Mohamed Mahdy's Architecture Portfolio

Page 1

muhmmadmahdy@gmail.com | +201061233513 MOHAMED MAHDY Portfolio | Selected work 2018-2023
Apartment 210630 (Role: Design, Technical Drawing, Visualization, and Construction) Apartment 210630 (Role: Design, Technical Drawing, Visualization, and Construction)

Apartment 210630 (Role: Design, Technical Drawing, Visualization, and Construction)

Plan MM-21001

Rehab October City -13A Apartment 502 12/16/2021

M.Mahdy - A.Hamdy A101

F UP F TV DW Washer Dryer 4.57 m 3.63 m 3.88 m 3.53 m 3.91 m 2.92 m 2.05 m 7.13 m 6.79 m 0.41 m 1.48 m 3.64 m 6.75 m 23.32 m² Master Bedroom 1 13.61 m² Kids Room (B) 3 13.48 m² Kids Room (A) 4 43.82 m² Reception+Dining+Living 5 6.53 m² Terrace 6 4.78 m² Guests Toilet 7 1.27 m 0.35 m 1.20 m 2.11 m 2.19 m 1.45 m 4.78 m 2.02 m 2.96 m 1.61 m 4.50 m 2.25 m 1.95 m 1.81 m 3.76 m 0.78 m 1.27 m 3.76 m 1.78 m 2.98 m 2.88 m 1.32 m 0.18 m 1.30 m 0.60 m 1.00 m0.10 m0.80 m0.42 m 2.36 m 0.70 m 0.85 m 0.90 m 0.80 m 0.09 m 0.07 m0.80 m 0.87 m 0.24 m0.64 m0.36 m0.19 m1.20 m 1.95 m 4.60 m 0.15 m0.95 m0.35 m 1.16 m 0.29 m0.16 m 4.05 m 3.53 m 0.11 m 3.97 m 2.00 m 0.82 m 4.35 m 0.22 m 0.89 m 2.00 m 0.75 m 0.41 m 2.83 m 0.40 m 1.89 m 0.15 m 0.67 m 2.00 m 1.05 m 0.42 m 2.11 m 0.39 m 0.98 m 1.17 m 0.80 m 0.85 m 0.90 m 0.30 m 0.70 m 0.42 m 0.70 m 0.31 m 0.19 m1.20 m 0.37 m0.69 m0.12 m0.69 m0.10 m 2.69 m 0.90 m 0.16 m 0.14 m 0.75 m 0.90 m 2.11 m 0.84 m 2.25 m 0.50 m0.17 m 0.12 m0.81 m 1.80 m 0.68 m0.12 m 0.07 m1.31 m 2.00 m 1.00 m0.20 m 0.15 m0.80 m 1.69 m 1.13 m 0.80 m 0.12 m 0.89 m 2.00 m 0.46 m0.29 m 0.12 m0.17 m0.70 m0.42 m0.70 m0.30 m0.90 m 0.60 m 0.62 m0.54 m 1.80 m 1.39 m 0.22 m 4.07 m 0.44 m 0.20 m 2.40 m 1.29 m 0.62 m 1.55 m 2.16 m 0.02 m 1.40 m 1.67 m 1.43 m 1.31 m 0.80 m 0.14 m 0.58 m 3.62 m 0.30 m 3.01 m 0.90 m 1.61 m 2.30 m 0.90 m 1.12 m 0.90 m 1.09 m 0.40 m 1.09 m 0.52 m0.53 m 0.53 m 0.10 m 3.00 m 0.60 m 0.56 m 1.09 m 0.40 m 1.23 m 0.60 m 0.84 m 2.09 m 0.60 m 1.07 m 2.09 m 3.64 m 4.26 m 3.64 m 7.90 m 1.20 m 1.00 m 0.90 m 0.30 m 0.21 m 4.05 m 3.64 m 0.67 m 2.86 m 2.13 m 3.99 m 1.82 m 2.64 m 0.08 m0.90 m 1.89 m 3.88 m 0.66 m 0.47 m 5.24 m² Master Toilet 16 11.37 m² Lower Kitchen 18 11.98 m² Lobby 19 0.75 m 0.90 m 2.11 m 0.08 m0.90 m Scale Design by Date Project number 1.DO NOT SCALE DRAWINGS. ANY DIMENSIONAL INFORMATION REQUIRED WHICH IS NOT INDICATED ON THE DRAWINGS SHALL BE OBTAINED BY THE ARCHITECT. 2.THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS (e.g: EXISTING STRUCTURAL ELEMENTS, SIZE & LOCATION OF ALL OPENINGS, AND METHODS OF CONSTRUCTION). 3.IF ANY DISCREPANCIES ARE FOUND, NOTIFY THE ARCHITECT BEFORE PROCEEDING ANY FIELDWORK. 4.THE ARCHITECT IS NOT RESPONSIBLE FOR DESIGN AND CONSTRUCTION OF ANY STRUCTURAL ELEMENTS OR LOAD CALCULATIONS. 1 : 25
Ground
1 : 25 Ground Plan 1 No.DescriptionDate 1Revision 1 Date 1

Spacious Bedroom (Role: Design, and Visualization)

Minimal Dining Area (Role: Design, and Visualization)

Cozy Living Area (Role: Design, Modeling, and Visualization)

Manshiet Nasser District Rehabilitation (Role: Design, Modeling, and Visualization)

Manshiet Nasser District Rehabilitation (Role: Design, Modeling, and Visualization)

Salah Al-Din Park Renovation (Role: Design, Modeling, and Visualization)

Salah Al-Din Park Renovation (Role: Design, Modeling, and Visualization)

Aswan Agricultural Port (Role: Design, Modeling, and Visualization)

Aswan Agricultural Port (Role: Design, Modeling, and Visualization)

Al-Nozha Cultural Center - Ground Floor Ceiling Plan for HVAC System (Role: Design, and Technical Drawing)

