1 minute read

Sand Springs Schools Construction

Next Article
Boulder Be Love

Boulder Be Love

SAND SPRINGS, OKLAHOMA

The Freshman Academy & STEM Center is a 58,000 SF addition to Charles Page High School in Sand Springs, providing much needed facilities, an updated main entrance, and façade for the building. A full masterplan study of site options was created to gain community support and Bond approval, while also ensuring the best location and design for the previously separate Ninth Grade center. This new design adds 24 classrooms including 4 fully outfitted STEM classrooms. The new grand lobby, learning stair, multipurpose commons and break out spaces promote Sand Springs’ desire to improve collaboration amongst students. The renovation extended to include updates to adjacent corridors, classrooms, administrative spaces, restrooms, and public spaces.

Advertisement

This article is from: