TCOv2_Report

Page 1

VMware TCO/ROI Calculator for CMC Careers VMware Infrastructure This 3-year analysis for CMC Careers calculates the estimated total cost of ownership (TCO) comparison between your current (As Is) environment and implementing the proposed VMware solution. Based upon the information provided for the 10 server environment, implementing VMware Infrastructure provides a potential direct savings of £ 43,012 and an indirect savings of £ 8,661 over 3 years. With the proposed VMware Infrastructure solution, the following can be achieved: Reduce the number of servers through virtualization, reducing servers from 10 to 2, a savings of 80.0% - with a target consolidation ratio of 5.0 to 1. With the virtualization of servers, consolidating SAN networking costs, helping to reduce the number of host bus adapters from 0 to 4, saving -4 HBAs and reducing SAN switches from 0 to 2, saving -2 SAN switches. With the reduction in overall number of servers, reducing operating power by 2.842 kWatts, cooling power by 3.550 kWatts, and data center space savings by 0 square feet. A reduction of 74,882 lbs (34 tons) of carbon emissions, equivalent to the average emissions of taking 6 cars off the road per year. Achieve an ROI of 503.9% from an investment of £ 10,255 in VMware Infrastructure, and projected direct savings of £ 43,012, indirect savings of £ 8,661. Cumulative 3 Year TCO Comparison

Current (As Is)

With VI (Projected)

Difference (£ and % savings)

£ 52,993

£ 16,954

£ 36,039 ; 68.0%

£ 845

£ 13,507

£ -12,662 ; -1,498.5%

VMware Infrastructure Benefits Data Center Server Hardware Data Center Server Storage Data Center Server Networking

£ 4,495

£ 2,248

£ 2,247 ; 50.0%

Data Center Server Power and Cooling Consumption

£ 11,230

£ 2,582

£ 8,648 ; 77.0%

Data Center Server Space

£ 12,028

£ 12,028

£ 0 ; 0.0%

£ 7,998

£ 601

£ 7,397 ; 92.5%

£ 48,314

£ 36,716

£ 11,598 ; 24.0%

£ 105

£ 33

£ 72 ; 68.6%

£ 30

£ 39

£ -9 ; -30.0%

£ 11,457

£ 2,859

£ 8,598 ; 75.0%

VI Software Licensing and SnS

£0

£ 10,255

£ -10,255 ; 0.0%

Additional Software Licensing Costs (if any)

£0

£0

£ 0 ; 0.0%

VI Design, Plan and Deployment Services

£0

£0

£ 0 ; 0.0%

VI Training

£0

£0

£ 0 ; 0.0%

£ 137,903

£ 94,891

£ 43,012 ; 31.2%

Data Center Server Provisioning Data Center Server Administration Data Center Server Disaster Recovery (Indirect) Data Center Site Disaster Recovery (Indirect) Data Center Server Unplanned Downtime (Indirect) Investment Required

TCO - Direct TCO - Indirect Total TCO (3 year) Expected Benefits from VI

£ 11,592

£ 2,931

£ 8,661 ; 74.7%

£ 149,495

£ 97,822

£ 51,673 ; 34.6%

Year 1

Year 2

Year 3

Total

Data Center Server Hardware

£ 10,888

£ 11,977

£ 13,174

£ 36,039

Data Center Server Storage

£ -3,821

£ -4,211

£ -4,630

£ -12,662

£ 679

£ 747

£ 821

£ 2,247

£ 2,613

£ 2,874

£ 3,161

£ 8,648

£0

£0

£0

£0

Data Center Server Provisioning

£ 2,142

£ 2,451

£ 2,804

£ 7,397

Data Center Server Administration

Data Center Server Networking Data Center Server Power and Cooling Consumption Data Center Server Space

£ 3,359

£ 3,843

£ 4,396

£ 11,598

Data Center Server Disaster Recovery (Indirect)

£ 24

£ 24

£ 24

£ 72

Data Center Site Disaster Recovery (Indirect)