+0.45 +0.90 14 13 12 10 33 32 31 30 28 27 25 24 22 15 35 36 G104 B01 B 4 Men Toilet G105 B01 4 E Women Toilet G110 B01 B E 3 Manager G114 B01 B 4 Stair 2 G116 B01 B Cafe G113 B01 B 4 HVAC G118 B01 4 Electric A B01 B B01 01 B01 03 B01 04 B01 05 B01 06 B01 07 B01 08 B01 10 B01 02 B01 +0.90 +2.25 +3.15 09 B01 19 13 12 10 15 16 18 19 34 32 31 29 26 24 23 35 01 B01 03 B01 04 B01 05 B01 06 B01 07 B01 08 B01 10 B01 02 B01 09 B01 A B01 B B01 G111 B01 B Workshop G112 B01 B Workshop +0.90 +2.25 +3.15 SCALE DRAWING TITLE AL-NOZHA CULTURAL HUB DATE WORKING Mohamed Khaled Mahdy 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY AR-101 04 16/05/2017 GROUND FLOOR PLAN CENTRAL HVAC C B01 D B01 E B01 F B01 G B01 H B01 C B01 D B01 E B01 F B01 G B01 H B01 G101 B01 4 Auditorium G102 B01 B E 3 Foyer G117 B01 B 4 Janitor room Branch Branch Branch Branch Branch Branch KEY 60*60 CM FOUR-WAY DIFFUSER Main Duct 73 146 cm 73 134 cm Reduction 40 x 41 cm 40 41 cm 40 41 cm 40 41 cm 40 41 cm 40 41 cm Main duct 71 142 Reduction 71 128 Reduction 2 60 69 Reduction 3 40 41 Branch 45 51 Branch 45 51 Branch 45 51 Branch 45 x 51 Branch 45 46 Branch 45 x 46 Branch 30 55 Main duct 106 X 213 Branch 70 x 73 Branch 70 73 Branch 70 73 Branch 70 73 Reduction 106 194 Reduction 2 106 132 G115 B01 B 4 Kitchen Reduction 3 106 108 Reduction 4 95 95 Reduction 80 82 Reduction 60 68 G101 B01 B E 3 INFO DESK Branch 60 64 Branch 60 64 Branch 60 64 Reduction 80 82 G106 B01 4 Stair Branch 55 60 Branch 55 60 Sub-Branch 55 60 Branch 45 91 Sub-branch 45 46 Sub-branch 45 46 G109 B01 B 4 Office G108 B01 4 Office G107 B01 B E 3 Meeting room

Al-Nozha Cultural Center - Ground Floor Ceiling Plan for Lighting System (Role: Design, and Technical Drawing)

SCALE DRAWING TITLE AL-NOZHA CULTURAL HUB DATE WORKING Mohamed Khaled Mahdy 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY AR-103 07 16/05/2017 GROUND FLOOR PLAN LOOKING UP 14 13 12 10 34 33 31 30 28 27 25 24 22 15 36 G104 B01 B 3 Men Toilet G105 B01 B E 3 Women Toilet G106 B01 4 E Stair 1 G107 B01 4 Meeting room G108 B01 B 4 Office G109 B01 B 4 Office G110 B01 B 4 Manager G114 B01 E Stair 2 G116 B01 E 3 Cafe G113 B01 4 E HVAC G118 B01 4 E Electric A B01 B B01 01 B01 03 B01 04 B01 05 B01 06 B01 07 B01 08 B01 10 B01 02 B01 09 B01 G115 B01 E Kitchen 16 17 18 20 21 14 13 11 10 15 19 20 34 33 31 30 29 28 27 25 24 22 36 01 B01 03 B01 04 B01 05 B01 06 B01 07 B01 08 B01 10 B01 02 B01 09 B01 A B01 B B01 G111 B01 4 E Workshop G101 B01 B INFO DESK C B01 D B01 E B01 F B01 G B01 H B01 C B01 D B01 E B01 F B01 G B01 H B01 G101 B01 E 3 Auditorium G102 B01 4 E Foyer G117 B01 B E 3 Janitor room G112 B01 B E 3 Workshop LEGEND FLORESCENT FIXTURE (4 LAMPS 65 WATT) FLORESCENT FIXTURE (4 LAMPS 15 WATT) FLORESCENT BULB (1 LAMP 25 WATT) ONE WAY ONE GANG SWITCH ONE WAY TWO GANG SWITCH FILAMENT FIXTURE (2 LAMP * 150 WATT) FLORESCENT FIXTURE (1 LAMPS 15 WATT) FLORESCENT FIXTURE (4 LAMPS 40 WATT) FLORESCENT FIXTURE (1 LAMPS 65 WATT) TWO WAY TWO GANG SWITCH ONE WAY THREE GANG SWITCH

Al-Nozha Cultural Center - Staircase Section (Role: Design, and Technical Drawing)

