24 DDC-P2C4-05-ARC-DR-POB-20902-01

25 DDC-P2C4-05-ARC-DR-POB-22232-01

SECTION DD 1:100 B

SCHEDULE NTS A

26 DDC-P2C4-05-ARC-DR-POB-22233-01 DOOR AND WINDOW SCHEDULE NTS A

27 DDC-P2C4-05-ARC-DR-POB-22235-01 DOOR DETAIL (SHEET 01 OF 04) AS SHOWN A

28 DDC-P2C4-05-ARC-DR-POB-22235-02 DOOR DETAIL (SHEET 02 OF 04) AS SHOWN A

29 DDC-P2C4-05-ARC-DR-POB-22235-03 DOOR DETAIL (SHEET 03 OF 04) AS SHOWN A

30 DDC-P2C4-05-ARC-DR-POB-22235-04 WINDOW DETAIL (SHEET 04 OF 04) AS SHOWN A

31 DDC-P2C4-05-ARC-DR-POB-29301-01 PUMP ROOM DETAIL AS SHOWN A

DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22 DRAWING LIST POONAMALLE BYPASS METRO B MS SV SR 01.03.2022 RK DL SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20001-01
LIST Sr. No. Drawing No. Drawing Title Scale Revision Remarks 1 DDC-P2C4-05-ARC-DR-POB-20001-01 DRAWING LIST NTS B 2 DDC-P2C4-05-ARC-DR-POB-20101-01 STREET LEVEL PLAN 1:300 B 3 DDC-P2C4-05-ARC-DR-POB-20102-01 STREET LEVEL PLAN (PART A) 1:200 A 4 DDC-P2C4-05-ARC-DR-POB-20102-02 STREET LEVEL PLAN (PART B) 1:200 A 5 DDC-P2C4-05-ARC-DR-POB-20201-01 CONCOURSE LEVEL PLAN 1:250 B 6 DDC-P2C4-05-ARC-DR-POB-20202-01 CONCOURSE LEVEL PLAN (PART A) 1:100 B 7 DDC-P2C4-05-ARC-DR-POB-20202-02 CONCOURSE LEVEL PLAN (PART B) 1:100 B 8 DDC-P2C4-05-ARC-DR-POB-20202-03 CONCOURSE LEVEL PLAN (PART C) 1:100 B 9 DDC-P2C4-05-ARC-DR-POB-20202-04 CONCOURSE LEVEL PLAN (PART D) 1:100 B 10 DDC-P2C4-05-ARC-DR-POB-20301-01 PLATFORM LEVEL PLAN 1:250 B 11 DDC-P2C4-05-ARC-DR-POB-20302-01 PLATFORM LEVEL PLAN (PART A) 1:100 B 12 DDC-P2C4-05-ARC-DR-POB-20302-02 PLATFORM LEVEL PLAN (PART B) 1:100 B 13 DDC-P2C4-05-ARC-DR-POB-20302-03 PLATFORM LEVEL PLAN (PART C) 1:100 B 14 DDC-P2C4-05-ARC-DR-POB-20501-01 ROOF LEVEL PLAN 1:250 A 15 DDC-P2C4-05-ARC-DR-POB-20801-01 LONG SECTION AA 1:250 B 16 DDC-P2C4-05-ARC-DR-POB-20802-01 LONG SECTION AA (PART A) 1:100 B 17 DDC-P2C4-05-ARC-DR-POB-20802-02 LONG SECTION AA (PART B) 1:100 B 18 DDC-P2C4-05-ARC-DR-POB-20802-03 LONG SECTION AA (PART C) 1:100 B 19 DDC-P2C4-05-ARC-DR-POB-20803-01 LONG SECTION BB 1:250 A 20 DDC-P2C4-05-ARC-DR-POB-20804-01 LONG SECTION BB (PART A) 1:100 A 21 DDC-P2C4-05-ARC-DR-POB-20804-02 LONG SECTION BB (PART-B) 1:100 A 22 DDC-P2C4-05-ARC-DR-POB-20804-03 LONG SECTION BB PART-C 1:100
DRAWING
A
CROSS
23 DDC-P2C4-05-ARC-DR-POB-20901-01
SECTION CC 1:100 B
CROSS
ROOM
NTS

6)ESCALATORANDLIFTSIZESAREINDICATIVEONLY,ANDFINALSIZESSHALLBEASPERMANUFACTURER'S REQUIREMENTASFINALIZEDBYCMRLANDTHEIRPITDRAINAGETOBEASPERE&MDRAWINGS.

7)REFERPLUMBINGDRAWINGSFORPLUMBINGANDDRAINAGELAYOUT.

8)ALLABOVEGROUNDSTRUCTURESTOBEDESIGNEDASPERDETAILEDARCHITECTURALDRAWINGS.

9)FORFINISHESREFERFINISHEDDRAWINGSANDTYPICALDETAILDRAWINGS.

10)THISDRAWINGWILLBEREVISEDONFINALIZATIONOFFINISHESANDABOVEGROUNDSTRUCTURES.

+24.890 ROAD MAINCARRIAGEWAY MAINCARRIAGEWAY MAINCARRIAGEWAY MAINCARRIAGEWAY MAINCARRIAGEWAY MAINCARRIAGEWAY MAINCARRIAGEWAY MAINCARRIAGEWAY MAINCARRIAGEWAY MAINCARRIAGEWAY F1,F2,F11 ENTRANCE LOBBY FOOTPATH F12 FOOTPATH +25.040 LEVEL-PLINTHTOCONC WIDTH-2575 DEPTH1975 LIFT-01 STAIRCASE-01 LEVEL-PLINTHTOCONC WIDTH-2400 TREAD300 RISER-150 NOOFSTEPS-75 UP ENTRY /EXIT-1 UP INTERMEDIATELEVEL UP RWHP PIT OPENLANDFORCMRL FUTUREDEVELOPMENT RAMP UP SLOPE1:12 D-01.1ELEC,S&TSHAFT D-02.1PHEFIRESHAFT ENTRANCE LOBBY PUMPROOM& WATERTANKBELOW RAMPUP SLOPE1:12 UP UP STAIRCASE-01 LEVEL-PLINTHTOCONC WIDTH-2400 TREAD300 RISER-150 NOOFSTEPS-75 STAIRCASE-02A LEVEL-PLINTHTOPUMP ROOM WIDTH-2100 TREAD300 RISER-150 NOOFSTEPS-47 +24.890M ROAD FOOTPATH +24.890M ROAD F1,F2,F11 +26.740 +29.740 RS-1 ENTRY /EXIT-2 LANDSCAPE BUSSTOP BUS EMERGENCYVEHICLE ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E KERBRAMP DROPOFFLANE3.6MWIDE UP SERVICEROAD SERVICE ROAD SERVICEROAD SERVICEROAD BUSSTOP DROPOFFLANE4.5MWIDE BUS LEVEL-PLINTHTOCONC WIDTH-2575 DEPTH1975 LIFT-02&3 UP AIRVENT ACCESS HATCH MANHOLE MANHOLE VALVECHAMBER ESCALATOR-03&04 LEVEL-INTERMEDIATE TOCONC WIDTH-1750 LENGTH19606 ESCALATOR-01&02 LEVEL-PLINTHTOINTERMEDIATE WIDTH-1750 LENGTH19606 ESCALATOR-05&06 LEVEL-PLINTHTOINTERMEDIATE WIDTH-1750 LENGTH19606 ESCALATOR-07&08 LEVEL-INTERMEDIATETOCONC WIDTH-1750 LENGTH19606 LANDSCAPE LANDSCAPE TABLETOP WALKING TABLETOP WALKING RWHP PIT KERBRAMP HANDRAILTODETAIL D-01.2ELEC,S&TSHAFT D-02.2PHEFIRESHAFT F1,F2,F11 A B D E C P533 P534 SP 16.50 SP 26.07 19.50 30.00 P529 EJ P530 CON. P531 EJ 25.00 FOOTPATH +0.15FromFGL FOOTPATH FOOTPATH +25.040 D 20902-01 B 20803-01 C 20901-01 A 20801-01 FOBTOENTRY/EXIT-1IS UNDERHOLDAWAITINGFOR APPROVALOFCOLUMN LOCATIONSFROMCMRL 2 8 3 4 5 6 7 1 9 C/L ISO A1 594mm x 841mm Printed on ___% Post-Consumer Recycled Content Paper Filename: 17
INTERSTATION DISTANCE
BYPASS INTERSTATION DISTANCE CH: 24359.887 M CH: M CH: M 18 TOPOWERHOUSE DATE REV. BY REVISIONS DESCRIPTION CHKD APP. BYDETAILDESIGNCONSULTANT DESIGNEDBY APPROVEDBYCHECKEDBY REVISIONNOTES:DATE NoObjection NoObjectionSubjecttothe commentsasnoted RevisionandResubmissionRequired subjecttothecommentsasnoted APPROVEDBY CHECKEDBY DATE ThedesignanddrawingsascertifiedandsubmittedbytheDesigner havebeenreviewedandproofcheckedbyCMRL. NOOBJECTIONFROMCMRL REVIEWEDBY PROJECTTITLE DRAWINGNUMBER DRAWINGTITLE REV CHENNAIMETRORAILLTD. DETAILDESIGNCONSULTANT CHENNAIMETRORAILDETAILEDDESIGNCONSULTANCY PHASE-2,CORRIDOR-4,PACKAGE-5 CADFileName2022.03m.01_SPB-StreetLevelPlan.dwg SCALE + ADMINISTRATIVEBUILDING,CMRLDEPOT,POONAMALLEEHIGHROAD,KOYAMBEDU,CHENNAI600107(INDIA) PreliminaryDesign DefinitiveDesign ConstructionReference GoodForConstruction DWGIssueRecord DWG Status CLIENT P2C4/05 LEADDESIGN CHECKERCERTIFICATION FORTHEWORKSANDSERVICESOFTHEDETAILEDDESIGNANDDRAWINGSFOR THECIVIL,STRUCTURAL,ARCHITECTURAL,MEP,VAC&TRACKWORKSCOVERING THEALIGNMENT,ANDELEVATEDSECTIONFROMPIERAFTERMEENAKSHICOLLEGE UGSTATIONTOPOONAMALLEEBYE-PASS(CH10027.102TO25829.793),INCLUDING APPROACHTODEPOT&MAINTENANCEDEPOTATPOONAMALLEE. PackageNo PROJECT END LINE 200MMTHK BLOCKWORKWALL STRUCTURALWALL (THK.AS/STR.Dwg.) SEC/ELENAME DRAWINGNUMBER CEILINGHEIGHT FROMFFL FLOORFINISH LEVEL CEILINGTYPE FLOORFINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOMNUMBER ROOMNAME 1 00000-00 SIM MEDIAN PEDESTRIANWALKWAY SOFTSCAPE STATIONBOX PUMPROOM& WATERTANKLOCATION RWHPPIT FLOOR-CEILING&WALLFINISH LEGEND CODE F1 DESCRIPTION F12 30mmthickManufacturedQuartz ConcretePaverBlocks W6 W9 Concretefinishtexturepaint InteriorAcrylicEmulsionPaint C5 Acrylicemulsioncoatonsurfaces F2 20mmthickhonedgranite F11 TactileflooringTile FGL-FORMEDGROUNDLEVEL ROW_E ROW_E NHAIROWLINE DOORSCHEDULE DOOR TAG DIMENSIONS (MM) FIRE RATING SILL (MM) LEAF RS-1 2250x2700 -- FD1 1800x2400 2HRS DOUBLE (900/900) ROOMSCHEDULE ROOMNO. ROOMNAME AREA(SQM) 120 PUMPROOM&WATERTANK 210 ENTRYEXIT-01 FD7 750x1800 1.5HRS 300 SINGLE -0.86 0.66 FD8 750x1800 0.5HRS 300 SINGLE ENT-01 ENT-02.1 D-01.1 D-01.2 D-02.1RS-3 3000x2700 - -208 ENTRYEXIT-02 ENT-02 ELEC,S&TSHAFT PHE&FIRESHAFT 0.86 ELEC,S&TSHAFT D-02.2 PHE&FIRESHAFT 0.66 PART-A 20102-01 PART-B 20102-02 1 22202-01 1 22201-01 A 17.03.21 RK ISSUEDFORSUBMISSION MS SR B 01.03.22 RK ISSUEDFORGCREVIEW MS SR MS SV SR 01.03.2022 STREETLEVELPLAN POONAMALLEBYPASSMETRO DDC-P2C4-05-ARC-DR-POB-20101-01 B 1:500@A1 ü NOTES1)ALLLEVELSAREINMETERSANDDIMENSIONSAREINMETER.
POONAMALLEBUS TERMINUS
POONAMALLEE
2)GROUNDLEVELWHERESHOWN,AREINDICATIVE.ACTUALLEVELSSHALLBETAKENFROMSURVEY DRAWINGSANDSHALLBECONFIRMEDATSITE. 3)RCCDIMENSIONSOFEXTERNALELEMENTSAREINDICATIVEONLYANDSUBJECTTOSTRUCTURALDESIGN. 4)RAILLEVELSHOWNINARCHITECTURALDRAWINGISINDICATIVEONLY.ABSOLUTERAILLEVELSHALLBE DERIVEDFROMTHEALIGNEMENTDRAWING. 5)INFORMATIONONACTUALSIZEOFCUTOUTANDOPENINGSSHALLBEASPERE&MDESIGN.
-LPSLANDBOUNDARY

2)GROUNDLEVELWHERESHOWN,AREINDICATIVE.ACTUALLEVELSSHALLBETAKENFROMSURVEY DRAWINGSANDSHALLBECONFIRMEDATSITE.

3)RCCDIMENSIONSOFEXTERNALELEMENTSAREINDICATIVEONLYANDSUBJECTTOSTRUCTURALDESIGN.

4)RAILLEVELSHOWNINARCHITECTURALDRAWINGISINDICATIVEONLY.ABSOLUTERAILLEVELSHALLBE DERIVEDFROMTHEALIGNEMENTDRAWING.

5)INFORMATIONONACTUALSIZEOFCUTOUTANDOPENINGSSHALLBEASPERE&MDESIGN.

6)ESCALATORANDLIFTSIZESAREINDICATIVEONLY,ANDFINALSIZESSHALLBEASPERMANUFACTURER'S REQUIREMENTASFINALIZEDBYCMRLANDTHEIRPITDRAINAGETOBEASPERE&MDRAWINGS.

7)REFERPLUMBINGDRAWINGSFORPLUMBINGANDDRAINAGELAYOUT.

8)ALLABOVEGROUNDSTRUCTURESTOBEDESIGNEDASPERDETAILEDARCHITECTURALDRAWINGS.

9)FORFINISHESREFERFINISHEDDRAWINGSANDTYPICALDETAILDRAWINGS.

10)THISDRAWINGWILLBEREVISEDONFINALIZATIONOFFINISHESANDABOVEGROUNDSTRUCTURES.

SERVICE ROAD

MAINCARRIAGEWAY MAINCARRIAGEWAY FD-1 ENTRANCE LOBBY PUMPROOM& WATERTANKBELOW RAMPUP SLOPE1:12 UP UP STAIRCASE-01 LEVEL-PLINTHTOCONC WIDTH-2400 TREAD-300 RISER-150 NOOFSTEPS-75 STAIRCASE-02A LEVEL-PLINTHTOPUMP ROOM WIDTH-2100 TREAD-300 RISER-150 NOOFSTEPS-47 +24.890M ROAD F12 FOOTPATH +25.040 +24.890M ROAD F1,F2,F11 C5 +26.740 +29.740 RS-1 FD-7FD-8 ENTRY /EXIT-2 LANDSCAPE EMERGENCYVEHICLE ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E KERBRAMP DROPOFFLANE3.6MWIDE UP SERVICEROAD
LEVEL-PLINTHTOCONC WIDTH-2575 DEPTH-1975 LIFT-02&3 UP AIRVENT ACCESS HATCH MANHOLE MANHOLE VALVECHAMBER ESCALATOR-05&06 LEVEL-PLINTHTOINTERMEDIATE WIDTH-1750 LENGTH19606 ESCALATOR-07&08 LEVEL-INTERMEDIATETOCONC WIDTH-1750 LENGTH-19606 TABLETOP WALKING RWHP PIT HANDRAILTODETAIL D-01.2ELEC,S&TSHAFT D-02.2PHE&FIRESHAFT F1,F2,F11 C5 +25.490 +28.490 RS-3 RAMPUP SLOPE1:8 SP 16.50 SP 12 1 3 -11 3 8 F12 FOOTPATH +25.040 D 20902-01 C 20901-01 ROADLEVEL +25.232M ROADLEVEL +25.232M ROADLEVEL +24.009M ROADLEVEL +24.306M ROADLEVEL +24.693M ROADLEVEL +25.219M ROADLEVEL +25.064M ROADLEVEL +25.064M ROADLEVEL +25.104M ROADLEVEL +25.061M ROADLEVEL +24.653M 2 8 3 4 5 6 7 1 9 C/L ISO A1 594mm x 841mm Printed on ___% Post-Consumer Recycled Content Paper Filename: DATE REV. BY REVISIONS DESCRIPTION CHKD APP. BYDETAILDESIGNCONSULTANT DESIGNEDBY APPROVEDBYCHECKEDBY REVISIONNOTES:DATE NoObjection NoObjectionSubjecttothe commentsasnoted RevisionandResubmissionRequired subjecttothecommentsasnoted APPROVEDBY CHECKEDBY DATE ThedesignanddrawingsascertifiedandsubmittedbytheDesigner havebeenreviewedandproofcheckedbyCMRL. NOOBJECTIONFROMCMRL REVIEWEDBY PROJECTTITLE DRAWINGNUMBER DRAWINGTITLE REV CHENNAIMETRORAILLTD. DETAILDESIGNCONSULTANT CHENNAIMETRORAILDETAILEDDESIGNCONSULTANCY PHASE-2,CORRIDOR-4,PACKAGE-5 CADFileName2022.03m.01_SPB-StreetLevelPlan.dwg SCALE + ADMINISTRATIVEBUILDING,CMRLDEPOT,POONAMALLEEHIGHROAD,KOYAMBEDU,CHENNAI600107(INDIA) PreliminaryDesign DefinitiveDesign ConstructionReference GoodForConstruction DWGIssueRecord DWG Status CLIENT P2C4/05 LEADDESIGN CHECKERCERTIFICATION FORTHEWORKSANDSERVICESOFTHEDETAILEDDESIGNANDDRAWINGSFOR THECIVIL,STRUCTURAL,ARCHITECTURAL,MEP,VAC&TRACKWORKSCOVERING THEALIGNMENT,ANDELEVATEDSECTIONFROMPIERAFTERMEENAKSHICOLLEGE UGSTATIONTOPOONAMALLEEBYE-PASS(CH10027.102TO25829.793),INCLUDING APPROACHTODEPOT&MAINTENANCEDEPOTATPOONAMALLEE. PackageNo DDC-P2C4-05-ARC-DR-PBO-20102-02 200MMTHK BLOCKWORKWALL STRUCTURALWALL (THK.AS/STR.Dwg.) SEC/ELENAME DRAWINGNUMBER CEILINGHEIGHT FROMFFL FLOORFINISH LEVEL CEILINGTYPE FLOORFINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOMNUMBER ROOMNAME 1 00000-00 SIM MEDIAN PEDESTRIANWALKWAY SOFTSCAPE DOORSCHEDULE DOOR TAG DIMENSIONS (MM) FIRE RATING SILL (MM) LEAF RS-1 2250x2700 -- FD1 1800x2400 2HRS DOUBLE (900/900) FD7 750x1800 1.5HRS 300 SINGLE -FD8 750x1800 0.5HRS 300 SINGLERS-3 3000x2700 - -A 01.03.22 RK ISSUEDFORGCREVIEW MS SR MS SV SR 01.03.2022 STREETLEVELPLAN(PART-A) POONAMALLEBYPASSMETRO DDC-P2C4-05-ARC-DR-POB-20101-01 A 1:200@A1 ü NOTES-
1)ALLLEVELSAREINMETERSANDDIMENSIONSAREINMETER.
ROOMSCHEDULE ROOMNO. ROOMNAME AREA(SQM) 120 PUMPROOM&WATERTANK 210 ENTRYEXIT-01 0.86 0.66 ENT-01 ENT-02.1 D-01.1 D-01.2 D-02.1 208 ENTRYEXIT-02 ENT-02 ELEC,S&TSHAFT PHE&FIRESHAFT 0.86 ELEC,S&TSHAFT D-02.2 PHE&FIRESHAFT 0.66 -STATIONBOX PUMPROOM& WATERTANKLOCATION RWHPPIT FLOOR-CEILING&WALLFINISH LEGEND CODE F1 DESCRIPTION F12 30mmthickManufacturedQuartz ConcretePaverBlocks W6 W9 Concretefinishtexturepaint InteriorAcrylicEmulsionPaint C5 Acrylicemulsioncoatonsurfaces F2 20mmthickhonedgranite F11 TactileflooringTile FGL-FORMEDGROUNDLEVEL ROW_E ROW_E NHAIROWLINE LPSLANDBOUNDARY

3)RCCDIMENSIONSOFEXTERNALELEMENTSAREINDICATIVEONLYANDSUBJECTTOSTRUCTURALDESIGN.

4)RAILLEVELSHOWNINARCHITECTURALDRAWINGISINDICATIVEONLY.ABSOLUTERAILLEVELSHALLBE DERIVEDFROMTHEALIGNEMENTDRAWING.

5)INFORMATIONONACTUALSIZEOFCUTOUTANDOPENINGSSHALLBEASPERE&MDESIGN.