£ -3

£ -3

£ -3

£ -9

£ 2,866

£ 2,866

£ 2,866

£ 8,598

£ 18,747

£ 20,568

£ 22,613

£ 61,928

Data Center Server Unplanned Downtime (Indirect) Total Benefits Expected Investment in VMware Solution

Initial / Year 1

Year 2

Year 3

Total

£ 7,325

£ 1,465

£ 1,465

£ 10,255

Additional Software Licensing Costs (if any)

£0

£0

£0

£0

VI Design, Plan and Deployment Services

£0

£0

£0

£0

VI Training

£0

£0

£0

£0

Total Costs

£ 7,325

£ 1,465

£ 1,465

£ 10,255

VI Software Licensing and SnS

POWERED BY

Copyright © 2001 - 2008, VMware, Inc. and Alinean, Inc. All rights reserved.

Page 1 of 10

v2.1


Appendix A: Details for VMware Infrastructure Data Center Server Hardware With VMware, workloads can be consolidated. Each instance of VMware ESX Server can support more than 100 virtual machines, and the vast majority of our customers are able to run as many as 10 or more applications on a single piece of hardware. Proposed Consolidation Strategy and Defaults

Current (As Is)

Workloads (After) Reallocation

Number of Servers With VI Post Consolidation

Number of CPUs (After) VI

1 CPU

0

0

0

0

2 CPU

10

10

2

4

4 CPU

0

0

0

0

8 CPU

0

0

0

0

16 CPU

0

0

0

0

32 CPU

0

0

0

0

10

10

2

4

Total

Proposed Target Consolidation Ratio: 5.0 to 1 Server Hardware

Current (As Is)

Proposed Savings with VI

With VI (Projected)

1 CPU Number of servers Average amortized cost per server per year Total

0

0

£ 985

£ 985

£0

£0

£0

2 CPU Number of servers Average amortized cost per server per year Total

10

2

£ 1,601

£ 2,561

£ 16,010

£ 10,888

£ 5,122

4 CPU Number of servers Average amortized cost per server per year Total

0

0

£ 3,769

£ 6,030

£0

£0

£0

8 CPU Number of servers Average amortized cost per server per year Total

0

0

£ 7,389

£ 11,084

£0

£0

£0

16 CPU Number of servers Average amortized cost per server per year Total

0

0

£ 34,483

£ 39,656

£0

£0

£0

32 CPU Number of servers Average amortized cost per server per year

0

0

£ 67,734

£ 74,508

Total

£0

£0

Total number of servers

10

8

2

£ 16,010

£ 10,888

£ 5,122

£ 10,888

£ 5,122

Total amortized annual cost Realizable savings (100.0%) Server Hardware Savings Costs with current (As Is) Schedule for virtualization Servers to be consolidated according to schedule Costs With VMware Infrastructure (Projected) Total realizable savings

£0

Year 1

Year 2

Year 3

£ 16,010

£ 17,611

£ 19,372

100.0%

0.0%

0.0%

8

8

8

£ 5,122

£ 5,634

£ 6,198

£ 10,888

£ 11,977

£ 13,174

Data Center Server Storage With the proposed VMware solution, servers can be consolidated helping to reduce the SAN infrastructure needed to connect servers to the storage network. Storage HBAs Average amortized cost of each HBA Total SAN switches Average amortized cost for each SAN switch Total DAS storage (GB)

Current (As Is)

Proposed Savings with VI

With VI (Projected)

0

4

£ 212

£ 212

£0

£ -848

£ 848

0

2

£ 1,019

£ 1,019

£0

£ -2,038

£ 2,038

500

0

Average amortized cost for DAS storage (per GB)

£ 0.51

£ 0.51

Total

£ 255

SAN storage (GB) Average amortized cost for SAN storage (per GB) Total Total Storage Savings Costs with current (As Is)

£ 255

£0

0

700

£ 1.70

£ 1.70

£0

£ -1,190

£ 1,190

£ 255 Year 1

£ -3,821 Year 2

£ 4,076 Year 3 £ 309

£ 255

£ 281

Schedule for virtualization

100.0%

0.0%

0.0%

Costs With VMware Infrastructure (Projected)

£ 4,076

£ 4,492

£ 4,939

£ -3,821

£ -4,211

£ -4,630

Total realizable savings

POWERED BY

Copyright © 2001 - 2008, VMware, Inc. and Alinean, Inc. All rights reserved.

