๐
Always be brave to designing things. Since I stepped into five years of Architecture school, Nothing is the same. It's inspired me to think logically, opened my mind, and had a lot of fun. I always put myself into a positive attitude toward new things in life. Strongly appreciate the possibility I had to get in touch with different ways of making Architecture. Through my experiences of educations had given me the development of understanding the importance of Architecture and design and more in social and context. Even more in advance in software skills and communication. I believe my CV & portfolio show my point of view and overall skills in terms of Architecture..................................................................................................
chonlakorn.tun@gmail.com Nam Tuntapakool
Nam Tuntapakool
(+66) 971306803
Sarasawited Bangbon school (Thailand) Nelson collage for girls (Nelson, New Zealand)
School of Architecture and design King Mongkut’s University of Technology ( Thailand)
Volunteers ASA camp 2015 (Position : Crew member) ASA of Kmutt is Design and Constrcution on site all member are students.
Volunteers ASA camp 2019 (Position : Senior member) responsible for design whole construction of site.
Out of sight exhibition. Group work selected by profressor to be on 2rd year student work.
Internship at Trop : terrains + open space 3months -Scheme design and development. -Design, Graphic design, constrcution details on Paving (Shui-Hong Project - HongKong) -Concept design and develop concept. -Reseach material (Local material at Chengdu, China)
Workshop Bamboo carft At Mingchi University of Technology International Built Environment week Conference at Sigapore.
Software Autocad Rhino Revit Grasshopper Sketch up Basic Lumion Enscape Illustrator (Ai) Photoshop (Ps) Adobe Dimension (Dm) Indesign
Language
Thai English
๐
๐
๑
๒
๓
๔
๕
๖
๗
๘
๙
๑๐
๙
๑๐
A1
A2
A3 A10
E2
E1 Lobby +0.00
E3
A4
A9
E10
B1
B2
A8 E9 A5
Auditorium +0.00
E4 F1
B3
B10
F2
A7
F3
E5 A6
E8
B4
B9
E7 C2
C1 B8
E6
F9
B5 D10
F5
F8
C3
Lounge +0.00 Lounge +0.00
B6
B7
F7
Meeting room +0.00
woodshop +0.00
D9
UP
C10
D1
F4
Exhibition space +0.00
Lobby +0.00
D2
Teacher room +0.00
C9
F6
C4
Meeting room +0.00
Lobby +0.00
D3
D8
office room +0.00 Stationary shop +0.00
C8 Metal shop +0.00 storage +0.00
D7
Dean’s room +0.00
C5
staff room +0.00
D4
C7
C6
D5 D6 Drop off
N
๑๑
A2
A1
Studio +4.00
A3
A10
E2
E1
Studio +4.00
DW
Relaxing space +4.00 UP
E3
A4
A9
Relaxing space +4.00
E10
B1
B2
A8 E9 A5
E4
Auditorium +4.00
F1
B3
B10 A7
F2
Individual lecture room +5.00
F3
E5 A6
B9
B4
Thesis studio +5.00
Exhibition area +4.00
E8 D10
B8
B5
E6
D1
Collection room +6.00
D9 C1
E7
C2
F9
F4
F5
D2 F8
Material room +6.00
B6
B7
F6
C10
C3
D3
D8 Library +6.00
F7
Study room +6.00
VR room +6.00
Model 1:1 scale room +6.00
C9
C4
D7
D4
Control room +6.00
Robotic laboratory +6.00
Model 1:1 scale room +6.00
C8
D5
C5 D6 C7
C6
N
๑
A2
A1
A3 A10
E3
A4
A9
Lobby +8.00
E2
E1
Studio +8.00
E10
DW
B1
B2
A8 E9 A5 B10 Photo room +10.00
A7
Lecture room +10.00
E8
B4
D10
Lecture room +10.00
E7
E6
D1
F9
F4
Lecture room +10.00
Lecture room +10.00
B5
Collection room +6.00
D9 C1
F3
E5
B9
B8
F2
UP
Lecture room +10.00
computer room +10.00
F1
+11.00
Lecture room +10.00
Digital lab +10.00
A6
E4
B3
F5
D2 F8
Material room +6.00
C2 F7
B6
B7 C10
C3 D8
D3
Library +6.00
Study room +6.00
VR room +6.00
C9
C4
F6
D7
D4
Model 1:1 scale room +6.00
C8
D5
C5 D6 C7
C6
๑๓
๑๔
๑๕
๑๖
