architecture portfolio nadhifa sarah khairunnisa 2018 - 2020
Throughout my study in college, Architecture has shaped me a lot, especially the way I see any kind of matters. Architecture is a figure of a discipline that I am interested in, because it is a form of creativity based on art and science. I believe that architecture is a discipline that will not work independently, however collaborative-approach is needed to make it work like a symphony where this discipline is flexible and may be influenced by other disciplines. So that in each work, I took time to study other fields, which can be part of the planning and self-learning process. The are still many things I want to learn in the field of There architecture to get into a deeper understanding and learn many other things that can be a part of me without thinking about my limit and to contribute to other expertise.
nadhifa sarah khairunnisa indonesia nadhifasrh@gmail.com +6281219227784 /nadhifasrh
EDUCATION
WORKSHOP AND SEMINARS
ARCHQUAKE Member of Event Division
SMA NEGERI 1 BEKASI Senior Highschool 2013 - 2016
Art Festival of Architecture Diponegoro University
DIPONEGORO UNIVERSITY Bachelor of Architecture GPA 3.66 2016 - 2020
LKMMPD DARYABENDRA Member of Event Division 2017
2017
HIMPUNAN MAHASISWA ARSITEKTUR AMOGHASIDA Senior Staff of Minat dan Bakat Department 2017-1018
OHANA THE STORY BEHIND RSI Group 2018
MINIATUR Member of Event Division
TRANSFORMASI PENDIDIKAN ARSITEKTUR MENYONGSONG PERKEMBANGAN PRFESI Diponegoro University 2017 STUCO: “TODAY FOR TOMORROW” theStudentLoop 2017
National Architecture Competition
2018 ARCHQUAKE Head of Event Division Art Festival of Architecture Diponegoro University
WORK EXPERIENCES
UX DESIGNER: “DIGITAL PRODUCT DEVELOPMENT” Skill Academy by Ruangguru 2020 SKILLS
AUTODESK AUTOCAD 2017, SKETCHUP, ADOBE PHOTOSHOP CS6, ADOBE ILLUSTRATOR, MICROSOFT WORD 2016, MICROSOFT POWERPOINT 2016, MICROSOFT EXCEL 2016, IMOVIES, LUMION Architecture Design, Concept Development, Team-work, Time Attendance
LANGUAGE
BAHASA INDONESIA Native ENGLISH Professional Working Proficiency
EXPERIENCES
HIMPUNAN MAHASISWA ARSITEKTUR AMOGHASIDA Staff of Minat dan Bakat Department 2016-2017
2018 DIPONEGORO UNIVERSITY Assistant Lecturer Worked as a mentor for a hundred students on green building class
2020 PT AIRMAS ASRI Student Internship Program Worked with multiple teams on multiple projects, projects include masterplan, residential, mixed-use building, produced schematic design and 3D modelling
2018 - 2019 ACHIEVEMENTS & PARTICIPATIONS
WISHWAKARMAN EXPO 2018 SAYEMBARA ARSITEKTUR “URBAN DISASTER LEARNING CENTER” Gajah Mada University 2018 PARAHYANGAN DESIGN COMPETITION Parahyangan Univeristy 2018 ARCHITECTURE FESTIVAL PETRA “POST DISASTER CHILDREN SPACE” Kristen Petra University 2019
studio projects & competition entry
p.1 asasta hospital (2020) p.9 torowongan (2019) p.21 athawarya hospital (2019) p.29 arda house (2019) p.39 other works (2018-2019)
It is known that everyday there are approximately 40-50 people die as th 0.03 percent (%) in 2019 compared to the previous year. Moreover, Indon drug users, one of the main factors that mig
So it takes a physically planned drug rehabilitation fa
Drug rehabilitation facilities are expected to clo
asasta h
drug treatm
type year location site area building area mentor
Undergraduate Thesis Project 2019 banten, indonesia + 18.000 m2 + 30.000 m2 Prof. Dr. Ir. Erni Setyowati, M.T.
he result of drug abuse, while there was an increase in drug trafficking by onesia has recorded the largest drug market in Asia with nearly 6 million ght be responsible is mental health problem.
acility with attention to the mental health of its users.
lose to nature and facilitate cognitive activities.
hospital
ment hospital
site and context education houses
shop and stalls
railway station
the location of the site is in a very busy district, there are various economic and social activities, most of which are formed by the Senen market and also the Senen station around the site. the site is located in letjen soeprapto street
heavy traffic
pedestrian way
medium traffic
railway
K.1
R.1
S.1 H.1
C.1 P.1
The site is surrounded by main roads and pedestrian streets equipped with bus stop facilities and street vendors around the site. on the east and west side is the st. Senen street while the south side is adjacent to Letjen Soeprapto street and the north side is adjacent to Pasar Senen adjace
concept
an inner space that has the illusion of being an outer space
rehabilitation facilities
public area
non-medical support
medical services
rehabilitation area
medical support
health care facilities
mass development
AASF 0.5 low-e coated glass
80 cm
In the planning process, the principles and calculations of green architecture are also applied, to minimize energy use and comply with applicable regional regulations thus achieved an energy saving rate of 30,06 % while the utility planning resulted in a water saving rate of 28,20 %.
