ARCHITECTURE /PORT FOLIO
ARCHITECTURAL PORTFOLIO MUHAMMAD AMIRUL NAJMI BSc (ARCHITECTURE) UNIVERSITI TEKNOLOGI MARA
email : amirul.nj@gmail.com mobile: +6016 209 6021
CONTENTS 01
02
03
04
05
06
01
STUDIO OFFICE
STUDIO OFFICE - BI / HOUSE
IDEATION
DICHOTOMY MODULES SITE BUILDABLE AREA SEMI PRIVATE PRIVATE SETBACK CIRCULATION
CONCEPTUAL DIAGRAM
UTILITIES GARAGE
CONSULTATION ROOM
KITCHEN
TOILET
LOBBY
LIVING ROOM
OFFICE
GROUND FLOOR
WEST ELEVATION
FIRST FLOOR
EAST ELEVATION
PERSPECTIVE BATHROOM 2
BATHROOM 1 BEDROOM 2
MASTER BEDROOM
COMMON AREA
BEDROOM 3
BEDROOM 4
SECOND FLOOR
BEDROOM 1
BATHROOM 1
KITCHEN
MASTER BEDROOM
CONSULTATION ROOM
UTILITIES
SOUTH ELEVATION
BATHROOM 2
SECTIONAL
GARAGE
BI / HOUSE 3-D PERSPECTIVE ROOF
SECOND FLOOR
FIRST FLOOR
GROUND FLOOR
02
URBAN IN-FILL
URBAN IN-FILL
- HOUSE OF DIMSUM / HDS
ADJACENT BUILDING
ADJACENT BUILDING
ROOF PLAN
PEDESTALWALKWAY
ADJACENT BUILDING
WAITING AREA RECEPTION
BOOTHS
WET KITCHEN
OPEN KITCHEN BAR STORE
ADJACENT BUILDING
GROUND FLOOR
CONCEPTUAL DIAGRAM
CK BLO G N LDI BUI
OR FLO T S FIR
R OO L DF UN O GR
CONCEPT BLOCKS ARE CREATED TO SEPARATE SPACES FOR PUBLIC & PRIVATE USE. THE INTEGRATED PART SERVES AS PRIVATE CIRCULATION AREA THAT CONNECTS WORKERS WORKING ENVIRONMENT & CUSTOMERS.
PUBLIC PRIVATE SEMI-PRIVATE SEMI-PUBLIC
ADJACENT BUILDING FOOD BAR
SERVERS
SMOKING SECTION
BOOTHS
T1 T2
FOOR BAR ADJACENT BUILDING
FIRST FLOOR
B
A
FRONT FACADE
SMOKING AREA
WAITING AREA
SECTIONAL ELEVATION A
FOOR BAR
RECEPTION
OPEN KITCHEN BAR
BOOTHS
BOOTHS
STORAGE
STAIRCASE WET KITCHEN
DUMB WAITER
TOILET
BOOTHS
FOOD BAR STAIRCASE
BOOTHS
OPEN KITCHEN BAR
SECTIONAL ELEVATION B
03
STUDENT CO-HOUSING
STUDENT CO-HOUSING - CEMPAKA
SITE LOCATION
SITE ANALYSIS
THIS PARTICULAR DESIGN TASK IS BEING ALLOWING STUDENTS TO EXPLORE AND DESIGN HOUSING TYPOLOGIES AND SHARED FACILITIES WITH THE CONSIDERATION OF SITE FORCES AND THE USERS’ NEEDS. IT CONSISTS OF BACKGROUND STUDIES ON HOUSING ISSUES AND PROJECTS ON HOUSING LAYOUT AND DESIGN.