J M PLAIN CONCRETE 10 cm. COMPACTED SOIL INTERLOCKING TILES 4 cm SAND 6 cm. COMPACTED SOIL RC 10 cm MORTAR 2cm TILES 2 cm SAND 6 cm DPC 2 cm PC 15 cm SKIRTING 10 cm +9.90 F.F.L +5.40 F.F.L +0.90 F.F.L -3.60 B.F.L +12.15 F.F.L +7.65 F.F.L +3.15 F.F.L -1.35 F.F.L F.P.L COMPACTED SOIL RC 10 cm MORTAR 2cm SAND 6 cm DPM 2 cm PC 15 cm SKIRTING 10 cm +14.40 1 2 3 SKIRTING 10 CM MORTAR 2 CM SAND 6 CM PC 15 CM SKIRTING 10 CM MORTAR 2 CM SAND 6 CM PC 15 CM SKIRTING 10 CM CERAMIC TILES 2 CM MORTAR 2 CM SAND 6 CM PC 15 CM PLASTER 2 CM SKIRTING 10 CM TILES 2 CM MORTAR 2 CM SAND 6 CM PC 15 CM PLASTER 2 CM SKIRTING 10 CM TILES 2 CM MORTAR 2 CM SAND 6 CM PC 15 CM PLASTER 2 CM 23 SKIRTING 10 CM TILES 2 CM MORTAR 2 CM SAND 6 CM PC 15 CM PLASTER 2 CM 4 5 6 7 8 9 10 11 12 14 13 1 2 3 4 5 6 7 8 9 10 11 12 14 13 1 2 3 4 5 6 7 8 9 10 11 12 14 13 1 2 3 4 5 6 7 8 9 10 11 12 14 13 15 16 17 18 19 20 21 22 23 24 25 26 27 15 16 17 18 19 20 21 22 24 25 26 27 28 15 16 17 18 19 20 21 22 23 24 25 26 27 28 15 16 17 18 19 20 21 22 23 24 25 26 27 28 28 6 12 MM ALUMINUM COMPOSITE SHEET MM MORTAR 2 CM +14.85 PC 15 CM B.F.L F.F.L SAND 6 CM -3.60 SKIRTING 10 CM +14.40 T.O.C SAND 6 cm DPM 2 cm RC SLAB 15 cm Thermal insulation 5 cm MORTAR 2 cm CEMENT TILES 2cm CONCRETE SLOPE INCLINATION 5 cm CEMENT SCREED 3 cm ACLIRIC PAINT 2 CM +18.97 T.O.C SKIRTING 10 CM TILES 2 CM MORTAR 2 CM SAND 6 CM PC 15 CM PLASTER 2 CM +0.45 +5.25 C.F.L +9.65 C.F.L +14.15 C.F.L CERAMIC TILES 2 CM CERAMIC TILES 2 CM CERAMIC TILES 2 CM CERAMIC TILES 2 CM +0.65 C.F.L +5.40 F.F.L +9.90 F.F.L +14.40 T.O.C +0.90 F.F.L -3.60 B.F.L +18.97 T.O.C +7.65 F.F.L +12.15 F.F.L +0.90 F.F.L +3.15 F.F.L -1.35 F.F.L -3.60 B.F.L +18.97 T.O.C +18.58 C.F.L
HKL Crystal Industrial Building - Hong Kong (Role: ARCH, STR, MEP Modeling and Coordination) HKL Crystal Industrial Building - Hong Kong (Role: ARCH, STR, MEP Modeling and Coordination) HKL Crystal Industrial Building - Hong Kong (Role: ARCH, STR, MEP Modeling and Coordination) MTR Tung Chung Station (Mass Transit Railway) - Hong Kong (Role: Modeling and Drafting) MTR Tung Chung Station (Mass Transit Railway) - Hong Kong (Role: Modeling and Drafting) MTR Tung Chung Station (Mass Transit Railway) - Hong Kong (Role: Modeling and Drafting) MTR Tung Chung Station (Mass Transit Railway) - Hong Kong (Role: Modeling and Drafting)

Marina H9 Hotel - Egypt (Role: Technical Drawing, Coordination)

1369 2 1370 4 1373 8 1374 10 1165 1470 1715 1765 1620 915 2255 2285 610 900 1620 1765 2675 1215 955 955 515 1620 510 100 1325 1325 100 800 655 935 525 330 300 2850 225 150 225 25 1050 25 215 150 235 100 2395 100 225 150 230 25 1050 25 235 150 215 100 2000 100 300 235 150 245 100 3345 100 240 120 215 520 275 100 4525 100 1205 100 2710 100 700 655 655 700 465 1470 465 1220 1200 630 100 3345 100 240 120 215 520 275 25 4680 25 275 650 275 25 2865 25 775 2505 850 700 2505 775 1000 1000 235 150 245 100 3345 100 240 120 215 520 275 100 4525 100 275 650 275 100 2710 100 1510 650 1905 3415 7915 840 630 100 3345 100 240 120 215 520 275 25 4680 25 300 600 300 25 4130 25 300 240 120 240 470 300 100 4525 100 300 600 300 100 3975 100 300 525 525 300 100 2000 100 215 150 235 25 1050 25 230 150 225 100 450 1495 450 100 235 150 215 25 1050 25 225 150 225 100 2645 100 300 330 865 2795 865 1325 1325 405 3875 405 2265 2265 525 525 2260 530 1730 500 700 700 500 325 3875 325 940 2800 940 525 525 1200 1200 320 3885 320 500 0 1250 250 1000 1000 510 1170 1165 1170 510 330 600 100 11530 100 1670 1675 760 2325 2795 2460 2460 730 675 2000 675 325 305 305EQ 305EQ D6 D6 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3950 301-601 301-603 1371 5A 1372 6A A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3700 675 1000 750 250 675 675 1000 750 250 675 150 475 150 775 4800 265 4800 265 4800 265 4800 265 3600 645 535 2400 555 2400 1165 830 4800 430 4800 1010 2255 955 1730 D18 D18 D18 D18 D18 D18 D18 D18 D6 D6 D6 D6 D6 D6 D18 D18 D6 D6 D18 D18 D6 D6 D6 D6 D6 D6 D6 D18 D18 D6 D18 D6 D18 D18 D6 D6 A.F.F. GYP/ PT-01 3950 D6 D6 D6 D6 D6 D6 D6 D6 655 515 1615 515 675 2000 675 10800 1190 575 805 1000 10800 525 525 hood 1200 D6 840 2125 l1 l1 l1 l1 l1 l1 l1 Access door for fcu 2265 530 1730 630 12965 4780 1970 7340 1390 830 1230 2460 2460 1795 2325 1260 675 1750 925 1670 1675 630 760 1460 2190 2700 3190 500 730 1325 1325 940 2800 940 1100 2725 700 400 3880 400 2845 1680 250 3405 325 1360 500 2110 325 3405 400 915 3395 1915 1700 1910 1730 1215 1615 3515 810 600 450 430 480 745 600 230 610 1700 1910 1730 1215 850 425 1265 1905 1510 2395 2710 1200 1370 4800 925 access door for wifi 2190 300 2190 375 300 375 14 1377 1376 1376 CEILING LEGEND DISCRIPTION TYPE SYMBOL 220-240V,50HZ,DALI CONTROL GEAR. LAMP DIMENSIONS :(D:.45mm ,C:89mm) FOR FULL DESCRIPTION WALL LED LAMP 2700K, 2*4.5W, 2*330LM, IP20, RATED, 220-240V,50HZ,DALI CONTROL GEAR. LAMP DIMENSIONS :(D:38mm ,C:110mm) HEIGHT 1650mm AFFL. FOR FULL DESCRIPTION REFER TO CONSULTANT 684LM, CRI90, 220V,50HZ, DALI CONTROL GEAR. DIMENSIONS: (D:55mm H:140mm) FOR FULL 2.5W LED ADJUSTABLE SPIKE MOUNTED SPOTLIGHT, 2700K, 19DEGREE BEAM ANGLE, IP66 RATED, 146LM, CRI90, 24Vdc,50HZ ,DALI CONTROL GEAR. DIMENSIONS: (D:34mm H:49mm) FOR FULL DESCRIPTION REFER CONSULTANT (D:80mm H:87.4mm) FOR FULL DESCRIPTION REFER TO CONSULTANT DITTO BUT WITH INTEGRATED BATTERY KIT HOURS FOR EMERGENCY LIGHTING. 11.02W/M LED FLEXIBLE LINEAR SILICON LUMINAIRE 2700K, 160DEGREE BEAM ANGLE, IP68 RATED, 540LM/M, CRI80+, 24V ,50HZ, DALI CONTROL GEAR. DIMENSIONS: (W:16mm H:16mm) D6E ,DALI CONTROL GEAR DIMENSIONS: (D:80mm CO:87.4mm) FOR FULL DESCRIPTION REFER CONSULTANT ,CRI:90, 50HZ, DALI CONTROL GEAR DIMENSIONS: (D:80mm H:87.4mm) FOR FULL DESCRIPTION REFER CONSULTANT Supplying, installing, connecting and testing 15 mm pendent quick response sprinkler heads Voice Evacuation speaker ceiling mounted Watt) DISCRIPTION TYPE SYMBOL DISCRIPTION TYPE SYMBOL DISCRIPTION TYPE SYMBOL 1 25 All Dining Ceiling Plan Part 1 1

