Architectural Portfolio

Page 1

M U H A M M E D S A F W A N

PORTFOLIO

2018 - 2023 2018 - 2022


HELLO.

I am Muhammed Safwan , and this is my PORTFOLIO. Here I am presenting my architectural portfolio, an artistic manifestation of my unwavering dedication to the world of design and innovation. As an aspiring architect with a deep passion for creating spaces that transcend the ordinary, this portfolio serves as a testament to my commitment to excellence and my vision for shaping the built environment. Within these pages, you will find projects that showcase my versatility, and ability to conceptualize spaces that intertwine functionality with artistic expression. Each project reflects a journey of exploration and growth, as I have continuously sought to push the boundaries of creativity and challenge conventional norms. Through my work, I strive to bridge the gap between form and purpose, embracing sustainability and human-centric design principles. Each project is an opportunity to reimagine spaces, encompassing a wide range of architectural domains

32


INTRODUCTION

3


4


INDEX

p.6 - p.17 | Industrial + public tourism project | SPICE PARK p.18 - p.23 | Residential project | THE LEVELS p.24 - p.33 | Public project | ELEVATE SPORTS HUB, URWA p.34 - p.37 | WORKING DRAWINGS p.38 - p.43 | MISCELLANEOUS Interiors, Freelance works, Sketching

5

5


TYPE

Industrial + public tourism

LOCA

Thodup

PROJEC

The establishment of Spice Processing Cent strategic approach to improving spice value driving economic development. This projec potential impacts of Spice Processing Centers an

The research delves into the socioeconomic and Spice Park. It examines their potential communities, enhance income opportunities sustainable agricultural practices such as o

6


ATION

puzha, Idukki

SPICE PARK

YEAR 2023

CT BRIEF

ter, Spice Park has gained attention as a chains, promoting sustainable agriculture, and ct explores the concept, functions, and nd Spice Parks in enhancing the spice industry.

environmental impacts of Spice Processing Center, to generate employment, empower local for farmers and processors, and promote organic farming and biodiversity conservation.

7


CONCEPT

8


SPICE PARK

Site plan 1. Spice garden 2. Museum 3. Restaurant 4. Business center + admin 5. Auction center 6. Wellness center 7. Processing units 8. Warehouses 9. Guest house 10. Staff quarters 11. Pump room 12. Electrical room 13. Rainwater harvesting

9


Ground floor plan

Museum

- 480 Sq m

Restaurant

- 340 Sq m

Wellness center

- 350 Sq m

Auction center

- 325 Sq m

Total ground floor area of main block

Admin + business center - 282 Sq m TOTAL BUILD UP AREA

10

- 2100 Sqm = 7995 sq m


SPICE PARK

First floor plan

Museum - 295 sqm

Restaurant - 270 sqm

Wellness center - 340 sqm

Business center- 755 sqm

Total first floor area of main block -1660 Sqm

11


Section A-A’

SectionB-B’

Facade details 12

Detail A


SPICE PARK

Axonometric view 13


14


SPICE PARK

15


Warehouse floor plan

16


SPICE PARK

section A-A’

17


TYPE

Residential

LOCA

Kapad

PROJEC

The Riverfront House project aims to design and con of its scenic location near a river. The main focu breathtaking views of the river while incorporating a m functionality of the house.

The architecture of the Riverfront House will be aesthetics, and the strategic use of materials tha Large glass panels and sliding doors will be u different rooms.

18


ATION

d, Calicut

THE LEVELS

YEAR 2019

CT BRIEF

nstruct a modern residence that takes full advantage us of the design is to provide the occupants with multi-level layout to enhance the overall experience and

contemporary, showcasing clean lines, minimalist at blend harmoniously with the natural landscape. utilized to frame the picturesque river views from

19


Ground floor plan 1. Foyer 2. Formal living 3. Living 4. Dining 5. Kitchen 6. Working area 20

7. Toilet 8. Bedroom 9. Garage


THE LEVELS

First floor plan 1. Bedroom 2. Toilet 3. Living (seen below) 4. Reading space (seen below) 5. Open terrace 21


Section A-A’

Section B-B’

22


THE LEVELS

23


TYPE

Public project

LOCA

Urwa, M

PROJEC

The Sports Complex project in Urwa, Mangalor caters to the diverse sporting needs of the loc sports enthusiasts, athletes, and fitness e amenities to promote a healthy and active ous indoor and outdoor sports facilities to c

The proposed location for the sports complex is str accessible to the local population and well-con of transportation.