6)ESCALATORANDLIFTSIZESAREINDICATIVEONLY,ANDFINALSIZESSHALLBEASPERMANUFACTURER'S REQUIREMENTASFINALIZEDBYCMRLANDTHEIRPITDRAINAGETOBEASPERE&MDRAWINGS.

7)REFERPLUMBINGDRAWINGSFORPLUMBINGANDDRAINAGELAYOUT.

8)ALLABOVEGROUNDSTRUCTURESTOBEDESIGNEDASPERDETAILEDARCHITECTURALDRAWINGS.

9)FORFINISHESREFERFINISHEDDRAWINGSANDTYPICALDETAILDRAWINGS.

10)THISDRAWINGWILLBEREVISEDONFINALIZATIONOFFINISHESANDABOVEGROUNDSTRUCTURES.

DROPOFFLANE4.5MWIDE

+24.890M ROAD MAINCARRIAGEWAY F1,F2,F11 C5 +25.490 +28.490 ENTRANCE LOBBY FOOTPATH +0.15FromFGL F12 F12 FOOTPATH +25.040 LEVEL-PLINTHTOCONC WIDTH-2575 DEPTH-1975 LIFT-01 STAIRCASE-01 LEVEL-PLINTHTOCONC WIDTH-2400 TREAD300 RISER-150 NOOFSTEPS-75 UP ENTRY /EXIT-1 UP F1,F2,F11 +30.490 +28.490 INTERMEDIATELEVEL UP RWHP PIT OPENLANDFORCMRL FUTUREDEVELOPMENT RAMP UP SLOPE1:12 D-01.1ELEC,S&TSHAFT D-02.1PHE&FIRESHAFT FD-7 FD-8 RS-1W6 W9 RS-3 ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E ROW_E BUSSTOP
BUS ESCALATOR-03&04 LEVEL-INTERMEDIATE TOCONC WIDTH-1750 LENGTH-19606 ESCALATOR-01&02 LEVEL-PLINTHTOINTERMEDIATE WIDTH-1750 LENGTH-19606 TABLETOP WALKING KERBRAMP 3 1 1 12 1 3 1 3 FOOTPATH +0.15FromFGL F12 8 7 9 ISO A1 594mm x 841mm Printed on ___% Post-Consumer Recycled Content Paper Filename: DATE REV. BY REVISIONS DESCRIPTION CHKD APP. BYDETAILDESIGNCONSULTANT DESIGNEDBY APPROVEDBYCHECKEDBY REVISIONNOTES:DATE NoObjection NoObjectionSubjecttothe commentsasnoted RevisionandResubmissionRequired subjecttothecommentsasnoted APPROVEDBY CHECKEDBY DATE ThedesignanddrawingsascertifiedandsubmittedbytheDesigner havebeenreviewedandproofcheckedbyCMRL. NOOBJECTIONFROMCMRL REVIEWEDBY PROJECTTITLE DRAWINGNUMBER DRAWINGTITLE REV CHENNAIMETRORAILLTD. DETAILDESIGNCONSULTANT CHENNAIMETRORAILDETAILEDDESIGNCONSULTANCY PHASE-2,CORRIDOR-4,PACKAGE-5 CADFileName2022.03m.01_SPB-StreetLevelPlan.dwg SCALE + ADMINISTRATIVEBUILDING,CMRLDEPOT,POONAMALLEEHIGHROAD,KOYAMBEDU,CHENNAI600107(INDIA) PreliminaryDesign DefinitiveDesign ConstructionReference GoodForConstruction DWGIssueRecord DWG Status CLIENT P2C4/05 LEADDESIGN CHECKERCERTIFICATION FORTHEWORKSANDSERVICESOFTHEDETAILEDDESIGNANDDRAWINGSFOR
PackageNo
200MMTHK BLOCKWORKWALL STRUCTURALWALL (THK.AS/STR.Dwg.) SEC/ELENAME DRAWINGNUMBER CEILINGHEIGHT FROMFFL FLOORFINISH LEVEL CEILINGTYPE FLOORFINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOMNUMBER ROOMNAME 1 00000-00 SIM MEDIAN PEDESTRIANWALKWAY SOFTSCAPE DOORSCHEDULE DOOR TAG DIMENSIONS (MM) FIRE RATING SILL (MM) LEAF RS-1 2250x2700 -- FD1 1800x2400 2HRS DOUBLE (900/900) FD7 750x1800 1.5HRS 300 SINGLE -FD8 750x1800 0.5HRS 300 SINGLERS-3 3000x2700 - -A 01.03.22 RK ISSUEDFORGCREVIEW MS SR MS SV SR 01.03.2022 STREETLEVELPLAN(PART-B) POONAMALLEBYPASSMETRO DDC-P2C4-05-ARC-DR-POB-20101-01 A 1:200@A1 ü NOTES-
THECIVIL,STRUCTURAL,ARCHITECTURAL,MEP,VAC&TRACKWORKSCOVERING THEALIGNMENT,ANDELEVATEDSECTIONFROMPIERAFTERMEENAKSHICOLLEGE UGSTATIONTOPOONAMALLEEBYE-PASS(CH10027.102TO25829.793),INCLUDING APPROACHTODEPOT&MAINTENANCEDEPOTATPOONAMALLEE.
DDC-P2C4-05-ARC-DR-PBO-20102-01
1)ALLLEVELSAREINMETERSANDDIMENSIONSAREINMETER. 2)GROUNDLEVELWHERESHOWN,AREINDICATIVE.ACTUALLEVELSSHALLBETAKENFROMSURVEY DRAWINGSANDSHALLBECONFIRMEDATSITE.
ROOMSCHEDULE ROOMNO. ROOMNAME AREA(SQM) 120 PUMPROOM&WATERTANK 210 ENTRYEXIT-01 0.86 0.66 ENT-01 ENT-02.1 D-01.1 D-01.2 D-02.1 208 ENTRYEXIT-02 ENT-02 ELEC,S&TSHAFT PHE&FIRESHAFT 0.86 ELEC,S&TSHAFT D-02.2 PHE&FIRESHAFT 0.66 -STATIONBOX PUMPROOM& WATERTANKLOCATION RWHPPIT FLOOR-CEILING&WALLFINISH LEGEND CODE F1 DESCRIPTION F12 30mmthickManufacturedQuartz ConcretePaverBlocks W6 W9 Concretefinishtexturepaint InteriorAcrylicEmulsionPaint C5 Acrylicemulsioncoatonsurfaces F2 20mmthickhonedgranite F11 TactileflooringTile FGL-FORMEDGROUNDLEVEL ROW_E ROW_E NHAIROWLINE LPSLANDBOUNDARY
2 3 4 6 9 5 C 7 8 D 20902-01 C 20901-01 1 A 20801-01 LIFT-04 A E B D 11250 11250 22500 P-01.2 ASS-2 P-02 UPS A-01 SCR D-02.4 PHE & FF SHAFT LIFT-05 16000 16000 17000 16000 17000 18000 18000 18000 5000 6250 6250 5000 P-01.1 ASS-1 +36.740 m FFL 20202-01 1 20202-03 1 PLATFORM PROFILE D-02.3 PHE & FF SHAFT 136000 20202-03 1 TRACK CENTRE 4900 T-08 DB ROOM P-03 S&T MAINTENANCE C-01 SER+PSD T-02.1 TOILET (M) LVL CONCOURSE TO PLATFORM Width 1750 mm Length 19191 mm ESC -12 LVL CONCOURSE TO PLATFORM Width 1750 mm Length 19191 mm ESC -11 LVL CONCOURSE TO PLATFORM Width 1750 mm Length 19191 mm ESC -09 LVL CONCOURSE TO PLATFORM Width 1750 mm Length 19191 mm ESC -10 STREET LVL TO CONCOURSE LVL Width = 2400 mm Tread = 300 mm Riser = 150.00 mm Steps = 72 STAIRCASE-02 LVL - INTERMEDIATE TO CONCOURSE Width 1750 mm Length - 16160 mm ESC -08 LVL - INTERMEDIATE TO CONCOURSE Width 1750 mm Length - 16160 mm ESC -07 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-04 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-03 T-09.3 TOILET (P) T-09.5 SECURITY ROOM LIFT-02 LIFT-03 C/l T-01 STAFF ROOM T-02.2 TOILET (F) T-03 CLEANER ROOM P-05 VRV TERRACE C-02 CER A-02 EFO/TOM D-01.4 ELEC & S&T SHAFT D-01.3 ELEC & S&T SHAFT D-02.2 PHE & FF SHAFT D-01.2 ELEC & S&T SHAFT T-08.1 DB CLOSET UNPAID AREA PAID AREA +36.740 m FFL 4680 7700 13901 10525 10525 4695 7875 3000 9545 5200 7325 9815 6425 4585 3245 4115 3275 2650 3000 2430 2050 4020 2550 2050 2500 4 00 B 20803-01 EXIT GATES ENTRY GATES DFMD & BAGGAGE SCANNERS TVM EL-01 22251-01 EL-01 22251-01 FHC-10 FHC-01 FHC-02 FHC-03 FHC-09 29507-01 1 29556-01 1 22002-01 22106-01 22104-01 22101-01 1 22103-02 1 22103-02 22250-03 1 22102-01 2200 2400 14150 5660 5660 5330 10060 1 22250-01 5600 FHC DISTANCE 19515 FHC DISTANCE 24357 FHC DISTANCE 22728 FHC DISTANCE 17361 FHC DISTANCE 38168 FOOT OVER BRIDGE TO ENTRY/EXIT-01 IS UNDER HOLD. AWAITING FOR APPROVAL OF COLUMN LOCATIONS FROM CMRL POWER HOUSE FHC-05 STREET LVL TO CONCOURSE LVL Width = 2400 mm Tread = 300 mm Riser = 150.00 mm Steps = 75 STAIRCASE-01 LVL INTERMEDIATE TO CONCOURSE Width - 1750 mm Length - 16160 mm ESC -05 LVL INTERMEDIATE TO CONCOURSE Width - 1750 mm Length - 16160 mm ESC -06 LIFT-01 D-01.1 ELEC & S&T SHAFT D-02.1 PHE & FF SHAFT 4000 10400 FHC-07 20202-04 1 17184 DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 250 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22 CONCOURSE LEVEL PLAN POONAMALLE BYPASS METRO B MS SV SR 01.03.2022 RK DL SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20201-01 1 : 250 CONCOURSE LEVEL PLAN 1 N ROOM SCHEDULE - CONCOURSE LEVEL ROOM NO. ROOM NAME AREA(SQM) A-01 SCR 38.62 A-02 EFO/TOM 14.36 C-01 SER+PSD 66.52 C-02 CER 36.09 D-01.1 ELEC & S&T SHAFT 0.86 D-01.2 ELEC & S&T SHAFT 0.66 D-01.3 ELEC & S&T SHAFT 1.11 D-01.4 ELEC & S&T SHAFT 1.19 D-02.1 PHE & FF SHAFT 0.86 D-02.2 PHE & FF SHAFT 0.66 D-02.3 PHE & FF SHAFT 1.17 D-02.4 PHE & FF SHAFT 1.11 E-02 PAID AREA 893.79 E-03 UNPAID AREA 830.88 P-01.1 ASS-1 116.16 P-01.2 ASS-2 113.77 P-02 UPS 34.29 P-03 S&T MAINTENANCE 13.35 P-05 VRV TERRACE 33.86 T-01 STAFF ROOM 35.84 T-02.1 TOILET (M) 14.96 T-02.2 TOILET (F) 13.45 T-03 CLEANER ROOM 8.24 T-08 DB ROOM 14.12 T-08.1 DB CLOSET 5.17 T-09.3 TOILET (P) 6.55 T-09.5 SECURITY ROOM 9.77

CONCOURSE LEVEL PLAN (PART A)

POONAMALLE BYPASS METRO

DDC-P2C4-05-ARC-DR-POB-20202-01

121110987654321 121110987654321 POWER HOUSE 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR
FINISHING SCHEDULE W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition 2 3 4 C 1 A 20801-01 A E B D F5 C1 +4.86m +36.740m P-01.2 ASS-2 F5 C1 +4.86m +36.740m P-02 UPS F10,F4,F3 C3 +2.80m +37.040m A-01 SCR FD1 16000 16000 17000 F5 C1 +4.86m +36.740m P-01.1 ASS-1 TRACK CENTRE 4900 6250 6250 5000 5000 11250 11250 22500 FD1 CUTOUT ABOVE KNOCKOUT PANEL 2400(W) X 3000(H) F5 C1 +4.86m +36.740m T-08 DB ROOM F3,F4 C5 +6.15m +37.040m C-01 SER+PSD F7 C5 +3.25m +36.740m P-03 S&T MAINTENANCE F7,F10 C2 +2.40m +36.890m T-02.1 TOILET (M) F7,F10 C2 +2.40m +36.890m T-09.3 TOILET (P) F7 C5 +3.35m +36.740m T-09.5 SECURITY ROOM CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-04 FD5 FD4 FD5 FD4 FD1 FD3 FD3 FD3 FD1 FD1 FD5 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-03 KNOCKOUT PANEL 2400(W) X 3000(H) DN DN DN DN UP UP FHC-11 Q-LENGTH 4000 Q-LENGTH 4000 PAID AREA F1,F2, F9 C5 +36.740 m +4.86 m 1200MM HIGH RAILING WITH 150MM UPSTAND 3770 400 2000 2000 1525 10525 13900 13900 110 ° 7700 4680 3200 4500 F7 C2 +3.00m +36.740m T-01 STAFF ROOM 3275 2125 1000 1800 1180 1000 2650 2550 D6 2430 2050 4020 13351200 1485 W2 3000 4680 1000 1000 1180 2050 2050 200 1250 200 2200 4695 7875 600 325 3770 1400 1000 3000 8870 300 1200 1600 1300 4245 2400 4695 F3,F4 C5 +2.95m +37.040m C-02 CER 5200 9815 4585 7325 6425 900 900 300 425 3200 2000 2100 2100 1625 SPACE FOR GAS CYLINDERS 4800 900 3875 3840 900 F7 C5 +3.35m +36.740m P-05 VRV TERRACE 7385 200 200 3785 800 200 3245 685 4115 2915 800 6675 1785 3955 2400 2200 3955 6815 1785 485 3600 915 915 3600 485 W3 W8 W3 W8 W3 W8 W5 W5 W5 W5 W7 W6 W7 W6 V1 V1 W2 W3 W8 W3 W8 W6 W12 W7 W6 W7 W6 W7 W6 W7 W6 W7 W6 W7 W6 W7 1200MM HIGH RAILING AS PER DETAIL 1200MM RAILING ENCLOSURE UNDERNEATH STAIRCASE 1200MM RAILING ENCLOSURE UNDERNEATH STAIRCASE 915 REFER DRG. No. 20201-01 SLOPE 1:12 ø 1800 W5 760 325 B 20803-01 F6 C5 +3.35m +36.740m T-03 CLEANER ROOM 425 300 200 BOH CORRIDOR F6 C1 +36.740 m +4.86 m EXHAUST AIR CUTOUT 600X600MM SILL HEIGHT -2600MM 200 FRESH AIR CUTOUT 600X600MM SILL HEIGHT2600MM EXHAUST AIR CUTOUT 400X400MM SILL HEIGHT -2000MM EXHAUST AIR CUTOUT 420X320MM SILL HEIGHT -2400MM GD2 1200MM HIGH RAILING WITH 150MM UPSTAND CUTOUT ABOVE 429 1000 849 1000 1200 1000 1040 1000 660 2400 2400 500 1000 1200 1000 1300 1000 825 1000 FRESH AIR CUTOUT 1200X600MM SILL HEIGHT -2800MM 645 EXHAUST AIR CUTOUT 1200X600MM SILL HEIGHT -2800MM FRESH AIR CUTOUT 1200X600MM SILL HEIGHT -2800MM EXHAUST AIR CUTOUT 1200X600MM SILL HEIGHT -2800MM FD2 1950 F7, F10 C2 +2.40m +36.890m T-02.2 TOILET (F) W1 620 DEMOUNTABLE RAILING DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22
WALL
B MS SV SR 01.03.2022 RK DL SR SR MS MS
DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 - DOUBLE (900/900) FD2 1000 x 2100 2HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD4 1200 x 2100 1.5 HRS - SINGLE FD5 1000 x 2100 0.5HRS - SINGLE FD7 750 x 2100 1.5HRS 300 SINGLE FD8 750 x 2100 0.5HRS 300 SINGLE FD10 2400 x 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 x 2100 - - SINGLE GD2 1000 x 2100 2HRS - SINGLE RS1 2250 x 2700 - - SINGLE RS3 3000 x 2700 - - SINGLE 1 : 100 CONCOURSE LEVEL PLAN (PART A) 1 KEY PLAN D A C B N ROOM SCHEDULE - CONCOURSE LEVEL - PART A ROOM NO. ROOM NAME AREA(SQM) A-01 SCR 38.62 C-01 SER+PSD 66.52 C-02 CER 36.09 P-01.1 ASS-1 116.16 P-01.2 ASS-2 113.77 P-02 UPS 34.29 P-03 S&T MAINTENANCE 13.35 P-05 VRV TERRACE 33.86 T-01 STAFF ROOM 35.84 T-02.1 TOILET (M) 14.96 T-02.2 TOILET (F) 13.45 T-03 CLEANER ROOM 8.24 T-08 DB ROOM 14.12 T-09.3 TOILET (P) 6.55 T-09.5 SECURITY ROOM 9.77 WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900

INTERIOR WALL FINISHING SCHEDULE

121110987654321 121110987654321 4 6 5 C D 20902-01 C 20901-01 A 20801-01 A E B D 1200 MM HIGH RAILING WITH 150MM UPSTAND LIFT-04 LIFT-05 D-02.4 PHE & FF SHAFT PAID AREA F1, F2, F9 C5 +17.840 m +4.86 m UNPAID AREA F1, F2, F9 C5 +17.840 m +4.86 m TRACK CENTRE 4900 FD8 FD7 FD8 FD7 D-02.3 PHE & FF SHAFT 5000 6250 6250 5000 11250 11250 22500 16000 17000 C/l LVL CONCOURSE TO PLATFORM Width - 1750 mm Length 19191 mm ESC -12 LVL CONCOURSE TO PLATFORM Width - 1750 mm Length 19191 mm ESC -11 LVL CONCOURSE TO PLATFORM Width - 1750 mm Length 19191 mm ESC -10 LVL CONCOURSE TO PLATFORM Width - 1750 mm Length 19191 mm ESC -09 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-04 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-03 Q-LENGTH 4000 Q-LENGTH 4000 Q-LENGTH 8000 Q-LENGTH 8000 Q-LENGTH 6000 Q-LENGTH 2400 Q-LENGTH 6000 FHC-01 FHC-09 UP UP 1200 MM HIGH RAILING WITH 150MM UPSTAND 1200MM HIGH RAILING ENCLOSURE BELOW ESCALATOR GD1 915 3600 485 1785 4315 900 1240 1240 915 3600 485 1785 4315 D-01.3 ELEC & S&T SHAFT 900 1240 1440 D-01.4 ELEC & S&T SHAFT 1250 9540 2915 1600 800 1750 50 1750 535 915 3550 1250 9650 1250 10220 800 1750501750535 915 3550 UP 2400 5040 1200 275 300 200 900 550 550 550 2440 910 WICKET GATE SECURITY CHECK AND BAGGAGE SCANNERS 885 550 550 550 550 550 550 550 WICKET GATE 2985 DFMD DFMD DFMD DFMD W11 W9 W11 W9 W11 W9 W11 W9 1600 W11 W9 W7 W6 W12 W11 W10 2100MM HIGH PARTITION 2100MM HIGH PARTITION 1200 MM HIGH RAILING WITH 150MM UPSTAND 1200 MM HIGH RAILING WITH 150MM UPSTAND 1200MM HIGH RAILING ENCLOSURE BELOW ESCALATOR 1200 MM HIGH RAILING AS/DETAIL 1200 MM HIGH RAILING AS/DETAIL W11 W9 REFER DRG. No. 20202-01 REFER DRG. No. 20202-03 B 20803-01 F7, F10 C5 +4.65m +37.040m A-02 EFO/TOM 2760 5660 Q-LENGTH 2400 Q-LENGTH 2400 1975 2575 1975 2575 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE
F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM POWER HOUSE FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting including plaster 6mm+1.52mm+6mm laminated toughened glass
LEGEND
W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22 CONCOURSE LEVEL PLAN (PART B) POONAMALLE BYPASS METRO B MS SV SR 01.03.2022 RK DL SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20202-02 1 : 100 CONCOURSE LEVEL PLAN (PART B) 1 ROOM SCHEDULE - CONCOURSE LEVEL - PART B ROOM NO. ROOM NAME AREA(SQM) A-02 EFO/TOM 14.36 D-01.1 ELEC & S&T SHAFT 0.86 D-01.3 ELEC & S&T SHAFT 1.11 D-01.4 ELEC & S&T SHAFT 1.19 D-02.1 PHE & FF SHAFT 0.86 D-02.3 PHE & FF SHAFT 1.17 D-02.4 PHE & FF SHAFT 1.11 E-02 PAID AREA 893.79 E-03 UNPAID AREA 830.88 WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900 DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 - DOUBLE (900/900) FD2 1000 x 2100 2HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD4 1200 x 2100 1.5 HRS - SINGLE FD5 1000 x 2100 0.5HRS - SINGLE FD7 750 x 2100 1.5HRS 300 SINGLE FD8 750 x 2100 0.5HRS 300 SINGLE FD10 2400 x 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 x 2100 - - SINGLE GD2 1000 x 2100 2HRS - SINGLE RS1 2250 x 2700 - - SINGLE RS3 3000 x 2700 - - SINGLE
D A C B
KEY PLAN

CONCOURSE LEVEL PLAN (PART C)

CONCOURSE LEVEL PLAN (PART C) POONAMALLE BYPASS METRO

DDC-P2C4-05-ARC-DR-POB-20202-03

72 71 70 69 68 67 66 65 64 63 62 61 6059585756555453525150 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition 6 9 C 7 8 D 20902-01 A 20801-01 A E B D EXIT GATES TRACK CENTRE 4900 18000 18000 18000 5000 6250 6250 5000 11250 11250 22500 UNPAID AREA F1, F2, F9 C1 +36.740 m +4.86 m Q-LENGTH 6000 Q-LENGTH 2400 Q-LENGTH 2400 ENTRY GATES Q-LENGTH 8000 FHC-02 STREET LVL TO CONCOURSE LVL Width = 2400 mm Tread = 300 mm Riser = 150.00 mm Steps = 72 STAIRCASE-02 LVL - INTERMEDIATE TO CONCOURSE Width - 1750 mm Length - 16160 mm ESC -08 LVL INTERMEDIATE TO CONCOURSE Width - 1750 mm Length - 16160 mm ESC -07 Q-LENGTH 4000 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL 2100MM HIGH PARTITION WALL GD1 2100MM HIGH PARTITION WALL F5 C1 +4.86m +36.740m T-08.1 DB CLOSET QL E N G T H 2400 QL E N G T H 2400 2575 1975 2575 D-01.2 ELEC & S&T SHAFT D-02.2 PHE & FF SHAFT 1100 1100 600 FD8 FD7 2400 5330 1200 275 300 885 550 550 550 550 550 550 550 WICKET GATE 2985 200 900 550 550 550 2440 910 WICKET GATE SECURITY CHECK AND BAGGAGE SCANNERS DFMD DFMD DFMD DFMD 4700 475 1750 50 1750 975 3560 5330 DN 5450 150 3000 1125 925 2050 2700 WIDE CORR DOR 4000 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL W7 W6 W12 W11 W10 W11 W9 TVM W11 W9 800 W3 W8 W11 W9 W11 W11 W9 W11 W11 W11 W11 W9 3600 REFER DRG. No. 20202-02 800800 B 20803-01 5065 9245 1000 2375 1035 140°140 ° 130 140° 1360 2665 UNPAID CORRIDOR F1,F2,F9 C1 +36.740 m +2.90 m 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL PLATFORM PROFILE FOOT OVER BRIDGE TO ENTRY/EXIT-01 IS UNDER HOLD. AWAITING FOR APPROVAL OF COLUMN LOCATIONS FROM CMRL POWER HOUSE DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22
B MS SV SR 01.03.2022 RK DL SR SR MS MS
DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 - DOUBLE (900/900) FD2 1000 x 2100 2HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD4 1200 x 2100 1.5 HRS - SINGLE FD5 1000 x 2100 0.5HRS - SINGLE FD7 750 x 2100 1.5HRS 300 SINGLE FD8 750 x 2100 0.5HRS 300 SINGLE FD10 2400 x 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 x 2100 - - SINGLE GD2 1000 x 2100 2HRS - SINGLE RS1 2250 x 2700 - - SINGLE RS3 3000 x 2700 - - SINGLE
100
1
1
PLAN D A C B N ROOM SCHEDULE - CONCOURSE LEVEL - PART C ROOM NO. ROOM NAME AREA(SQM) A-02 EFO/TOM 14.36 D-01.2 ELEC & S&T SHAFT 0.66 D-02.2 PHE & FF SHAFT 0.66 E-02 PAID AREA 893.79 E-03 UNPAID AREA 830.88 T-08.1 DB CLOSET 5.17 WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900
KEY
75 74 73 72 71 70 69 68 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 STREET LVL TO CONCOURSE LVL Width = 2400 mm Tread = 300 mm Riser = 150.00 mm Steps = 75 STAIRCASE-01 D-02.1 PHE & FF SHAFT D-01.1 ELEC & S&T SHAFT LVL INTERMEDIATE TO CONCOURSE Width 1750 mm Length 16160 mm ESC -05 LVL INTERMEDIATE TO CONCOURSE Width 1750 mm Length 16160 mm ESC -06 FHC-07 FD7 FD8 FHC-06 QLENGTH4000 Q-LENGTH 2400 100° 100° 90 90 QLENGTH8000 WIDECORRIDOR 10400 WIDE CORRIDOR4000 2575 1975 UNPAID CORRIDOR F1,F2,F9 C1 +36.740 m +2.90 m UNPAID CORRIDOR F1,F2,F9 C1 +36.740 m +2.90 m 1430 1430 600 W11 W9 W11 W11 W11 W11 W11 W11 W9 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL RCC COLUMN BELOW RCC COLUMN BELOW N 1442540405 E 400384070 N 1442540140 E 400388312 N 1442539770 E 400394250 N 1442531713 E 400394348 N 1442532121 E 400387811 N 1442532386 E 400383569 LIFT-01 FOOT OVER BRIDGE TO ENTRY/EXIT-01 IS UNDER HOLD. AWAITING FOR APPROVAL OF COLUMN LOCATIONS FROM CMRL 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition POWER HOUSE DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22 CONCOURSE LEVEL PLAN (PART D)
BYPASS METRO B MS SV SR 01.03.2022 RK DL SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20202-04 1 100 CONCOURSE LEVEL 1 WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900 DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 - DOUBLE (900/900) FD2 1000 x 2100 2HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD4 1200 x 2100 1.5 HRS - SINGLE FD5 1000 x 2100 0.5HRS - SINGLE FD7 750 x 2100 1.5HRS 300 SINGLE FD8 750 x 2100 0.5HRS 300 SINGLE FD10 2400 x 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 x 2100 - - SINGLE GD2 1000 x 2100 2HRS - SINGLE RS1 2250 x 2700 - - SINGLE RS3 3000 x 2700 - - SINGLE KEY PLAN D C ROOM SCHEDULE - CONCOURSE LEVEL - PART D ROOM NO. ROOM NAME AREA(SQM) D-01.1 ELEC & S&T SHAFT 0.86 D-02.1 PHE & FF SHAFT 0.86
POONAMALLE
2 3 4 6 9 5 C 7 8 D 20902-01 C 20901-01 1 A 20801-01 A E B D D-02.4 PHE & FF SHAFT LIFT-04 LIFT-05 P-04 TRR 11250 11250 22500 5000 6250 6250 5000 16000 16000 17000 16000 17000 18000 18000 18000 136000 LOW HEIGHT PLATFORM SCREEN GATE 20302-01 1 E-01.2 PLATFORM E-01.1 PLATFORM E-01.2 PLATFORM E-01.1 PLATFORM D-02.3 PHE & FF SHAFT 20302-03 2 T-09.1 TELECOM CLOSET T-09.2 TELECOM CLOSET T-08.2 DB CLOSET C/l 20302-03 2 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-04 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-03 LVL - CONCOURSE TO PLATFORM Width 1750 mm Length - 19191 mm ESC -12 LVL - CONCOURSE TO PLATFORM Width 1750 mm Length 19191 mm ESC -11 LVL - CONCOURSE TO PLATFORM Width 1750 mm Length 19191 mm ESC -10 LVL - CONCOURSE TO PLATFORM Width 1750 mm Length - 19191 mm ESC -09 CUTOUT FOR ACCESS HATCH ABOVE CUTOUT FOR ACCESS HATCH ABOVE CUTOUT FOR ACCESS HATCH ABOVE CUTOUT FOR ACCESS HATCH ABOVE DN DN FHC-12 FHC-13 FHC-14 FHC-15 FHC-16 FHC-17 ACCESS STAIRCASE-01 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 6 ACCESS STAIRCASE-04 LVL-Platform to Rail Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 6 ACCESS STAIRCASE-02 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 6 ACCESS STAIRCASE-03 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 6 D-01.4 ELEC & S&T SHAFT D-01.3 ELEC & S&T SHAFT +43.490 m FFL +43.490 m FFL TRACK CENTRE 4900 8400 4315 2000 1500 4900 1500 3525 2000 FHC DISTANCE 22960 FHC DISTANCE 43200 FHC DISTANCE 42417 FHC DISTANCE 27043 B 20803-01 1 29507-01 1 29556-01 22002-01 1 22250-03 LOW HEIGHT PLATFORM SCREEN GATE PLATFORM LENGTH 135900 ROOF PROFILE ROOF PROFILE POWER HOUSE DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 250 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22 PLATFORM LEVEL PLAN POONAMALLE BYPASS METRO B MS SV SR 01.03.2022 RK DL SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20301-01 1 : 250 PLATFORM LEVEL 1 N ROOM SCHEDULE - PLATFORM LEVEL ROOM NO. ROOM NAME AREA(SQM) E-01.1 PLATFORM 732.24 E-01.2 PLATFORM 773.84 P-04 TRR 35.95 T-08.2 DB CLOSET 7.35 T-08.3 DB CLOSET 5.29 T-09.1 TELECOM CLOSET 4.00 T-09.2 TELECOM CLOSET 4.00

PLATFORM LEVEL PLAN (PART A) 1

PLATFORM LEVEL PLAN (PART A)

454443424140393837 363534333231302928272625 24232221 454443424140393837 363534333231302928272625 24232221 CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM 2 3 4 C C 20901-01 1 A 20801-01 A E B D D-02.4 PHE & FF SHAFT LIFT-04 LIFT-05 F5 C1 +3.90m +43.490m P-04 TRR F1,F2,F9,F11 C4 +5.25m +43.490m E-01.2 PLATFORM F1,F2,F9,F11 C4 +5.25m +43.490m E-01.1 PLATFORM LOW HEIGHT PLATFORM SCREEN GATE LOW HEIGHT PLATFORM SCREEN GATE 11250 11250 22500 TRACK CENTRE 4900 1200MM HIGH RAILING WITH 150MM UPSTAND 50MM EXPANSION JOINT D-02.3 PHE & FF SHAFT SLOPE 1:300 RW GUTTER 300MMx300MM AS PER SPECIFICATION PLATFORM SEATING 5000 6250 6250 5000 16000 16000 17000 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-04 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-03 FD7 FD8 FD10 FD7 FD8 F5 C4 +5.25m +43.490m T-08.2 DB CLOSET RW GUTTER 300MMx300MM AS PER SPECIFICATION FHC-12 Q-LENGTH 4000 Q-LENGTH 4000 PLATFORM SEATING FHC-17 F5 C4 +5.25m +43.490m T-09.2 TELECOM CLOSET LOW HEIGHT PLATFORM SCREEN GATE LOW HEIGHT PLATFORM SCREEN GATE SLOPE 1:300 CUTOUT FOR CAT LADDER ABOVE CUTOUT FOR ACCESS HATCH ABOVE CUTOUT FOR ACCESS HATCH ABOVE ACCESS STAIRCASE-01 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 6 ACCESS STAIRCASE-04 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 6 50MM EXPANSION JOINT STEEL COLUMN TO SUPPORT STRUCTURAL ROOF AS/STRUCTURAL DETAIL STEEL COLUMN TO SUPPORT STRUCTURAL ROOF AS/STRUCTURAL DETAIL F5 C4 +5.25m +43.490m T-08.3 DB CLOSET 2055 1520 2450 2450 1520 2055 2600 1520 2450 2450 1520 2600 3385 915 3600 485 8400 320 200 585 4315 4900 1500 900 1235 1235 D-01.4 ELEC & S&T SHAFT 6450 1600 800 3385 915 3600 485 6450 1600 800 4280 2000 900 1235 1235 1500 3525 D-01.3 ELEC & S&T SHAFT 590 7185 160 110 ° 1950 14000 1950 4030 110° 160° W11 W11 W9 W11 W3 W8 W11 W9 W11 W9 W9 W11 W11 W11 W9 W11 W11 W9 W11 W9 W11 W11 W9 PLATFORM END GATE PLATFORM END GATE REFER DRG. No. 20302-02 B 20803-01 3105 3105 1200MM HIGH RAILING WITH 150MM UPSTAND 1200MM HIGH RAILING WITH 150MM UPSTAND 1200MM HIGH RAILING WITH 150MM UPSTAND DN DN 11000 FLOOR CUTOUT 11000X3650MM 3650 FLOOR CUTOUT 11000X3650MM 11000 3650 Q-LENGTH 2400 1975 Q-LENGTH 2400 1975 ROOF PROFILE ROOF PROFILE 14000 300MM WIDE FLOOR DRAIN 300MM WIDE FLOOR DRAIN 2575 2575 POWER HOUSE DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22
POONAMALLE BYPASS
B MS SV SR 01.03.2022 RK DL SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20302-01 DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 - DOUBLE (900/900) FD2 1000 x 2100 2HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD4 1200 x 2100 1.5 HRS - SINGLE FD5 1000 x 2100 0.5HRS - SINGLE FD7 750 x 2100 1.5HRS 300 SINGLE FD8 750 x 2100 0.5HRS 300 SINGLE FD10 2400 x 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 x 2100 - - SINGLE GD2 1000 x 2100 2HRS - SINGLE RS1 2250 x 2700 - - SINGLE RS3 3000 x 2700 - - SINGLE
100
METRO
1 :
KEY PLAN D A C B N ROOM SCHEDULE - PLATFORM LEVEL - PART A ROOM NO. ROOM NAME AREA(SQM) E-01.1 PLATFORM 732.24 E-01.2 PLATFORM 773.84 P-04 TRR 35.95 T-08.2 DB CLOSET 7.35 T-08.3 DB CLOSET 5.29 T-09.2 TELECOM CLOSET 4.00 WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900

LEVEL PLAN (PART B)

POONAMALLE BYPASS METRO

LEGEND

4 6 5 C C 20901-01 A 20801-01 A E B D C/l D-02.4 PHE & FF SHAFT LIFT-04 LIFT-05 LOW HEIGHT PLATFORM SCREEN GATE F1,F2,F9,F11 C4 +5.25m +43.490m E-01.2 PLATFORM D-02.3 PHE & FF SHAFT REFER DRG. No. 20302-01 F1,F2,F9,F11 C4 +5.25m +43.490m E-01.1 PLATFORM 5000 6250 6250 5000 11250 11250 22500 TRACK CENTRE 4900 F5 C1 +3.90m +43.490m P-04 TRR 16000 3000 14000 F5 C4 +5.25m +43.490m T-09.1 TELECOM CLOSET FD10 FD7 FD8 FD7 FD8 F5 C4 +5.25m +43.490m T-08.2 DB CLOSET LVL CONCOURSE TO PLATFORM Width - 1750 mm Length 19191 mm ESC -12 LVL CONCOURSE TO PLATFORM Width - 1750 mm Length 19191 mm ESC -11 LVL CONCOURSE TO PLATFORM Width - 1750 mm Length 19191 mm ESC -10 LVL CONCOURSE TO PLATFORM Width - 1750 mm Length 19191 mm ESC -09 PLATFORM SEATING PLATFORM SEATING FHC-13 FHC-16 LOW HEIGHT PLATFORM SCREEN GATE LOW HEIGHT PLATFORM SCREEN GATE CUTOUT FOR ACCESS HATCH ABOVE Q-LENGTH 8000 LOW HEIGHT PLATFORM SCREEN GATE CUTOUT FOR ACCESS HATCH ABOVE Q-LENGTH 8000 SLOPE 1:300 1200MM HIGH RAILING WITH 150MM UPSTAND 1200MM HIGH RAILING WITH 150MM UPSTAND RW GUTTER 300MMX300MM AS/SPECIFICATION RW GUTTER 300MMX300MM AS/SPECIFICATION SLOPE 1:300 4280 585 615 200 585 4315 4900 1500 900 1240 1235 900 1240 1235 1500 3525 590 2650 1520 2450 2450 1520 2650 2055 1520 2450 2450 1520 2055 450 1600 800 450 1600 800 2000 2000 370 4230 CUTOUT FOR CAT LADDER ABOVE 7860 3440 915 1750 50 1775 510 7875 3440 915 1750501775510 F5 C4 +5.25m +43.490m T-08.3 DB CLOSET W3 W8 W11 W9 W9 W11 W11 W9 W11 W11 W9 W9 W11 W11 W11 W9 W11 W11 W11 W11 REFER DRG. No. 20302-03 B 20803-01 3105 3105 1200MM HIGH RAILING WITH 150MM UPSTAND 1200MM HIGH RAILING WITH 150MM UPSTAND FLOOR CUTOUT 11300X3600MM 300MM WIDE FLOOR DRAIN 300MM WIDE FLOOR DRAIN 1975 Q-LENGTH 2400 Q-LENGTH 2400 FLOOR CUTOUT 11300X3600MM ROOF PROFILE ROOF PROFILE POWER HOUSE 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE
F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22 PLATFORM
B MS SV SR 01.03.2022 RK DL SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20302-02 1 : 100 PLATFORM LEVEL PLAN (PART B) 1 WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900 DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 - DOUBLE (900/900) FD2 1000 x 2100 2HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD4 1200 x 2100 1.5 HRS - SINGLE FD5 1000 x 2100 0.5HRS - SINGLE FD7 750 x 2100 1.5HRS 300 SINGLE FD8 750 x 2100 0.5HRS 300 SINGLE FD10 2400 x 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 x 2100 - - SINGLE GD2 1000 x 2100 2HRS - SINGLE RS1 2250 x 2700 - - SINGLE RS3 3000 x 2700 - - SINGLE N KEY PLAN D A C B ROOM SCHEDULE - PLATFORM LEVEL - PART B ROOM NO. ROOM NAME AREA(SQM) E-01.1 PLATFORM 732.24 E-01.2 PLATFORM 773.84 P-04 TRR 35.95 T-08.2 DB CLOSET 7.35 T-08.3 DB CLOSET 5.29 T-09.1 TELECOM CLOSET 4.00

PLATFORM LEVEL PLAN (PART C) 2 KEY PLAN

1 100

PLATFORM LEVEL PLAN (PART C)

