PORTFOLIO
MUKUL PRATAP SINGH
MUKUL PRATAP SINGH
Internships
Aspiring architecture intern seeking hands on experience to enhance my design skills and creative thinking to contribute in company projects while exapnding my expertise in this field .
Architectural internship at Parry And associates, Mohali, punjab
june 2023- Aug 2023
Academic Achievements Sheltergenius Competetion - Design for Disaster Releif
+91 7983026898 singhmukulpratap039@gmail.com Mukul Pratap Singh Gamma II , Greater Noida, UTTAR PRADESH
Key Competencies
• Construction Knowledge • Technical Drawings • Site Analysis • Project Management • Working Drawings • Submission Drawings
Extra curicular • Architectural Publication of coffee Table book • Member of Deparment of Student Welfare ,CHANDIGARH UNIVERSITY • Member of Sports Department , Chandigarh University • Annual Corbufest winner, Chandigarh University. • Volunteer in Fashion Modeling competetion ,CU fest 2022,2023
Chandigarh University
EDUCATION
Certifications
• BACHELOR OF ARCHITECTURE First Semester Second Semester Third Semester Fourth Semester Fifth Semester Sixth Semester
CGPA - 7.69 6.1 7.56 7.89 7.91 8.31 7.76
2020-2025
• DIPLOMA IN ARCHITECTURAL ASSISTANTSHIP
CGPA - 62 %
2017-2020
Seth Ganga Sagar Jatia , Bulandshahr, Uttar pradesh
Sardar patel HSS Inter College, Bulandshahr, Uttar Pradesh • HSC
CGPA - 82 %
SKILLS
-Nov 2023 2nd Position
2017
• Autodesk Autocad Certified user by Autodesk University • Autodesk Revit Certified user by Autodesk University • Entrepreneurship from Linkedin • Social And Professional Ethics from Linkedin • SEEK Course by UNESCO MGIEP
Jan 2019 Aug 2019 Jun 2022 Jun 2022 Apr 2022
Workshops/Training • Capacity Building Training workshop on energy conservation • Cultural and Heritage Preservation • Employability Enhancement • Health Care Design Workshop • Introduction to Energy Efficiency • Intrnational Workshop with University of Florence
Projects
• Residence • Play School • Commuity Center • Beach Resort • Veterinary Hospital • Low Rise Housing • Auditorium • Hospital
Mar 2023 Apr 2023 June 2022 Sept 2023 Sep 2023 Oct 2023
Mar 2023 Apr 2023 June 2022 Sept 2023 Sep 2023 Oct 2023 Oct 2023 Oct 2023
1
“Architecture should speak of its time and place, but yearn for timelessness” - Frank Gehry
CONTENTS •LOW RISE HOUSING •AUDITORIUM •HOSPITAL •DISASTER RELIEF SHELTER
1" 8'-12
1" 8'-12
3' 1" 2'-12
3'
3'
2'-121"
1" 42
SILVER SHIMMER VENEER 1" 2'-22
3'
3 4" THICK PLYBOARD
1" 2'-22
1" 42
LONG HANGINGS
DRAWER FOR JEWELRY
OPEN SHELF
MIRROR
15 MM THICK PLASTER
PULL DOWN WARDROBE RAIL 3 4" PLYBOARD OPENING SHUTTER
3 4" PLYBOARD OPENING
SILVER SHIMMER VENEER
1" 8'-12
1" 2'-12
SILVER SHIMMER VENEER
PVD FINISHED CONCEALED HANDLE
1" 42
12 MM THICK PLASTER LONG HANGINGS
PULL DOWN WARDROBE RAIL 3 4" PLYBOARD OPENING SHUTTER
DRAWER FOR JEWELRY
15 MM THICK PLASTER
3 4" PLYBOARD OPENING
SILVER SHIMMER VENEER SKIRTING
ELEVATION
SECTIONAL PLAN 2
1'-1"
OPEN SHELF
WINTER CLOTHES
1'-1"
OPEN SHELF
2'-12"
WINTER CLOTHES
1" 2'-12 1
OPEN SHELF
1"
1'-1"
1" 2'-12
3'
WINTER CLOTHES
WINTER CLOTHES
PULL DOWN WARDROBE RAIL
HANDLE
1" 7'-12
SHORT HANGINGS
LONG HANGINGS
10'
OPEN SHELF
3 -
1"
DRAWER FOR JEWELRY
10'
5'
LONG HANGINGS
1'-3"
5'
2 -
3'-9"
OPEN SHELF
1" 7'-12
OPEN SHELF
HANDLE
3 4" THICK PLYBOARD
•MISCELLANEOUS
FFL
SHUTTER
3'
PULL DOWN WARDROBE RAIL
OPEN SHELF
1" 2'-22
3 4" THICK PLYBOARD
1" 4'-22
1" 82
3'
2"
SECTIONAL PLAN 1 3'
PVD FINISHED CONCEALED HANDLE
10'
4'-11"
PVD FINISHED CONCEALED HANDLE
1" 3'-32
SHUTTER
1" 42
•WORKING DRAWINGS
2"
12 MM THICK PLASTER
2'-11" 1'
8" OPEN SHELF
8"
OPEN SHELF
1'
CLOTHES
3"
OPEN SHUTTER ELEVATION 4 -
FFL
DRAWER
3 4" THICK PLYBOARD
