Architecture Portfolio 2021_ Landscape

Page 1

Nakaya Davis

P O R T F O L I O


CONTACT INFO 815-540-9556 Inari368@gmail.com www.linkedin.com/in/nakaya-davis


PROJECTS 01 FORDAM FARM

05 DESIGN BUILD SHELTER

UNIVERSITY PROJECT SPRING 2021

UNIVERSITY PROJECT FALL 2016

02 ECO TOWER

06 KENYAN ORPHANAGE

UNIVERSITY PROJECT FALL 2020

UNIVERSITY PROJECT SPRING 2015

03 LOFTS

07 CUBE PROJECT

PROFESSIONAL WORK FALL 2019

UNIVERSITY PROJECT SPRING 2014

04 MOOSEHEART

08 OTHER WORKS

PROFESSIONAL WORK FALL 2019


01 FORDAM FARM UNIVERSITY PROJECT YEAR: SPRING 2021 LOCATION: Rockford, IL, USA The south west side of Rockford, Illinois has been neglected over the years due to political, economical and racial issues. This left this once rich and bustling area with little resources, and a poorly designed built environment. After developing a master plan to revitalize this area my classmates and I began to develop individual projects. I chose an urban farm because I believe it will greatly serve the community by inspiring and educating the people of the neighborhood, provide jobs, offer inexpensive healthy food options, and create an economically sustainable systems, This project will lead to a better physical health. Studies show that a better physical health will also lead to a better mental health because the brain in receiving better nutrition. Furthermore, the opportunity to connect with neighbors and make friends leads to better emotional health as well.


Diagrams

Process Models

Developed Models

Site

5


Areoponics

Hydroponics

Vermiculture

Soil Management

Animal Farming

Composting

Bee Keeping

Horticulture

CROPS 3RD GROWING SPACES LABS

2ND CROPS

CROPS

WORK SHOPS/ CLASSROOMS OFFICES GROWING SPACES LABS

1ST LOGISTICS EXHIBIT PROCESSING AUDITORIUM GROWING SPACE ANIMAL FARMING MARKET BEE KEEPING

6


13

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

X

11

10

9

8

7

6

5

4

3

2

1

West Elevation

South Elevation

7


8


Outdoor Learning

Open Workshop

9


02 ECO TOWER COURSE: Arc651 ADVISOR: D. Hussey YEAR: Fall 2020 The Bronzeville neighborhood in Chicago Illinois is an another example of what a history of neglect can have on a neighborhood. Visiting this area I noticed that resources were scarce. My studio proposed to redevelop the Bronzeville area in order to create a sustainable, pedestrian friendly corridor. My site is located along 35th Street, an empty lot across from IIT. I developed Eco Towers, a high-density mixed-use development. Designed for the future. This design seeks to create a vibrant and permeable urban center. Eco tower strives for inclusion, diversity and a healthier life for people and for the planet. I focused on exploring a living building and how it could increase the biodiversity in the area while also making the people who would occupy it healthier.


Concept Model Creating one building that separates the public and the private area, while having some shared spaces

A strong focus was placed on designing plaza space to invite people to interact with the each other and the design.

Site Plan

3D

11


12

North Elevation

East Elevation

South Elevation

West Elevation


Elevated Plaza

Community Area

Section 13


03 LOFTS PROFESSIONAL WORK YEAR: Fall 2019 LOCATION: Rockford, IL, USA Developers seek to restore the Rockford area and help with the housing shortage one abandoned industrial building at a time. Rockford, Illinois was once a rich, thriving city with plenty of factory job opportunities. Unfortunately, the way times have changed has led the downtown area to be filled with large abandoned industrial buildings. Creating a lot of uncomfortable and unsafe areas. Instead of letting these abandoned building sit vacant or be demolished a client came to us with a desire to redesign an old factory building into industrial style lofts with a lounge and gym on the first floor. The lofts are adjacent to the Rock river and is near the downtown area. I believe if the city keeps moving in this direction of adaptively reusing the many abandoned building this area has a chance to be restored to its former glory.


