Capital campaign v2 4 web version

Page 1

Case for Support Capital Campaign Presentation V2.4


This is Mulgrave A school with energy, spirit and a ‘can do’ attitude:  A staff of gifted, compassionate and committed educators.

 A legacy of doing what it takes to provide our children with the very best education.  A highly engaged and supportive parent community.

1


Mulgrave School - A Cinderella Story A story of uncommon ambition, commitment and achievement. 1993: The history of Mulgrave begins humbly in a portable cabin in North Vancouver.

 A committed group of parents  A shared vision  An entrepreneurial resolve 2001: The opening of our current building  $30 million project financed by our founding families and bank debt.

2


A Fast Track to Excellence In record time, Mulgrave becomes a leading Canadian Pre-K to Grade 12 day school with a reputation for excellence:  An IB World School – considered the best educational program in the world.  Academic top ranking in BC.  Competitive Athletics teams.  Notable Performing and Fine Arts programs.  Extensive involvement in Community and Service projects.

3


Strong Academic Results Provincial Exams In 2013 Mulgrave continues to outperform Private School and BC averages by approximately 10%:

IB Diploma Exams Strong, positive trend in IB results

June 2013 Provincial Exam Mark Averages (%) Mulgrave

BC Private Schools

Schools in BC

Math and PreCalculus 10

81

77

70

Science 10

80

74

70

English 10

82

71

72

English 12

77

67

69

4


Impressive Results Lead to Prestigious Universities University acceptances to top schools: Harvard, Cambridge, Oxford, Princeton, Stanford, McGill, NYU, Cornell, UBC, U of Penn, London School of Economics, USC, Berkeley, Carnegie Mellon, Edinburgh, St. Andrew’s, Duke, Queen’s and Georgetown.

100% of grads accepted to a university of their choice.

5


Raising Our Sights Our Strategic Plan, Mulgrave 2020: from Good to Great, represents the next chapter and will position Mulgrave at the cutting edge of education worldwide. We will:  Further develop our current IB Academic Programs.  Increase personalized learning and modern skill development.  Strengthen other strands: Arts, Athletics, Global Outreach & Service.

 Strengthen our sense of community, with both current a and alumni families.  Attract, develop and retain the best teachers.  Protect and enhance our environment, natural and learning.

6


What Will It Take to be Successful?  Focused, committed and well supported students.

 Outstanding well trained and developed teachers.  Good leadership at all levels in the school.

 Supportive parents.  Excellent resources.

To truly optimize the above elements we require a world class educational environment and facility.

7


Mulgrave Senior School 2012

8


Status Quo is Not an Option! Our current facilities have a number of serious shortcomings. We have outgrown our school: built for 640; holds 850. Lack of:  Specialist academic facilities and resources

 Appropriate space for University Counselling  Meeting spaces for students and teachers  Study spaces for students in all divisions

Insufficient:  Gym and sports facilities  Specialist Arts facilities

Issues associated with temporary facilities. Theatre/Cafeteria congestion. Chronic parking and school access challenges.

9


Master Plan 2035

10


The New Senior School Project

11


Lower Main Floor Plan

12


What Facilities will be included in this First Project? (including new building and renovation/relocation)

New Senior School

 Senior Academic Study Centre  University Guidance/Student Support Centre  Math, Social Studies, English & Language Learning Centres

 MVP Shop

 Community Lounge  Student Art Gallery  Admissions Suite

 New Gym (existing Annex)

 Film Studio

 Choral Room

 Outdoor Education Centre

 Black Box Drama Studio

New Whole School Facilities  Dining Room/Cafeteria

 Grand Entrance, Staircase/ Reception

 Performing Arts Centre  200 parking stalls; improved access/traffic flow

13


Project Costs and Impact Project cost $30 million.

ď ˇ Cost estimate for new facilities circa $22.5 million ď ˇ Potential land acquisition and debt extinction circa $7.5 million All-equity funding of the new project, coupled with reduction in the existing debt will result in a manageable development in operating expenses and school fees. The project does not contemplate an expansion in the size of our student body.

14


Campaign Timeline

Public Phase of Campaign

“Quiet Phase” of Campaign

2012

2013

Groundbreaking July, 2013

2014

Construction Phase

Completion of New Facilities Dec. 2014

15


Our Continuing Journey The education our children are receiving today has been made possible by Mulgrave’s founding families. We stand on their shoulders. While we celebrate our successes, there is so much more for us to do to continue Mulgrave’s journey:  Raise our sights with the new vision.  Build on our existing strengths.  Address our challenges.

This project is our opportunity to benefit our own children and “pay it forward” to future generations.

16


If Not Us, Who? If Not Now, When? We need your help in taking this critical next step. Mulgrave was founded on a spirit of accountability and generous giving.

No one else is going to make this happen.

Success of the Capital Campaign rests with us.

17


Appendix

18


Senior School Expansion 2014 Capital Expenditures New Senior Academic and Specialist Centre

$10m

Senior Academic Study Centre; University Guidance/Student Support Centre; Math, Social Studies, English & Language Learning Centres; Film Studio; Outdoor Ed Room New Whole School Facilities

$6m

Dining Room/Cafeteria; Grand Entrance, Staircase /Reception; MVP Shop; Community Lounge; Student Art Gallery; Admissions Suite; Choral Room; Black Box Drama Studio Renovated Whole School Facilities

$1m

2nd full-sized gymnasium (existing Annex); Performing Arts Centre 200 parking stalls and improved access/traffic flow

$5.5m

Land

$3.5m

Acquisition of land contiguous to the school to secure 50 year outlook and protect natural environment Debt

$4m

Pay down existing debt to absorb operating costs on new facility and need for fee increases beyond the normal rate of inflation Total Capital Required

$30m

19


Overall South Elevation and Entry Detail

20


Front Entry

21


Interior Plan

22


Aerial View

23


Interior View

24


Site Sections

25