OPEN SHELF
CLOTHES
SKIRTING
3"
SHOE RACKS
8"
DRAWER
CLOTHES
1" 4'-12
OPEN SHELF
DRAWER
8"
8" 1'
2'-11"
FFL
DRAWER
3"
1'
SKIRTING
DRAWER
8"
1"
LOCKER 3 4" THICK PLYBOARD
SECTIONAL ELEVATION 4
2
LOW COST HOUSING “a concept of reduction in cost of construction without sacrificing the strength required for the strength required for the performance of building.”
3
LOW COST HOUSING Low Cost Housing as an issue, option and strategy is assuming critical importance in achieving the global target of providing affordable shelter for all. Considering criticality of shelter as a major determinant of quality of life with majority of housing shortage falling in the EWS and LIG categories, low- cost housing appears to be the only option for creating, augmenting and expanding the housing stock in the country. Considering the prevailing high cost of land, materials, labour etc., most of the housing stock remains unaffordable for majority of urban dwellers. Urban migrants, pushed out of rural areas due to poverty, find it hard to secure minimal shelter due to prevailing high land, labour and material cost, which makes housing unaffordable. Accordingly, it becomes important that housing costs are minimized, reduced and rationalized, to make it affordable and accessible to even poorest of the poor residents of any city. • As covid 19 was a very harsh pandemic world wide. there was an questions for the safety of children because adults and teen agers can follor the safety measuresbut children are not able in play areas. So in the housing project I have design a playground for children which will restrict the spread the disease.
Site plan
4
ny
balcony
toilet
lc ba
toilet
y on
lco
ba
om
ro
bed ny
bedroom
om
ro
lco
ba
bed
bedroom om
ro
y on
bed om
ro
lc ba
kitchen
ing
bed
ing
ea
ar
liv
living area
ing
din
en
ch kit
ing
CLUSTER PLAN 1 BHK
din
en
ch kit
y
n lco
ba
s ta i r w e l l / staircase ny
en
bed
INDIVIDUAL FLOORS
ing
ing
ea
ar
liv
m oo
r
bed
e
ing
ea
ar
liv
ing
din
en
ch kit
om
ro
bed
om
ro
lco
ny
bed
ba
PLAN
ce raner nt
din
ba
lco
balcony
ch kit
m
o ro
SECTION
ELEVATION
ny
lco
ba
ea
ar
liv
CLUSTER PLAN 2BHK
foy
EXPLODED 3D VIEW
6
RENDERS / VIEWS
Auditorium
“a room built to enable an audience to hear and watch performances. Speech, vocal performances and music should all sound clear rather than distorted or echoey.”
AUDITORIUM Auditorium, the part of a public building where an audience sits, as distinct from the stage, the area
on which the performance or other object of the audience’s attention is presented. In a large theatre an auditorium includes a number of floor levels frequently designed as stalls, private boxes, dress circle, balcony or upper circle, and gallery
CONCEPTDYNAMIC RYTHM By the joinery of two blocks of different levels (theatre and Back stage ,Conference/ Entrance Area. It creates a (level difference) Fynamic Form of by space frame at the roof. form is deeloped by the placement of spaces and connection, segregation as well. the form of building taken from the Mouse ( mechanical device). Entrance foyer
Performers Area
Ramp
Ramp
VIP Area
Sitting Space Auditorium hall
Decidious treesin Sun Path DirectionDecidious trees allows Sun light Penetration in winters and block the access of Sun light and Solar heat gain in summers . in the northern Side of the building Decidious trees creates dynamic South facing Fascade.
Provision Of Vertical Gardens on th exterior walls vertical Gardens maintains the building tempreture and reduce energy usage .Trees and vegetative shade building and exterio surface and maintain the tempreture ehile evaporating eater from the leaves of vertical gradens .
