Primavera P6 Online Training

Page 1

Primavera®P6 Let’s Get Started!


Introduction to the PrimaveraÂŽP6 PrimaveraÂŽP6 is the project portfolio management software for the organization. The software includes the project management, product management, collaboration and control capabilities and integrates with other enterprise software such as Oracle and SAP's ERP systems. This has ability to handle Multi-faced projects that require a simultaneous activities to be functioned. This is very high performance Project management software.


Use of Primavera®P6 The software is used in: • Balancing the resource capacity • Allocating the best resources as well as the track progress • Conducting what-if analysis and analyze the alternative project plans • Monitoring as well as visualizing the project performance versus plan


An overview to the course Modules • • • • • • • • • • • •

Introduction to Primavera® Creating EPS and OBS Work Breakdown Structure Budgeting Adding Activities Relationship Resource and Roles Assigning Resource and Leveling Baseline Scheduling Thresholds, Issues, Risk Report Setup, Creating Project Website, Export and Import


Who Should Attend this Training • • • • •

Project Managers Event Organizers Project Planners Consultants Financial Project Analyst


Abilities Candidates acquire after getting trained on Primavera®P6

• • • •

Navigate the user interface Implement, manage, and update the schedule Calculate the project risk Customize the layouts, reports, as well as grouping/sorting/filtering data • Import and Export the data


Thank You!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.