what’s ins de Design & Presentation Bank Competition Design Competition NAIT Dormitory

4-5

2-3 6-7

8

Construction Drawings Single Family Residence Jones Residence NAIT Dormitory Custom Millwork

Personal Works School Expansion Kamminga Residence Graphic Design Photography

9-10 13-14 18-19 22

1

11-12 15-16 20-21 23

17



design & presentation

1


bank competition In a second-year design class, students designed an innovative and sustainable ATB bank branch to be located in Grande Prairie, Alberta. As a top ten finalist, I presented my design to industry professionals. Programs used included AutoCAD, SketchUp, Adobe Photoshop, and Adobe Illustrator. Interior Render - The choice of blue throughout the space provides interest while the wood touches and the mural behind the desk portray ATB and its connection with the local community.

Exterior Render - A large, central glass atrium expresses transparency, while the steel and stone combine to convey security while adding interest.

Aerial Render

2


Site Plan

Interior Render - A large, central glass atrium allows light to flood the interior.

FILE ROOM

COPY AREA

SECURE ROOM

BULL - PEN

PATIO

N

LAN / DATA ROOM

MEETING ROOM WORK STATIONS STAFF ROOM

VESTIBULE

UP

DN

JANITOR

BANK

BANK

TELLERS AREA

NETWORK / IT ROOM

SDB VAULT

PUBLIC

OFFICE MANAGER’S OFFICE

WC

RESTRICTED PUBLIC

SDB VIEWING ROOM

MANAGER’S OFFICE

ASSOCIATE’S OFFICE

STAFF MEETING ROOM

STAFF ROOM PHOTOCOPY / MULTI-PURPOSE ROOM

REFERENCES ROOM

SITE PLAN

MEN’S GREEN ROOF ABOVE

WAITING AREA

CLOSING OFFICE

ARCHITECT’S OFFICE

JANITOR

SENIOR ASSOCIATE’S OFFICE

PUBLIC

MEN’S WC

RESTRICTED PUBLIC

MEETING ROOM

WOMEN’S

STAFF

PRINCIPAL’S OFFICE RECEPTION

SECOND FLOOR ABOVE

COFFEE AREA

OPEN TO BELOW

TOUCH-DOWN ZONE

WOMEN’S

MEETING ROOM ATM / NIGHT DEPOSITORY ROOM

VESTIBULE / ATM LOBBY

ELEVATOR & LOBBY

ELEVATOR & LOBBY PUBLIC ATRIUM OPEN TO ABOVE

RECEPTION / WAITING AREA

DN

DN

LIVING WALL

OPEN TO BELOW

UP

Main Floor Plan

RESTRICTED PUBLIC STAFF

EVENT STORAGE

CLOSING OFFICE

ATB CONNECT

PUBLIC PATIO

0

0

3

1

7

3

1

7

LIVING WALL

Second Floor Plan

Exterior Render

3


design competition In second year, students were able to participate in an extracurricular design competition. The competition was sponsored by ProCura Real Estate Services Ltd. and involved students in the Architectural Technology, Interior Design Technology, Landscape Architectural Technology, and Alternative Energy Technology programs.

Exterior Render Exterior Render

4


Exterior Render Exterior Render

In teams, students were asked to redesign the current Kingsway Professional Building into a mixed-use commercial/residential building. As an architectural technologist on the team, I designed and modelled the exterior of the building. ArchiCAD was used to render the model. SketchUp and Adobe Photoshop were also used throughout the process.

5


nait dormitory In a first-year design class, students designed a dormitory for NAIT. My design included a public cafe on the main floor with dormitories occupying the upper two floors. Programs used included AutoCAD and SketchUp. The final design boards were hand rendered.

Exterior Render

Side Elevation

Front Elevation

6


N UP

DORM LOBBY

MYRON VAN DIJK / WINTER 201 ARCT 1220 - X01 / DESIGN STUDIO

VEST.

VEST.

SUSTAINABLE DESIGN

UP

JANITOR

MACH.

MECH.