Marina H9 Hotel - Egypt (Role: Technical Drawing, Coordination)

ST-01 ST-02 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3700 MT-30 WD-02 MT-30 WD-02 WD-02 MT-30 WD-02 MT-30 301-601 301-601 301-601 D6 D6 D18 D18 D6 METAL SKIRTING METAL SKIRTING FIXED FURNITURE DETAILS WILL BE SUBMITTED SEPARATELY PT-04 PT-04 70 3880 3950 1000 1200 555 945 6 1376 5 1376 800 1100 1110 1205 3620 1200 3620 340 13295 370 900 370 770 570 530 90 3510 800 100 370 370 570 3070 370 370 900 370 370 370 370 570 530 3700 3700 3700 7 1398 D6 WD-02 MT-30 PT-04 PT-04 MT-30 WD-02 MT-30 WD-02 WD-02 WD-02 301-601 301-601 301-601 D18 D6 D6 D6 ST-01 ST-01 ST-01 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3950 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3950 D18 D18 D6 A.F.F. GYP/ PT-01 3700 A.F.F. GYP/ PT-01 3950 METAL SKIRTING FIXED FURNITURE DETAILS WILL BE SUBMITTED SEPARATELY METAL SKIRTING 1000 1200 555 945 3700 3450 250 1376 5 330 250 3700 530 2070 1000 1200 2755 1205 3620 1205 1110 1110 815 900 2170 530 3450 250 3700 13295 90 3510 7 1398 680 135 1190 1145 1215 3690 1205 1280 2775 S25 S25 1850 1850 LEGEND: LE-01 MT-01 MT-02 MT-03 MT-04 MT-05 PL-01 PT-01 PT-02 PT-03 PT-04 PT-06 ST-01 WD-01 PT-05 ST-02 WC-01 WD-02 FAUX LEATHER FOR HEAD BOARD METAL PROFILE 2MM METAL PROFIL AND SKIRTING 2MM METAL FRAMES, PROFILE AND TRIM 2MM METAL FRAMING 2MM METAL STAINLESS STEEL 2MM LAMINATE 1MM S0500 NFENOMASTIC MY HOME,RICH MATT 1624 SKYLIGHT FEBOMASTIC WONDERWALL grey mattarazzo marble VINYL WALL COVERING PRODEX EXTERIOR PANELS DYED BRICH VENEER S0500 NFENOMASTIC HYGIENE 1973 OBJECTIVEFENOMASTIC MY HOME,RICH MATT 1973 OBJECTIVEFENOMASTIC WONDERWALL 1624 SKYLIGHTSTAIN WC-30 VINYL WALL COVERING WC-31 VINYL WALL COVERING white ardesian marble 230V- 16A, SOCKET OUTLET, 2P+E, IP20 FLUSH MOUNTED WITH SAFETY SHUTTERS, AND SIDE EARTH CONTACT (SCHUKO TYPE). S01 S14 SAME AS S01 BUT FURNITURE MOUNTED (WITH POWER POINT FROM FLOOR OUTLET UNDER FURNITURE). SAME AS S014 BUT INTEGRATED WITH USB OUTLET. S25 20 All Dining Elvation 3 3 20 All Dining Elvation 4 4
MASAR Urban Development Project - Saudi Arabia (Role: Visualization) MASAR Urban Development Project - Saudi Arabia (Role: Visualization)

ACU | Ahram Canadian University Hospital and Colleges of Medicine & Nursing - Egypt (Role: Modeling and Visualization)

ACU | Ahram Canadian University Hospital and Colleges of Medicine & Nursing - Egypt (Role: Modeling and Visualization)

Walk

Cairo “Offices” - Egypt (Role: Design Associate and Drafting)