1
9 3 7
8
6
10
4 5
11
13
12
2
24 14 26
25
24
15
14 23 14 22
19
17
16
21
20 18
27
28 30
29
29
๑๗
๑๘
๑๙
rain drain
1m
¡
๒๐
๒๑
๒๒
๒๓
๒๔
Owner
Owner
Enter address here
Enter address here
A
B
C
E
D
F
G
H
I
I
H
G
F
E
D
C
B
A
Edit this information by opening the titleblock in the family editor, then use the type selector to set your office location
Level 15 56.00
56.00
4.00
4.00
Level 14
4.00
4.00
52.00
Level 13
Level 13
48.00
4.00
4.00
48.00
Level 12
Level 12
44.00
4.00
4.00
44.00
Level 11
Level 11
40.00
4.00
4.00
40.00
Level 10
Level 10
36.00
4.00
4.00
36.00
Level 09
Level 09
32.00
4.00
4.00
32.00
Level 08
Level 08
28.00
4.00
4.00
28.00
Level 07
Level 07
24.00
4.00
4.00
24.00
Level 06
Level 06
20.00
Description
4.00
4.00
20.00
Date
Level 05
4.00
4.00
Level 04
4.00
4.00
12.00
Level 03
Level 03
8.00
4.00
4.00
8.00
Seal / Signature
Level 02
Level 02
4.00
4.00
Seal / Signature 4.00
4.00
NOT FOR CONSTRUCTION
Level 01
Level 01
0.00
0.00
Basement -4.00
Elevation 1 - C
29/11/2562 19:45:32
1 : 100
MIX-USE BUILDING PROJECT
4.00
C:\Users\Z370\Documents\Central file-Peach team_chonlakorn.t.rvt
4.00
Project Name
1
Description
16.00
Level 04 12.00
C:\Users\Z370\Documents\Central file-Peach team_chonlakorn.t.rvt
Date
Level 05
16.00
29/11/2562 20:42:59
Edit this information by opening the titleblock in the family editor, then use the type selector to set your office location
Level 15
C A501 Level 14 52.00
Project Number
Basement
0001
-4.00
Description
1
Description
ELEVATION A
Elevation 1 - A
1 : 100
Project Number
0001
ELEVATION C
Scale
NOT FOR CONSTRUCTION Project Name
MIX-USE BUILDING PROJECT
1 : 100 Scale
1 : 100
A403
A401
© 2015 Gensler
© 2015 Gensler
1
A
B
Owner
Enter address here
C
Edit this information by opening the titleblock in the family editor, then use the type selector to set your office location
A
WOODEN PLANK , MATERIALS : NAUGHTONE WOOD OAK
VERTICAL WOOD PLANK 150 X 50 MM 10.00 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29
Level 03
10.00
8.00
4.00
---
Level 02 4.00
4.00
B
Level 01 0.00
2
FACADE TOP VIEW 1 : 50
4
FACADE FRONT VIEW 1 : 50
1
WOODEN PLANK , MATERIALS : NAUGHTONE WOOD OAK VERTICAL 150 X 50 MM, H : 8000 MM Level 06 20.00
WOODEN PLANK , MATERIALS : NAUGHTONE WOOD OAK VERTICAL 150 X 50 MM, H : 8000 MM CONCRETE COLUMN 300 X 500
Level 05 16.00
Date
Description
Level 04 12.00
4
Level 03
A206
8.00
HORIZONTAL WOOD PLANK 100 MM, L : 10000 MM
Level 02 4.00
Seal / Signature
NOT FOR CONSTRUCTI
Level 01
29/11/2562 20:46:20
C:\Users\Z370\Documents\Central file-Peach team_chonlakorn.t.rvt
0.00
Project Name
MIX-USE BUILDING PROJECT
Basement -4.00
Project Number
1
Elevation 1 - C Copy 1
5
FACADE SIDE VIEW 1 : 50
FACADE ISOMETRIC VIEW
0001 Description
FACADE DETAILS
1 : 100 Scale
As indicated
A501 © 2015 Gensler
๒๕
๒๖
๒๗
๒๘
๒๙
๓๐
Baan Pune Community Ra
ma
ge
ge
Ra
ma
ge
VII
IB
Daowadeungsaram Community
IB
rid
ge
TE
Ph ra
ya
Riv
ya R Ph ra ao
VII
Ch
N
Phrayasiri aisawan community
rid
ma
rid
r
SI r Riv e ray a Ph Ch ao
IB
Ra
IB
ive
E uil
VII
The crossing bridge
rid
ge
ya hra ao P Ch
Ch
ao
Ph ray
aR
Riv
ive
er
r
SI TE
SI TE
ma
VII
er
rid
(B
er Riv ya hra Ch ao P
Ra
IB
da
SIT
SI TE
Phrayasiri aisawan community
VII
ao
ge
Ch
rid
TE
IB
SI
ma
VII
a)
ma
are
Ra
ble
Phrayasiri aisawan community
Ra
๓๑
๓๒
D
E
C
A
B
1
2
3
4
5
6
7
8
๓๓
D
E
C
A
B
1
2
3
4
5
6
7
8
๓๔
๓๕
๓๖
๓๗
๓๘
๓๙
๔๐
๔๑
๔๒
๔๓
๔๔
๔๕
๔๖
-1.70 +2.20
-2.00
splash pad
-1.70
+2.20
-1.00
+1.00
+5.00
+1.00
+5.00
๔๗
๔๘
๔๙
๕๐
๕๑
๕๒
๐