POONAMALLE BYPASS METRO

FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM POWER HOUSE 6 9 C 7 8 D 20902-01 A 20801-01 A E B D 18000 18000 18000 LOW HEIGHT PLATFORM SCREEN GATE F1,F2,F9,F11 C4 +5.25m +43.490m E-01.1 PLATFORM F1,F2,F9,F11 C4 +5.25m +43.490m E-01.2 PLATFORM 1200MM HIGH RAILING WITH 150MM UPSTAND RW GUTTER 300mmx300mm AS PER SPECIFICATION PLATFROM SEATING 5000 6250 6250 5000 11250 11250 22500 TRACK CENTRE 4900 LOW HEIGHT PLATFORM SCREEN GATE LOW HEIGHT PLATFORM SCREEN GATE LOW HEIGHT PLATFORM SCREEN GATE FHC-14 FHC-15 1200MM HIGH RAILING WITH 150MM UPSTAND RW GUTTER 300mmx300mm AS PER SPECIFICATION LVL CONCOURSE TO PLATFORM Width - 1750 mm Length - 19191 mm ESC -12 LVL CONCOURSE TO PLATFORM Width - 1750 mm Length - 19191 mm ESC -11 LVL CONCOURSE TO PLATFORM Width - 1750 mm Length 19191 mm ESC -10 LVL CONCOURSE TO PLATFORM Width - 1750 mm Length 19191 mm ESC -09 Q-LENGTH 8000 Q-LENGTH 8000 SLOPE 1:300 SLOPE 1:300 CUTOUT FOR ACCESS HATCH ABOVE CUTOUT FOR ACCESS HATCH ABOVE STEEL COLUMN TO SUPPORT STRUCTURAL ROOF AS/STRUCTURAL DETAIL STEEL COLUMN TO SUPPORT STRUCTURAL ROOF AS/STRUCTURAL DETAIL ACCESS STAIRCASE-02 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 6 ACCESS STAIRCASE-03 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 6 3440 915 1750 50 1775 510 3440 915 1750501775 510 2055 1520 2450 2450 1520 2055 8065 1600 800 8065 1600 800 160° 110° 160 110 ° 3170 14780 4040 3170 14780 4040 W11 W9 W11 W11 W9 W11 W11 W11 PLATFORM END GATE PLATFORM END GATE 50MM EXPANSION JOINT REFER DRG. No. 20302-02 B 20803-01 PLATFROM SEATING PLATFROM SEATING 50MM EXPANSION JOINT PLATFROM SEATING 1200MM HIGH RAILING WITH 150MM UPSTAND 1200MM HIGH RAILING WITH 150MM UPSTAND 300MM WIDE FLOOR DRAIN 300MM WIDE FLOOR DRAIN ROOF PROFILE DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22
B MS SV SR 01.03.2022 RK DL SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20302-03 DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 - DOUBLE (900/900) FD2 1000 x 2100 2HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD4 1200 x 2100 1.5 HRS - SINGLE FD5 1000 x 2100 0.5HRS - SINGLE FD7 750 x 2100 1.5HRS 300 SINGLE FD8 750 x 2100 0.5HRS 300 SINGLE FD10 2400 x 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 x 2100 - - SINGLE GD2 1000 x 2100 2HRS - SINGLE RS1 2250 x 2700 - - SINGLE RS3 3000 x 2700 - - SINGLE
A C B N ROOM SCHEDULE - PLATFORM LEVEL - PART C ROOM NO. ROOM NAME AREA(SQM) E-01.1 PLATFORM 732.24 E-01.2 PLATFORM 773.84 WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900
2 3 4 6 9 5 C 7 8 D 20902-01 C 20901-01 1 A 20801-01 A E B D C/l B 20803-01 16000 16000 17000 16000 17000 18000 18000 18000 136000 3000 ROOF LENGTH 141800 5000 6250 6250 5000 11250 11250 22500 CUTOUT FOR ACCESS HATCH CUTOUT FOR ACCESS HATCH CUTOUT FOR CAT LADDER 400MM WIDE GUTTER CUTOUT FOR ACCESS HATCH CUTOUT FOR ACCESS HATCH CUTOUT FOR CAT LADDER 400MM WIDE GUTTER SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:27 SLOPE 1:16 SLOPE 1:16 SLOPE 1:16 SLOPE 1:16 SLOPE 1:16 SLOPE 1:16 SLOPE 1:16 400MM WIDE GUTTER 400MM WIDE GUTTER 400MM WIDE GUTTER 400MM WIDE GUTTER SLOPE 1:16 SLOPE 1:16 SLOPE 1:16 SLOPE 1:16 SLOPE 1:16 SLOPE 1:16 2900 1616 1616 2900 2900 2900 1574 1574 ROOF ENTRY/EXIT -02 FOOT OVER BRIDGE TO ENTRY/EXIT-01 IS UNDER HOLD. AWAITING FOR APPROVAL OF COLUMN LOCATIONS FROM CMRL FOOT OVER BRIDGE ROOF ESCALATOR ROOF ENTRY/EXIT-01 ROOF ENTRY/EXIT-01 DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 250 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22 ROOF LEVEL PLAN POONAMALLE BYPASS METRO A MS SV SR 01.03.2022 RK DL SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20501-01 1 : 250 ROOF LEVEL 1
CONCOURSE LEVEL EL +36.740 m PLATFORM LEVEL EL +43.490 m RAIL LEVEL EL +42.400 m 2 3 4 6 9 5 7 8 1 16000 16000 17000 16000 17000 18000 18000 18000 E-01.2 PLATFORM E-01.2 PLATFORM ROOF LEVEL. EL +48.740 m 20802-01 1 PLINTH LEVEL EL +25.490 m 20802-02 2 20802-03 3 PAID AREA INTERMEDIATE LEVEL EL +31.740 m C/l 136000 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-03 LVL CONCOURSE TO PLATFORM Width - 1750 mm Length 19191 mm ESC -09 5250 6750 5000 6250 1090 18000 LVL - INTERMEDIATE TO CONCOURSE Width 1750 mm Length 16160 mm ESC -07 LVL - PLINTH TO INTERMEDIATE Width 1750 mm Length 16160 mm ESC -03 P-01.2 ASS-2 C-01 SER+PSD P-03 S&T MAINTENANCE D-02.3 PHE & FF SHAFT LOW HEIGHT PLATFORM SCREEN GATE LOW HEIGHT PLATFORM SCREEN GATE FHC-01 FHC-14 FHC-13 FHC-12 UNPAID AREA ACCESS STAIRCASE-01 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 7 ACCESS STAIRCASE-02 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 7 SECURITY CHECK & BAGGAGE SCANNERS ROAD LVL +25.232m ROAD LVL +24.009m ROAD LVL +24.306m ROAD LVL +24.693m ROAD LVL +25.219m ROAD LVL +25.064m ROAD LVL +25.104m ROAD LVL +25.061m ROAD LVL +24.653m ENTRY/EXIT-02 SEEN IN ELEVATION 6590 GROUND LEVEL EL VARIES POWER HOUSE 1 250 LONG SECTION AA A DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 250 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22 LONG SECTION AA POONAMALLE BYPASS METRO B MS SV SR 17.03.2021 RK DL SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20801-01 KEY PLAN ROOM SCHEDULE - LONG SECTION ROOM NO. ROOM NAME AREA(SQM) C-01 SER+PSD 66.52 C-02 CER 36.09 E-01.2 PLATFORM 773.84 P-01.2 ASS-2 113.77 P-03 S&T MAINTENANCE 13.35 P-05 VRV TERRACE 33.86
CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting including plaster 6mm+1.52mm+6mm laminated toughened glass
FINISHING SCHEDULE W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM POWER HOUSE CONCOURSE LEVEL EL +36.740 m PLATFORM LEVEL EL +43.490 m RAIL LEVEL EL +42.400 m 2 3 4 1 ROOF LEVEL. EL +48.740 m PLINTH LEVEL EL +25.490 m 16000 16000 17000 F1,F2,F9,F11 C4 +5.25m +43.490m E-01.2 PLATFORM F5 C1 +4.86m +36.740m P-01.2 ASS-2 REFER DRG. No. 20802-02 LOW HEIGHT PLATFORM SCREEN GATE INTERMEDIATE LEVEL EL +31.740 m F3,F4 C5 +6.15m +37.040m C-01 SER+PSD FD3 FD5 FD3 FD3 5250 6750 5000 6250 18000 1090 FHC-12 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-03 F7 C5 +3.25m +36.740m P-03 S&T MAINTENANCE FHC-01 ACCESS STAIRCASE-01 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 6 F1,F2,F9,F11 C4 +5.25m +43.490m E-01.2 PLATFORM PERFORATED SHEET PANEL 3350 3250 6150 2955 4600 F3,F4 C5 +2.95m +37.040m C-02 CER F7 C5 +3.35m +36.740m P-05 VRV TERRACE 4900 2285 300 300 1200MM HIGH RAILING WITH 150MM UPSTAND 2900 2250 2900 TELECOM CLOSET IN ELEVATION 2250 3350 RW GUTTER 300MMX300MM AS/SPECIFICATION W3 W8 W6 W7 W6 W7 W6 W7 W6 W7 W11 W9 W11 W9 W11 W9 W11 W9 11000 ROAD LVL +25.232m ROAD LVL +24.009m ROAD LVL +24.306m ROAD LVL +24.639m LOUVRE AS/DETAIL GROUND LEVEL EL VARIES DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22 LONG SECTION AA (PART A) POONAMALLE BYPASS METRO B MS SV SR 17.03.2021 RK DL SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20802-01 DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 - DOUBLE (900/900) FD2 1000 x 2100 2HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD4 1200 x 2100 1.5 HRS - SINGLE FD5 1000 x 2100 0.5HRS - SINGLE FD7 750 x 2100 1.5HRS 300 SINGLE FD8 750 x 2100 0.5HRS 300 SINGLE FD10 2400 x 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 x 2100 - - SINGLE GD2 1000 x 2100 2HRS - SINGLE RS1 2250 x 2700 - - SINGLE RS3 3000 x 2700 - - SINGLE 1 : 100 LONG SECTION AA (PART A) 1 KEY PLAN WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900 ROOM SCHEDULE - LONG SECTION - PART A ROOM NO. ROOM NAME AREA(SQM) C-01 SER+PSD 66.52 C-02 CER 36.09 E-01.2 PLATFORM 773.84 P-01.2 ASS-2 113.77 P-03 S&T MAINTENANCE 13.35 P-05 VRV TERRACE 33.86
INTERIOR WALL

LONG SECTION AA (PART B)

100

CONCOURSE LEVEL EL +36.740 m PLATFORM LEVEL EL +43.490 m RAIL LEVEL EL +42.400 m 4 6 5 ROOF LEVEL. EL +48.740 m PLINTH LEVEL EL +25.490 m LIFT-04 REFER DRG. No. 20802-01 REFER DRG. No. 20802-03 INTERMEDIATE LEVEL EL +31.740 m C/l 5250 6750 5000 6250 18000 1090 LOW HEIGHT PLATFORM SCREEN GATE LVL CONCOURSE TO PLATFORM Width - 1750 mm Length 19191 mm ESC -09 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-03 D-02.3 PHE & FF SHAFT 16000 17000 3000 F1,F2,F9,F11 C4 +5.25m +43.490m E-01.2 PLATFORM FHC-13 PAID AREA F1, F2, F9 C5 +35.277 m +4.86 m 3350 2250 6500 5900 4900 PLATFORM SEATING 2900 EFO/TOM IN ELEVATION ENTRY GATES 2100 2100MM HIGH PARTITION SECURITY CHECK & BAGGAGE SCANNERS 3365 3350 LOW HEIGHT PLATFORM SCREEN GATE 1200MM HIGH RAILING WITH 150MM UPSTAND FHC-01 1200MM HIGH RAILING WITH 150MM UPSTAND 1200MM HIGH RAILING WITH 150MM UPSTAND 1500 1975 6500 5900 W11 W9 W11 W9 W11 W9 W11 W9 W11 W9 11300 W12 W11 W10 W11 W11 ROAD LVL +24.639m ROAD LVL +25.219m ROAD LVL +25.064m LOUVRE AS/DETAIL GROUND LEVEL EL VARIES TELECOM CLOSET IN ELEVATION CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM POWER HOUSE DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22
B MS SV SR 17.03.2021 RK DL SR SR MS MS
1
LONG SECTION AA (PART B) POONAMALLE BYPASS METRO
DDC-P2C4-05-ARC-DR-POB-20802-02
2 DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 - DOUBLE (900/900) FD2 1000 x 2100 2HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD4 1200 x 2100 1.5 HRS - SINGLE FD5 1000 x 2100 0.5HRS - SINGLE FD7 750 x 2100 1.5HRS 300 SINGLE FD8 750 x 2100 0.5HRS 300 SINGLE FD10 2400 x 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 x 2100 - - SINGLE GD2 1000 x 2100 2HRS - SINGLE RS1 2250 x 2700 - - SINGLE RS3 3000 x 2700 - - SINGLE KEY PLAN ROOM SCHEDULE - LONG SECTION - PART B ROOM NO. ROOM NAME AREA(SQM) C-01 SER+PSD 66.52 C-02 CER 36.09 E-01.2 PLATFORM 773.84 P-01.2 ASS-2 113.77 P-03 S&T MAINTENANCE 13.35 P-05 VRV TERRACE 33.86 WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900
CONCOURSE LEVEL EL +36.740 m PLATFORM LEVEL EL +43.490 m RAIL LEVEL EL +42.400 m 6 9 7 8 F1,F2,F9,F11 C4 +5.25m +43.490m E-01.2 PLATFORM ROOF LEVEL. EL +48.740 m PLINTH LEVEL EL +25.490 m SECURITY CHECK & BAGGAGE SCANNER REFER DRG. No. 20802-02 LOW HEIGHT PLATFORM SCREEN GATE INTERMEDIATE LEVEL EL +31.740 m 5250 6750 5000 6250 18000 1090 18000 18000 18000 FHC-14 1200MM HIGH RAILING WITH 150MM UPSTAND 2100MM HIGH PARTITION TVM LVL INTERMEDIATE TO CONCOURSE Width - 1750 mm Length 16160 mm ESC -07 LVL - INTERMEDIATE TO CONCOURSE Width 1750 mm Length - 16160 mm ESC -08 LOW HEIGHT PLATFORM SCREEN GATE EFO & TOM IN ELEVATION 1200MM HIGH RAILING WITH 150MM UPSTAND LVL - CONCOURSE TO PLATFORM Width - 1750 mm Length - 19191 mm ESC -09 1200MM HIGH RAILING WITH 150MM UPSTAND ACCESS STAIRCASE-02 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 6 UNPAID AREA F1, F2, F9 C5 +36.740 m +4.86 m 2950 3350 3350 2100 5900 6500 PLATFORM SEATING 1200MM HIGH RAILING WITH 150MM UPSTAND ESCALATOR ENCLOSURE IN ELEVATION 3650 5100 BLOCKWORK IN ELEVATION 3000 GALVALUME SHEET ROOFING RW GUTTER 300MMX300MM AS/SPECIFICATION 1250 1200MM HIGH BLOCKWORK W12 W11 W10 W11 W11 W9 W11 W9 W11 W9 ROAD LVL +25.064m ROAD LVL +25.104m ROAD LVL +25.061m ROAD LVL +24.653m LOUVRE AS/DETAIL ENTRY/EXIT-02 SEEN IN ELEVATION VIADUCT SEEN IN ELEVATION 6700 GROUND LEVEL EL VARIES CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM POWER HOUSE DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22 LONG SECTION AA (PART C) POONAMALLE BYPASS METRO B MS SV SR 01.03.2022 RK DL SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20802-03 1 : 100 LONG SECTION AA (PART C) 3 DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 - DOUBLE (900/900) FD2 1000 x 2100 2HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD4 1200 x 2100 1.5 HRS - SINGLE FD5 1000 x 2100 0.5HRS - SINGLE FD7 750 x 2100 1.5HRS 300 SINGLE FD8 750 x 2100 0.5HRS 300 SINGLE FD10 2400 x 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 x 2100 - - SINGLE GD2 1000 x 2100 2HRS - SINGLE RS1 2250 x 2700 - - SINGLE RS3 3000 x 2700 - - SINGLE
WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900 ROOM SCHEDULE - LONG SECTION - PART C ROOM NO. ROOM NAME AREA(SQM) C-01 SER+PSD 66.52 C-02 CER 36.09 E-01.2 PLATFORM 773.84 P-01.2 ASS-2 113.77 P-03 S&T MAINTENANCE 13.35 P-05 VRV TERRACE 33.86
KEY PLAN
CONCOURSE LEVEL EL +36.740 m PLATFORM LEVEL EL +43.490 m RAIL LEVEL EL +42.400 m 2 3 4 6 9 5 7 8 1 ROOF LEVEL. EL +48.740 m PLINTH LEVEL EL +25.490 m INTERMEDIATE LEVEL EL +31.740 m C/l 20804-02 B 16000 17000 18000 18000 18000 16000 16000 17000 P-01.1 ASS-1 P-02 UPS T-08 DB ROOM A-01 SCR CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-03 LVL -CONCOURSE TO PLATFORM Width -1000 mm Length -19191 mm ESC -10 LVL -INTERMEDIATE TO CONCOURSE Width -1000 mm Length -16160 mm ESC -08 LVL -PLINTH TO INTERMEDIATE Width -1000 mm Length -16160 mm ESC -04 STREET LVL TO CONCOURSE LVL Width = 2400 mm Tread = 300 mm Riser = 150.00 mm Steps = 72 STAIRCASE-02 FHC-15 FHC-16 FHC-17 LOW HEIGHT PLATFORM SCREEN GATE LOW HEIGHT PLATFORM SCREEN GATE 20804-01 A 20804-03 C 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL FHC-09 2100MM HIGH GLASS RAILING AS PER DETAIL LIFT-04 SEEN IN ELEVATION D-01.3 ELEC & S&T SHAFT SEEN IN ELEVATION T-09.2 TELECOM CLOSET SEEN IN ELEVATION D-08.3 DB CLOSET SEEN IN ELEVATION ENTRY/EXIT-02 SEEN IN ELEVATION DMFD & SECURITY CHECK TOM/EFO-02 IN ELEVATION ACCESS STAIRCASE-02 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 7 ACCESS STAIRCASE-01 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 7 PLATFORM -01.2 SEEN BEHIND 136000 ROAD LVL +24.653m ROAD LVL +25.061m ROAD LVL +25.104m ROAD LVL +25.064m ROAD LVL +25.219m ROAD LVL +24.693m ROAD LVL +24.306m ROAD LVL +24.009m ROAD LVL +25.232m GROUND LEVEL EL VARIES STEEL ROOF AS PER DETAIL LOUVERS TO DETAIL 6250 5000 6750 5250 1090 CONNECTING CORRIDOR TO ENTRY/EXIT-02 SEEN IN ELEVATION ESCALATOR CLOSURE SEEN IN ELEVATION PLATFORM -01.2 SEEN BEHIND 8940 FHC-08 BOH CORRIDOR E-03 UNPAID AREA E-02 PAID AREA 1750 mm 1750 1750 mm POWER HOUSE DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. 9)THIS DRAWING WILL BE REVISED ON FINALIZATION OF FINISHES AND ABOVE GROUND STRUCTURES. ✓ 1 250 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22 LONG SECTION BB POONAMALLE BYPASS METRO B MS SV SR 01.03.2022 RK PR SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20803-01 1 250 LONG SECTION BB B ROOM SCHEDULE - LONG SECTION B ROOM NO. ROOM NAME AREA(SQM) A-01 SCR 38.62 E-02 PAID AREA 893.79 E-03 UNPAID AREA 830.88 P-01.1 ASS-1 116.16 P-02 UPS 34.29 T-08 DB ROOM 14.12 KEY PLAN

LEGEND

CONCOURSE LEVEL EL +36.740 m PLATFORM LEVEL EL +43.490 m RAIL LEVEL EL +42.400 m 6 9 7 8 ROOF LEVEL. EL +48.740 m PLINTH LEVEL EL +25.490 m INTERMEDIATE LEVEL EL +31.740 m 18000 18000 18000 FHC-15 ACCESS STAIRCASE-02 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 7 STREET LVL TO CONCOURSE LVL Width = 2400 mm Tread = 300 mm Riser = 150.00 mm Steps = 72 STAIRCASE-02 LVL -PLINTH TO INTERMEDIATE Width -1000 mm Length -16160 mm ESC -04 LVL -INTERMEDIATE TO CONCOURSE Width -1000 mm Length -16160 mm ESC -08 GROUND LEVEL EL VARIES LOW HEIGHT PLATFORM SCREEN GATE ENTRY/EXIT-02 SEEN IN ELEVATION DMFD & SECURITY CHECK TOM/EFO-02 IN ELEVATION 2100MM HIGH GLASS RAILING AS PER DETAIL 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL 6250 5000 6750 5250 1090 RW GUTTER 300MMX300MM AS/SPECIFICATION W11 W9 2250 2820 9645 3150 4860 W11 W9 W12 W10 MATCHLINE REFER DRG. No. 20804-02 FD8 FD7 FHC-08 ROAD LVL +24.653m ROAD LVL +25.104m ROAD LVL +25.061m ROAD LVL +24.064m STEEL ROOF AS PER DETAIL 5315 3430 PLATFORM -01.2 SEEN BEHIND TVM ESCALATOR ENCLOSURE SEEN IN ELEVATION 2820 2100 CORRIDOR SEEN BEHIND CONNECTING CORRIDOR TO ENTRY/EXIT-02 SEEN IN ELEVATION F1,F2,F9 C5 +4.68m +36.740m E-03 UNPAID AREA 1750 mm 1750 mm POWER HOUSE 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE
F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting
plaster 6mm+1.52mm+6mm laminated toughened glass
W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22 LONG SECTION BB (PART A) POONAMALLE BYPASS METRO B MS SV SR 01.03.22 RK PR SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20804-01 1 100 LONG SECTION BB PART A A DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 - DOUBLE (900/900) FD2 1000 x 2100 2HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD4 1200 x 2100 1.5 HRS - SINGLE FD5 1000 x 2100 0.5HRS - SINGLE FD7 750 x 2100 1.5HRS 300 SINGLE FD8 750 x 2100 0.5HRS 300 SINGLE FD10 2400 x 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 x 2100 - - SINGLE GD2 1000 x 2100 2HRS - SINGLE RS1 2250 x 2700 - - SINGLE RS3 3000 x 2700 - - SINGLE ROOM SCHEDULE - LONG SECTION B - PART A ROOM NO. ROOM NAME AREA(SQM) E-03 UNPAID AREA 830.88 WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900 KEY PLAN
including
INTERIOR WALL FINISHING SCHEDULE
CONCOURSE LEVEL EL +36.740 m PLATFORM LEVEL EL +43.490 m RAIL LEVEL EL +42.400 m 3 4 6 5 ROOF LEVEL. EL +48.740 m PLINTH LEVEL EL +25.490 m INTERMEDIATE LEVEL EL +31.740 m C/l 17000 16000 17000 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL LIFT -04 SEEN IN ELEVATION D-01.3 ELEC& S&T SHAFT SEEN IN ELEVATION T-09.2 TELECOM CLOSET SEEN IN ELEVATION D-08.3 DB CLOSET SEEN IN ELEVATION FHC-09 LVL -CONCOURSE TO PLATFORM Width -1000 mm Length -19191 mm ESC -10 FHC-16 F10,F4,F3 C3 +2.80m +37.040m A-01 SCR GROUND LEVEL EL VARIES CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-03 FD7 LOW HEIGHT PLATFORM SCREEN GATE MATCHLINE MATCHLINE REFER DRG. No. 20804-01 REFER DRG. No. 20804-03 W11 W9 W11 W9 W11 W9 W7 W6 2800 4860 2820 3430 2250 2250 2900 2900 3060 9645 TOM/EFO-02 IN ELEVATION 6250 5000 6750 5250 ROAD LVL +25.064m ROAD LVL +24.693m ROAD LVL +24.306m ROAD LVL +25.219m W12 W10 2820 4860 STEEL ROOF AS PER DETAIL 5315 PLATFORM -01.2 SEEN BEHIND LOUVERS TO DETAIL 1090 2100 F1,F2,F9 C5 +6.50m +36.740m E-02 PAID AREA 1750 POWER HOUSE 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22
POONAMALLE BYPASS METRO B MS SV SR 01.03.22 RK PR SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20804-02
100
LONG SECTION BB (PART-B)
1
DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 - DOUBLE (900/900) FD2 1000 x 2100 2HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD4 1200 x 2100 1.5 HRS - SINGLE FD5 1000 x 2100 0.5HRS - SINGLE FD7 750 x 2100 1.5HRS 300 SINGLE FD8 750 x 2100 0.5HRS 300 SINGLE FD10 2400 x 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 x 2100 - - SINGLE GD2 1000 x 2100 2HRS - SINGLE RS1 2250 x 2700 - - SINGLE RS3 3000 x 2700 - - SINGLE WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900 ROOM SCHEDULE - LONG SECTION B - PART B ROOM NO. ROOM NAME AREA(SQM) A-01 SCR 38.62 E-02 PAID AREA 893.79 KEY PLAN
LONG SECTION BB PART B B