Page 2 of 10

v2.1


Appendix A: Details for VMware Infrastructure (continued) Data Center Server Networking With the proposed VMware solution, servers can be consolidated helping to reduce the network switch infrastructure needed to connect servers to the data network.

Network

Current (As Is)

Number of servers

Proposed Savings with VI

With VI (Projected)

10

2

Number of NICs per server

2

3

Number of ports per NIC

2

2

24

24

Number of ports per network switch Number of network switches needed Annual amortized cost per network switch Total

2

1

£ 679

£ 679

£ 1,358

£ 679

Realizable savings (100.0%)

£ 679

£ 679

£ 679

Year 1

Year 2

Year 3

Costs with current (As Is)

£ 1,358

£ 1,494

£ 1,643

Schedule for virtualization

100.0%

0.0%

0.0%

Costs with VMware Infrastructure (Projected)

£ 679

£ 747

£ 822

Total realizable savings

£ 679

£ 747

£ 821

Storage Savings

Data Center Server Power and Cooling Consumption With the proposed VMware solution, servers can be consolidated helping to significantly reduce the power and cooling requirements and costs. Power and Cooling Consumption before VMware

Number of Servers

Actual Operating Power (Watts)

Actual Cooling Power (Watts)

1 CPU

0

318

398

£0

2 CPU

10

369

461

£ 3,393

4 CPU

0

637

796

£0

8 CPU

0

1,072

1,340

£0

16 CPU

0

2,948

3,685

£0

32 CPU

0

6,164

7,705

£0

10

3,690 Watts

4,610 Watts

£ 3,393

Number of Servers

Actual Operating Power (Watts)

Actual Cooling Power (Watts)

Total Annual Operating Power Cost

1 CPU

0

366

458

£0

2 CPU

2

424

530

£ 780

4 CPU

0

733

916

£0

8 CPU

0

1,233

1,541

£0

16 CPU

0

3,390

4,238

£0

32 CPU

0

7,089

8,861

£0

Total

2

848 Watts

1,060 Watts

£ 780

2,842 Watts

3,550 Watts

£ 2,613

Total Operating and Cooling Power Savings (kWatts)

Average CO2 emission per kWh of Electrical Power (in lbs)

Total Operating Hours

Total Carbon Emission Reduction (in lbs)

6.392

1.341

8,736

74,882

Total Power and Cooling Consumption with VMware

Estimated savings

Carbon Emission Reduction

With VMware Infrastructure (Projected)

Total Annual Operating Power Cost

Power and Cooling Consumption Savings

Year 1

Year 2

Year 3

Costs with current (As Is)

£ 3,393

£ 3,732

£ 4,105

Schedule for virtualization

100.0%

0.0%

0.0%

£ 780

£ 858

£ 944

£ 2,613

£ 2,874

£ 3,161

Costs With VMware Infrastructure (Projected) Total realizable savings

POWERED BY

Copyright © 2001 - 2008, VMware, Inc. and Alinean, Inc. All rights reserved.