TOROWONGAN type year location site area colaborator
Competition 2019 banten, indonesia + 100 m2 Aisyah Ardine
The idea of a shelter is to provide a safe zone for children after a traumatic event has occurred. so that the shelter is expected to pay attention to the psychology of children with trauma and the need for children to express themselves which can be filled with various play and learning activities. Then, how about a planned and physical form of a children's shelter that takes care of these needs?
On December 2018, two big waves of tsunami occured in Sunda Strait. It followed by an eruption and partial collapse of Anak Krakatau and massively damaged two areas near it, Banten in Java and Lampung in Sumatra, Indonesia. To be more particular, Pandeglang (Banten) got the most damage out of them all, as well as the victim. A village was virtually wiped out by the tsunami and 7 other villages in Pandeglang were also heavily affected.
Dusun 1, located at Desa Tanjung Jaya, Pandeglang, Banten was one of the neighbourhood that not get affected by the tsunami. The village located quite far from the coast (about 1 km) and has quite of raised-ground.
unchained
companion necessity
behaviour
reaching the midpoint where children given oppurtinity to talk about what they fee and will be able to be free and explore
feeling of safety
Circular shape considered to be more flexible for kids to go around running and having activities with others.
Mass-reduction on the center part is applied to give an open area for the kids to enjoy outdoor activities.
To give more playful impression, the module has one lowered pole on one of the side.
8 4 3
2 6 5
5
7
1
1 car tire (as foundation) 2 u-beam 3 plywood 4 branches (with wire mesh) 5 bamboo fencing 6 circular bamboo screen 7 planting from bamboo 8 bamboo roof
a b
d
c e
a bed b reading corner
c d learning area (7-12 y.o.)
e learning area (4-6 y.o)
Circular linear formartion are done in such a way that, the circular area (red line) that made because of the module formation would provided an open area for the kids to play in a safe zone, not hampered by the natural environement that once give them such trauma. But, an alternative entrance and exit (white line) does exist, if another disaster event would happen.
athawarya Type: C Hospital
type year location site area building area mentor
4th year studio project 2019 jakarta, indonesia + 7500 m2 + 18000 m2 Prof. Dr. Erni Setyowati, M.T.
hospital Circulation planning and zoning space are the two main things in good hospital planning, where the two are interconnected to achieve maximum efficiency, so it is hoped that the space can function both for medical staff and patients. On the other hand, it also requires good physical planning to create sense of comfort, especially for psychological patients who will help the patient's recovery.
But what is a hospital planning with a psychological approach?
site & context analysis gn. sahari public health center hermina hospital
type A hospital
Within a 2 km radius of the site there are 2 health facilities, namely a type A hospital and a public health center
site location
bus stop health care residential area office area
on the front side of the site is Jalan Angkasa and to the left of the site is Jalan HBR. Moetik, each side has pedestrian access
zoning plan emergency
serene
medical services
office
sterile
medical services emergency lobby medical services
office
healing
private non-medical support
medical services medical infrastructure lobby
mass transformation
cozy
site plan
zoning axonometric
critical area diagnostic area medical support non-medical support office inpatient area public facilities
spaces
south elevation
west elevation
north elevation
east elevation
ARDA HOUSE type year location site area building area mentor
1st year studio project 2019 semarang, indonesia + 432 m2 + 250 m2 Prof. Dr. Erni Setyowati, M.T.
a family of four, consisting of: one middle-aged father one middle-aged mother (;likes to cook) two teenage daughter (;both like music, and want their own room)
Located in a residential area in the BSB City area, Semarang with tropical climate condition near the coast of the site. Hence, it is important to pay attention to thermal comfort as well as global warming design by focusing in energy consumption in the house to produce an environmentally friendly design.
12
10
9
8
7
6
11
6
5
4 2
1
3
GROUND FLOOR PLAN BUILDING COVERAGE 60% 2 LAND AREA 432 m BUILDING LAND AREA 250 m2 1. carport; 2. guest room; 3. master bedroom; 4. master bathroom; 5. bathroom; 6. kids room; 7. living room; 8. dining room; 9. kitchen; 10. prayer room; 11. laundry area; 12. back porch
mass transformation
available space with front and back setback limit 3 meters
the mass of the building is set back to fulfill the required space function
raised roof serves to avoid rain and reduce incoming sunlight
the building mass is equipped with openings and doors for access, natural lighting and air circulation
sections
kitchen & dining area rendering
exterior rendering
master bedroom rendering
living room rendering
other works as my experience to work as an internship student at PT Airmas Asri, I was involved in three stages of the design process, they are proposal design, schematic design and design development. At every stage of the design process, I was involved in various architecture projects, in each project I was asked to develop an existing designs, perfecting the 3D models, making alternative minor designs especially on building elements, and being involved in making presentations on a minor-scale. These projects include apartment towers, mixed-use building and residential.
airmas asri internship
thank you
nadhifasrh@gmail.com 2018 - 2020