PLANNING
HOSPITAL
“hospital is an integral part of a social and medical organization, the function of which is to provide for the population complete health care, both curative and preventive.”
FORM REOLUTION
HOSPITAL DESIGN CONCEPT- HOPE OF LIFE AND SENSE F RECOVERY. Healing Architecture for describes a physical setting that support patient and families through the stresses that develop as a result of illness , hospitalization medical visists and the healing process . The Concept implies that the physical healthcare enviornment can make a difference in how quickly patient recover or adapt to specific condition. • The building is designed in such a way that the spaces elimate the poor air quality, noise, lack of privacy, lack of Sunlight. Building is haingg the open cooridoors with the view of natural elements . • Design introduce the natural elements like outside views, interior gardens and water elements , an dnatural sunlight.
• The form of the building is developed in such a way that the summer winds are move from the between the 2 blocks. but winter winds will be diverted by a block .And the winter winds will not enter in the hospital blocks.
DISASTER RELIEF SHELTER
“provide private and secure places for people to live who have left or lost their usual accommodations as a result of some form of disaster.”
RAP-AID SHELL INSPIRED BY BUBBLE WRAP
our temporary structure will be be also like a bubble wrap (a air filled pocket) protecting fragile items
electric pumps will pump air inside the tent to inflate it like a ballon
then frame structure will come into play by assembling them inside with aluminium rods
alumiunium foldable rods wiill be assembled with angles to stregthen the tent from inside and then pump will be removed
Himalayas near Dharamshala in Himachal Pradesh, India, generally experiences cold weather throughout the year. Summers (April to June) are cool and pleasant, with temperatures ranging from around 10 to 25 degrees Celsius (50 to 77 degrees Fahrenheit). Monsoon season (July to September) brings rainfall, and it's advisable to be cautious of slippery paths during this time. In autumn (October and November), temperatures start to drop, and by winter (December to February), Triund experiences snowfall, and temperatures can go below freezing. The trek to Triund might be challenging during winter due to snow-covered paths.
SITE PLAN WITH SUN DIRECTION
RAP-AID SHELL IS A READY TO MOVE, EASY SETUP, EASILY TRANSPORTABLE & DURABLE
FOLDABLE TOP LID
FOLDABLE BALLASTIC NYLON SHEETS
ALUMINIUM RODS SUPPORT
WODDEN PALLETS FOR FLOORING
EXPLODED VIEW SUBJECT: ARCHITECTURAL DESIGN- VII
PLAN
CLUSTER PLANS REMARKS:
SUBMITTED BY:
SHEET NO.
WORKING DRAWING 3'
2'-121"
DRAWER FOR JEWELRY
OPEN SHELF
3'
2'-121"
421"
SILVER SHIMMER VENEER 1" 2'-22
3'
8'-121"
3'
3 4" THICK PLYBOARD
1" 2'-22
421"
8'-121"
2"
12 MM THICK PLASTER LONG HANGINGS
MIRROR
15 MM THICK PLASTER
PULL DOWN WARDROBE RAIL 3 "4 PLYBOARD OPENING SHUTTER
3 4" PLYBOARD OPENING
SILVER SHIMMER VENEER
8'-121"
3'
2'-121"
DRAWER FOR JEWELRY
OPEN SHELF
SILVER SHIMMER VENEER
PVD FINISHED CONCEALED HANDLE
421"
12 MM THICK PLASTER LONG HANGINGS
PULL DOWN WARDROBE RAIL 3 "4 PLYBOARD OPENING SHUTTER
3 4" PLYBOARD OPENING
SKIRTING
FFL
SHUTTER
ELEVATION
SECTIONAL PLAN 2
OPEN SHELF WINTER CLOTHES
1'-1"
OPEN SHELF
WINTER CLOTHES
1'-1"
WINTER CLOTHES
1" 2'-12 1" 2'-12
2'-121"
3'
1"
1'-1"
3'
PULL DOWN WARDROBE RAIL
15 MM THICK PLASTER
SILVER SHIMMER VENEER 1" 2'-22
3 4" THICK PLYBOARD
1" 4'-22
1" 82
3'
2"
SECTIONAL PLAN 1 421"
WINTER CLOTHES
PULL DOWN WARDROBE RAIL
OPEN SHELF
HANDLE
5'
LONG HANGINGS
8"
DRAWER
OPEN SHELF
10'
OPEN SHELF
3 -
1"
DRAWER FOR JEWELRY
10'
LONG HANGINGS 1'-3"
5'
2 -
3'-9"
OPEN SHELF
2'-11" 1'
1" 7'-12
SHORT HANGINGS
1" 7'-12
OPEN SHELF
HANDLE
3 4" THICK PLYBOARD
SHOE RACKS
8"
CLOTHES
OPEN SHELF 8"
OPEN SHELF
1'
CLOTHES
3"
OPEN SHUTTER ELEVATION 4 -
FFL
CLOTHES
3 4" THICK PLYBOARD
SKIRTING
3"
DRAWER
1" 4'-12
OPEN SHELF
DRAWER
8"
8" 1'
2'-11"
FFL
DRAWER
3"
1'
SKIRTING
DRAWER
8"
1"
LOCKER 3 4" THICK PLYBOARD
PVD FINISHED CONCEALED HANDLE
10'
4'-11"
PVD FINISHED CONCEALED HANDLE
1" 3'-32
SHUTTER
SECTIONAL ELEVATION 4
PLINTH BEAM
P.L.
3'-0"
LxB
W. F. 2
9"
TYPICAL PEDESTAL DETAIL
3" 9" 3"
L
2'-6"
F2
COL.
10 ø @ 6" c/c
3'-0"
W. F. 2
W. F. 2
3"
5'
5'
P. B. 1 5'
P. B. 2
F2
4'
B
FOOTING SCHEDULE FOR COLUMNS STARTS FROM N.G.L.
W. F. 1 5' 3'-0"
W. F. 2
W. F. 1
W. F. 1
W. F. 1
F2
W. F. 1
3'-0"
P. B. 2
10 ø @ 6" c/c
F2
THICKNESS OF FOOTING SIZE OF P.C.C. SIZE OF R.C.C. FOUNDATION BASE LXB LXB NO. d D
REINF. IN BOTHWAY
FOR F1
4'-6" x 4'-6"
4'-0" x 4'-0"
9"
12"
10 Ø @ 6" C/C
FOR F2
5'-6" x 5'-6"
5'-0" x 5'-0"
9"
12"
10 Ø @ 6" C/C
AST
F1
TOP PLAN OF TYPICAL ISOLATED FOOTING
9"
4'
5'
P. B. 2
3'-0"
5'
5'
F2
PB-A TIE:- 8ø 2 legged @ 6 c/c
BARS:- 8- 10ø TIE:- 8ø 2 legged @ 6 c/c
5'
2'-6"
4'
3'-0"
F1
5' 3'-0"
F2
5'
W. F. 1
W. F. 1
P. B. 1
W. F. 2 5'
421" 9"
3'-0"
W. F. 2
5'
TIE:- 8ø 2 legged @ 6 c/c
3"
TYPICAL DETAIL
5'
4'
4'
W. F. 1
W. F. 1
W. F. 1
F2
MAIN BARS:1 TO 4,6 = 12 ø (THR-OUT) 5 = 12 ø (THR-OUT) STRPS : 8 ø 2L @6" UP TO L/4 FROM SUPPORTS + REST @ 8" C/C
W. F. 1
W. F. 1 4'
3'-0"
F1
3'-0"
4'
3'-0"
4'
2'-6"
3"
DETAIL OF PLINTH BAND PB-2
3"
W. F. 1
P. B. 1
W. F. 1
F2
4'
F1
5"
P:C:C: 1:5:10
P. B. 1
4'
F1
15"
3'-0"
W. F. 1
PB-1
DETAIL OF PB - 1) D
15"
d
W. F. 1
W. F. 1
4'
5'
3'-0"
F1
1'
4'
9"
9"
PEDESTAL TIES
4'-0"
5'
4'
PEDESTAL BARS 10 ø @ 6" c/c
W. F. 1
5'
12"
PEDESTAL
F1
5'
F2
N.G.L.
AS APPLICABLE
N.G.L. F2
9"
W. F. 1
5'
421"
DPC
DPC
FFL
PLINTH BAND AS PER ARCH DWG
F2
W. F. 1
W. F. 2
P. B. 1
W. F. 2
W. F. 1
3'-0"
5'
4'
N.G.L
W. F. 1
1'-121"
2'-6" 1
6"
TRENCH PLAN
2'-3" PCC 1:5:10
5"
6"
1'-6"
6"
1'-1021"
9"
W. F. 1
W. F. 1
5"
1'-6"
1'-121"
6"
5'
F2
4'
F1
3'-0"
3'-0"
5'
N.G.L
5'
FFL
PLINTH BAND
AS PER ARCH DWG
5'
6"
2'-6"
6"
4'
F1
3'-0"
4'
F1
2'-6"
P. B. 2
W. F. 2
W. F. 1
2'-6"
4'
F2
5'
4'
6"
W. F. 1
3'-0"
4'
3'-0"
F1
W. F. 1
5'
W. F. 1
5'
DETAIL OF FOOTING AT 42" THICK BRICK WALL (W.F. - 2)
3'-0"
DETAIL OF FOOTING AT 9" THICK BRICK WALL (W.F. - 1)
9"
TOILET 8'-0"X8'-721"
IC 2'x1'-6"
IC 2'x1'-6"
3"Ø WS 4"Ø VS
GT 1'x 1'
6'-0" HIGH WALL
1" 6'-42
GT 1'x 1'
GT 1'x 1'
GT 1'x 1'
GT 1'x 1'
1" 7'-12
6'-0" HIGH WALL
3 4"ØGIP UP
8'-0"X8'-121"
GT 1'x 1'
B
SLOPE 1:40
U
DRESS
R
8'-0"X5'-6"
F
4"Ø VS
O
1" 40'-42
LOBBY
11'-6"X17'-721"
U
SLOPE 1:40 6' HIGH WALL
8'-0"X8'-721"
12'-421"X17'-0"
SLOPE 1:40
SLOPE 1:40
F
22'-421"
27'-3" GT 1'x 1'
F
D E
SLOPE 1:40
E 13
15
17
3'-0'' HIGH RAILING
9
R
7
5
3
19'-3"X21'-6"
49
53
51
55
57
3'-0'' HIGH RAILING
P.L.+3'-0"LVL
UP
1
16'-6"
DINING AREA
W=3'-0'' T=10" R=7.16" NOS =19
19
1'x1' KHURRA
8'-6"
11
SLOPE 1:40
41
47
R
39
W=3'-0'' T=10" R=7.16" NOS =19
10'
13'-0"X15'-6"
6' HIGH WALL
A
BEDROOM
F
SLOPE 1:40
4"Ø WS
16'-3"
STORE
KITCHEN
GT 1'x 1'
IC 2'x1'-6"
UP
6' HIGH WALL
17'-721"X12'-1021"
8'-421"X13'-3"
PROJECTION LINE ABOVE
1'-6"
3'-3" HIGH RAILING GT 1'x 1'
SLOPE 1:40
SLOPE 1:40 18'-6"
1" 18'-72
8'-121"X12'-1021"
G.L.+1'-6"LVL
P.L.+3'-0"LVL
PROJECTION LINE ABOVE
+1'-3"LVL
3'-3" HIGH RAILING
3'-3" HIGH RAILING
PROJECTION LINE ABOVE
+1'-3"LVL
GT 1'x 1'
50'-421"
RAIN WATER HARVESTING TANK 8'-0"X 6'-0"
FRONT LAWN
GT 1'x 1'
IN
IN
15'-9"
FRONT LAWN
4"Ø WS
SLOPE 1:40
6'-0" HIGH WALL
6'-0" HIGH WALL
DOWN
1'x1' KHURRA
1'x1' KHURRA
4"Ø WS
GT 1'x 1'
SLIDING DOOR
1'x1' KHURRA
UP
PROJECTION LINE ABOVE
DRAWING ROOM
3 4"ØGIPUP
TOILET
BEDROOM
14'-1021"X13'-0"
1'x1' KHURRA
3"Ø WS 1'x1' KHURRA
6' HIGH WALL
BEDROOM
SLOPE 1:40
6' HIGH WALL
B
3'-3" HIGH RAILING
DOWN
SLOPE 1:40
4"Ø WS
DRESS
P.L.+3'-0"LVL
3 4"ØGIPUP
DOWN
7'-0"X7'-0"
4'-0" WIDE PROJ. AT ROOF LVL.
3'-3" HIGH RAILING
29'-10"
7'-0"X7'-6"
6' HIGH WALL
DRESS
4"Ø WS
TOILET
T=12" R=6"
3'-3" HIGH RAILING
3 4"ØGIPUP
T=12" R=6"
OUT
GT 1'x 1'
PUMP
IC 2'-0x1'-6" DOOR WHEN OPEN
B
U
F
F
E
R
SLIDING GATE
RAMP
SCHEMETIC DRAINAGE
DOOR WHEN OPEN
B
U
F
F
E
R
SLIDING GATE
RAMP
RAIN WATER HARVESTING/ TERRACE DRAINAGE
M.L +33'-9"LVL
R
A
D
T.L.+24'-6"LVL
+ 5'-0"LVL
- 11'-421" LVL
±0'-0" LVL.
9"
9"
9"
9"
421" THK RCC SLAB
4'
- 20'-421" LVL. 10'-9"
- 20'-421" LVL.
±0'-0" LVL.
1 21" THK FLOOR FINISH 4 21" THK CEMENT CONCRETE (1:5:10) 6" THK SAND FILLING RAMMED EARTH
R.L.±0'-0" LVL
10'-9"
FIXED
W= 6'-0" T=12" R=6"
P.L.+3'-0"LVL G.L.+1'-6"LVL
FIXED
10'
W3
W= 14'-0" T=12" R=6"
+ 3'-0" LVL
3'
FIXED
10' 9"
- 11'-421" LVL
10'-9" 10'
FIXED
1 21" THK FLOOR FINISH 4 21" THK CEMENT CONCRETE (1:5:10) 6" THK SAND FILLING RAMMED EARTH
+ 5'-0" LVL
9"
1" 42
W3
1'-6" 1'-6" 3'
1'-6" 3'
9"
W4
- 33'-1021" LVL.
FIXED
±0'-0" LVL.
1'-6"
3'
F.F.L.+13'-9"LVL
1" 9'-72 10'-9"
10'-9" 10' 5'
W=3'-0'' T=10" R=7.16" NOS =18
P.L.+3'-0"LVL 1'-6" 1'-6"
ENTRANCE FOYER
DINING AREA
D3
R.L.±0'-0" LVL
10'-9" 2'-9"
121" TH FLOOR FINISH 3" CEMENT CON. 1:8:16 421" THK RCC SLAB 1:1:5:3
FIXED
1'-6" 1'-6"
121" TH FLOOR FINISH
3'-3"
10'-9" 1 42"
FIXED
34'-6"
FIXED
3" CEMENT CON. 1:8:16 421" THK RCC SLAB 1:1:5:3
G.L.+1'-6"LVL
W3
W3
3' 1'-6" 1'-6"
D3
1" 9'-72 10'-9"
W4 D3
3'-3"
1" 2'-102 3'-3"
3" MUD PHASKA 2 COATS OF HOT BITUMEN
3'-3"
6'
9'-3"
121" THK TILE TERRACING
1" 13'-102
2'-9"
O
9'-3" 2'-9"
2'-6"
1'-6"
421" THK RCC SLAB
9" 1'-6"
3" MUD PHASKA 2 COATS OF HOT BITUMEN 1'-6"
RAIN WATER HARVESTING/ TERRACE DRAINAGE
SCHEMETIC DRAINAGE (G.F.)
121" THK TILE TERRACING
FRONT ELEVATION
SECTION A-A'
MIRROR LIGHT 3'
SBO4
SWITCH BOARDS
G
SBO1
2'
AIR CONDITIONER
6'-9"
1'-6"
4'-9"
CEILING SPOT LIGHT
6'-6"
CEILING FAN 4'-0" DIAMETER 4'-3"
CEILING COVE LIGHT
14'-1021"X11'-6"
SPLIT AC
CEILING SPOT LIGHT
CEILING SPOT LIGHT
BEDROOM 2'
SBO1
14'-1021"X11'-6"
1'-6"
BEDROOM 4'-3"
CEILING COVE LIGHT
AC SOCKET
SBO7
3'
1'-6"
SBO6
1'-6"
SBO5
3'-3"
1' 1" 7'-12
SBO5
1" 1'-42
3'-6"
8'-0"X5'-6"
SBO8
SBO4
DRESS
1'-6"
GEYSER 5 AMP SOCKET
CEILING SPOT LIGHT
TOILET
7'-0"X7'-6"
EXHAUST FAN
1" 3'-02
CEILING SPOT LIGHT
1" 1'-112
3'-6"
1" 3'-102
CEILING FAN 3'-0" DIAMETER
1" 7'-42
3'-6"
4'
4'-6"
3'
1'
6"
6'-6"
1'
SBO3
SBO2
1'-6"
1" 5'-112
5'-11"
SBO3
SBO2
1'-6"
2'-6"
1" 8'-42
4'
FOOT LIGHT
WALL LIGHT
6" 1'
1'-121" 1'-421" 2'-6"
1'
I
1'-2"
N 1 2" DROP
D -
1' X1' PORCELAIN TILES FLOORING
10'
10'
7'-3" 8'
7'
E
FLOOR LEVEL 3'
5'-721"
ELEVATION C
1'-3" 1" 2'-52 3'-6"
1" 1'-42
2'-10"