Page 3 of 10

v2.1


Appendix A: Details for VMware Infrastructure (continued) Data Center Server Space With the proposed VMware solution, servers can be consolidated helping to reduce the real estate consumed by server racks, and the associated data center space costs (facilities and overhead). Includes cost for space as well as amortized build-out costs. Data Center Space Square footage consumed Average annual cost per square foot Total annual facilities cost

Current (As Is)

Proposed Savings with VI

23

0

£ 157.98

With VI (Projected) 23 £ 157.98

£ 3,634

Realizable savings (100.0%)

£0

£ 3,634

£0

£ 3,634

Data Center Space Savings

Year 1

Year 2

Year 3

Costs with current (As Is)

£ 3,634

£ 3,997

£ 4,397

Schedule for virtualization

100.0%

0.0%

0.0%

Costs With VMware Infrastructure (Projected)

£ 3,634

£ 3,997

£ 4,397

£0

£0

£0

Total realizable savings

Data Center Server Provisioning With the proposed VMware solution, servers can be provisioned more efficiently - allowing the team to add new servers, or move/add/change existing servers more productively. With individual servers before VMware, it typically takes on average 20 hours to build / rebuild and reload a server. With VMware, these tasks are consolidated to redirect virtual disk to new VMware virtual machine instance. Since tools and applications are already loaded these tasks can be avoided. Server Provisioning Number of servers added / provisioned per year

Current (As Is)

Proposed Savings with VI

With VI (Projected)

4

4

20.0

1.5

Average hourly cost for server administration / provisioning labor

£ 28.95

£ 28.95

Total

£ 2,316

Expected person hours to procure, prepare and provision each server (physical for Current (As Is), Virtual for VMware)

Realizable savings (100.0%)

£ 2,142

£ 174

£ 2,142

£ 174

Server Provisioning Savings

Year 1

Year 2

Year 3

Costs with current (As Is)

£ 2,316

£ 2,650

£ 3,032

Schedule for virtualization

100.0%

0.0%

0.0%

£ 174

£ 199

£ 228

£ 2,142

£ 2,451

£ 2,804

Costs With VMware Infrastructure (Projected) Total realizable savings

Data Center Server Administration With the proposed VMware solution, servers can be consolidated helping to reduce the number of physical servers to manage and associated IT operations and administrative tasks including on-going moves, add and change management, problem and incident management, monitoring, performance and availability management, asset management, security management, patch and upgrade management, demand management, backup and recovery, restores, storage management, disaster planning, compliance management/reporting, vendor and contracts management, chargeback, and financial/budget management. Server Administration Total number of workloads under management

Current (As Is)

Proposed Savings with VI

With VI (Projected)

10

10

Average number of workloads managed per IT operations and administration staff FTE

40.0

75.0

Number of server administrator FTEs managing servers

0.25

Burdened labor cost per server administrator

£ 55,973

Total

£ 13,993

Realizable savings (50.0%)

Server Administration Cost Savings Costs with current (As Is) Schedule for virtualization Costs with VMware Infrastructure (Projected) Total savings

POWERED BY

0.12

0.13 £ 55,973

£ 6,717

£ 7,276

£ 3,359

£ 10,634

Year 1

Year 2

Year 3

£ 13,993

£ 16,008

£ 18,313

100.0%

0.0%

0.0%

£ 10,634

£ 12,165

£ 13,917

£ 3,359

£ 3,843

£ 4,396

Copyright © 2001 - 2008, VMware, Inc. and Alinean, Inc. All rights reserved.

Page 4 of 10

v2.1


Appendix A: Details for VMware Infrastructure (continued) Data Center Server Disaster Recovery (Indirect) With the proposed VMware solution, servers can be consolidated helping to reduce the number of physical servers which need to be restored in case of disaster, helping to reduce recovery time: Complex server configuration is unnecessary with VMware Infrastructure due to virtual machine hardware independence; Multi-step restorations are simplified to single-step file recovery. Disaster Recovery

Current (As Is)

Likelihood of a disaster recovery event in a given year

Proposed Savings with VI

With VI (Projected)

3.0%

Expected time to perform a full recovery (hours)

3.0%

10.0

Average hourly cost during disaster downtime

7.0

£ 1,181

Total (likelihood * time to recover * cost per hour)

3.0 £ 1,181

£ 354

£ 248

£ 106

£ 35

£ 24

£ 11

Year 1

Year 2

Year 3

£ 35

£ 35

£ 35

100.0%

0.0%

0.0%

Costs With VMware Infrastructure (Projected)