LONG SECTION BB PART-C POONAMALLE BYPASS METRO

CONCOURSE LEVEL EL +36.740 m PLATFORM LEVEL EL +43.490 m RAIL LEVEL EL +42.400 m 2 3 1 ROOF LEVEL. EL +48.740 m PLINTH LEVEL EL +25.490 m INTERMEDIATE LEVEL EL +31.740 m 16000 16000 6250 5000 6750 5250 1090 MATCHLINE REFER DRG. No. 20804-02 F5 C1 +4.86m +36.740m P-01.1 ASS-1 F5 C1 +4.86m +36.740m P-02 UPS F5 C1 +4.86m +36.740m T-08 DB ROOM F10,F4,F3 C3 +2.80m +37.040m A-01 SCR FHC-17 CONCOURSE LVL TO PLATFORM LVL Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-03 ACCESS STAIRCASE-01 LVL-Platform to Rail Lvl Width = 800 mm Tread = 210 mm Riser = 181.6 mm Steps = 7 FD4 FD1 RW GUTTER 300MMX300MM AS/SPECIFICATION LOW HEIGHT PLATFORM SCREEN GATE 1200MM HIGH RAILING WITH UPSTAND AS PER DETAIL W8 W3 W8 W3 W7 W6 2250 5315 4860 2800 4860 2820 2285 9645 W8 W3 ROAD LVL +24.306m ROAD LVL +25.232m ROAD LVL +24.009m W11 W9 GROUND LEVEL EL VARIES STEEL ROOF AS PER DETAIL PLATFORM -01.2 SEEN BEHIND LOUVERS TO DETAIL 3430 F1,F2,F9 C5 +6.50m +36.740m E-02 PAID AREA BOH CORRIDOR F6 C1 +36.740 m +4.86 m 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM
HOUSE CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high concrete skirting Concrete finish texture paint Laminated Glass cladding 25mm thick granite skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm Ht. finished with glazed vitrified tiles W14 HPL Partition FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 20mm thick Manufactured Quartz 30mm thick 600mm wide flamed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPB-20001.rvt A ISSUED FOR APPROVAL 17.03.21 B ISSUED FOR APPROVAL 01.03.22
POWER
B MS SV SR 01.03.22 RK PR SR SR MS MS DDC-P2C4-05-ARC-DR-POB-20804-03 1 100 LONG SECTION BB PART C C WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900 DOOR SCHEDULE DOOR TAGDIMENSIONS FIRE RATING SILLLEAF D6 1200 2100 - - SINGLE FD1 1800 2400 - DOUBLE (900/900) FD2 1000 2100 2HRS - SINGLE FD3 1500 2400 1.5HRS - DOUBLE (750/750) FD4 1200 2100 1.5 HRS - SINGLE FD5 1000 2100 0.5HRS - SINGLE FD7 750 2100 1.5HRS 300 SINGLE FD8 750 2100 0.5HRS 300 SINGLE FD10 2400 3000 1.5 HRS - DOUBLE (900/900) GD1 1000 2100 - - SINGLE GD2 1000 2100 2HRS - SINGLE RS1 2250 2700 - - SINGLE RS3 3000 2700 - - SINGLE ROOM SCHEDULE - LONG SECTION B - PART C ROOM NO. ROOM NAME AREA(SQM) A-01 SCR 38.62 E-02 PAID AREA 893.79 P-01.1 ASS-1 116.16 P-02 UPS 34.29 T-08 DB ROOM 14.12 KEY PLAN
18000 9 18000 7 8 UP 12 1 UP 31 DN -11 RAMPUP SLOPE1:12 UP 31 1 8 +24.890M ROAD +25.040M FOOTPATH +25.490M LOBBY-1 UP +26.740M LOBBY-2 6200 1016 MEP SHAFT LIFT LIFT VALVE CHAMBER AIR EXHAUST FRESHAIR INLET MANHOLE 20002500 A ACCESS HATCH 18000 7 8 MEP SHAFT -47 -35 -34 UP 5200 2000 DOMESTICTANK-01 SIZE-15KL DOMESTICTANK-02 SIZE-15KL A PUMPROOM 1016 9530 6200 2200 7500 5000 6335 2000 2840 2200 2350 FIRETANK-01 SIZE-50KLD FIRETANK-02 SIZE-50KLD SLOPE SUCTION PIT SUCTIONPIT 1200 AIR EXHAUST FRESHAIR INLET DRAIN PIT MANHOLE ACCESS HATCH LIFTPIT LIFTPIT 731 1174 1508 602 1600 2300 2000 VALVECHAMBER -6.000 F5 BOTTOMOF PUMPROOMLEVEL -6.000m(18.890m) ROADLEVEL ±0.000m(24.890m) -5.200m(19.690m) FOOTPATHLEVEL +0.150m BOTTOMOF FIRETANKLEVEL PLINTHLEVEL +0.600m 6000 3450 -47 -36 -35 -23 -11 -01 -12 2000 3450 3300 01 +25.940M 01 03 12 2000 +25.490M +25.040M 1200750 1700 3100 500 5600 800 200 900 FIRETANK-02 SIZE-50KLD 7500 900 750 500 200 FOOTHPATHLVL WATER INLET WATER OUTLET MIN 1200/VARIES DATE REV. BY REVISIONS DESCRIPTION CHKD APP. BYDETAILDESIGNCONSULTANT ISO A1 594mm x 841mm Printed on ___% Post-Consumer Recycled Content Paper Filename:D:\01-ProjectFolder\01-CORRIDOR-4\18-Land&StreetLevelPlanInXref\03-StationBox&Entry-Exit\18-SPB\01-PumproomDetail\2022.03m.03_SPB_PumpRoom-Updated.dwgMar04,202211:57amrk.moorthy APPROVEDBY DATE NoObjection NoObjectionSubjecttothe commentsasnoted RevisionandResubmissionRequired subjecttothecommentsasnoted APPROVEDBY CHECKEDBY DATE ThedesignanddrawingsascertifiedandsubmittedbytheDesigner havebeenreviewedandproofcheckedbyCMRL. NOOBJECTIONFROMCMRL REVIEWEDBY PROJECTTITLE DRAWINGNUMBER DRAWINGTITLE REV CHENNAIMETRORAILLTD. DETAILDESIGNCONSULTANT CHENNAIMETRORAILDETAILEDDESIGNCONSULTANCY PHASE-2,CORRIDOR-4,PACKAGE-5 CADFileName2022.03m.03_SPB_PumpRoom-Updated.dwg SCALE + ADMINISTRATIVEBUILDING,CMRLDEPOT,POONAMALLEEHIGHROAD,KOYAMBEDU,CHENNAI600107(INDIA) PreliminaryDesign DefinitiveDesign ConstructionReference GoodForConstruction DWGIssueRecord DWG Status CLIENT PackageNo P2C4/05 LEADDESIGN CHECKERCERTIFICATION FORTHEWORKSANDSERVICESOFTHEDETAILEDDESIGNANDDRAWINGSFOR THECIVIL,STRUCTURAL,ARCHITECTURAL,MEP,VAC&TRACKWORKSCOVERING THEALIGNMENT,ANDELEVATEDSECTIONFROMPIERAFTERMEENAKSHICOLLEGE UGSTATIONTOPOONAMALLEEBYE-PASS(CH10027.102TO25829.793),INCLUDING APPROACHTODEPOT&MAINTENANCEDEPOTATPOONAMALLEE. A 01.03.22 RK ISSUEDFORGCREVIEW MS SR RK MS SR 01.03.2022 PUMPROOMDETAIL POONAMALLEBYPASSMETRO DDC-P2C4-05-ARC-DR-POB-29301-01 A 1:100@A1 ü CHECKEDBYREVIEWEDBY PLAN@PUMPROOMLEVEL SCALE1:1002 PLAN@STREETLEVEL SCALE1:1001 SECTION-A SCALE1:1003 NOTES1)ALLLEVELSAREINMETERSANDDIMENSIONSAREINMILLIMETER. 2)GROUNDLEVELWHERESHOWN,AREINDICATIVE.ACTUALLEVELSSHALLBETAKENFROMSURVEY DRAWINGSANDSHALLBECONFIRMEDATSITE. 3)RCCDIMENSIONSOFEXTERNALELEMENTSAREINDICATIVEONLYANDSUBJECTTOSTRUCTURALDESIGN. 4)RAILLEVELSHOWNINARCHITECTURALDRAWINGISINDICATIVEONLY.ABSOLUTERAILLEVELSHALLBE DERIVEDFROMTHEALIGNEMENTDRAWING. 5)INFORMATIONONACTUALSIZEOFCUTOUTANDOPENINGSSHALLBEASPERE&MDESIGN. 6)ESCALATORANDLIFTSIZESAREINDICATIVEONLY,ANDFINALSIZESSHALLBEASPERMANUFACTURER'S REQUIREMENTASFINALIZEDBYCMRLANDTHEIRPITDRAINAGETOBEASPERE&MDRAWINGS. 7)REFERPLUMBINGDRAWINGSFORPLUMBINGANDDRAINAGELAYOUT. 8)ALLABOVEGROUNDSTRUCTURESTOBEDESIGNEDASPERDETAILEDARCHITECTURALDRAWINGS. 9)FORFINISHESREFERFINISHEDDRAWINGSANDTYPICALDETAILDRAWINGS. 10)THISDRAWINGWILLBEREVISEDONFINALIZATIONOFFINISHESANDABOVEGROUNDSTRUCTURES.
LEGEND CODE F5 DESCRIPTION 52mmHardoniteFlooringWithEpoxycoating SEC/ELENAME DRAWINGNUMBER CEILINGHEIGHT FROMFFL FLOORFINISH LEVEL CEILINGTYPE FLOORFINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOMNUMBER ROOMNAME 1 00000-00 SIM
SECTION@VALVECHAMBER SCALE1:75 4 FLOOR-CEILING&WALLFINISH

Sr.

DRAWING LIST

20 GFC-P2C4-05-ARC-DR-IYP-22232-01 ROOM SCHEDULE NTS A

21 GFC-P2C4-05-ARC-DR-IYP-22233-01 DOOR WINDOW SCHEDULE NTS A

22 GFC-P2C4-05-ARC-DR-IYP-22235-01 DOOR DETAIL (SHEET 01 OF 05) AS SHOWN A

23 GFC-P2C4-05-ARC-DR-IYP-22235-02 DOOR DETAIL (SHEET 02 OF 05) AS SHOWN A

24 GFC-P2C4-05-ARC-DR-IYP-22235-03 DOOR DETAIL (SHEET 03 OF 05) AS SHOWN A

25 GFC-P2C4-05-ARC-DR-IYP-22235-04 DOOR DETAIL (SHEET 04 OF 05) AS SHOWN A

26 GFC-P2C4-05-ARC-DR-IYP-22235-05 WINDOW DETAIL (SHEET 05 OF 05) AS SHOWN A

27 GFC-P2C4-05-ARC-DR-IYP-29301-01 PUMP ROOM DETAILS AS SHOWN A

DETAIL DESIGN CONSULTANT The General Concultant of CMRL has reviewed this drawing and has no objection for this to be used for construction . DESIGNED BY CHECKED BY APPROVED BY DATE BY DETAIL DESIGN CONSULTANT REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL PROJECT PHASE 2, CORRIDOR-4, CONTRACT NO. C4/ECV02 CONSTRUCTION OF ELEVATED METRO STATIONS AT PORUR BYPASS CROSSING METRO, THELLIYARAGARAM METRO,IYYAPANTHANGAL METRO,KATTUPAKKAM METRO,KUMANAN CHAVADI METRO,KARAYAN CHAVADI METRO,MULLAITHOTTAM METRO,POONAMALLEE METRO,POONAMALLEE BYPASS METRO & ASSOCIATED VIADUCT FROM CHAINAGE 17982.240 TO CHAINAGE.25928.186 AND APPROACH TO DEPOT AT POONAMALLEE AND ALL ASSOCIATED WORKS. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Contract No C4/ECV02 DWG Issue Record REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. Good For Construction ✓ @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SID-20001.rvt A ISSUED FOR SUBMISSION 12.08.2022 DRAWING LIST IYYAPANTHANGAL METRO A MS NP SR 13.01.2022 NS SR MS GFC-P2C4-05-ARC-DR-IYP-20001-01
No. Drawing Number Drawing Name Scale RevisionRemarks
GFC-P2C4-05-ARC-DR-IYP-20001-01 DRAWING LIST NTS A 2 GFC-P2C4-05-ARC-DR-IYP-20101-01 STREET PLAN 1:300 A
GFC-P2C4-05-ARC-DR-IYP-20102-01 STREET LEVEL PLAN (PART A) 1:200 A
GFC-P2C4-05-ARC-DR-IYP-20102-02 STREET LEVEL PLAN (PART B) 1:200 A 5 GFC-P2C4-05-ARC-DR-IYP-20201-01 CONCOURSE LEVEL PLAN 1:300 A
GFC-P2C4-05-ARC-DR-IYP-20202-01 CONCOURSE LEVEL PLAN (PART A) 1:100 A 7 GFC-P2C4-05-ARC-DR-IYP-20202-02 CONCOURSE LEVEL PLAN (PART B) 1:100 A 8 GFC-P2C4-05-ARC-DR-IYP-20301-01 PLATFORM LEVEL PLAN 1:300 A 9 GFC-P2C4-05-ARC-DR-IYP-20302-01 PLATFORM LEVEL PLAN (PART A) 1:100 A 10 GFC-P2C4-05-ARC-DR-IYP-20302-02 PLATFORM LEVEL PLAN (PART B) 1:100 A 11 GFC-P2C4-05-ARC-DR-IYP-20302-03 PLATFORM LEVEL PLAN (PART C) 1:100 A 12 GFC-P2C4-05-ARC-DR-IYP-20401-01 ROOF LEVEL PLAN 1:300 A 13 GFC-P2C4-05-ARC-DR-IYP-20801-01 LONG SECTION A 1:300 A 14 GFC-P2C4-05-ARC-DR-IYP-20802-01 LONG SECTION A (PART A) 1:100 A 15 GFC-P2C4-05-ARC-DR-IYP-20802-02 LONG SECTION A (PART B) 1:100 A 16 GFC-P2C4-05-ARC-DR-IYP-20802-03 LONG SECTION A (PART C) 1:100 A 17 GFC-P2C4-05-ARC-DR-IYP-20901-01 CROSS SECTION B 1:100 A 18 GFC-P2C4-05-ARC-DR-IYP-20902-01 CROSS
1:100
1
3
4
6
SECTION C
A
CROSS
19 GFC-P2C4-05-ARC-DR-IYP-20903-01
SECTION D 1:100 A
DN DNDN UP UP 10 9 8 7 6 3 C/L C 5 4 C 20902-01 B 20901-01 11 12 E B D 20202-01 1 20202-02 1 19250 19250 19250 9750 9750 19250 19250 19250 15000 15000 A 20801-01 D 20903-01 ENTRY GATES BAGGAGE & SECURITY CHECK ROOF PROFILE ABOVE ROOF PROFILE ABOVE ROOF PROFILE ABOVE ROOF PROFILE ABOVE ROOF PROFILE ROOF PROFILE ROOF PROFILE ROOF PROFILE LIFT-03 2 1 O-13 STAFF ROOM O-09 TOILET (P) EXIT GATES O-04 RETAIL AREA O-14 SECURITY 15000 15000 O-08.1 TOILET (M) O-08.2 TOILET (F) UNPAID CORRIDOR UNPAID CORRIDOR D-04.3 DB CLOSET LIFT-02 O-02 UNPAID AREA LIFT-01 TRACK CENTER 12000 FHC-01 A 25006000 60002500 17000 O-03 PAID AREA D-04.2 ELEC & S&T SHAFT FLOOR CUTOUT ON PLATFORM 1 22200-01 1 22250-02 1 22250-03 1 22250-04 1 22002-01 22002-01 1 29504-01 1 22052-01 1 22106-01 22104-01 22102-02 22201-01 1 22200-01 Ground level to concourse level Width = 2400 mm Tread = 300 mm Riser = 150.00 mm Steps = 48 STAIRCASE-02 Ground level to concourse level Width 2400 mm Tread 300 mm Riser = 150.00 mm Steps = 48 STAIRCASE-01 D-1.1 PHE & FF SHAFT D-04.1 ELEC. & S&T SHAFT D-01.2 PHE & FF SHAFT 3570 3100 5270 4700 4000 4850 3340 2200 6700 6270 195000 +26.240 m +26.240 m +26.240 m +26.240 m FHC-04 Concourse Level to Platform Level Width = 3550 mm Tread 300 mm Riser = 150.00 mm Steps 42 Staircase-04 Concourse Level to Platform Level Width = 3550 mm Tread = 300 mm Riser = 150.00 mm Steps = 42 Staircase-03 P-04.2 DB CLOSET D-01.3 PHE&FF SHAFT 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL 9645 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL EL-02 22250-02 EL-01 22250-01 D-03.1 RWP SHAFT P-04.1 DB CLOSET A-02 EFO/TOM 11180 1500 2900 12390 LVL -Ground level to Concourse level Width -1000 mm Length -19607 mm ESC -ESCALATOR-02 LVL -Concourse level to Platform level Width -1000 mm Length -18412 mm ESC -03 2100MM GLASS PARTITION AS PER DETAIL FHC DISTANCE 34412 LVL -Concourse level to Platform level Width -1000 mm Length -18412 mm ESC -04 LVL -CONCOURSE TO PLATFORM Width -1000 mm Length -19607 mm ESC -ESCALATOR-01 1700 5270 8320 FRISKING BOOTH FHC-02 FHC-01 FHC-05 FHC-03 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL CUTOUT ABOVE 6820 5330 5770 3110 FHC DISTANCE 20940 FACADE TO DETAIL FACADE TO DETAIL O-11 CLEANERS ROOM 13690 F H C D S T A N C E 22116 TVM TAP-OFF BOX TAP-OFF BOX POWER HOUSE POONAMALLEE BYPASS DETAIL DESIGN CONSULTANT The General Concultant of CMRL has reviewed this drawing and has no objection for this to be used for construction . DESIGNED BY CHECKED BY APPROVED BY DATE BY DETAIL DESIGN CONSULTANT REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL PROJECT PHASE 2, CORRIDOR-4, CONTRACT NO. C4/ECV02 CONSTRUCTION OF ELEVATED METRO STATIONS AT PORUR BYPASS CROSSING METRO, THELLIYARAGARAM METRO,IYYAPANTHANGAL METRO,KATTUPAKKAM METRO,KUMANAN CHAVADI METRO,KARAYAN CHAVADI METRO,MULLAITHOTTAM METRO,POONAMALLEE METRO,POONAMALLEE BYPASS METRO & ASSOCIATED VIADUCT FROM CHAINAGE 17982.240 TO CHAINAGE.25928.186 AND APPROACH TO DEPOT AT POONAMALLEE AND ALL ASSOCIATED WORKS. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Contract No C4/ECV02 DWG Issue Record REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. Good For Construction ✓ 1 300 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SID-20001.rvt A ISSUED FOR SUBMISSION 12.08.2022 CONCOURSE LEVEL PLAN IYYAPANTHANGAL METRO A MS NP SR 12.08.2022 KJ SR MS
1 300 CONCOURSE LEVEL 1 ROOM SCHEDULE_CONCOURSE ROOM NO. ROOM NAME AREA(SQM) A-02 EFO/TOM 18.25 D-1.1 PHE & FF SHAFT 0.96 D-01.2 PHE & FF SHAFT 0.70 D-01.3 PHE&FF SHAFT 1.11 D-03.1 RWP SHAFT 0.74 D-04.1 ELEC. & S&T SHAFT 1.28 D-04.2 ELEC & S&T SHAFT 0.72 D-04.3 DB CLOSET 1.11 O-02 UNPAID AREA 767.05 O-03 PAID AREA 614.38 O-04 RETAIL AREA 96.19 O-08.1 TOILET (M) 17.78 O-08.2 TOILET (F) 17.64 O-09 TOILET (P) 7.11 O-11 CLEANERS ROOM 16.34 O-13 STAFF ROOM 33.51 O-14 SECURITY 10.37 P-04.1 DB CLOSET 4.58 P-04.2 DB CLOSET 9.22 N
GFC-P2C4-05-ARC-DR-IYP-20201-01

CONCOURSE LEVEL PLAN (PART A)