The NAIT dormitory includ which pursue sustainable WOMEN'S

SERVICE AREA

STORAGE/KITCHEN

MEN'S

·

Low VOC paint is use to reduce the release compounds, ensurin

·

Clerestory windows a main floor to allow lig coffee shop, reducin artificial lighting.

·

Dual flush toilets are reduce the water usa

·

Water consumption i water harvesting whi water for different sy flushing.

·

Solar panels are use through a clean, rene emission free.

·

A geothermal system the building, reducin impact.

F/P

1

Main PlanPLAN - Cafe - COFFEE SHOP MAINFloor FLOOR

BED

7

DN

BED

KIT. / LIV.

UP

KIT. / LIV.

BED

BATH

1

BED

LAUN. BATH KIT. / LIV.

BATH

UP

3

.5

BED

DN

0

BATH KIT. / LIV.

KIT. / LIV.

KIT. / LIV.

KIT. / LIV.

BED BED

BED

Second/Third Floor Plan - Dormitories 2nd & 3rd FLOOR PLAN - DORMITORIES

BED

BED BED

BED

BED

BED

BED

7



construction documents

8


Single family Residence

36'-0" 8'-0"

DECK OVER

10'-6 1/2"

2x10 DECK JOISTS @ 16" O.C.

11'-5"

2'-3 1/2"

5'-11 1/2"

18'-9"

BEDROOM 3 12' X 14'

26'-0"

1'-6"

10'-6"

DEN 10' X 13'

2'-5"

2'-0"

1'-11 1/2"

1'-11 1/2"

WOOD STEPS TO SPEC

5'-10 3/4"

ROUGH BUCK TO SUIT SITE

36"x80"

FOYER

12'-1 3/4"

8x60 (MIN.) REINF. CONC. FDN WALL ON 20x8 REINF. CONC. STRIP FOOTINGS

32"x80" 5'-6"

80'-11" 7'-0"

81'-0"

8x60 (MIN.) REINF. CONC. FDN WALL ON 20x8 REINF. CONC. STRIP FOOTINGS 4" (MIN.) CONC. SLAB ON COMPACTED SAND FILL

10'-0"

WASH DRY

DECK

60'-10 1/2"

2x4 FROST WALL R12 INSULATION 6MIL POLY 13'-0 1/2"

CANT. ABOVE

6'-3" 3'-9 1/2"

32"x80"

32"x80"

S.D.

3" Ø SAP ON 36X36X8 REINFORCED CONCRETE PAD FOOTING

3'-1 1/2"

7'-3"

BATH

℄ BEAM 20'-7 1/4"

10'-6"

ENG. - APP. BEAM BY OTHERS

SECURELY TIE GARAGE FDN TO FDN WALL W/2x15m BARS MID. T&B @ ELE.

5'-11 1/2"

2x6 PLUMB WALL

43'-11"

32"x80"

RAILING

14'-1"

MECHANICAL/ STORAGE 9'-4" X 20'

8'-6"

BEDROOM 2 13' X 12'

5'-0"

H.W.T.

FURN.

3'-9 1/2"

2 - 30"x80"

11-7/8" ENG. - APP. I-JOISTS @ 16" O.C. - TO MANUFACTURER'S SPECS - TYP.

4'-0" 7'-2"

14'-8 1/2"

ELEC. PANEL

ROUGH BUCK TO SUIT SITE

2'-5"

COVERED VERANDA

10'-3"

GARAGE 20' X 25'-6" X 23'-6"

9'-11"

4'-10"

11'-0"

12"x12" COLUMN C/W SOLID POST I/S

9'x8' OHD

18'-0 1/2"

36'-0"

9'x8' OHD 18'-8"

9'-11 1/2"

10'-10" 8'-3"

4 - 2x10 SPRUCE BEAM 4"

1'-1"

14'-0" 80'-11"

62'-6" 32"x80"

13'-6"

9'-9 1/2"

36"x80"

Foundation Plan

FOUNDATION PLAN - 1761 SQ. FT.