2'-3"
3'-6"
10'
H
G
B
8'
10'
F
I
1" 6'-12
SHOWER AREA
8'
10'
K
G
2'-6" 3'-6"
H 9"
6' HIGH GLASS PARTITION
5'-8"
FLOOR TRAP
J
6" X 6" MOSAIC TILES ON WALLS
BRICK WALL 412" THICK
FLOOR LEVEL
9"
G
6" X 6" MOSAIC TILES ON WALLS
6' HIGH GLASS PARTITION
1" 2'-52 1'-3"
K
D
8'
C -
A -
BOTTOM OF SLAB
BOTTOM OF SLAB
3'-6"
6' HIGH GLASS PARTITION
1'-10"
ELEVATION B
ELEVATION D
1'-9"
1'10"
1 2" DROP
1'-10"
BRICK WALL 412" THICK
M
1 2" DROP
1'
1" 3'-112 1'-8"
1" 8'-72
1'
DEF
1'-2"
3'
L
7'
C
1'
3'
B
2'-6"
FLOOR LEVEL
8'
5'-6"
2'-10"
FLOOR TRAP
O
6"
2'
2'
2'-10"
B -
2'
1'
A
3'-6"
BOTTOM OF SLAB
3'
2'
5'
BRICK WALL 9" THICK
6" 1'
6"
8'
10'
G
G 9"
FLOOR LEVEL
2'-10" 3'-6"
D -
1 2" DROP
1'-2"
H
H
2'-10"
N
E
K
3'-6" 1" 2'-52
I
1'-10"
9"
1'
1'-8"
H
DOOR
J
CENTER LINE OF LAV K FAUCET K
7'-3"
J
2'-10"
G
2'
K
J
E
1'-9"
C -
A -
BRICK WALL 9" THICK
9"
6' HIGH GLASS PARTITION
6" X6" MOSAIC TILES ON WALLS
6" X 6" MOSAIC TILES ON WALLS CENTER LINE OF BOTTLE TRAP AND BASIN
1'10"
1 2" DROP
BOTTOM OF SLAB
D
2'-3"
1' BRICK WALL 412" THICK
M
1 2" DROP
1'
1" 3'-112
1" 8'-72
1'
DEF
BOTTOM OF SLAB
D
10'
L
C
BOTTOM OF SLAB
BOTTOM OF SLAB
3'
B 3'
FLOOR TRAP
B -
6"
1'
A
2'
2'-10"
5'
BRICK WALL 9" THICK
8'
1'-8"
3'-1121" 8'-721"
ELEVATION A
3'
1" 1'-52
1'-8"
2'-4"
1'-3"
1'-1"
2'-6"
1" 2'-42
8"
1'
2'
1" 1'-102
1'-3"
1'-5"
2'-3"
1'-2"
1" 1'-12
1'-8"
2'-6"
BOTTOM OF THE SLAB
E
B -
C
J
K
COREAN COUNTER TOP 22 MM THICK
D -
2'
FLOOR LEVEL
2'
2
2
1'
ELEVATION (A) 1" 2'-62
5'
2'
2'-9"
2'-9" 2'-3"
O
2'-3"
O
1" 9" 102
2'
1'-6"
W7
L
1" 1'-102
1'-3"
COREAN COUNER TOP 22 MM THICK
9"
H
1'-6"
10'
O
P
2'-9"
M
7'-3"
2'-3"
COREAN COUNER TOP 22 MM THICK 1200
C
M
G
L
I
F
E
1'-8"
1" 2'-62
FLOOR LEVEL
3" 2'-6"
S
3" 2'-6"
2'-9"
SAMSUNG
B
L
J
N
1'-8"
1'-8"
I
K
D
C
B
1'-8"
1'-6"
1" 1'-12
2'
FLOOR LEVEL
2'
1" 1'-12
1'-5"
9"
1'-6"
2'-3"
ELEVATION (D)
BUILT IN HOB UNDER COUNTER OVEN C LARGE POTS BRASS D SMALL POTS E DOUBLE DOOR REFRIGIRATOR F CABINET FOR MICRO WAVE G BOTTLE DRAWER H SINK DOUBLE BOWL 4' X 1'-3" I DRAWERS J UNDER COUNTER WATER PURIFIER /RO K TRASH L CABINET M SAUCE PANS, SKILLETS,CONDIMENTS N BOTTLE TRAP O CROCERY P SPICES STORAGE Q ELECTRICAL APPLIANCES R SMALL ELECTRICAL APPLIANCES S TRAYS,BAKING SHEETS,COOLING RACKS A