IYYAPANTHANGAL METRO

GFC-P2C4-05-ARC-DR-IYP-20202-01

48 47 46 45 44 43 42 41 40 39 38 37 3635343332313029282726 DN UP POWER HOUSE
BYPASS 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 30mm thick Manufactured Quartz 20mm thick honed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high cement skirting Concrete finish texture paint Laminated Glass cladding 20mm thick Granite Skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm ht. finished with glazed vitrified tiles 6 C/L C 5 4 C 20902-01 E B D REFER DRG. No. 20202-02 A 20801-01 2500 6000 6000 TRACK CENTRE= 12000 EXIT GATES BAGGAGE SCANNER AND SECURITY CHECK FRISKING BOOTH 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL ROOF PROFILE ROOF PROFILE TVM O-04 RETAIL AREA ENTRY GATES 22201-04 LIFT-02 MATCHLINE A F1,F2,F9 C5 +4.41m +26.240m O-02 UNPAID AREA 2500 17000 F1,F2,F9 C5 +4.41m +26.240m O-03 PAID AREA W11 W9 FLOOR DRAIN Ground level to concourse level Width = 2400 mm Tread = 300 mm Riser = 150.00 mm Steps = 48 STAIRCASE-01 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL F7 C5 +4.41m +26.240m O-14 SECURITY Concourse Level to Platform Level Width = 3550 mm Tread = 300 mm Riser = 150.00 mm Steps = 42 Staircase-03 FD7 FD8 3570 14253 Q.LENGTH 2400 D-04.1 ELEC. & S&T SHAFT D-1.1 PHE & FF SHAFT UNPAID CORRIDOR W7 W6 W10 W12 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL Q.LENGTH 4000 Q.LENGTH 2400 8320 550 8900 1600 1200 800 LIFT-03 900 550 550 5330 640 Q.LENGTH 4000 1980 2100mm HIGH PARTITION 1200M WIDE SWING GATE 3882 12785 2575 1975 STEEL COLUMN FOR ROOF SUPPORT STEEL ROOF AS/STRUCTURAL DETAIL F1,F2,F9 C5 +4.41m +26.240m O-02 UNPAID AREA 6725 6725 F1,F2,F9 C5 +4.41m +26.240m O-02 UNPAID AREA 11265 4245 8280 3265 3004 1500 FHC-02 3660 W7 W6 F3,F7,F10 C5 +2.40m +26.240m A-02 EFO/TOM FACADE TO DETAIL RAILING CLOSURE BELOW ESCALATOR AS PER DETAIL CONCOURSE SEATING 50MM EXPANSION JOINT 797 1703 1600 1950 D2 FD5 W2 615 590 W2 200 50MM EXPANSION JOINT 50MM EXPANSION JOINT 50MM EXPANSION JOINT 9754 FACADE TO DETAIL CONCOURSE SEATING 2670 3105 6060 7900 1590 5990 W6 W7 1835 Q.LENGTH 2400 Q.LENGTH 2400 3100 UP UP GD1 2060 2450 19250 9750 19250 Q.LENGTH 8000 19250 CONCOURSE DRAIN 200 200 13690 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL FACADE TO DETAIL 1600 650 SEATING ESCALATOR CLOSURE RAILING TO DETAIL Q L E N G T H 2400 135 000° F5 C1 +2.40m +26.240m P-04.1 DB CLOSET 4065 300 550 2455 UNPAID CORRIDOR 520 1975 2575 6800 6800LVL -CONCOURSE TO PLATFORM Width -1000 mm Length -19607 mm ESC -ESCALATOR-01 TAP-OFF BOX TAP-OFF BOX DETAIL DESIGN CONSULTANT The General Concultant of CMRL has reviewed this drawing and has no objection for this to be used for construction . DESIGNED BY CHECKED BY APPROVED BY DATE BY DETAIL DESIGN CONSULTANT REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL PROJECT PHASE 2, CORRIDOR-4, CONTRACT NO. C4/ECV02 CONSTRUCTION OF ELEVATED METRO STATIONS AT PORUR BYPASS CROSSING METRO, THELLIYARAGARAM METRO,IYYAPANTHANGAL METRO,KATTUPAKKAM METRO,KUMANAN CHAVADI METRO,KARAYAN CHAVADI METRO,MULLAITHOTTAM METRO,POONAMALLEE METRO,POONAMALLEE BYPASS METRO & ASSOCIATED VIADUCT FROM CHAINAGE 17982.240 TO CHAINAGE.25928.186 AND APPROACH TO DEPOT AT POONAMALLEE AND ALL ASSOCIATED WORKS. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Contract No C4/ECV02 DWG Issue Record REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. Good For Construction ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SID-20001.rvt A ISSUED FOR SUBMISSION 12.08.2022
POONAMALLEE
A MS NP SR 12.08.2022 NS SR MS
DOOR SCHEDULE DOOR TAG DIMENSIONS FIRE RATING SILL LEAF D1 1000 x 2100 3HRS - SINGLE D2 1000 x 2100 - SINGLE D3 750 x 1800 - 300 SINGLE D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 2HRS - DOUBLE (900/900) FD2 1000 x 2100 2 HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD5 1000 x 2100 0.5HRS - SINGLE FD6 FD7 750 x 1800 1.5HRS 300 SINGLE FD8 750 x 1800 0.5HRS 300 SINGLE FD10 2400 x 3000 2 HRS - DOUBLE (900/900) FD11 FD12 GD1 1000 x 2100 - - SINGLE GD2 1200 x 2400 2HRS SINGLE RS-01 2250 x 2700 - -RS-02 1600 x 2700 - -RS-03 3000 x 2700 - -1 100 CONCOURSE LEVEL (PART A) 1 KEY PLAN ROOM SCHEDULE_CON-PART A ROOM NO. ROOM NAME AREA(SQM) D-1.1 PHE & FF SHAFT 0.96 D-04.1 ELEC. & S&T SHAFT 1.28 O-02 UNPAID AREA 767.05 O-03 PAID AREA 614.38 O-04 RETAIL AREA 96.19 O-14 SECURITY 10.37 N WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900

CONCOURSE LEVEL PLAN (PART B)

IYYAPANTHANGAL METRO

GFC-P2C4-05-ARC-DR-IYP-20202-02

UP UP DN 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 8 7 6 C/L C 5 C 20902-01 B 20901-01 E B D REFER DRG. No. 20202-01 A 20801-01 2500 6000 6000 2500 TRACK CENTRE= 12000 EXIT GATES BAGGAGE SCANNER AND SECURITY CHECK FRISKING BOOTH D-04.3 DB CLOSET FD7 FD8 FACADE AS PER DETAIL TVM ENTRY GATES 1 22201-04 F7 C2 +3.00m +26.240m O-13 STAFF ROOM F7,F10 C2 +2.40m +26.240m O-08.1 TOILET (M) F7,F10 C2 +2.40m +26.240m O-08.2 TOILET (F) A F1,F2,F9 C5 +4.41m +26.240m O-03 PAID AREA W11 W9 FLOOR DRAIN MATCHLINE Concourse Level to Platform Level Width = 3550 mm Tread = 300 mm Riser = 150.00 mm Steps = 42 Staircase-03 W10 W12 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL Q.LENGTH 4000 Q.LENGTH 2400 8320 550 8900 FHC-01 LIFT-02 D-04.2 ELEC & S&T SHAFT D-01.2 PHE & FF SHAFT FD7 Q LENGTH 2400 W6 W13 W5 W5 W5 1200 2400 2250 2500 2000 1400 1800 1300 2200 3340 D6 200 FD5 FD5 6700 LIFT-03 900 550 550 FHC-04 D3 RAILING CLOSURE BELOW ESCALATOR AS PER DETAIL Concourse Level to Platform Level Width = 3550 mm Tread = 300 mm Riser = 150.00 mm Steps = 42 Staircase-04 F5 C1 +3.20m +26.240m P-04.2 DB CLOSET 1800 5330 640 W3 W8 1980 25751975 5506 1600 650 1207 1168 600 F1,F2,F9 C5 +4.41m +26.240m O-02 UNPAID AREA D-01.3 PHE&FF SHAFT W1 V1 V1 W2 2100mm HIGH PARTITION 1200M WIDE SWING GATE EXHAUST AIR CUTOUT 300X300mm (SILL HT=3200mm) 6725 6725 575 1187 1188 600 1240 F1,F2,F9 C5 +4.41m +26.240m O-02 UNPAID AREA 5705 3100 5270 4850 4700 4000 D-03.1 RWP SHAFT FHC-02 3660 F3,F7,F10 C5 +2.40m +26.240m A-02 EFO/TOM RAILING CLOSURE BELOW ESCALATOR AS PER DETAIL CONCOURSE SEATING 50MM EXPANSION JOINT 797 1703 1600 1950 50MM EXPANSION JOINT 50MM EXPANSION JOINT 9754 CONCOURSE SEATING 2670 3105 6060 7900 1590 5990 W6 W7 1835 Q.LENGTH 2400 Q.LENGTH 2400 3100 UP UP GD1 2060 2450 1600 1650 850 4395 D2 5270 LVL -Concourse level to Platform level Width -1000 mm Length -18412 mm ESC -04 LVL -Concourse level to Platform level Width -1000 mm Length -18412 mm ESC -03 CUTOUT ABOVE FLOOR TRAP 3540 2730 200 4070 1200 200 200 D1 D1 Q.LENGTH 8000 1900 WATER DISPENSER 400 19250 19500 19250 W11 W9 W10 W9 F5 C1 +3.20m +26.240m P-04.2 DB CLOSET F6 C5 +2.41m +26.240m O-11 CLEANERS ROOM LVL -Ground level to Concourse level Width -1000 mm Length -19607 mm ESC -ESCALATOR-02 Q LENGTH 8000 CONCOURSE DRAIN CONCOURSE DRAIN 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL FACADE TO DETAIL SEATING Q L E N G T H 2400 4065 300 550 1000 1180 2250 2960 UNPAID CORRIDOR 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL CORRIDOR 2960 520 1975 2575 6800 6800 1240 6565 2200 2335 2950 240050MM EXPANSION JOINT 1150 1510 6430 190 3520 EXHAUST AIR CUTOUT 420X320mm (SILL HT=3200mm) F7,F10 C2 +2.40m +26.240m O-09 TOILET (P) TAP-OFF BOX TAP-OFF BOX 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE
F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 30mm thick Manufactured Quartz 20mm thick honed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high cement skirting Concrete finish texture paint Laminated Glass cladding 20mm thick Granite Skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm ht. finished with glazed vitrified tiles POWER HOUSE POONAMALLEE BYPASS 5 Ground level to concourse level Width = 2400 mm Tread = 300 mm Riser = 150.00 mm Steps = 48 STAIRCASE-02 LVL -Ground level to Concourse level Width -1000 mm Length -19607 mm ESC -ESCALATOR-02 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL CORRIDOR 2960 DETAIL DESIGN CONSULTANT The General Concultant of CMRL has reviewed this drawing and has no objection for this to be used for construction . DESIGNED BY CHECKED BY APPROVED BY DATE BY DETAIL DESIGN CONSULTANT REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL PROJECT PHASE 2, CORRIDOR-4, CONTRACT NO. C4/ECV02 CONSTRUCTION OF ELEVATED METRO STATIONS AT PORUR BYPASS CROSSING METRO, THELLIYARAGARAM METRO,IYYAPANTHANGAL METRO,KATTUPAKKAM METRO,KUMANAN CHAVADI METRO,KARAYAN CHAVADI METRO,MULLAITHOTTAM METRO,POONAMALLEE METRO,POONAMALLEE BYPASS METRO & ASSOCIATED VIADUCT FROM CHAINAGE 17982.240 TO CHAINAGE.25928.186 AND APPROACH TO DEPOT AT POONAMALLEE AND ALL ASSOCIATED WORKS. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Contract No C4/ECV02 DWG Issue Record REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. Good For Construction ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SID-20001.rvt A ISSUED FOR SUBMISSION 12.08.2022
LEGEND
A MS NP SR 12.08.2022 NS SR MS
1 : 100 CONCOURSE LEVEL (PART B) 1 DOOR SCHEDULE DOOR TAG DIMENSIONS FIRE RATING SILL LEAF D1 1000 x 2100 3HRS - SINGLE D2 1000 x 2100 - SINGLE D3 750 x 1800 - 300 SINGLE D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 2HRS - DOUBLE (900/900) FD2 1000 x 2100 2 HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD5 1000 x 2100 0.5HRS - SINGLE FD6 FD7 750 x 1800 1.5HRS 300 SINGLE FD8 750 x 1800 0.5HRS 300 SINGLE FD10 2400 x 3000 2 HRS - DOUBLE (900/900) FD11 FD12 GD1 1000 x 2100 - - SINGLE GD2 1200 x 2400 2HRS SINGLE RS-01 2250 x 2700 - -RS-02 1600 x 2700 - -RS-03 3000 x 2700 - - -
PLAN ROOM SCHEDULE_CON-PART B ROOM NO. ROOM NAME AREA(SQM) D-01.3 PHE&FF SHAFT 1.11 D-04.3 DB CLOSET 1.11 O-02 UNPAID AREA 767.05 O-03 PAID AREA 614.38 O-08.1 TOILET (M) 17.78 O-08.2 TOILET (F) 17.64 O-09 TOILET (P) 7.11 O-11 CLEANERS ROOM 16.34 O-13 STAFF ROOM 33.51 P-04.2 DB CLOSET 9.22 N 1 : 100 CONCOURSE LEVEL 2 WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900
KEY
10 9 8 7 6 3 C/L C 5 4 C 20902-01 B 20901-01 11 12 E B D TRACK CENTRE = 12000 25006000 6000 (PLATFORM LENGTH) 135000 19250 19250 19250 19500 19250 19250 19250 15000 15000 A 20801-01 D 20903-01 ACCESS STAIRCASE-01 LVL-Platform to Rail lvl Width = 775 mm Tread 210 mm Riser = 181.71 mm Steps 7 SERVICE CORRIDOR SERVICE CORRIDOR LIFT-03 SERVICE CORRIDOR SERVICE CORRIDOR +32.540 m ACCESS STAIRCASE-02 LVL-Platform to Rail lvl Width = 720 mm Tread 210 mm Riser = 181.71 mm Steps 7 20302-01 1 20302-02 1 20302-03 1 2 1 C-02 CER P-01 ASS 1 15000 15000 D-04.3 DB CLOSET P-10.1 TELECOM CLOSET D-04.1 REFRIGERANT PIPE SHAFT A 1 22052-01 22056-01 1 22002-01 DN DN LOW HT. PSG LOW HT. PSG 1 22002-01 LOW HT. PSG LOW HT. PSG P-02 ASS 2 22103-01 2500 D-03.2 RWP SHAFT Concourse Level to Platform Level Width 3550 mm Tread = 300 mm Riser 150.00 mm Steps = 42 Staircase-03 Concourse Level to Platform Level Width = 3550 mm Tread = 300 mm Riser = 150.00 mm Steps = 42 Staircase-04 P-06 ELECTRICAL ROOM A-01 SCR O-19 COMMON MAINTANANCE 1 22105-01 FHC-08 O-18.2 PLATFORM-02 ACCESS STAIRCASE-03 LVL-Platform to Rail lvl Width = 755 mm Tread = 210 mm Riser = 181.71 mm Steps 7 ACCESS STAIRCASE-04 LVL-Platform to Rail lvl Width = 755 mm Tread = 210 mm Riser = 181.71 mm Steps 7 +32.540 m P-03 UPS ROOM FHC-07 FHC-09 T-10.2 TELECOM CLOSET 6985 8408 5162 6781 5310 7820 3440 2000 1770 1870 10540 3420 2105 2105 2942 2942 2540 2540 5400 15600 D-01.3 PHE&FF SHAFT 22101-01 O-18.1 PLATFORM-01 +32.540 m D-03.1 RWP SHAFT D-03.3 RWP SHAFT D-04.3 DB CLOSET P-12.1 GAS CLOSET P-12.3 GAS CLOSET O-17 SPARE ROOM 4040 3 5 7 5 2000 4350 2340 990 3623 2440 2800 2350 2440 4520 3440 1275 1825 1825 1275 FHC-11 LVL -Concourse level to Platform level Width -1000 mm Length -18412 mm ESC -03 LVL -Concourse level to Platform level Width -1000 mm Length -18412 mm ESC -04 1275 1825 FHC DISTANCE 45675 FHC DISTANCE 36724 FHC DISTANCE 42201 P-09 BTR C-01 SER P-12.2 GAS CLOSET 1825 900 195000 ACCESS HATCH FOR LADDER EQUIPMENT ACCESS HATCH ACCESS HATCH FOR LADDER EQUIPMENT ACCESS HATCH EMERGENCY PLUNGER EMERGENCY PLUNGER POWER HOUSE POONAMALLEE BYPASS 3 CAR COACH 6 CAR COACH DETAIL DESIGN CONSULTANT The General Concultant of CMRL has reviewed this drawing and has no objection for this to be used for construction . DESIGNED BY CHECKED BY APPROVED BY DATE BY DETAIL DESIGN CONSULTANT REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL PROJECT PHASE 2, CORRIDOR-4, CONTRACT NO. C4/ECV02 CONSTRUCTION OF ELEVATED METRO STATIONS AT PORUR BYPASS CROSSING METRO, THELLIYARAGARAM METRO,IYYAPANTHANGAL METRO,KATTUPAKKAM METRO,KUMANAN CHAVADI METRO,KARAYAN CHAVADI METRO,MULLAITHOTTAM METRO,POONAMALLEE METRO,POONAMALLEE BYPASS METRO & ASSOCIATED VIADUCT FROM CHAINAGE 17982.240 TO CHAINAGE.25928.186 AND APPROACH TO DEPOT AT POONAMALLEE AND ALL ASSOCIATED WORKS. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Contract No C4/ECV02 DWG Issue Record REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. Good For Construction ✓ As indicated @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SID-20001.rvt A ISSUED FOR SUBMISSION 12.08.2022 PLATFORM LEVEL PLAN IYYAPANTHANGAL METRO A MS NP SR 12.08.2022 NS SR MS GFC-P2C4-05-ARC-DR-IYP-20301-01 1 300 PLATFORM LEVEL 1 N ROOM SCHEDULE_PLATFORM ROOM NO. ROOM NAME AREA(SQM) A-01 SCR 32.97 C-01 SER 33.95 C-02 CER 40.58 D-03.1 RWP SHAFT 0.71 D-03.2 RWP SHAFT 0.60 D-03.3 RWP SHAFT 1.46 D-04.1 REFRIGERANT PIPE SHAFT1.46 D-04.3 DB CLOSET 3.44 O-17 SPARE ROOM 7.27 O-18.1 PLATFORM-01 479.52 O-18.2 PLATFORM-02 481.96 O-19 COMMON MAINTANANCE 31.30 P-01 ASS 1 71.99 P-02 ASS 2 78.52 P-03 UPS ROOM 32.78 P-06 ELECTRICAL ROOM 14.96 P-09 BTR 6.88 P-10.1 TELECOM CLOSET 3.74 P-12.1 GAS CLOSET 1.22 P-12.2 GAS CLOSET 3.60 P-12.3 GAS CLOSET 1.40 T-10.2 TELECOM CLOSET 5.74 10) ALL SOD REQUIREMENTS HAVE BEEN COMPLIED WITH REFERENCE TO DOCUMENT "SCHEDULE OF DIMENSIONS FOR STANDARD GUAGE-CHENNAIL METRO RAIL, MARCH 2013"
CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high cement skirting Concrete finish texture paint Laminated Glass cladding 20mm thick Granite Skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm ht. finished with glazed vitrified tiles FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 30mm thick Manufactured Quartz 20mm thick honed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM 3 C 4 E B D MATCHLINE REFER DRG. No. 20302-02 19250 A 20801-01 W3 W8 WICKET GATE WICKET GATE TRACK CENTRE LINE LOW HEIGHT P.S.G TRACK CENTRE LINE LOW HEIGHT P.S.G FLOOR TRAP W8 W3 W6 W12 W6 W7 ACCESS STAIRCASE-01 LVL-Platform to Rail lvl Width = 775mm Tread = 210 mm Riser = 181.71 mm Steps = 7 ACCESS STAIRCASE-02 LVL-Platform to Rail lvl Width = 720 mm Tread = 210 mm Riser = 181.71 mm Steps = 7 1 22201-04 22201-04 SERVICE CORRIDOR F6 +32.54 m SERVICE CORRIDOR F6 +32.54 m 2 1 A 17000 F7 C5 +4.28m +32.540m O-19 COMMON MAINTANANCE F3,F4 C5 +3.98m +32.840m C-02 CER F7 C5 +4.28m +32.540m O-17 SPARE ROOM F5 C4 +4.28m +32.540m P-10.1 TELECOM CLOSET F3,F4,F10 C3 +2.40m +32.840m A-01 SCR F1,F2,F9 C4 +5.25m +32.540m O-18.2 PLATFORM-02 D-04.1 REFRIGERANT PIPE SHAFT W7 1 22250-03 FD8 D3 FD5 W9 W11 FD3 FD3 W6 W7 W6 W7 W6 W7 W6 W7 W6 W7 PRD CUTOUT 170X170mm (SILL HEIGHT=2860mm) FRESH AIR CUTOUT 175X175mm (SILL HEIGHT=2855mm) UP UP UP 15000 15000 1 22300-01 1 22300-02 22300-01 22300-02 2500 6000 6000 2500 TRACK CENTER= 12000 W3 W8 8408 4820 5160 5325 6780 7820 300 2700 1200 300 2100 200 2100 1200 300 200 3440 2000 1770 1870 FHC-07 1620 1620 1600 1190 300 10540 3420 F1,F2,F9 C4 +5.25m +32.540m O-18.1 PLATFORM-01 F5 C1 +4.28m +32.540m P-03 UPS ROOM 6995 W2 6690 280 320 2110 2565 2595 2700 200 900 1 8 2 5 1825 3840 2560 1520 1620 1 4 1 2 1 3 1 5 1 2 8 5 1276 FACADE WITH PERFORATED PANELS AS/DETAIL FACADE WITH PERFORATED PANELS AS/DETAIL D-03.3 RWP SHAFT 1300 935 200 EXHAUST CUTOUT 175X175mm (SILL HEIGHT=2855mm) W7 W6 3625 995 4345 775 275 995 2200 200 3825 W6 W7 2000 2800 2440 FD2 1000 1400 P-12.1 GAS CLOSET P-12.3 GAS CLOSET FD5 FD1 GD2 2560 DEMOUNTABLE PANEL FOR EQUIPMENT ACCESS DEMOUNTABLE PANEL FOR EQUIPMENT ACCESS PRD CUTOUT 175X175mm (SILL HEIGHT=2855mm) 2075 1590 1525 4040 3 5 7 5 4675 F3,F4 C5 +3.98m +32.840m C-01 SER F5 C1 +4.28m +32.540m P-09 BTR 1115 1480 1720 3575 1500 P-12.2 GAS CLOSET 1275 FRESH AIR CUTOUT -300X200 SILL HEIGHT-2505 650 200 MEP/S&T FLOOR CUTOUT AS PER DETAIL MEP/S&T FLOOR CUTOUT AS PER DETAIL 2475 3200 900 900 EQUIPMENT ACCESS HATCH ACCESS HATCH EXHAUST CUTOUT 170X170mm (SILL HEIGHT=2855mm) W6 W7 EMERGENCY PLUNGER POWER HOUSE POONAMALLEE BYPASS 3 CAR COACH 6 CAR COACH DETAIL DESIGN CONSULTANT The General Concultant of CMRL has reviewed this drawing and has no objection for this to be used for construction . DESIGNED BY CHECKED BY APPROVED BY DATE BY DETAIL DESIGN CONSULTANT REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL PROJECT PHASE 2, CORRIDOR-4, CONTRACT NO. C4/ECV02 CONSTRUCTION OF ELEVATED METRO STATIONS AT PORUR BYPASS CROSSING METRO, THELLIYARAGARAM METRO,IYYAPANTHANGAL METRO,KATTUPAKKAM METRO,KUMANAN CHAVADI METRO,KARAYAN CHAVADI METRO,MULLAITHOTTAM METRO,POONAMALLEE METRO,POONAMALLEE BYPASS METRO & ASSOCIATED VIADUCT FROM CHAINAGE 17982.240 TO CHAINAGE.25928.186 AND APPROACH TO DEPOT AT POONAMALLEE AND ALL ASSOCIATED WORKS. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Contract No C4/ECV02 DWG Issue Record REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. Good For Construction ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SID-20001.rvt A ISSUED FOR SUBMISSION 12.08.2022
A MS NP SR 12.08.2022 NS SR MS
DOOR SCHEDULE DOOR TAG DIMENSIONS FIRE RATING SILL LEAF D1 1000 x 2100 3HRS - SINGLE D2 1000 x 2100 - SINGLE D3 750 x 1800 - 300 SINGLE D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 2HRS - DOUBLE (900/900) FD2 1000 x 2100 2 HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD5 1000 x 2100 0.5HRS - SINGLE FD6 FD7 750 x 1800 1.5HRS 300 SINGLE FD8 750 x 1800 0.5HRS 300 SINGLE FD10 2400 x 3000 2 HRS - DOUBLE (900/900) FD11 FD12 GD1 1000 x 2100 - - SINGLE GD2 1200 x 2400 2HRS SINGLE RS-01 2250 x 2700 - -RS-02 1600 x 2700 - -RS-03 3000 x 2700 - -1 100 PLATFORM LEVEL (PART A) 1 KEY PLAN ROOM SCHEDULE_PLAT-PART A ROOM NO. ROOM NAME AREA(SQM) A-01 SCR 32.97 C-02 CER 40.58 D-03.3 RWP SHAFT 1.46 D-04.1 REFRIGERANT PIPE SHAFT 1.46 O-17 SPARE ROOM 7.27 O-18.1 PLATFORM-01 479.52 O-18.2 PLATFORM-02 481.96 O-19 COMMON MAINTANANCE 31.30 P-03 UPS ROOM 32.78 P-10.1 TELECOM CLOSET 3.74 N WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900 10) ALL SOD REQUIREMENTS HAVE BEEN COMPLIED WITH REFERENCE TO DOCUMENT "SCHEDULE OF DIMENSIONS FOR STANDARD GUAGE-CHENNAIL METRO RAIL, MARCH 2013"
PLATFORM LEVEL PLAN (PART A) IYYAPANTHANGAL METRO
GFC-P2C4-05-ARC-DR-IYP-20302-01