£ 11

£ 11

£ 11

Total realizable savings

£ 24

£ 24

£ 24

Realizable savings (10.0%) Disaster Recovery Savings Costs with current (As Is) Schedule for virtualization

Data Center Site Disaster Recovery (Indirect) With the proposed VMware solution, servers can be consolidated helping to reduce the number of physical servers which need to be restored in case of disaster, helping to reduce the hardware and software that needs to be recovered should a disaster occur: Complex server configuration is unnecessary with VMware Infrastructure due to virtual machine hardware independence; Multi-step restorations are simplified to single-step file recovery. Disaster Recovery Site Investment

Current (As Is)

Likelihood of a disaster recovery event in a given year

Proposed Savings with VI

With VI (Projected)

3.0%

3.0%

1

1

Average amortized annual hardware cost per server

£ 1,601

£ 2,561

Average software cost per server

£ 1,529

Number of servers that need to be rebuilt / restored should a disaster strike

Total hardware and software recovery cost (all servers that need to be restored)

£ 94

Person hours to setup and deploy each replacement system Burdened hourly labor cost per server administrator Labor cost to setup and deploy replacement systems

£ 1,529 £ -29

£ 123

6.0

6.0

£ 26.91

£ 26.91

£5

£0

£5

Total (hardware and software recovery cost + labor cost to setup and deploy)

£ 99

£ -29

£ 128

Realizable savings (10%)

£ 10

£ -3

£ 13

Year 1

Year 2

Year 3

£ 10

£ 10

£ 10

100.0%

0.0%

0.0%

Costs With VMware Infrastructure (Projected)

£ 13

£ 13

£ 13

Total realizable savings

£ -3

£ -3

£ -3

Disaster Recovery Site Investment Savings Costs with current (As Is) Schedule for virtualization

Data Center Server Unplanned Downtime (Indirect) With the proposed VMware solution, server availability can be better managed by implementing Virtual Machines so that workload can be balanced and proactively moved from overloaded hosts, and Virtual Machines can be quickly restored on other servers if a host experiences hardware failure. Unplanned Downtime Unplanned downtime hours per year Average hourly cost for unplanned downtime Total Realizable savings (10.0%)

Current (As Is)

Proposed Savings with VI

With VI (Projected)

43.7

10.9

£ 874

£ 874

£ 38,194

£ 28,667

£ 9,527

£ 3,819

£ 2,866

£ 953

Unplanned Downtime Savings

Year 1

Year 2

Year 3

Costs with current (As Is)

£ 3,819

£ 3,819

£ 3,819

Schedule for virtualization

100.0%

0.0%

0.0%

£ 953

£ 953

£ 953

£ 2,866

£ 2,866

£ 2,866

Costs With VMware Infrastructure (Projected) Total realizable savings

POWERED BY

Copyright © 2001 - 2008, VMware, Inc. and Alinean, Inc. All rights reserved.

Page 5 of 10

v2.1


Appendix A: Details for VMware Infrastructure (continued) VI Software Licensing and SnS The proposed VMware solution requires an investment in software licensing and annual support and subscription fees (SnS). VI Software Licensing and SnS

Number of Units

Unit Cost

Total Initial License Cost

Annual Subscription Cost Total (recurring)

VI Enterprise Edition*

2

£ 2,930

£ 5,860

£ 1,465

VI Standard Edition

0

£ 1,526

£0

£0

VI Foundation Edition

0

£ 507

£0

£0

VirtualCenter Management Server

0

£ 2,545

£0

£0

£ 5,860

£ 1,465

Total cost (if implemented initially)

Annual support and subscription rate (starting in year 1)

25.0%

VI Software Licensing and SnS

Initial

Year 2

Year 3

Schedule for virtualization

100.0%

0.0%

0.0%

Licensing cost

£ 5,860

£0

£0

Cumulative licensing cost

£ 5,860

£ 5,860

£ 5,860

Annual support and subscription fees (SnS)

£ 1,465

£ 1,465

£ 1,465

Total licensing cost and annual subscription fees

£ 7,325

£ 1,465

£ 1,465

*VI Enterprise edition components include: ESX Server, VMFS, VirtualCenter Agent, Virtual SMP, VMotion, VMware HA, VMware DRS and Consolidated Backup

VMware Infrastructure Design, Plan and Deployment Services The services to design, plan and deploy the VMware Infrastructure solution.

