSISTS OF A CAFE, KITCHEN, STAFF LOUNGE, URBANSCAPE, SPAREPARTS STORAGE, SEMINAR ROOM, OFFICES, AND SHOWROOM.

SECTION A-A’

COMPARTMENTALIZATION

SECTION B-B’

PERSPECTIVE VIEWS & BUILDING DESIGN





AUDI TERMINAL 3-D PERSPECTIVE

FIRE STAIRCASE

FIRE STAIRCASE

FIRE STAIRCASE

7 HAND-OVER AREA

2

6 5

1 4

3

7

FIRE STAIRCASE

DROP-OFF AREA


PERSONAL PROJECT

05



CAD DRAWING



#3 SHOP 3-D PERSPECTIVE


06

PERSONAL INTEREST


SKETCHES / IDEAS


OASIS SENTRAL, ARA DAMANSARA, SELANGOR

MASSING MODELS

CENTRAL PLAZA, JALAN SULTAN ISMAIL, KUALA LUMPUR



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.