CONC. STEPS TO SPEC

5'-1 1/2" 10'-3 1/2"

THE

ENGINEER APPROVED BEAM BY OTHERS

ANTHONY

2'-0"

ENGINEER APPROVED BEAM BY OTHERS

5'-2"

32"x80" S.D.

4'-6 1/2"

3'-6"

BENCH

36"x68" SHOWER

DN 15R

2'-8" 3" 2'-4"

3'-6 3/4"

3'-3"

LAUN.

6'-7 3/4"

ROD & SHELF 4 - 24"x80"

11'-6 1/2"

W.T.P.

19'-10 1/2"

12'-2" 49'-0"

15'-8"

ROD & SHELF

9'-10" 32"x80"

4'-7 1/2"

ENSUITE

32"x80" 32"x80" POCKET

32"x80" POCKET

36"x80"

LOWER SHELVES

2 - 30"x80"

NOTE: LATERAL BRACING REQ'D EVERY 38.4" O.C. (MAX.) 1-8"x24"x20ga. FRAMING STRAP IMBEDDED IN CONC.

LINEN

3'-5 1/2"

D/W

5'-11 1/2"

COOKTOP

KITCHEN 19' X 13'

WALL OVEN

19'-1" 6'-5 1/2"

W.T.C.

BAR

UP 15R

STUB WALL

FRIDGE

5'-4 1/2"

ROD & SHELF

24"x80"

8'-5" RAILING 2'-3 1/2" 3'-10 1/2"

DINING 8' X 14'

6'-0"

DROPPED CEILING 4'-1 1/4" 3'-0"

FLUSH EATING COUNTER

81'-0"

32"x80"

S.D.

1'-6"

7'-0 1/2"

7'-6"

32"x80"

2'-11" 2'-0"

4'-11"

2 - 36"x80" FRENCH

DN 2R

BAR COUNTER 9'-8"

6'-0"

51'-7"

- MAX. RISE = 8" - MIN. RUN = T.B.D. - MIN. TREAD = 9 3 4" - MIN. HEADROOM = T.B.D. - HANDRAIL HEIGHT FROM 32" - 36"

THEATRE 15' X 19'-7"

3" Ø SAP ON 36X36X8 REINFORCED CONCRETE PAD FOOTING

BENCH

6'-9"

4'-0"

32"x80"

2'-3 1/2"

GREAT ROOM 13'-8" X 19' 4'-0"

ENG. - APP. BEAM BY OTHERS SCREEN LOCATION

STAIR CONSTRUCTION NOTES:

18'-11 1/2"

14'-0"

MASTER BEDROOM 13' X 20'

GAMES ROOM 12' X 24'

FAMILY ROOM 14' X 13'-8"

9'-5 1/2"

7'-3"

GAS F/P

3.5" (MIN.) CONC. SLAB 6MIL POLY ON COMP. SAND FILL (SEE REINF.)

8x108 REINF. CONC. FDN. WALL ON 18x8 REINF. CONC. STRIP FOOTINGS

CANT. ABOVE

12'-11 1/4"

1'-3"

2'-3"

36"x80" FRENCH

2x10 DECK JOISTS @ 16" O.C.

℄ BEAM 20'-7 1/4"

3'-11 1/2"

2'-3"

2'-3"

5'-0"

6 1/2"

31'-6"