VI Design, Plan and Deployment Services

Initial Cost

Planning and design (VA)

£0

Deployment

£0

VMware travel and materials

£0

Total cost

£0

VMware Infrastructure Design, Plan and Deployment Services

Initial

Year 2

Year 3

100.0%

0.0%

0.0%

£0

£0

£0

Number of Classes

Cost

Total Training Costs (initial, non-recurring)

Install and configure

0

£ 1,526

£0

Design, scale, and automate (with VCP)

0

£ 1,768

£0

Total cost (if implemented immediately)

0

Schedule for virtualization Total cost

VMware Infrastructure Training The number of classes and total training costs for the VMware Infrastructure solution.

VI Training

VI Training Schedule for virtualization Total cost

POWERED BY

£0

Initial

Year 2

Year 3

100.0%

0.0%

0.0%

£0

£0

£0

Copyright © 2001 - 2008, VMware, Inc. and Alinean, Inc. All rights reserved.

Page 6 of 10

v2.1


Appendix A: Details for VMware Infrastructure (continued) VMware TCO Advantage Over Other Virtualization Products When comparing costs of VMware products to costs of other virtualization products, it is important to account for the scalability benefit offered by the advanced technology in VMware Infrastructure. VMware Infrastructure typically supports double or more the number of concurrently running virtual machines on the same server hardware as do competing products from Microsoft or Xen. That scalability advantage stems from our support for memory oversubscription - a VMware exclusive - and also from our direct I/O architecture. VMware Infrastructure memory oversubscription permits the aggregate memory allocated to the virtual machines to exceed the physical memory installed in the host server. VMware enables memory oversubscription with exclusive technologies that reduce host memory requirements: Transparent page sharing examines every memory page stored by the virtual machines to identify similar pages and store only one copy. For example, if several virtual machines are running Windows Server 2003, they will have many identical memory pages. Transparent page sharing consolidates those identical pages into a single memory location. Only VMware has this powerful virtualization feature. Idle virtual machines would normally consume their full allocation of memory. To make better use of those wasted resources, VMware Infrastructure uses a memory balloon driver to artificially exert memory pressure on idle virtual machines so that they page out their memory to disk. This frees up memory that can then be used by active virtual machines.

The result of this innovative technology is the ability to run, on average, twice as many virtual machines on a VMware Infrastructure host without sacrificing performance as you could run on a competing platform. In fact, a 2:1 memory oversubscription ratio is conservative and much higher ratios can often be attained. The impact of memory oversubscription on TCO is dramatic because half as many VMware host servers will be required to support the same number virtual machines. Another contributor to the better scalability of VMware Infrastructure is the direct driver model we use for virtual machine network and storage I/O. VMware places the device drivers for physical network and storage adapters directly in the ESX Server hypervisor. That lets us optimize I/O operations for the unique workloads generated by multiple virtual machines. Competing hypervisors channel all virtual machine I/O through generic Linux or Windows drivers in a general purpose management operating system, which results in resource contention and bottlenecks. The VMware direct driver architecture supports more concurrently operating virtual machines than does the indirect driver design of the competition.

POWERED BY

Copyright Š 2001 - 2008, VMware, Inc. and Alinean, Inc. All rights reserved.

Page 7 of 10

v2.1


Appendix A: Details for VMware Infrastructure Assumptions Discount Rate

Value Used in Analysis

What discount rate should be used for net present value (NPV) calculations? Salary and Other Profiles

9.5% Value Used in Analysis

What is the average hourly burdened labor rate for IT administration and support staff?