UP

UP

UP

UP

Floor Plan

Elevation

Section

15


04 MOOSEHEART PROFESSIONAL WORK YEAR: 2019 LOCATION: Mooseheart, IL, USA Mooseheart, located in Kane County, Illinois, is an unincorporated community and a home for children administered by the Loyal Order of Moose. Our firm designed an activity center that included a gym, open gaming area, multipurpose rooms, small theater, and children’s play area. All activities surround the open gaming, lounge, and snack area. The raised roof above the main corridor allows for more natural light within the central area. Offices are located to have control over and eyes on all areas within the facility.


Gym Interior

Central Interior

Central Interior

East Elevation

South Elevation 17


Providing a space for the children of Mooseheart to have fun and feel safe. This area accommodates all ages who live and work on the campus.

F. .EC .

F R Z

Floor Plan

18

Section

Section


ROOF Parapet cap integral with metal panel system Roof membrane R30 continuous insulation

WALL Intercept entyre metal panel system R7.5 Continuous Insulation Weather barrier under insulation 5/8 glass fiber reinforce sheathing 8” steel stud @ 16” o.c. R21 min. batt insulation Metal return trim from face to Storefront to metal panel at head and jambs Aluminum store front 5/8” gyp. Cont. Vapor retarder

FLOOR Slab on grad R 10 rigid insulation Vapor retarder Extend insulation horizontally down to top of footing and horizontally 2’-0” from inside face of foundation wall.

Wall Elevation

Wall Section

19


05 SHELTER COURSE: Arc351 ADVISOR: S. Burtelson YEAR: Spring 2016 At the end of 2016 the number of forcibly displaced people worldwide reached over 65,600,000. In order to alleviate the refugee crisis John Brown University held a shelter building competition, in hopes to provide victims with temporary relief homes. The parameters of the project brought on many challenges to my team of five others and I, whom were building a structure to human scale for the first time. The stipulations were that the shelter had to house 4 or more persons, not to exceed a 16’x20’ footprint, have a 2 meter height clearance, cost less than 1,500 USD, last a year or more, and be easily transported and erected. On site tests included earthquake stability, heat retention, overnight habitability, and wind resistance. Against 9 other teams we placed 5th and won Best Report and Presentation. I myself wrote the report and prepared the presentation slide and speeches.


HARDWARE (piano hinge, barrel bolt) INTERIOR PLASTIC SHEATHING WOOD BRACING INSULATION PANELS EXTERIOR PLASTIC SHEATHING STEEL CHANNEL FRAME

Door Design

DOOR DESIGN LAYERS

We divide our floor plan into three sections, separated by panels and a magnetic fabric to cover the openings. This allows for privacy and for the shelter to divided up how the family sees fit, rather by sexes (as seen in many middle eastern homes) or by age. The center of the shelter is were the two front doors are located, the idea gives a sense of a court yard when both doors are open, which resembles an element of traditional middle eastern homes.

Elevation

Elevation

Window Design

Packaged

21


06 KENYAN ORPHANAGE COURSE: Arc252 ADVISOR: J. Lindsey & S. Burtelson YEAR: Spring 2015 Creating a stable & holistic environment for orphans. This village of homes seeks to provide a design solution for Touched by Love International Ministries. Each home houses up to six children and a parent. The interior design allows for the front room to be used in multiply ways, with a built in ‘L’ shaped table along the shared living room wall, children can eat, study, get together or do arts and crafts together. The homes are placed around the perimeter of the property and surround the playing field, water well and garden. Keeping sustainability, cost and convenience in mind each house is constructed from locally sourced materials, have a simple modular form and is designed to collect any rainwater to be used for gray water.


Site Plan

Floor Plan

Section

Section 23


07 CUBE PROJECT COURSE: Arc251 ADVISOR: J. Lindsey & S. Burtelson YEAR: Fall 2014 This project sought to teach us the basics in communication and architectonics. Before we could start designing buildings we first had to understand the relationship between solid and void and how together they shape the spaces we exist in. For this project we merged two cubes into one while still defining were both cubes begin and end, creating another cube where the two meet. We had to keep in mind organization, regular repetition and alignment as I chose to focus on interconnection, dialog and interaction. Always asking ourselves “Did we accurately define space? Articulate concept? Think of scale in relation to humans?


Section

Elevation

Section

Elevation

Section

25


08 Other Projects Sketches & Watercolor

26


27


Nakaya Davis 815-540-9556 Inari368@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.