WOC |
Of

Cairo “Trambolin Services Building” - Egypt (Role: Design Associate, Technical Drawing, and Modeling)

WOC |
Of
Walk

WOC | Walk Of Cairo “Trambolin Services Building” - Egypt (Role: Design Associate, Technical Drawing, and Modeling)

Cairo “Trambolin Services Building” - Egypt (Role: Design Associate, Technical Drawing, and Modeling)

WOC |
Of
Walk

| Walk Of Cairo “Trambolin Services Building” - Egypt (Role: Design Associate, Technical Drawing, and Modeling)

WOC

Walk Of Cairo “Basement Floor” - Egypt (Role: Design Associate, Technical Drawing, and Modeling)

WOC |

Cairo “Gate 01” - Egypt (Role: Design Associate, Modeling, and Visualization)

WOC |
Walk Of

Walk

Cairo “Gate 01” - Egypt (Role: Design Associate, Modeling, and Visualization)

WOC |
Of

| Walk Of Cairo “Cinema” - Egypt (Role: Design Associate, Technical Drawing, and Modeling)

UP UP DN UP UP UP UP UP UP UP UP UP UP UP UP L2 L3 L4 L5 D1 L6 D2 D3 D4 L7 11 D5 G1 G2 15 G3 G4 18 G5 G6 21 22 K L G 93 92 91 90 89 88 87 86 85 84 83 82 1.50 m 4.32 m 10.10 m 10.18 m 3.46 m 2.45 m 4.29 m 3.23 m 2.28 m 4.54 m 0.90 m 3.23 m 9.93 m 1.50 m 1.50 m 14.18 m 2.85 m 1.50 m 1.85 m 3.69 m 3.22 m ENTRANCE LOBBY HALL (1) 85 SEAT HALL (2) 84 SEAT HALL (3) 39 SEAT EXIT STAFF MEP MEP 2.97 m 2.45 m 2.68 m 2.45 m 10.08 m 1.50 m 3.49 m 2.39 m 5.70 m 3.66 m 5.70 m 4.05 m 3.70 m 1.68 m 2.59 m 3.18 m HALL (6) 149 SEAT 4.29 m 1.50 m 10.15 m 1.50 m 9.68 m 12.02 m 4.48 m 3.28 m 3.20 m 9.28 m 1.50 m 3.62 m 13.13 m KITCHEN 13.45 m 3.05 m LOUNGE STORAGE 3.03 m 3.14 m VIP HALLS ENTRANCE REGULAR HALLS ENTRANCE FOOD AND BEVERAGE + TICKETS 2.02 m 3.61 m 9.55 m 2.20 m HALL (9) 25 SEAT HALL (8) 30 SEAT 8.20 m 4.00 m 0.99 m 6.87 m 2.02 m 7.10 m 6.24 m 4.00 m 0.72 m 6 4 0 m 2 50 m 1 5 m 1 3 3 6 m EXIT EXIT EXIT HALL (7) 49 SEAT 9.93 m 2.95 m 3.69 m 1.50 m 9.83 m 5.96 m W.C (F) 2.53 m HALL (4) 86 SEAT HALL (5) 86 SEAT W.C (M) LOUNGE LOUNGE 1.50 m 6.42 m 3.03 m 4.29 m 3.20 m 3.28 m 0.90 m 0.90 m 0.90 m 0.66 m 0.40 m 4.00 m 7.63 m 8.65 m 4.23 m 2.96 m 10.96 m 13.19 m 4 6 0 m 0 5 6 F.F.L. + 0.00 m F.F.L. + 0.98 m F.F.L. + 0.00 m F.F.L. 0.49 m F.F.L. 0.49 F.F.L. 0.00 F.F.L. 0.35 F.F.L. 0.00 m F.F.L. 0.98 m F.F.L. 1.46 m F.F.L. 0.98 m F.F.L. 0.98 m F.F.L. 0.00 m F.F.L. + 0.00 m F.F.L. 0.00 W.C W.C CONCIERGE F.F.L. 1.46 m 0.76 m 7.52 m 8.52 m 8.52 m CONCIERGE LOUNGE 8.65 m 3 VIP HALL = 98 SEATING 5 REGULAR HALL = 467 SEATING 1 KIDS HALL = 20 SEATING TOTAL: 9 HALLS = 585 SEATING F.F.L. 0.34 7.10 m F.F.L. 0.34 m
WOC

Walk Of Cairo “Cinema” - Egypt (Role: Design Associate, Technical Drawing, and Modeling)

WOC
|

Al-Nas Hospital “Main Entrance Ceiling Plan” - Egypt (Role: Technical Drawing and Modeling)