£ 26.91

What is the average hourly burdened labor rate for IT system provisioning staff?

£ 28.95

What is the fully burdened rate of development per hour for bug reproduction?

£ 30.99

What is the fully burdened rate of development per hour for customer support engineer?

£ 26.91

What is the average annual increase in salaries anticipated over next 3 years?

4.0%

What is the adjustment that should be made for any soft (indirect) benefits?

10.0%

Current (As Is) Consolidation Schedule

Value Used in Analysis

What percentage of the current servers will be virtualized using VI - virtualized schedule? Initial + Year 1

100.0%

Year 2

0.0%

Year 3

0.0%

Total

100.0%

Current (As Is) Data Center Server Profile

Value Used in Analysis

On average, by what percentage does your server install base increase each year?

10.0%

On average, what is the average server useful life (in years)?

3

Original average purchase price for existing data center servers 1 CPU

£ 2,038

2 CPU

£ 3,312

4 CPU

£ 7,797

8 CPU

£ 15,288

16 CPU

£ 71,344

32 CPU

£ 140,140

What is the annual support and maintenance cost (as a percentage of original purchase price) for existing data center servers? What percentage of the annual server cost savings can be realized?

Current (As Is) Data Center Operating Hours

15.0% 100.0%

Value Used in Analysis

How many hours per day does the data center operate?

24

How many days per week does the data center operate?

7

How many weeks per year does the data center operate?

52

Current (As Is) Data Center Storage Profile

Value Used in Analysis

On average, by what percentage does your server storage increase each year?

10.0%

When server is attached to a SAN, what is the number of HBAs per host?

2.0

How many ports are there per typical SAN switch?

24

What is the cost of each HBA?

£ 637

What is the cost for SAN switches?

£ 3,058

What is the cost for DAS storage (per GB)?

£ 1.53

What is the cost for SAN storage (per GB)?

£ 5.10

Current (As Is) Data Center Server Networking Profile

Value Used in Analysis

What are the current number of network interface cards (NICs) per server?

2

What are the current number of ports per NIC?

2

What are the current number of ports per network switch What is the total cost for a network switch?

£ 2,038

On average, by what percentage does your server networking costs increase each year? What percentage of the annual server networking savings can be realized?

POWERED BY

24

Copyright © 2001 - 2008, VMware, Inc. and Alinean, Inc. All rights reserved.

10.0% 100.0%

Page 8 of 10

v2.1


Appendix A: Details for VMware Infrastructure (continued) Current (As Is) Data Center Server Data Center Real Estate

Value Used in Analysis

What is the average rack size for current server hardware (in number of U per server)? 1 CPU

1

2 CPU

2

4 CPU

4

8 CPU

6

16 CPU

12

32 CPU

24

What is the current average size of each rack (specified in U)?

24

Total number of racks

1

What measurement systems do you want to use to calculate space?

Square Feet

What is the average number of square feet per rack?

7.00

What percentage of space is currently used by racks (upward scaling factor to rack space consumption)?

30%

Total area of data center consumed by these servers (square feet)

23

What is the capital cost for facilities data center space build-out (per square foot)?

£ 612

What is the capital cost for power and cooling equipment (per square foot)?

£ 764

What is the average weighted depreciation to use for build-out and equipment (in years)? What is the cost for the space (lease, rent, mortgage) in square feet per year? The average fully burdened data center cost per square foot per year? On average, by what percentage does your server data center facilities costs increase each year? What percentage of the annual data center facilities savings can be realized? Current (As Is) Data Center Server Data Center Power and Cooling What is the current price of electricity (cost per kWatt hour) for the data center facilities?

10 £ 20.38 £ 157.98 10.0% 100.0% Value Used in Analysis £ 0.0468

What is the operating power (in Watts) per server? 1 CPU

475

2 CPU

550

4 CPU

950

8 CPU

1,600

16 CPU

4,400

32 CPU

9,200

What is the steady-state constant used to convert nameplate power consumption to steady state? What is the utilization uplift to power consumption for VMware virtualized servers?