13'-1 1/4" - ALL CONSTRUCTION MUST CONFORM TO LOCAL BYLAWS &/OR ALBERTA BUILDING CODE - WEEPING TILE TO BE INSTALLED AROUND ALL STRIP FOOTINGS AND TIED TO DRAINAGE AS PER CODE - ALL DIMENSIONAL FLOOR JOISTS TO BE #2D.F. OR BETTER AND DOUBLED AROUND ALL OPENINGS - PREMANUFACTURED FLOOR SYSTEM - AS PER SUPPLIER - ROOF TRUSSES TO BE ENGINEERED BY OTHERS - ALL CANTILEVERED FLOORS TO HAVE R32 INSULATION - ALL M=L &/OR GLULAM BEAMS TO BE ENGINEERED FOR OTHERS - * INDICATED 2'-8" x 6'-8" DOOR C/W 1HR. MIN. RATING & SELF CLOSER AND WEATHER STRIPPING - ATTIC ACCESS MUST BE 22" x 28" (MIN.) & INCLUDE INSULATION & WEATHER STRIPPING - PROVIDE INSULATION STOPS - PROVIDE PREFINISHED FASCIA & EAVESTROUGHING - WINDOW SIZES INDICATED ARE APPROXIMATE GLASS SIZE ONLY. ALL WINDOW R.O.'S, SIZES, STYLES, AND TYPES MUST BE VERIFIED WITH OWNER PRIOR TO ANY INSTALLATION OR ORDERING - FLASHING MUST BE PROVIDED OVER DOORS & WINDOWS - GRADE LINE IS SUGGESTED ONLY. VERIFY STEPS & ACTUAL GRADE LINE ON SITE WITH CONDITIONS - MAIN FLOOR HEIGHT TO ATTACHED GARAGE SLAB HEIGHT IS TO BE VERIFIED BY SURVEYOR WITH ACTUAL GRADE ON SITE - PROVIDE SMOKE DETECTOR(S) AS PER CODE - MIN. 2" CLEARANCE AROUND FURNACE & F/P FLUES - DRYER VENT MUST BE 4"Ø C/W HOOD - INDICATES EXHAUST FAN TO EXTERIOR

COVERED DECK 21'-6" X 17'

4'-6"

In a second-year residential construction and design class, students created a set of drawings for a single family home. AutoCAD was used.

4'-5"

GENERAL NOTES

14'-0"

9'-6"

10'-6 1/2" 22'-1 3/4"

12"x12" COLUMN C/W SOLID POST I/S

2'-3"

- CONCRETE FOUNDATION WALLS TO BE R/W 10m @ 24" O.C. (VERT) & 10m @ 18" O.C. (HORIZ.) - 2-10m DOWELS E/S OF OPENINGS - CONCRETE STRIP FOOTINGS TO BE R/W 2-10m BARS CONTINUOUS - BASEMENT SLAB R/W WWM C/W 6 MIL POLY MOISTURE BARRIER ON SAND COMPACTED TO 98% PROCTOR - CONCRETE PAD FOOTINGS R/W 10m @ 12" O.C. E/W - GARAGE SLAB R/W 2-10m BARS @ 12" O.C. E/W ON COMPACTED SAND - TO 98% PROCTOR - GRADE BEAM R/W 2-10m CONTINUOUS T&B C/W 10m TIES @ 18" O.C. - TYPICAL PILES TO BE 12"Ø x 14'-0" DEEP R/W 3-15m EXTENDED 60" ABOVE CONCRETE & BENT E/W - OTHER PILES TO BE ENGINEERED - TIE SLAB &/OR SIDEWALK TO GRADE BEAM/FOUNDATION WALL W-10m TIES @ 12" O.C. - TIE GRADE BEAM TO FOUNDATION WALL W/2-10m T&B @ELE - ENGINEER'S DRAWINGS &/OR STAMP TO BE THE RESPONSIBILITY OF BUILDER/OWNER

4 - 2x10 SPRUCE BEAM 6 1/2"

29'-4"

14'-0"

14'-0" 7'-0"

36'-0" 8'-0"

REINFORCING NOTES

14'-0"

4'-11 1/2"

4'-11" 9'-10"

2'-5"

2'-5"

5'-6"

4'-10"

DESIGNED/DRAWN BY: MYRON VAN DIJK SCALE: 3/16" = 1'-0" DATE: MARCH 15, 2018

SHEET #: 2 2

5'-6" 11'-0"

36'-0"

MAIN FLOOR - 1761 SQ. FT. MainPLAN Floor Plan

THE

ANTHONY

DESIGNED/DRAWN BY: MYRON VAN DIJK SCALE: 3/16" = 1'-0" DATE: MARCH 15, 2018

SHEET #: 1 2

9


12 6 ASPHALT SHINGLES TO SPEC

WOOD TRUSS 8" TRIM

2'-0"