KEY PLAN

PLATFORM LEVEL PLAN (PART B) IYYAPANTHANGAL METRO

GFC-P2C4-05-ARC-DR-IYP-20302-02

424140393837363534333231 302928272625242322212019 CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high cement skirting Concrete finish texture paint Laminated Glass cladding 20mm thick Granite Skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm ht. finished with glazed vitrified tiles FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 30mm thick Manufactured Quartz 20mm thick honed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM 8 7 6 C/L C 5 B 20901-01 E B D MATCHLINE MATCHLINE REFER DRG. No. 20302-03 REFER DRG. No. 20302-01 17000 2500 6000 6000 TRACK CENTRE=1200 19250 9750 9750 19250 A 20801-01 W11 W9 D-04.3 DB CLOSET 22201-05 A Concourse Level to Platform Level Width = 3550 mm Tread = 300 mm Riser = 150.00 mm Steps = 42 Staircase-03 F1,F2,F9 C4 +5.25m +32.540m O-18.2 PLATFORM-02 FHC-08 2500 FHC-09 LOW HEIGHT P.S.G FLOOR TRAP FLOOR TRAP FD8 D3 FD7 LIFT -03 Q-LENGTH 2400 LOW HEIGHT P.S.G STEEL COLUMN TO SUPPORT ROOF AS PER STRUCTURAL DETAIL 1 22201-05 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL FLOOR CUTOUT 10725X3600 FLOOR CUTOUT 9700MM X 3600MM 2575 1975 1775 1775 800 1237 1238 Q.LENGTH 4000 D-01.3 PHE&FF SHAFT F1,F2,F9 C4 +5.25m +32.540m O-18.1 PLATFORM-01 1025 10725 3600 1185 500 9700 9822 650 D-03.1 RWP SHAFT 1520 2105 2105 1520 2105 1520 1520 2105 PLATFORM SEATING PLATFORM SEATING 3600 LVL -Concourse level to Platform level Width -1000 mm Length -18412 mm ESC -04 LVL -Concourse level to Platform level Width -1000 mm Length -18412 mm ESC -03 50MM EXPANSION JOINT 2942 2942 2540 2540 2540 2540 1600 800 650 150 900 1340 200 150 800 650 1200MM HIGH RAILING WITH 150MM HIGH UPSTAND AS PER DETAIL EQUIPMENT ACCESS HATCH POWER HOUSE POONAMALLEE BYPASS 3 CAR COACH 6 CAR COACH DETAIL DESIGN CONSULTANT The General Concultant of CMRL has reviewed this drawing and has no objection for this to be used for construction . DESIGNED BY CHECKED BY APPROVED BY DATE BY DETAIL DESIGN CONSULTANT REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL PROJECT PHASE 2, CORRIDOR-4, CONTRACT NO. C4/ECV02 CONSTRUCTION OF ELEVATED METRO STATIONS AT PORUR BYPASS CROSSING METRO, THELLIYARAGARAM METRO,IYYAPANTHANGAL METRO,KATTUPAKKAM METRO,KUMANAN CHAVADI METRO,KARAYAN CHAVADI METRO,MULLAITHOTTAM METRO,POONAMALLEE METRO,POONAMALLEE BYPASS METRO & ASSOCIATED VIADUCT FROM CHAINAGE 17982.240 TO CHAINAGE.25928.186 AND APPROACH TO DEPOT AT POONAMALLEE AND ALL ASSOCIATED WORKS. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Contract No C4/ECV02 DWG Issue Record REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. Good For Construction ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SID-20001.rvt A ISSUED FOR SUBMISSION 12.08.2022
A MS NP SR 12.08.2022 NS SR MS
DOOR SCHEDULE DOOR TAG DIMENSIONS FIRE RATING SILL LEAF D1 1000 x 2100 3HRS - SINGLE D2 1000 x 2100 - SINGLE D3 750 x 1800 - 300 SINGLE D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 2HRS - DOUBLE (900/900) FD2 1000 x 2100 2 HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD5 1000 x 2100 0.5HRS - SINGLE FD6 FD7 750 x 1800 1.5HRS 300 SINGLE FD8 750 x 1800 0.5HRS 300 SINGLE FD10 2400 x 3000 2 HRS - DOUBLE (900/900) FD11 FD12 GD1 1000 x 2100 - - SINGLE GD2 1200 x 2400 2HRS SINGLE RS-01 2250 x 2700 - -RS-02 1600 x 2700 - -RS-03 3000 x 2700 - -1 : 100 PLATFORM LEVEL (PART B) 1
ROOM SCHEDULE_PLAT-PART B ROOM NO. ROOM NAME AREA(SQM) D-01.3 PHE&FF SHAFT 1.11 D-03.1 RWP SHAFT D-04.3 DB CLOSET 1.11 O-18.1 PLATFORM-01 479.52 O-18.2 PLATFORM-02 481.96 N 10) ALL SOD REQUIREMENTS HAVE BEEN COMPLIED WITH REFERENCE TO DOCUMENT "SCHEDULE OF DIMENSIONS FOR STANDARD GUAGE-CHENNAIL METRO RAIL, MARCH 2013" WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900

PLATFORM LEVEL PLAN (PART C)

METRO

GFC-P2C4-05-ARC-DR-IYP-20302-03

42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high cement skirting Concrete finish texture paint Laminated Glass cladding 20mm thick Granite Skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm ht. finished with glazed vitrified tiles FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 30mm thick Manufactured Quartz 20mm thick honed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM POWER HOUSE POONAMALLEE BYPASS 10 9 C 11 12 E B D MATCHLINE REFER DRG. No. 20302-02 2500 6000 6000 19250 15000 15000 A 20801-01 D 20903-01 W9 W11 W3 W8 W3 W6 W7 ACCESS STAIRCASE-03 LVL-Platform to Rail lvl Width = 755 mm Tread = 210 mm Riser = 181.71 mm Steps = 7 ACCESS STAIRCASE-04 LVL-Platform to Rail lvl Width = 755 mm Tread = 210 mm Riser = 181.71 mm Steps = 7 W6 W7 TRACK CENTRE= 12000 SERVICE CORRIDOR F6 +32.54 m SERVICE CORRIDOR F6 +32.54 m A Concourse Level to Platform Level Width = 3550 mm Tread = 300 mm Riser = 150.00 mm Steps = 42 Staircase-04 F5 C1 +4.95m +32.540m P-01 ASS 1 F5 C1 +4.95m +32.540m P-02 ASS 2 F5 C1 +5.25m +32.540m P-06 ELECTRICAL ROOM D-03.2 RWP SHAFT 2500 Q-LENGTH 4000 FLOOR DRAIN STEEL COLUMN TO SUPPORT ROOF AS PER STRUCTURAL DETAIL 1200mm HIGH RAILING WITH UPSTAND AS PER DETAIL 17000 LOW HT. PSG LOW HT. PSG FLOOR CUTOUT 10725 X 3600 FLOOR TRAP 1 22250-03 1 22201-04 1 22201-04 22300-01 1 22300-01 22300-02 1 22300-02 W8 W3 W8 FD10 FD10 EXHAUST AIR CUTOUT 1600X500mm (SILL HEIGHT=3200mm) EXHAUST AIR CUTOUT 1600X500mm (SILL HEIGHT=3200mm) FRESH AIR CUTOUT 1000X600mm (SILL HEIGHT=3100mm) FRESH AIR CUTOUT 1000X620mm (SILL HEIGHT=3100mm) FD2 WICKET GATE WICKET GATE W3 W8 W9 W11 F1,F2,F9 C4 +5.25m +32.540m O-18.2 PLATFORM-02 F5 C4 +5.25m +32.540m T-10.2 TELECOM CLOSET 1775 1775 2540 14300 200 5535 200 6225 15600 5400 1100 1100 F1,F2,F9 C4 +5.25m +32.540m O-18.1 PLATFORM-01 965 1415 945 1415 EXHAUST AIR CUTOUT 300X250mm (SILL HEIGHT =3045mm) 960 1415 960 1420 10725 250 3600 200 1275 1825 1520 1520 2105 FHC-11 D3 2350 2440 4525 FD4 3440 EXHAUST AIR CUTOUT 420X320mm (SILL HEIGHT =2975mm) 2560 1520 750 1200 1200 2900 1600 3400 1600 3300 7251600 5280 1600 2805 1275 1825 MEP/S&T FLOOR CUTOUT AS PER DETAIL MEP/S&T FLOOR CUTOUT AS PER DETAIL 2475 3200 EQUIPMENT ACCESS HATCH ACCESS HATCH 900 900 1720 1100 2145 1090 EXPANSION JOINT EMERGENCY PLUNGER 3 CAR COACH 6 CAR COACH DETAIL DESIGN CONSULTANT The General Concultant of CMRL has reviewed this drawing and has no objection for this to be used for construction . DESIGNED BY CHECKED BY APPROVED BY DATE BY DETAIL DESIGN CONSULTANT REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL PROJECT PHASE 2, CORRIDOR-4, CONTRACT NO. C4/ECV02 CONSTRUCTION OF ELEVATED METRO STATIONS AT PORUR BYPASS CROSSING METRO, THELLIYARAGARAM METRO,IYYAPANTHANGAL METRO,KATTUPAKKAM METRO,KUMANAN CHAVADI METRO,KARAYAN CHAVADI METRO,MULLAITHOTTAM METRO,POONAMALLEE METRO,POONAMALLEE BYPASS METRO & ASSOCIATED VIADUCT FROM CHAINAGE 17982.240 TO CHAINAGE.25928.186 AND APPROACH TO DEPOT AT POONAMALLEE AND ALL ASSOCIATED WORKS. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Contract No C4/ECV02 DWG Issue Record REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. Good For Construction ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SID-20001.rvt A ISSUED FOR SUBMISSION 12.08.2022
IYYAPANTHANGAL
A MS NP SR 12.08.2022 NS SR MS
DOOR SCHEDULE DOOR TAG DIMENSIONS FIRE RATING SILL LEAF D1 1000 x 2100 3HRS - SINGLE D2 1000 x 2100 - SINGLE D3 750 x 1800 - 300 SINGLE D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 2HRS - DOUBLE (900/900) FD2 1000 x 2100 2 HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD5 1000 x 2100 0.5HRS - SINGLE FD6 FD7 750 x 1800 1.5HRS 300 SINGLE FD8 750 x 1800 0.5HRS 300 SINGLE FD10 2400 x 3000 2 HRS - DOUBLE (900/900) FD11 FD12 GD1 1000 x 2100 - - SINGLE GD2 1200 x 2400 2HRS SINGLE RS-01 2250 x 2700 - -RS-02 1600 x 2700 - -RS-03 3000 x 2700 - -1 : 100
(PART C) 1 KEY PLAN ROOM SCHEDULE_PLAT-PART C ROOM NO. ROOM NAME AREA(SQM) D-03.2 RWP SHAFT 0.60 O-18.1 PLATFORM-01 479.52 O-18.2 PLATFORM-02 481.96 P-01 ASS 1 71.99 P-02 ASS 2 78.52 P-06 ELECTRICAL ROOM 14.96 T-10.2 TELECOM CLOSET 5.74 N WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900 10) ALL SOD REQUIREMENTS HAVE BEEN COMPLIED WITH REFERENCE TO DOCUMENT "SCHEDULE OF DIMENSIONS FOR STANDARD GUAGE-CHENNAIL METRO RAIL, MARCH 2013"
PLATFORM LEVEL
10 9 8 7 6 3 C/L C 5 4 C 20902-01 B 20901-01 11 12 E B D A 20801-01 D 20903-01 19250 19250 19250 9750 9750 19250 19250 19250 15000 15000 SLOPE 1:40 ROOF BELOW ROOF BELOW GUTTER AS PER DETAIL GUTTER AS PER DETAIL ROOF LEGTH 136500 ROOF WIDTH 17000 25006000 60002500 TRACK CENTRE= 12000 2 1 A 15000 15000 +36.970 m +37.640 m SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 SLOPE 1:40 RCC ROOF RCC ROOF ENTRY/EXIT-01 ROOF BELOW RCC ROOF ENTRY/EXIT-02 ROOF BELOW 17000 28450 550 1825 1275 5800 1275 1825 195000 445 555 38823400 28518 2775 2507 3275 RWP FLOOR DRAIN (INDICATIVE/) RWP FLOOR DRAIN LIGHTING ARRESTOR(INDICATIVE) LIGHTING ARRESTOR(INDICATIVE) LIGHTING ARRESTOR(INDICATIVE) LIGHTING ARRESTOR(INDICATIVE) 12045 12045 12045 12045 12045 12045 12045 12045 12045 12045 12045 FALL PROTECTION SYSTEM FALL PROTECTION SYSTEM OUTDOOR UNIT SLOPE SLOPE EQUIPMENT ACCESS HATCH ACCESS HATCH ENTRY/EXIT-01 ROOF BELOW ENTRY/EXIT-02 ROOF BELOW 13895 13210 32250 10465 12770 6500 3200 ESCALATOR ROOF BELOW ESCALATOR ROOF BELOW ESCALATOR ROOF BELOW SLOPE SLOPE VIA DUCT SEEN BELOW VIA DUCT SEEN BELOW POWER HOUSE POONAMALLEE BYPASS DETAIL DESIGN CONSULTANT The General Concultant of CMRL has reviewed this drawing and has no objection for this to be used for construction . DESIGNED BY CHECKED BY APPROVED BY DATE BY DETAIL DESIGN CONSULTANT REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL PROJECT PHASE 2, CORRIDOR-4, CONTRACT NO. C4/ECV02 CONSTRUCTION OF ELEVATED METRO STATIONS AT PORUR BYPASS CROSSING METRO, THELLIYARAGARAM METRO,IYYAPANTHANGAL METRO,KATTUPAKKAM METRO,KUMANAN CHAVADI METRO,KARAYAN CHAVADI METRO,MULLAITHOTTAM METRO,POONAMALLEE METRO,POONAMALLEE BYPASS METRO & ASSOCIATED VIADUCT FROM CHAINAGE 17982.240 TO CHAINAGE.25928.186 AND APPROACH TO DEPOT AT POONAMALLEE AND ALL ASSOCIATED WORKS. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Contract No C4/ECV02 DWG Issue Record REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. Good For Construction ✓ 1 300 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SID-20001.rvt A ISSUED FOR SUBMISSION 12.08.2022 ROOF LEVEL PLAN IYYAPANTHANGAL METRO A MS NP SR 12.08.2022 NS SR MS GFC-P2C4-05-ARC-DR-IYP-20401-01 1 300 ROOF LEVEL 1 N 200MM THICK UPSTAND SOLAR PANELS 200MM THICK UPSTAND SOLAR PANELS
POWER HOUSE POONAMALLEE BYPASS CONCOURSE LEVEL EL +26.240 m PLATFORM LEVEL EL +32.540 m RAIL LEVEL EL +31.450 m ROOF LEVEL EL +37.790 m 10 9 8 7 6 3 C/L 5 4 11 12 15000 15000 19250 19250 19250 19500 19250 19250 19250 (PLATFORM LENGTH) 135000 ACCESS STAIRCASE-01 LVL-Platform to Rail lvl Width = 775 mm Tread = 210 mm Riser = 181.71 mm Steps = 7 ACCESS STAIRCASE-03 LVL-Platform to Rail lvl Width = 755 mm Tread 210 mm Riser 181.71 mm Steps 7 5250 6300 7590 1090 12800 LIFT-03 2 1 C-02 CER P-01 ASS O-17 SPARE ROOM 15000 15000 P-02 ASS O-02 UNPAID AREA O-04 RETAIL AREA O-03 PAID AREA D-04.3 DB CLOSET LVL -Concourse level to Platform level Width -1000 mm Length -18412 mm ESC -03 Concourse Level to Platform Level Width 3550 mm Tread 300 mm Riser 150.00 mm Steps = 42 Staircase-04 Concourse Level to Platform Level Width 3550 mm Tread 300 mm Riser 150.00 mm Steps = 42 Staircase-03 ROAD LVL +18.319m ROAD LVL +18.348m ROAD LVL +18.328m ROAD LVL +18.516m ROAD LVL +18.140m ROAD LVL +18.129m ROAD LVL +18.650m ROAD LVL +18.422m ROAD LVL +18.246m ROAD LVL +18.409m ROAD LVL +18.168m ROAD LVL +18.622m O-19 COMMON MAINTANANCE O-18.2 PLATFORM-02 O-18.2 PLATFORM-02 O-03 PAID AREA P-06 ELECTRICAL ROOM FHC-07 A-01 SCR FHC-09 1200 mm HIGH RAILING WITH 150 MM HIGH UPSTAND AS PER DETAIL 1200MM HIGH RAILING AS PER DETAIL 20802-01 A 20802-02 B 20802-03 C LOW HEIGHT PLATFORM SCREEN GATE ENTRY/ EXIT-01 IN ELEVATION 1 22002-01 1 22052-01 1 29504-01 22002-01 22102-02 22103-01 22105-01 1 22101-01 T-10.2 TELECOM CLOSET LOW HEIGHT PLATFORM SCREEN GATE P-03 UPS ROOM GROUND LEVEL VARIES D-03.1 RWP SHAFT D-03.3 RWP SHAFT 3830 4950 9700 10725 10725 FHC-04 FHC-08 5250 FHC-02 2410 5450 BAGGAGE SCANNER AND SECURITY 5450 3520 2400 2410 2850 4400 3100 4500 3800 3530 3980 2855 3130 4280 2080 2200 3830 2500 4400 2250 3800 3100 3800 RAINWATER FLOOR DRAIN EQUIPMENT HATCH 1200 mm HIGH RAILINGWITH 150 MM HIGH UPSTAND AS PER DETAIL EQUIPMENT HATCH C-01 SER D-04.3 DB CLOSET RAINWATER FLOOR DRAIN 10912 MS RAILING AS PER DETAIL MS RAILING AS PER DETAIL DETAIL DESIGN CONSULTANT The General Concultant of CMRL has reviewed this drawing and has no objection for this to be used for construction . DESIGNED BY CHECKED BY APPROVED BY DATE BY DETAIL DESIGN CONSULTANT REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL PROJECT PHASE 2, CORRIDOR-4, CONTRACT NO. C4/ECV02 CONSTRUCTION OF ELEVATED METRO STATIONS AT PORUR BYPASS CROSSING METRO, THELLIYARAGARAM METRO,IYYAPANTHANGAL METRO,KATTUPAKKAM METRO,KUMANAN CHAVADI METRO,KARAYAN CHAVADI METRO,MULLAITHOTTAM METRO,POONAMALLEE METRO,POONAMALLEE BYPASS METRO & ASSOCIATED VIADUCT FROM CHAINAGE 17982.240 TO CHAINAGE.25928.186 AND APPROACH TO DEPOT AT POONAMALLEE AND ALL ASSOCIATED WORKS. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Contract No C4/ECV02 DWG Issue Record REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. Good For Construction ✓ 1 300 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SID-20001.rvt A ISSUED FOR SUBMISSION 12.08.2022 LONG SECTION A IYYAPANTHANGAL METRO A MS NP SR 12.08.2022 NS SR MS GFC-P2C4-05-ARC-DR-IYP-20801-01 1 300 LONG SECTION A A KEY PLAN ROOM SCHEDULE_SEC-A ROOM NO. ROOM NAME AREA(SQM) A-01 SCR 32.97 C-01 SER C-02 CER 40.58 D-03.1 RWP SHAFT D-03.3 RWP SHAFT 1.46 D-04.1 REFRIGERANT PIPE SHAFT 1.46 D-04.3 DB CLOSET O-04 RETAIL AREA 96.19 O-17 SPARE ROOM 7.27 O-18.2 PLATFORM-02 481.96 O-19 COMMON MAINTANANCE 31.30 P-01 ASS 1 71.99 P-02 ASS 2 78.52 P-03 UPS ROOM 32.78 P-06 ELECTRICAL ROOM 14.96 P-09 BTR 6.88 T-10.2 TELECOM CLOSET 5.74 35.94 3.44 0.71
200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM CONCOURSE LEVEL EL +26.240 m PLATFORM LEVEL EL +32.540 m RAIL LEVEL EL +31.450 m ROOF LEVEL EL +37.790 m C E B D 6000 6000 2500 TRACK CENTRE=12000 SLOPE 1:300 SLOPE 1:300 1200mm HIGH WITH 150MM UPSTAND RAILING AS PER DETAIL LOW HEIGHT PSG LOW HEIGHT PSG 10.5M WIDE ROAD 10.5M WIDE ROAD FOOTPATH FOOTPATH 2750mm MEDIAN ROW LINE 30000 A Concourse Level to Platform Level Width = 3550 mm Tread = 300 mm Riser = 150.00 mm Steps = 42 Staircase-03 2500 17000 F1,F2,F9 C5 +4.41m +26.240m O-03 PAID AREA F1,F2,F9 C4 +5.25m +32.540m O-18.2 PLATFORM-02 40 877 ° 40 877° SOD FIXED STRUCTURE LINE 2750 ROOF AS PER DETAIL GALVALUME SHEET ROOFING 21 22227-01 EXIT GATES BAGGAGE AND SCANNER SECURITY CHECK FHC-08 CONCRETE GUTTER AS PER DETAIL ROOF AS PER DETAIL ENTRY/EXIT-02 IN ELEVATION ENTRY/EXIT-01 IN ELEVATION EL-01 22250-01 EL-02 22250-01 ROAD LVL +18.140m ROAD LVL +18.140m FOOTPATH LVL +18.240m FOOTPATH LVL +18.240m Ground level to concourse level Width = 2400 mm Tread = 300 mm Riser = 150.00 mm Steps = 48 STAIRCASE-02 6040 LENGTH 3210 SLEEVES SLEEVES LIFT-01 4400 ROOF IN ELEVATION 150 3520 6540 LENGTH 1600 1600 1520 2105 4750 2105 1520 LIFT IN ELEVATION UNPAID CORRIDOR CONNECTION TO CONCOURSE LIFT PIT GROUND LEVEL EL VARIES ENTRY EXIT -PLINTH LEVEL LEVEL EL +18.740 m 5250 6300 6990 1090 LVL -Ground level to Concourse level Width -1000 mm Length -19607 mm ESC -ESCALATOR-02 FHC-01 W2 2400 LVL -CONCOURSE TO PLATFORM Width -1000 mm Length -19607 mm ESC -ESCALATOR-01 6090 LIGHTNING ARRESTER INDICATIVE (REFER MEP DWG) LIGHTNING ARRESTER INDICATIVE (REFER MEP DWG) 1000 1000 1200mm HIGH WITH 150MM UPSTAND RAILING AS PER DETAIL LIFT IN ELEVATION FACADE AS/DETAIL FACADE AS/DETAIL 3400 5110 1060 F1,F2,F9 C4 +5.25m +32.540m O-18.1 PLATFORM-01 FLOOR & CEILING FINISH SCHEDULE CODE F1 DESCRIPTION F2 F3 F4 F5 F6 F7 F8 F9 F10 C1 30mm thick Manufactured Quartz 20mm thick honed granite 600x600mm USF1500 raised access floor 300mm high Granite stone tread 52mm Hardonite flooring with Epoxy coating 600x600mm double charge vitrified tile 14mm thick 600x600mm full-body vitrified tile Anti-dust sealer coat on concrete floor Tactile -S.S Studs 316 grade Granite worktop with supports Anti-dust sealer coat on surfaces C2 Calcium Silicate board C3 Metal Panel Ceiling C4 Galvalume Sheet w. flashing, trim & continuous metal edge C5 Acrylic emulsion coat on surfaces CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Honed Granite Riser 600 600mm 20mm thick honed Granite Anti-dust sealer paint Perforated stainless steel sheet riser Walls up to 2100mm height finished with 300x600mm glazed vitrified tiles Interior Acrylic Emulsion Paint 100mm high glazed vitrified tile skirting 300mm high cement skirting Concrete finish texture paint Laminated Glass cladding 20mm thick Granite Skirting including plaster 6mm+1.52mm+6mm laminated toughened glass INTERIOR WALL FINISHING SCHEDULE W13 Walls upto 2100mm ht. finished with glazed vitrified tiles DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SID-20001.rvt A ISSUED FOR SUBMISSION 12.08.2022 B ISSUED FOR APPROVAL CROSS SECTION C IYYAPANTHANGAL METRO A 12.08.2022 C 13.01.22 ISSUED FOR APPROVAL MS NP SR 12.08.2022 NS MD MD SR SV SV MS MS MS GFC-P2C4-05-ARC-DR-IYP-20902-01 1 : 100 CROSS SECTION C C KEY PLAN C DOOR SCHEDULE DOOR TAG DIMENSIONS FIRE RATING SILL LEAF D1 1000 x 2100 3HRS - SINGLE D2 1000 x 2100 - SINGLE D3 750 x 1800 - 300 SINGLE D6 1200 x 2100 - - SINGLE FD1 1800 x 2400 2HRS - DOUBLE (900/900) FD2 1000 x 2100 2 HRS - SINGLE FD3 1500 x 2400 1.5HRS - DOUBLE (750/750) FD5 1000 x 2100 0.5HRS - SINGLE FD6 FD7 750 x 1800 1.5HRS 300 SINGLE FD8 750 x 1800 0.5HRS 300 SINGLE FD10 2400 x 3000 2 HRS - DOUBLE (900/900) FD11 FD12 GD1 1000 x 2100 - - SINGLE GD2 1200 x 2400 2HRS SINGLE RS-01 2250 x 2700 - -RS-02 1600 x 2700 - -RS-03 3000 x 2700 - -ROOM SCHEDULE_SEC-C ROOM NO. ROOM NAME AREA(SQM) O-18.1 PLATFORM-01 479.52 O-18.2 PLATFORM-02 481.96 10) ALL SOD REQUIREMENTS HAVE BEEN COMPLIED WITH REFERENCE TO DOCUMENT "SCHEDULE OF DIMENSIONS FOR STANDARD GUAGE-CHENNAIL METRO RAIL, MARCH 2013" WINDOW SCHEDULE CODE DIMENSIONS(MM) SILL(MM) V1 1200X600 1800 W1 2400X1200 900 W2 1200X1200 900