7 8 9 10 11 12 13 15 C.F.L 0.80+ C.F.L 1.40+ C.F.L 1.40+ C.F.L 0.80+ C.F.L 0.80+ C.F.L 0.80+ C.F.L 1.10+ C.F.L 1.10+ C.F.L 1.10+ C.F.L 1.70+ C.F.L 1.70+ C.F.L 2.20+ C.F.L 2.20+ C.F.L 0.80+ C.F.L 0.50+ C.F.L 1.40+ C.F.L 1.40+ C.F.L 0.50+ C.F.L 0.80+ 0.62 0.62 C.F.L 2.20+ C.F.L 1.70+ C.F.L 2.20+ C.F.L 0.80+ C.F.L 1.10+ C.F.L 1.70+ C.F.L 0.80+ C.F.L 1.40+ C.F.L 1.40+ C.F.L 0.80+ C.F.L 0.80+ C.F.L 1.10+ C.F.L 1.70+ C.F.L 2.20+ C.F.L 2.20+ C.F.L 2.20+ C.F.L 2.20+ C.F.L 0.40+ C.F.L 0.30+ C 01 03 C 06 09 C 02 C 05 C 04 C 08 C 19 C 14 12 C 18 C 17 C 16 C 13 C 11 C 10 0.60 2.47 1.36 1.23 0.60 0.60 2.41 1.36 1.23 1.95 1.95 4.29 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.41 0.25 0.25 0.25 0.60 0.60 0.60 0.25 0.25 0.25 2.47 0.25 0.25 8.80 8.81 0.25 0.25 HIDDEN LED TAPE 23.8 29 LED SPOTLIGHTS SPACING VARIES BETWEEN AND CM 0.25 0.25 12 LED SPOTLIGHTS SPACING VARIES BETWEEN 7 AND CM 10 SPOTLIGHT SPACING VARIES AND CM LED SPOTLIGHTS SPACING VARIES BETWEEN AND CM 10 LED SPOTLIGHTS SPACING VARIES BETWEEN AND CM SPOTLIGHTS SPACING VARIES BETWEEN 7 AND CM LED SPOTLIGHTS SPACING VARIES BETWEEN AND CM LED SPOTLIGHTS SPACING VARIES BETWEEN AND CM LED SPOTLIGHTS SPACING VARIES BETWEEN AND CM LED SPOTLIGHTS SPACING VARIES BETWEEN AND CM 12 LED SPOTLIGHTS SPACING VARIES BETWEEN AND CM HIDDEN LED TAPE HIDDEN LED TAPE 14.2 M HIDDEN LED TAPE 8.5 HIDDEN LED TAPE 8.3M LED SPOTLIGHTS SPACING VARIES BETWEEN AND 9 CM HIDDEN LED TAPE 6.5 M HIDDEN LED TAPE 5.4 TAPE 5.4 HIDDEN LED TAPE 5.4 M HIDDEN LED TAPE 5.4 M TAPE 5.4 M HIDDEN LED TAPE 5.4 M 8 LED SPOTLIGHTS SPACING VARIES BETWEEN 7 AND CM HIDDEN LED TAPE 14.2 M HIDDEN LED TAPE 12.4 HIDDEN LED TAPE 12.4 M HIDDEN LED TAPE 6.5 M HIDDEN LED TAPE 8.3M HIDDEN LED TAPE 8.5 M HIDDEN LED TAPE M PROJECT OWNER NORTH CONSULTANTS MARK DATE DESCRIPTION SHEET TITLE NAS BONYAN HOSPITAL 1 APRIL- 2019 2 FEB- 2020 ISSUE 2 DESIGN DEVELOPMENT CONSTRUCTION DRAWINGS NOTES: MATERIALS AND COLORS TO BE VERIFIED ACCORDING TO OWNER'S APPROVAL CAD DWG FILE: CSF-IN-100.DWG DRAWN BY: ARCH. AKRAM YOUSSEF CHECKED BY: DR. HUSSAM MAGDY HOSPITAL ENTRANCE LOBBY DRAWING SCALE: 1:50 REFLECTED CEILING PLAN REFLECTED CEILING PLAN DRAWING SCALE 1:50 IN ARCH. SAMAR AFIFI OVERALL LIGHTING DESIGN ARCH. MOHAMED MAHDY ASSOCIATE MSA UNIVERSITY PROFESSOR ADDITIONAL CUSTOMIZED LIGHTING UNITS DESIGN AS SHOWN IN DETAILS SHEETS LEGEND: FLORECENT BOX 60 X 60 CM LED SPOTLIGHT LED TAPE

Al-Nas Hospital “Donor Wall” - Egypt (Role: Modeling and Visualization)

EPC | Egyptian Plasma Center - Egypt (Role: Design Associate, Technical Drawing, Modeling, and Visualization)