5'
1" 1'-72
2'
ELEVATION (C)
1" 1'-72
1'-3"
O
Q
13'-3"
2'
ABOVE COUNTER PLAN
10'
P
R
1" 1'-102
5'
B
Q R
1'-6"
1'-6"
BOTTOM OF THE SLAB
2'-3"
P M
2'-3"
1" 1'-72
BOTTOM OF THE SLAB
2'-9"
BOTTOM OF THE SLAB
1" 1'-102
1'-3"
2'-3"
1" 1'-102
1'-3"
2'
1'-7"
A -
UNDER COUNTER PLAN 1'-5" 2'-3" 1'-8" 1'-11" 1'-11"
1'
2'-9"
0"
1" 5'-12
1" 1'-42
1" 2'-42
1'
2'-3"
1" 3'-22
C
B
3" 2'-6"
C
2'-9"
J
2'
3'
I
P
1" 2'-42
A -
8'-421"X13'-3" H
D
D -
E
D -
1'
C
KITCHEN
F
10'
A B
I
L
O
7'-3"
G
P
O
10"
M
2'-3"
1" 2'-42
C
O
1" 1'-11" 1'-12 2
C
2'-3"
C
1'-5"
3'
CHIMNEY 2'-412" X 1'-3"
2'
9"
2'-9"
1'-5"
2'-9"
A -
1" 1'-22
2'
1" 2'-12
3'
2'-121"
1" 42
SILVER SHIMMER VENEER 1" 2'-22
3'
3'
3 4" THICK PLYBOARD
1" 2'-22
1" 42
1" 8'-12
1" 8'-12
3'
DRAWER FOR JEWELRY
OPEN SHELF
2"
12 MM THICK PLASTER LONG HANGINGS
MIRROR
15 MM THICK PLASTER
PULL DOWN WARDROBE RAIL 3 4" PLYBOARD OPENING SHUTTER
3 4" PLYBOARD OPENING
SILVER SHIMMER VENEER
1" 8'-12
3'
SILVER SHIMMER VENEER
PVD FINISHED CONCEALED HANDLE
1" 42
12 MM THICK PLASTER LONG HANGINGS
PULL DOWN WARDROBE RAIL 3 4" PLYBOARD OPENING SHUTTER
DRAWER FOR JEWELRY
15 MM THICK PLASTER
3 4" PLYBOARD OPENING
SKIRTING
FFL
SHUTTER
ELEVATION
SECTIONAL PLAN 2
OPEN SHELF WINTER CLOTHES
1'-1"
OPEN SHELF
WINTER CLOTHES
1'-1"
WINTER CLOTHES
1" 2'-12 1" 2'-12
1" 2'-12
3'
1"
1'-1"
3'
PULL DOWN WARDROBE RAIL
OPEN SHELF
SILVER SHIMMER VENEER 1" 2'-22
3 4" THICK PLYBOARD
1" 4'-22
1" 82
3'
1" 2'-12
2"
SECTIONAL PLAN 1 1" 42
WINTER CLOTHES
PULL DOWN WARDROBE RAIL
OPEN SHELF
HANDLE
5'
LONG HANGINGS
DRAWER
10'
OPEN SHELF
3 -
1"
DRAWER FOR JEWELRY
10'
LONG HANGINGS
1'-3"
5'
2 -
3'-9"
OPEN SHELF
8"
1" 7'-12
SHORT HANGINGS
1" 7'-12
OPEN SHELF
HANDLE
3 4" THICK PLYBOARD
OPEN SHELF
OPEN SHELF
OPEN SHUTTER ELEVATION 4 -
1'
CLOTHES
3" 8"
1'
8"
CLOTHES
FFL
3 4" THICK PLYBOARD
OPEN SHELF
CLOTHES
SKIRTING
3"
SHOE RACKS
2'-11" 1'
DRAWER
1" 4'-12
OPEN SHELF
DRAWER
3"
FFL
DRAWER
8"
8" 1'
2'-11"
SKIRTING
DRAWER
8"
1"
LOCKER 3 4" THICK PLYBOARD
PVD FINISHED CONCEALED HANDLE
10'
4'-11"
PVD FINISHED CONCEALED HANDLE
1" 3'-32
SHUTTER
SECTIONAL ELEVATION 4
MISCELLANEOUS
Thankyou