Getting to Know Primavera P6
Primavera P6 Training Online
Defining Primavera P6
Oracle’s Primavera P6 is most sought after software tool that is used for project management. Primavera P6 can be used for managing intricate details of a project to toplevel management details.
Benefits of Primavera
Benefits of Using Primavera Decreased overrun scheduled cost Quick and easy prediction of activities or projects
Globally used software tool
Reduced risk
Optimized resource management
Industries where Primavera is Used
Aerospace and Defense
Automotive
Healthcare
Construction
Oil and Gas
Engineering
Manufacturing
Alternatives of Primavera
Alternatives that can be used in place of Primavera Wrike Zoho Projects
Mavenlink
Primavera Alternatives EPM Live
Insightly
Workfront
Primavera P6 Training Online
Thank You (+91) 8130666209 info@multisoftvirtualacademy.com www.multisoftvirtualacademy.com