A201 2 A201 1 A201 3 A201 4 1 1 2 3 4 5 6 7 7 4.25 m 6.05 m 7.15 m 7.15 m 5.10 1.65 m 3.85 m 6.05 m A A B B C C 6.70 m 3.17 m 3.83 m 6.90 m 6.70 m 6.70 m D E E 37.00 F F 37.00 EXAM EXAM WAITING N.D. EXAM WAITING E.D. RESTROOM RESTROOM RECEPTION VITAL STATIONS CONTROL DESK OFFICE OFFICE OFFICE KIOSKS RESTROOM BREAKROOM ON DECK JAINTORIAL FREEZER 1 FREEZER 2 ELEC ROOM BIOHAZARD WASTEEQUIPMENT REPAIR DONOR FLOOR PLASMA PROCESSING DONOR RECOVERY DATA ROOM SOFTGOODS/ SUPPLIES SHIPPING RESTROOM RESTROOM RESTROOM CHANGING ROOM CHANGING ROOM ARCHIVE TRAINING MEETING ROOM WAITING AREA DONORS' FELLOWS WAITING 2' 1' D' 6.73 m 2.92 m 6.73 m 5.80 m 4.90 m 2.05 4.90 m 4.90 m 2.33 m 2.33 m 3.66 m 6.10 m 3.45 m 2.20 m 3.75 m 5.10 m 1.89 m 6.85 m SCREENING BOOTH 7.60 2.61 m 6.10 m 3.33 m 11.93 m 2.05 3.80 m 3.28 m 3.64 m 3.45 m 4.90 m 3.50 3.15 1.45 m 4.00 m 2.73 m 4.90 m 3.50 3.15 24.85 m 19.30 7.25 m 16.80 m 3.35 m 3.45 m 6.10 m 4.70 m 3.33 m 3.43 m 3.40 3.45 m 3.80 m 3.80 m 3.45 m 1.50 m 3.40 3.33 m 8.36 m 10.63 m 2.83 m LOADING DOCK ENTRANCE LOBBY SIDEWALK 2.48 m 3.76 m 3.76 m 4' 5' 6' 4.25 m 4.95 6.95 m 3.90 m 5.30 m 5.30 m 5.30 m 5.30 3' 6.70 m 6.70 m 7.20 m 6.70 m 6.70 m 2.40 m 3.00 m 4.53 m 4.00 m 1'' 1'' E' GENERATOR AREA 2.80 m 1.15 m 2.48 m 1.15 m 2.83 m WC 2.56 m F.F.L + 0.20 F.F.L 0.20 m F.F.L 0.20 m F.F.L 0.20 F.F.L + 0.20 F.F.L 0.20 m F.F.L 0.20 m F.F.L 0.20 m F.F.L 0.20 m F.F.L 0.15 F.F.L 0.05 m OPTIONAL CAR PARKING SIDEWALK 1.41 m 3.53 7.50 m 3.45 m 25.00 m 4.50 5.00 m 2.50 m 5.07 m 2.50 m 6.48 m TRUCK PARK FOR DOCKING F.F.L 0.15 m F.F.L 0.15 m F.F.L + 0.15 F.F.L + 0.15 F.F.L 0.15 m 5.00 m 1.48 m 2.20 m 10.00 m 8.64 m 7.50 m 0.60 m 11.33 m 11.33 m 5.43 m 1.05 5.00 m 1.50 m MAIN ENTRANCE 3.30 m 3.70 m 5.20 m 3.40 m 8.53 m 1.50 3.75 m 4.61 m 1.45 m 6.15 EXAM A301 A301 2 A301 2 A301 A301 A301 4 A302 4 A302 5 A302 5 A302 5'' 1.48 m 6.65 m 2.50 m 1.35 m 4.60 2.73 m 1.80 m 1.35 m0.10 4.10 m 19.30 1.10 m1.52 m 1.50 1.50 m 0.60 m 1.10 m 2.39 m 3.55 7.60 0.10 m2.51 6.20 6.85 m 1.48 m 0.41 m 2.40 m0.10 m 3.90 m 2.45 m0.90 m 1.55 2.19 m 1.65 m 1.65 m 0.95 m 0.95 m 0.95 m 1.21 m 1.70 m 1.23 m1.69 m 1.69 m1.23 m 0.95 m 1.20 m0.10 m 3.90 m 1.47 m 1.18 5.30 m 12.20 m 2.70 m 3.04 Optional Story-Window F.F.L 0.20 m F.F.L -0.80 0.00 m 0.00 0.00 m2.05 m 1.69 m 2.08 m 2.03 m SLOPE 1:12 1.55 3.90 m 1.70 m 1.10 m 1.73 m 1.73 m 5.00 m 1.46 Scale Checked by Drawn by Date Project Code Project: Owners: Main Consultant: Architect: Sheet Number North Notes: 1 : 100 Typical Ground Floor Plan Egyptian Plasma Center 29/3/2021 Arch. Mohamed Mahdy Eng. Mai Azzam A101 1 100 Typical Ground Floor Plan 1 -All dimensions are in the metric system. -All finishing materials to be confirmed by partners in future phases. -Optional story-windows to be confirmed for each location depending on the climate analysis of each site. -The sign wall height range from 1.50 to 3.00 meters over the TOC level according to municipality regulations in each site. Abbreviations: -T.O.C: Top Of Concrete -LD.F.L: Loading Dock Finish Level -S.F.L: Street Finish Level -G.F.L: Ground Finish Level -C.F.L: Ceiling Finish Level Schematic Design (30%) 22/03/2021 No.DescriptionDate GRIFOLS EGYPT

| Egyptian Plasma Center - Egypt (Role: Design Associate, Technical Drawing, Modeling, and Visualization)

S.F.L 0.00 C.F.L 4.20 A B C E F D' G.F.L 0.20 -0.80 m T.O.C 4.45 S.F.L 0.00 m C.F.L 4.20 m 1 2 3 4 5 6 7 5'' G.F.L 0.20 m LD.F.L -0.80 m T.O.C 4.45 m S.F.L 0.00 m C.F.L 4.20 m 1 7 2' 1' 4' 5' 6' 3' G.F.L 0.20 m -0.80 m T.O.C 4.45 m S.F.L 0.00 m C.F.L 4.20 m A B C D E F E' G.F.L 0.20 m LD.F.L -0.80 m T.O.C 4.45 m Scale Checked by Drawn by Date Project Code Project: Owner: Main Consultant: Architect: Sheet Number North Notes: 1 : 100 Elevations Egyptian Plasma Center 01/04/2021 Arch. Mohamed Mahdy Eng. Mai Azzam A201 1 : 100 Elevation 1 1 1 : 100 Elevation 2 2 1 : 100 Elevation 4 4 1 : 100 Elevation 3 3 -All dimensions are in the metric system. -All finishing materials to be confirmed by partners in future phases. -Optional story-windows to be confirmed for each location depending on the climate analysis of each site. -The sign wall height range from 1.50 to 3.00 meters over the TOC level according to municipality regulations in each site. Abbreviations: -T.O.C: Top Of Concrete -LD.F.L: Loading Dock Finish Level -S.F.L: Street Finish Level -G.F.L: Ground Finish Level -C.F.L: Ceiling Finish Level 1 Schematic Design (30%) 22/03/2021 GRIFOLS EGYPT No.DescriptionDate EPC

Egyptian Plasma Center - Egypt (Role: Design Associate, Technical Drawing, Modeling, and Visualization)

EPC |

ABV | Almaza Bay Villa “Ground Floor Plan” - Egypt (Role: Design Associate, Technical Drawing, and Modeling)