2'-0" 2424F

4824F

2424F

2460c

4860F

2460C

HARDIE BOARD SIDING TO SPEC

2424F

7224F

2424F

2460F

2460F

12"x12" WOOD COLUMN C/W SOLID POST I/S

6'-6" H. STONE FINISH C/W 2" CAP

6030SL 42" H. ALUM. RAILING

REAR ELEVATION

Rear Elevation

ASPHALT SHINGLES TO SPEC

12 6

8" TRIM

12 6

2'-0"

ASPHALT SHINGLES TO SPEC

HARDIE BOARD SIDING TO SPEC

3624F

2424F

4824F

2424F

5460C

2460C

12"x12" WOOD COLUMN C/W SOLID POST I/S

2424F

2424F

2424F 2'-0"

2460C

8" TRIM

2460C

6" FASCIA - TYP.

2460C

2460F 4836SL

24" STONE FINISH RETURN

2'-0" 6'-6" STONE FINISH C/W 2" CAP

42" H. ALUM. RAILING

3624FF

3624F

4" TRIM TYP.

2'-0" 3660FC 6" TRIM

4" TRIM

4830SL HARDIE BOARD SIDING TO SPEC

LEFT ELEVATION

Left Elevation

12"x12" WOOD COLUMN C/W SOLID POST I/S 6'-6" H. STONE FINISH C/W 2" CAP

6" TRIM

THE

42" H. ALUMINUM RAILING CONC. STEPS & VERANDAH TO SPEC

FRONT ELEVATION

ANTHONY

Front Elevation

DESIGNED/DRAWN BY: MYRON VAN DIJK SCALE: 3/16" = 1'-0" DATE: MARCH 29, 2018

SHEET #: 2 2

ASPHALT SHINGLES TO SPEC 12 6

8" TRIM

2'-0" 1824F

2424F

1842F

2442C

1824F

1824F

1860F

1860F

2'-0" 12"x12" WOOD COLUMN C/W SOLID POST I/S

24" STONE FINISH RETURN

6'-6" H. STONE FINISH C/W 2" CAP

RIGHT ELEVATION

4" TRIM TYP.

4830SL 42" H. ALUM. RAILING

HARDIE BOARD SIDING TO SPEC

6'-6" STONE FINISH C/W 2" CAP

4830SL 42" H. ALUM. RAILING

12"x12" WOOD COLUMN C/W SOLID POST I/S

Right Elevation

THE

ANTHONY

DESIGNED/DRAWN BY: MYRON VAN DIJK SCALE: 3/16" = 1'-0" DATE: MARCH 29, 2018

SHEET #: 1 2

10


jones residence NORTH

In a first-year construction documents class, students produced floor plans, elevations, a building section, and a foundation plan for a single family home. The program used was AutoCAD.

1

FOUNDATION PLAN

Foundation Plan JONES RESIDENCE

SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT

FOUNDATION PLAN

NORTH

A1

ARCHITECTURAL TECHNOLOGY

M. BEDRM 14'7x13'5

ENSTE.

W.I.C.

LIVING 14'3x14'4

A

MAIN FLOOR PLAN

LAUND.

BATH

FOYER

BDRM. 2 10'9x10'9

Main Floor Plan

JONES RESIDENCE

SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT ARCHITECTURAL TECHNOLOGY

MAIN FLOOR PLAN

A2

11


4

1

12

4

1

EAST ELEVATION

WEST ELEVATION

Rear Elevation

Front Elevation

2

SOUTH ELEVATION

2

Left Elevation

JONES RESIDENCE

SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT

12

A4

EAST / SOUTH ELEVATIONS

ARCHITECTURAL TECHNOLOGY

NORTH ELEVATION

Right Elevation

JONES RESIDENCE

A3

WEST / NORTH ELEVATIONS

SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT ARCHITECTURAL TECHNOLOGY

· ·

· ·

·

· ·

· ·

· ·

· ·

·

· · ·

·

· ·

· · · · ·

A - A BUILDING SECTION

Building Section

· · · ·

·

JONES RESIDENCE

SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT ARCHITECTURAL TECHNOLOGY

BUILDING SECTION

A5

12


NAIT Dormitory

1

2

3

4

5

6 WALL CONSTRUCTION SCHEDULE

STAIR 2

SCHOOL OF SUSTAINABLE BUI AND ENVIRONMENTAL MANAGE

ARCHITECTURAL TECHNOLOG

STAIR 1

A

LOBBY

VEST.

