MUHAMMAD FARIS BIN MOHD SABRI architecture . urban design . portfolio CONSTRUCTION PACKAGE
PROJECT 1
Practice works- Bagan Datoh Sports Complex
The sports complex was part of a bid fora newly build sports in the Bagan Datoh area.The document shows parts of the construction and working drawings that has been submitted to the local authority for the bidding process. All working drawings are drawn by the owner of the porfolio unless stated otherwise.
Administration building 1. Plan and door and window schedule 2.Roof plan 3.Elevations Extreme park proposal 1. Proposed plan 2. Pespective
PROJECT 2
The Cooperative Masterplan- Construction Drawings
A supporting document to the project within the design portoflio showing the construction drawings being employed within the project Bricks and blocks + sips 1. Axonometric 2,. 1:5 axonometric detail 3. Roof detail ( SIPS panel) 4. Intermediate floor detail (SIPs to Block) 5.Foundation detail ( Brick and block)
Steel strcuture 1. Construction axonometric 2.Cantilever floor detail 3.Foundation detail
D
1:5 Wall to beam detail
ROOF DETAILS 300mm wide zinc roofing Horizontal timber battens
G
Damp Proof Membrane ( DPM) SIPs screws Flashing 100x100mm aluminium gutter Structural Insulated Panels (SIPs) DPM Plasterboard Finish Treated Timber Battens
A
External Timber Panels Timber Fins ROOF
INTERMEDIATE FLOOR DETAILS
SIPs pitched roof U-Value : 0.10
H
External Timber Panels
E
1:5 SIPs to blockwork detail
SIPs ( Structural Insulated Panels) DPM Treated Timber Battens Plasterboard Finish SIPs Screws Metal flashing Cavity closer
SIPs wall U-Value : 0.11
Anchor Bolts Slip Bricks SIPs
B
D
215x100mm concrete block 150mm x 130mm concrete beam
FIRST FLOOR
50mm wall cavity 100mm rigid insulation Timber battens 25mm wooden floor finish
E
Acoustic insulated floor
F Timber battens Concrete block
C
GROUND DETAILS 105x70mm brick
Wall tie
GROUND FLOOR
Cavity tray Damp Proof Course (minimum 150mm from ground)
Timber cladding
150x130mm concrete beam External paver
Inner Structural walls Concrete block perimeter
1:5 Base joint detail
F
Concrete infill Block Void Concrete foundation
Rigid insulation Brick wall
I
Prefabricated concrete slab
A
TOP UNIT
I-Beam Zinc roof Roof structure [ METSEC + Insulation]
CANTILEVER DETAIL
D
Pressed metal sil External Timber cladding Render finish Insulation METSEC Base track
Horizontal I-beam
Zinc roofing
B
Main runner round slot keel 20mm plasterboard ceiling GROUND DETAILS
CANTILEVER Render finish on METSEC Wall
Prefabricated cocnrete slab
C
DPM running through under cantilever Wall cavity
E
Insulated sheathing board 100x50mm C-channels 70x105mm brick Wall tie Plaster board DPC at least 150mm above ground METSEC base track Timber battens
GROUND FLOOR METSEC + Insulation
Treated fimber floor finish Poured concrete
Insulated sheathing board
Sand binding
External brick cladding Structural Steel Column
1200x600mm foundation strip
PROJECT 3
Home Kit- Construction Drawings
A document showing the construction details for a university project Annex and deck details 1. Wall to roof joint detail 2.Foundation detail 3. Deck detail 4. 1:20 Detail model
DETAIL A
DETAIL C
DETAIL B
DETAIL C
DETAIL A
DETAIL B