24


ATION

Mangalore

ELEVATE SPORTS HUB, URWA

YEAR 2020

CT BRIEF

re aims to create a state-of-the-art facility that cal community. The complex will be a hub for enthusiasts, providing top-notch facilities and e lifestyle. The project will encompass varicater to people of all ages and skill levels.

rategically chosen in Urwa, Mangalore. It should be nnected to nearby neighborhoods, ensuring ease

25


Vertical zoning

Ground level Outdoor kabaddi Warm-up pool Gym Office space Conference room Cafetreia

26

First level Indoor cricket nets Squash Yoga/zumba

Third level Badminton

Second level Indoor kabaddi Table tennis

Fourth level Multicourt


ELEVATE SPORTS HUB, URWA

Site plan

27


Ground floor plan

28


ELEVATE SPORTS HUB, URWA

29


First floor plan

Second floor plan 30


ELEVATE SPORTS HUB, URWA

Third floor plan

Fourth floor plan 31


Section A-A’

32


ELEVATE SPORTS HUB, URWA

33


East elevation Scale 1:100

Ground floor plan Scale 1:100

34


WORKING DRAWINGS

Section Scale 1:100

Rain water storage tank details

First floor plan Scale 1:100

35


Location plan Not to scale

Septic tank details

Site plan Scale 1:100 36


WORKING DRAWINGS

Ground floor plan

First floor plan 37


124 cm

90 cm

90 cm

5 cm

28.0 cm

23 cm

5 cm

Interior boardworks done at grillax 0.6 cm eq

eq

eq

eq

eq

eq

MASONRY WALL

24 cm

EXISTING COLOUMN

CEILING

124 cm52 cm

317 cm

PLAN

MASONRY WALL

333 cm

201 cm

1025 cm REVISIONS 1 2 3 4 5

PARTITION WALL DETAILED DRAWING

REMARKS

... ... ... ... ...

115 cm

220 cm 5 cm

GRILLAX

MM/DD/YY _ _ /_ _ /_ _ _ _ /_ _ /_ _ _ _ /_ _ /_ _ _ _ /_ _ /_ _ _ _ /_ _ /_ _

02

5EXISTING cm BEAM

219 cm

A

EXISTING COLOUMN

28 cm

36.2 cm cm

25 cm

7.5 cm

eq

124 cm

5 cm

90 cm

24 cm

90 cm

5 cm

90 cm

716 cm PULL OUT DRAW

PARTITION WALL

EXISTING MASONRY HALF WALL

312 cm

333 cm 29.5 cm

29.5 cm

29.5 cm

219 cm

312 cm

333 cm

95 cm Plyboard

REVISIONS

BOARDWORKS DETAILED DRAWING

GRILLAX

38

1 2 3 4 5

MM/DD/YY _ _ /_ _ /_ _ _ _ /_ _ /_ _ _ _ /_ _ /_ _ _ _ /_ _ /_ _ _ _ /_ _ /_ _

REMARKS

... ... ... ... ...

01

64 cm

ELEVATION BOARDWORK ABOVE LINTEL LEVEL AND BELOW EXISTING BEAM

A

5 cm

40 cm 60 cm

56 cm

96 cm

219 cm

36.2 cm

36.2 cm

PLAN


INTERIOR + RENDERS

39


40


INTERIOR + RENDERS

41


42


SKETCHING

43


THANK YOU

Muhammed Safwan | Architect

muhd.safwanv@gmail.com | +91 7356533208


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.