VEST. UP

UP

JAN. MACH

MECH

SEATING AREA KITCHEN

MENS

WOMENS

SERVERY

B

1

MAIN FLOOR PLAN

STAIR 2

LAUN.

A

In two second-year construction documents classes, students produced construction documents for the NAIT dormitory designed in first year. AutoCAD was used to create these.

STAIR 1

DN

DN

ELEV. LOBBY

SUITE 2

SUITE 1

UP

UP

NAIT DORMITOR

CORRIDOR SUITE 3

SUITE 6

SUITE 5

MAIN FLOOR PL 2ND & 3RD FLOOR

SUITE 4

SUITE 7

B

2

2ND & 3RD FLOOR PLAN

A2 Floor Plans

13


6

5

4

3

2

1

A

B

SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY

A

EAST ELEVATION

B

1

C

2

3

4

5

WEST ELEVATION

B

D

A

A

NORTH ELEVATION

6

A

SOUTH ELEVATION

B NAIT DORMITORY

BUILDING ELEVATIONS

ANCILLARY VIEW 1

ANCILLARY VIEW 2

ANCILLARY VIEW 3

A3.1 Elevations

14


custom millwork

1

2

PLAN

3

ELEVATION

4

ELEVATION

5

In a second-year construction documents class, students designed and created a custom millwork installation for the tenant on the main floor in the NAIT dormitory project. Details were produced using AutoCAD.

ELEVATION

ELEVATION

CUSTOM MILLWORK

SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT ARCHITECTURAL TECHNOLOGY

PLAN & ELEVATIONS

5A

15


1

SECTION

2

SECTION

3

SECTION

4

SECTION DETAIL

5

SECTION DETAIL

6

SECTION DETAIL

CUSTOM MILLWORK

SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT

SECTIONS & SECTION DETAILS

5B

ARCHITECTURAL TECHNOLOGY

16



personal works

17


school expansion Preliminary floor plans were created as options for expansion for the Parkland Immanuel Christian School. The designs were created with the input of the Land Use and Facility Development Committee. AutoCAD was used.

Main Floor Plan - Expansion option 1 showing an addition on the back of the existing building.

18


WF

MOP SINK

UP 20 RISERS

WF

SUMP

UP 20 RISERS

Main Floor Plan - Expansion option 2 showing an addition to the back of the existing building, to be combined with the replacement of the front portion.

Main Floor Plan - Expansion option 2 showing a replacement of a front portion of the building.

Second Floor Plan - Expansion option 2 showing a replacement of a front portion of the building.

19


kamminga residence Preliminary floor plans and a 3D model of a single family home were created for a home to be built in Carman, MB. Programs used include AutoCAD, SketchUp, and Adobe Photoshop.

Exterior Render

20


MASTER BEDROOM 16'-0" x 12'-0"

LIVING ROOM 16'-0" x 18'-0"

ENSTE.

DINING ROOM 12'-6" x 16'-0"

BATH

KITCHEN 14'-0" x 13'-10"

LAUND.

Front Elevation

W.I.C.

BEDROOM 2 11'-8 1/2" x 10'-0"

FOYER

OFFICE 16'-0" x 11'-0"

Main Floor Plan 1

Side Elevation

MAIN FLOOR PLAN

21


Graphic design The following graphic design was created for a local barber. Designs included the main logo, a menu, and a contest graphic as well as the design of custom barber towels. Programs used included Adobe Photoshop and Adobe InDesign.

Contest Graphic

Barber Menu

Shear Edge by Darcie Logo

22


photography

Boyne River, Carman, MB

Valemount, BC

Whiteshell Provincial Park, MB

Peyto Lake, AB

Mount Robson, BC

St. Albert, AB

23


Myron van Dijk Architectural Technologist mvandijk98@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.