U P U P U P U P 9 8 3 U P U P U P U P U P U P U P U P U P 1 A201 1 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 A A B B C C D D E E F F G G H H I I J J K K L L M M N N O O LIVING DINING KITCHEN BEDROOM 5 TERRACE GUEST TOILET STORE A420 1 3 4 2 1 2 2 1 A428 1 3 4 2 A414 1 2 3 4 A415 1 4 3 2 MAID'S BATHROOM 5 A418 1 4 3 2 A418 5 8 7 6 DRIVER ROOM BATHROOM 7.36 0.20 0.85 1.23 0.80 3.70 2.98 1 A301 1 A301 0.80 1.11 0.361.08 0.60 1.66 0.90 0.92 7 2 3 3 0 1 9 0.36 2 A302 2 A302 1 A302 1 A302 6.09 0 4 0 7 0 7 0.850.480.90 0.900.35 0 2 7 0 9 1 0 1 1.10 2.30 1.57 0.50 0.62 1.28 0.60 0.78 0.30 0.36 1 9 7 1 1 1.15 1 1 0 1 1 9 8 6.09 1.27 3.55 3.23 1.46 0.78 3.48 2 STAIRCASE PORCH LOBBY 0.72 0.83 0.40 0.80 1.52 1.20 1.02 0.63 1.95 1.97 0.250.250.67 2 0 2 5 0.25 0.25 1.97 1.71 0.27 0.60 5.90 3 A303 4 A303 4 A304 0 5 1 0 3 0 5 7.41 5.34 0.25 2.02 1.34 4.06 4 6 1 A304 4 A305 3 A305 1 A305 2 A305 2 A306 1 A303 1 A306 4 A307 3 A307 2 A304 1 A307 2 A307 4 A308 3 A308 2 A308 1 A308 2 A303 SIDE ENTRANCE0 6 5 0.52 3.66 0.87 5.34 5.09 0.25 0.25 4.20 0.60 0.55 0 3 7 4 8 1 7 2.44 1.16 3.70 2.34 0.35 3.11 1.36 1.68 1 POOL DECK POOL 1 0.80 2.05 0.34 6.78 2.66 0.66 5 CARS PARKING 0.87 2.50 0.87 0.92 2.62 1.46 1.10 0.50 5.05 2.50 2.07 15.38 0 1 6 0 3 8 1 4 1.07 0.460.60 0.65 1.20 0.78 0.94 0.95 0.15 0.93 0.54 0.85 1.00 0 2 3 0 2 7 4.97 0 2 2 9 3 3 1.83 0.99 0.51 1.02 0.52 0.990.24 0.95 0.70 1.01 0.800.08 4.71 2.07 1 7 0 9 0 1.95 0.27 0.89 2.64 4.20 3.901 1 51 6 5 F F L 0 1 5 0 3 0 0 3 0 0 0 0 0 0 0 8 1 0 7 4 4.24 3.56 3 4 1 0 0 1 6 2 1 0 2 A309 2 A3090 3 00 6 5 4.54 3 A309 3 A309 5.59 1 A309 1 A309 S L O P E 1 2 SLOPE 1:10 1.25 3.57 4.82 2.07 1.36 0 1 0 1 0 0 0 0 3 5 1 A422 3 A422 0 2 8 0 A426 5.15 0.92 2 A426 0.280.350.150.950.150.350.250.850.28 0 1 8 2 0 0 0 1 8 9 0.111.02 1.20 1.000.10 1.55 0.40 0.80 0.42 0.10 1.00 0.10 1.00 0.10 1.130 5 30 4 10 1 5 0 0 0 Scale Checked by Drawn by Date Project number 1 : 50 Ground Floor Plan 20002 Almaza Bay Villa 01/20/2021 Arch. M. Mahdy Dr. Hussam Magdy A101 1 : 50 Level 1 1 1 For Construction 20/01/21 Architect Owner: Dr. Farouk Ismael No.DescriptionDate

ABV | Almaza Bay Villa “Pool Sections” - Egypt (Role: Design Associate, Technical Drawing, and Modeling)

Level 0 0.00 Level 1 0.15 1 2 3 4 5 6 7 8 9 10 -0.15 0.30 -1.15 -1.65 0.00 0.00 -0.92 -0.69 -0.46 -0.23 1.45 1.00 0.45 0.50 1.00 0.150.30 1.95 1.65 0.30 0.50 Level 0 0.00 Level 2 3.30 Level 1 0.15 A -0.65 -1.15 -0.30 0.30 0.00 -0.15 -0.20 -0.16 0.50 1.15 1.15 0.50 1.65 Level 0 0.00 Level 2 3.30 Level 1 0.15 A 0.00 -1.15 -1.65 0.30 0.15 0.00 -0.15 1.65 Scale Checked by Drawn by Date Project number Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail 1 : 25 Swimming Pool Sections 0001 Almaza Bay Villa 11/01/20 Arch. M. Mahdy Dr. Hussam Magdy A309 1 25 Section F-F 2 1 : 25 Section E-E 3 1 25 Section D-D 1 No.DescriptionDate

IN-TUNE - Egypt (Role: Design Associate, and Modeling)

CAC | Cairo American College
III “High School Building
-
(Role:
Phase
Renovation”
Egypt
Technical Drawing)

CAC | Cairo American College Phase III “High School Building Renovation” - Egypt (Role: Technical Drawing)

AS SHOWN SD-803 NOTES: ISSUED FOR CONSTRUCTION DRAWING NAME: PROJECT NAME: DRAWING NUMBER: SHEET SIZE: A0 REV DATE: 02 CAC PHASE III HS RENOVATION PROJECT SUB PHASE lll MAIN CONSTRUCTION WORKS AT THE HS BUILDING SCALE: 29/11/2018 1 Midan Digla 11431, Cairo American College Owner: Maadi, Cairo, Egypt Conceptual Design Architect: Architecture of Record: SUB CONTRACTOR 1st floor. 203 Airport Road Heliopolis, Cairo Egypt Tel: +202 2269 5164 Fax: +202 2269 5162 info@gcc-intl.com www.gcc-intl.com CONTRACTOR Cosmos-E Engineers & Consultants 80 Elmoltaka Elaraby, Masken Sheraton Heliopolis, Cairo, Egypt Tel: +202-22697760 +202-20644309 +202-20644310 +201068836955 Fax: +202-22697702 website: http://www.cosmos-eng.com/ DATE NO. ISSUE REVISIONS: 00 22/01/2018 REF. TENDER DRAWING (A-601,A-602,A-604,A-605) (A-905,A-906) V.E. REPORT REVISION (RV00,RV01) COSMOS Engineers Consaltants 01 18/02/2018 02 29/11/2018 SHOP DRAWING SHOP DRAWING SHOP DRAWING RFI-AR-14
UNDP | Urban Renewal Project For Reconstruction of the City of Benghazi - Libya (Role: Data Analysis and Visualization using GIS)

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.