0.67 115.0%

What is the estimated cooling load factor (Watts of cooling electricity needed to dissipate 1W of heat)?

0.8

What is the airflow redundancy required to cool the data center?

25%

What is the current airflow de-rating (percentage available for cooling)? By what percentage do your server data center power and cooling costs increase each year?

Current (As Is) Data Center Server Provisioning

80% 10.0%

Value Used in Analysis

How many servers are provisioned per year (growth / replacements)? On average, by what percentage does your server provisioning task workload increase each year? What percentage of the annual provisioning labor savings can be realized?

Current (As Is) Data Center Server IT Operations and Administration

4 10.0% 100.0%

Value Used in Analysis

What is the average server:administ rator ratio?

40.0

What percentage of the annual IT operations and administration overhead labor savings can be realized?

POWERED BY

Copyright © 2001 - 2008, VMware, Inc. and Alinean, Inc. All rights reserved.

50.0%

Page 9 of 10

v2.1


Appendix A: Details for VMware Infrastructure (continued) Current (As Is) Data Center Server Downtime

Value Used in Analysis

Which most closely describes the application(s) supported by these server operations?

Other / Combination

On average, how many unplanned downtime hours occur per year for these server operations? On average, what is the per hour business cost in lost productivity or transactions from these downtime events?

Current (As Is) Data Center Server Disaster Recovery Risks and Costs

43.7 £ 874

Value Used in Analysis

What is the likelihood of a disaster occurring in any given year which will require recovery? What is the estimated hourly cost of recovery including downtime and labor costs?

3.0% £ 1,181

What is the expected time (in hours) for full recovery for all servers / data? What is the expected percentage of servers affected if a disaster occurs? What is the average software cost to recover each server in the event of a disaster?

10 10.0% £ 1,529

What is the expected person hours to setup and deploy a recovery / replacement system?

VMware Infrastructure Proposed Configuration and Benefit Assumptions

6.0

Value Used in Analysis

For the VMware solution, the number of workloads/virtu al machines targeted per CPU?

4

Original average purchase price for data center servers with VMware Infrastructure 1 CPU

£ 2,038

2 CPU

£ 5,299

4 CPU

£ 12,475

8 CPU

£ 22,932

16 CPU

£ 82,046

32 CPU

£ 154,154

What is the estimated provisioning task time reduction factor with VMware?

13.48

What is the estimated number of workloads/vms per IT operations and administration staff FTE with VMware?

75

What is the estimated disaster recovery reduction factor with VMware?

75.0%

What is the estimated unplanned downtime reduction factor with VMware?

75.0%

For the VMware solution, the GB to add per workload/vm unit? After VMware, what percentage of storage will be SAN?

20.0 100.0%

What is the number of Network Interface Card (NIC) per server with the VMware solution?

3

What is the number of ports per NIC with the VMware solution?

2

Disclaimer: This information and tool are provided to you for self-help purposes and the information and tool contained herein are provided to you "as is". VMware, Inc. and Alinean, Inc. disclaim all express and implied warranties including, but not limited to, implied warranties of merchantability or fitness for a particular purpose. VMware, Inc. and Alinean, Inc. do not warrant or make any representations regarding the use, validity, or accuracy of the results of the tool. In no event shall VMware, Inc. and Alinean, Inc. be liable for any damages, including those arising as a result of VMware, Inc.'s or Alinean, Inc.'s negligence whether those damages are direct, consequential, incidental, or special, even if VMware, Inc. or Alinean, Inc. has been advised of the possibility of such damages. The ultimate responsibility for achieving the calculated results remains with you. Additionally, VMware, Inc. and Alinean, Inc. are not liable for and do not endorse any third party assessments or proposals conducted using the tool and shall not be liable for any information, representations, interpretations, errors or omissions provided in such assessment or proposal.

POWERED BY

Copyright © 2001 - 2008, VMware, Inc. and Alinean, Inc. All rights reserved.

Page 10 of 10

v2.1