TARGET USER
+*. ).$ ' 0$ 1 4*)$)" ¥ -+ .$ '
CONDUCTED WITH THE MAIN OBJECTIVE OF
/$' $)" * $ ). .$*)
UI TM
BO UN DA RY
$ /' .$*)
PROJECT BRIEF
CONCEPT
UNIT TYPES UNIT A FOR 4 PERSON
JAL AN BIJ AK
CENTRAL PIAZZA
P O DR
REFUSE CHAMBER
FF O
TOTAL UNIT(S) : 60 APP. OCCUPANTS : 240
UNIT B
FOR 2 PERSON
TOTAL UNIT(S) : 100 APP. OCCUPANTS : 200
TYPICAL FLOOR PLAN
DRO P OF F
GROUND FLOOR PLAN
ROOF PLAN
JAL AN BIJ AK
CENTRAL PIAZZA
P O DR
REFUSE CHAMBER
FF O
DRO P OF F
SITE SECTION
NORTH ELEVATION
EAST ELEVATION
SOUTH ELEVATION
WEST ELEVATION
CONSTRUCTION SEQUENCES
CONSTRUCTION DETAILS
STRIP FOUNDATION IS USED FOR 4 ENDS
TYPICAL FLOOR PLAN 2ND - 5TH FLOOR
PRECAST BOX UNIT IS USED FOR TYPE A UNIT
PRECAST UNIT B & COMMON AREA UNIT C
FIRST FLOOR PLAN
PRE-ASSEMBLED STEEL ROOF & ROOF SLAB
BLOCK PLANS
RESIDENTIAL COLLEGE
STUDENTS’ FACILITIES
CENTRAL PIAZZA
04
AUTOMOTIVE CENTRE OF EXCELLENCE
AUTOMOTIVE CENTRE OF EXCELLENCE
PROJECT BRIEF
VORSPRUNG DURCH TECHNIK (ADVANCEMENT THROUGH TECHNOLOGY)
($)$( '$-.$ ยก-. ('$) #$. ./
(/# (( ($ /' ) %($ $) 4 '$ =;;D@@;=>D
-.# .$
. #)$ '
$)$.$ ' *(+*-$.$*)
' 0 '$)" !* 4*)$)"
-#*1 **(
- 0$ -
$)$$.$ ' ( --$)"
SITE PLAN
GROUND FLOOR PLAN
DIAGRAMMATIC ANALYSIS
FIRST FLOOR PLAN
NOTE: ALL PLANS ARE NOT TO ACTUAL SCALE
BASEMENT PLAN
WATER SUPPLY
ELECTRICAL LAYOUT
ELEC. ROOM
FIRST FLOOR PLAN
WATER TANKS ON THE ROOFTOP
MECHANICAL VENTILATION SYSTEM
SECONDARY ELEC. LAYOUT
AHU ROOM
SECONDARY DISTRIBUTION PIPES
PRIMARY DUCTING
BASEMENT FLOOR PLAN
GROUND FLOOR PLAN
PRIMARY DISTRIBUTION PIPES
BOOSTER PUMP TO WATER TANK
FROM THE MAIN PIPE ALONG MAIN ROAD
TNB SUBSTATION (SINGLE CHAMBER)
PRIMARY PIPES DIRECTLY TO THE BASEMENT LEVEL
SECONDARY ELEC. LAYOUT TO WIRING DETAILS
PURPOSE OF GROUP
TRAVEL DISTANCE
FIRE RATED DOORS
IV - OFFICE V - SHOP
FIRE FIGHTING PROVISION
STAIRCASE WIDTH AND NUMBER IN ACCORDANCE TO UBBL, THERE ARE 8 FIRE-RATED DOORS (SINGLE LEAF) 1HR TO ACCOMMODATE EACH FIRE STAIRCASES
CATEGORY OF TOP MOST FLOOR
IN ACCORDANCE TO UBBL, BASED ON THE SCHEDULE OF ACCOMMODATION, THE FIRST FLOOR OF THIS BUILDING IS CONSIDERED AS THE TOP MOST FLOOR BECAUSE IT HAS THE MOST OCCUPANCY AND THE MOST VOLUME OF THE OVERALL TOTAL OF SOA. THE FIRST FLOOR CONSISTS OF A CAFE, KITCHEN, STAFF LOUNGE, URBANSCAPE, SPAREPARTS STORAGE, SEMINAR ROOM, OFFICES, AND SHOWROOM.
SECTION A-A’
COMPARTMENTALIZATION
SECTION B-B’
PERSPECTIVE VIEWS & BUILDING DESIGN
AUDI TERMINAL 3-D PERSPECTIVE
FIRE STAIRCASE
FIRE STAIRCASE
FIRE STAIRCASE
7 HAND-OVER AREA
2
6 5
1 4
3
7
FIRE STAIRCASE
DROP-OFF AREA
PERSONAL PROJECT
05
CAD DRAWING
#3 SHOP 3-D PERSPECTIVE
06
PERSONAL INTEREST
SKETCHES / IDEAS
OASIS SENTRAL, ARA DAMANSARA, SELANGOR
MASSING MODELS
CENTRAL PLAZA, JALAN SULTAN ISMAIL, KUALA LUMPUR