DETAILDESIGNCONSULTANT LEADDESIGN CHECKERCERTIFICATION

CHENNAIMETRORAILLTD. ADMINISTRATIVEBUILDING,CMRLDEPOT,POONAMALLEEHIGHROAD,KOYAMBEDU,CHENNAI600107(INDIA)

1)ALLLEVELSAREINMETERSANDDIMENSIONSAREINMILLIMETER.

2)GROUNDLEVELWHERESHOWN,AREINDICATIVE.ACTUALLEVELSSHALLBETAKENFROMSURVEY DRAWINGSANDSHALLBECONFIRMEDATSITE.

3)RCCDIMENSIONSOFEXTERNALELEMENTSAREINDICATIVEONLYANDSUBJECTTOSTRUCTURALDESIGN.

4)RAILLEVELSHOWNINARCHITECTURALDRAWINGISINDICATIVEONLY.ABSOLUTERAILLEVELSHALLBE DERIVEDFROMTHEALIGNEMENTDRAWING.

5)INFORMATIONONACTUALSIZEOFCUTOUTANDOPENINGSSHALLBEASPERE&MDESIGN.

6)ESCALATORANDLIFTSIZESAREINDICATIVEONLY,ANDFINALSIZESSHALLBEASPERMANUFACTURER'S REQUIREMENTASFINALIZEDBYCMRLANDTHEIRPITDRAINAGETOBEASPERE&MDRAWINGS.

7)REFERPLUMBINGDRAWINGSFORPLUMBINGANDDRAINAGELAYOUT. 8)ALLABOVEGROUNDSTRUCTURESTOBEDESIGNEDASPERDETAILEDARCHITECTURALDRAWINGS.

9)FORFINISHESREFERFINISHEDDRAWINGSANDTYPICALDETAILDRAWINGS. 10)THISDRAWINGWILLBEREVISEDONFINALIZATIONOFFINISHESANDABOVEGROUNDSTRUCTURES.

PROJECTTITLE CHENNAIMETRORAILDETAILEDDESIGNCONSULTANCY PHASE-2,CORRIDOR-4,PACKAGE-05

FORTHEWORKSANDSERVICESOFTHEDETAILEDDESIGNANDDRAWINGSFOR THECIVIL,STRUCTURAL,ARCHITECTURAL,MEP,VAC&TRACKWORKSCOVERING THEALIGNMENTANDELEVATEDSECTIONFROMPIERAFTERMEENAKSHI COLLEGEUGSTATIONTOPOONAMALLEBYE-PASS(CH10027.102TO25829.793), INCLUDINGAPPROACHTODEPOT&MAINTENANCEDEPOTATPOONAMALLEE.

2 3 4 6 9 5 C 7 8 1 A E B D C/L 5030 6220 6220 5030 22500 16000 16000 17000 16000 17000 18000 18000 18000 136000 PCJ MD NV SV SR MS MS MS N 1:250@A1
NOOBJECTIONFROMCMRL
NoObjection NoObjectionSubjecttothe commentsasnoted RevisionandResubmissionRequired subjecttothecommentsasnoted CHECKEDBYREVIEWEDBYAPPROVEDBY DATE CHECKEDBYREVIEWEDBYAPPROVEDBY DATE ByDetailDesignConsultant REVISIONS REV. DATE BY DESCRIPTION REFERENCEDRAWINGS/NOTES:-
ThedesignanddrawingsascertifiedandsubmittedbytheDesigner havebeenreviewedandproofcheckedbyCMRL.
CLIENT DRAWINGTITLE
PackageNo P2C4/05 DWGIssueRecord PreliminaryDesign DefinitiveDesign ConstructionReference GoodForConstruction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKDAPP.
DRAWINGNUMBER
NOTES-
✓ BIM360://60613850-DDCforCorridor4Package-5_CMRL-Phase-2/DDC-P2C4-05-ARC-M3-SVV-20001.rvt A ISSUEDFORAPPROVAL 12.02.2021 B ISSUEDFORAPPROVAL 16.07.2021 CONCOURSELEVELPLAN C C 21.02.2022 ISSUEDFORAPPROVAL SV MS SR 21.02.2022 PCJ MD NV SV SR MS MS MS 1:250 CONCOURSELEVELPLAN1 POONAMALLEBYPASSMETRO
DDC-P2C4-05-ARC-DR-POB-20201-01

CHENNAIMETRORAILLTD. ADMINISTRATIVEBUILDING,CMRLDEPOT,POONAMALLEEHIGHROAD,KOYAMBEDU,CHENNAI600107(INDIA)

1)ALLLEVELSAREINMETERSANDDIMENSIONSAREINMILLIMETER.

2)GROUNDLEVELWHERESHOWN,AREINDICATIVE.ACTUALLEVELSSHALLBETAKENFROMSURVEY DRAWINGSANDSHALLBECONFIRMEDATSITE.

3)RCCDIMENSIONSOFEXTERNALELEMENTSAREINDICATIVEONLYANDSUBJECTTOSTRUCTURALDESIGN.

4)RAILLEVELSHOWNINARCHITECTURALDRAWINGISINDICATIVEONLY.ABSOLUTERAILLEVELSHALLBE DERIVEDFROMTHEALIGNEMENTDRAWING.

5)INFORMATIONONACTUALSIZEOFCUTOUTANDOPENINGSSHALLBEASPERE&MDESIGN.

6)ESCALATORANDLIFTSIZESAREINDICATIVEONLY,ANDFINALSIZESSHALLBEASPERMANUFACTURER'S REQUIREMENTASFINALIZEDBYCMRLANDTHEIRPITDRAINAGETOBEASPERE&MDRAWINGS.

7)REFERPLUMBINGDRAWINGSFORPLUMBINGANDDRAINAGELAYOUT.

8)ALLABOVEGROUNDSTRUCTURESTOBEDESIGNEDASPERDETAILEDARCHITECTURALDRAWINGS.

9)FORFINISHESREFERFINISHEDDRAWINGSANDTYPICALDETAILDRAWINGS.

10)THISDRAWINGWILLBEREVISEDONFINALIZATIONOFFINISHESANDABOVEGROUNDSTRUCTURES.

PROJECTTITLE CHENNAIMETRORAILDETAILEDDESIGNCONSULTANCY PHASE-2,CORRIDOR-4,PACKAGE-05

FORTHEWORKSANDSERVICESOFTHEDETAILEDDESIGNANDDRAWINGSFOR THECIVIL,STRUCTURAL,ARCHITECTURAL,MEP,VAC&TRACKWORKSCOVERING THEALIGNMENTANDELEVATEDSECTIONFROMPIERAFTERMEENAKSHI COLLEGEUGSTATIONTOPOONAMALLEBYE-PASS(CH10027.102TO25829.793), INCLUDINGAPPROACHTODEPOT&MAINTENANCEDEPOTATPOONAMALLEE.

2 3 4 6 9 5 C 7 8 1 A E B D C/L 5030 6220 6220 5030 22500 16000 16000 17000 16000 17000 18000 18000 18000 136000 PCJ MD NV SV SR MS MS MS N 1:250@A1
NOOBJECTIONFROMCMRL ThedesignanddrawingsascertifiedandsubmittedbytheDesigner havebeenreviewedandproofcheckedbyCMRL. NoObjection NoObjectionSubjecttothe commentsasnoted RevisionandResubmissionRequired subjecttothecommentsasnoted CHECKEDBYREVIEWEDBYAPPROVEDBY DATE CHECKEDBYREVIEWEDBYAPPROVEDBY DATE ByDetailDesignConsultant REVISIONS REV. DATE BY DESCRIPTION REFERENCEDRAWINGS/NOTES:-
DETAILDESIGNCONSULTANT LEADDESIGN CHECKERCERTIFICATION
CLIENT DRAWINGTITLE
PackageNo P2C4/05 DWGIssueRecord PreliminaryDesign DefinitiveDesign ConstructionReference GoodForConstruction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKDAPP. NOTES-
DRAWINGNUMBER
✓ BIM360://60613850-DDCforCorridor4Package-5_CMRL-Phase-2/DDC-P2C4-05-ARC-M3-SVV-20001.rvt A ISSUEDFORAPPROVAL 12.02.2021 B ISSUEDFORAPPROVAL 16.07.2021 CONCOURSELEVELPLAN C C 21.02.2022 ISSUEDFORAPPROVAL SV MS SR 21.02.2022 PCJ MD NV SV SR MS MS MS 1:250 CONCOURSELEVELPLAN1 POONAMALLEBYPASSMETRO
DDC-P2C4-05-ARC-DR-SPJ-20201-01
10 9 8 7 6 5 4 1 C/L A B C D E B 20803-01 C 20901-01 3 2 12500 12500 17000 17000 17000 17000 17000 12500 12500 135000 5250 6000 6000 5250 22500 UNPAID AREA TRACK CENTRE = 12000 LIFT-3 T-10 RETAIL T-08 STAFF ROOM A-01 SCR T-06 TOM/EFO-02 T-04 CLEANER'S ROOM T-01 TOILET(P) T-07 SECURITY ROOM 9075 9075 5700 5885 5550 5700 22103-02 22103-02 UP UP LVL-Concourse to Platform Level Width = 3600 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 STAIRCASE-04 LVL-Ground to Concourse level Width 2400 mm Tread 300 mm Riser 150.00 mm Steps = 46 STAIRCASE -03 22002-01 22102-02 4250 4190 EXIT GATES +31.640 m UP 1 29556-01 LVL -LVL-Concourse to Platform level Width -1750 mm Length -19191 mm ESC -ESCALATOR-08 LVL -LVL-Concourse to Platform level Width -1750 mm Length -19191 mm ESC -ESCALATOR-07 LVL -LVL-Concourse to Platform level Width -1750 mm Length -19191 mm ESC -ESCALATOR-06 22002-02 1 29556-02 1 22102-01 2775 UP UP BAGGAGE SCANNER & SECURITY CHECK LIFT-02 LIFT-1 LIFT-4 LIFT-5 7450 5400 3600 3095 LVL-Ground to Concourse level Width = 2400 mm Tread = 300 mm Riser = 150.00 mm Steps 46 STAIRCASE-01 LVL -Ground to Concourse level Width -1750 mm Length -13936 mm ESC -ESCALATOR-04 LVL -Ground to Concourse level Width -1750 mm Length -13936 mm ESC -ESCALATOR-05 T-03 TOILET(M) T-02 TOILET(F) 6375 6375 13600 4450 2625 22250-01 1 22250-01 FRISKING BOOTH FRISKING BOOTH D-1.1 PHE SHAFT D-2.1 ELEC & S&T SHAFT D-1.2 PHE SHAFT D-2.5 ELEC & S&T SHAFT D-2.3 ELEC,S&T SHAFT 1 22200-01 DN DN DN 1 29507-01 1 29507-02 A 20801-01 E 20903-01 D 20902-01 LVL-Concourse to Platform Level Width = 1800 mm Tread = 300 mm Riser = 150.00 mm Steps = 45 ESCAPE STAIRCASE-02 LVL-Concourse to Platform Level Width 1800 mm Tread 300 mm Riser 150.00 mm Steps = 45 ESCAPE STAIRCASE LVL -LVL-Concourse to Platform level Width -1750 mm Length -19191 mm ESC -ESCALATOR-09 20202-01 1 20202-01 2 20202-02 1 20202-03 1 20202-03 2 22102-01 UNPAID AREA UNPAID AREA UNPAID AREA +31.640 m +31.640 m PAID AREA +31.640 m FHC-01 FHC-02 FHC-10 FHC-09 FHC-03 FHC-04 FHC-05 FHC-06 FHC-07 FHC-08 LVL-Ground to Concourse level Width = 2400 mm Tread = 300 mm Riser = 150.00 mm Steps 46 STAIRCASE-02 T-05 TOM/EFO-01 D-3.1 FIRE SHAFT D-2.2 ELEC & S&T SHAFT D-3.3 FIRE SHAFT D-2.4 ELEC .&S&T SHAFT D-3.2 FIRE SHAFT D-1.3 PHE SHAFT 5700 E-1.3 BOH CORRDOR KNOCKOUT PANEL KNOCKOUT PANEL 5490 2640 13720 13720 5910 11485 ENTRY GATES EXIT GATES ENTRY GATES ROOF PROFILE ROOF PROFILE ROOF PROFILE ROOF PROFILE 3880 5 70 99 BAGGAGE SCANNER & SECURITY CHECK 1 22200-02 4740 T-19 DB CLOSET P01.1 ASS-01 P01.2 ASS-02 C-01 CER C-02 SER P-02 UPS ROOM P-04 L&E ROOM P-03 VRV 23090 29330 1100 P-07 S&T MAINTAINENCE P-06 DB ROOM POWER HOUSE POONAMALLEE BYPASS DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8)ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DRAWINGS. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. 10)THIS DRAWING WILL BE REVISED ON FINALIZATION OF FINISHES AND ABOVE GROUND STRUCTURES. ✓ 1 250 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SPT-20001.rvt A ISSUED FOR GC REVIEW 02.12.21 CONCOURSE LEVEL PLAN POONAMALLEE METRO A MS SV SR 02.12.2021 MD SR MS DDC-P2C4-ECV02-ARC-DR-POO-20201-01 1 250 CONCOURSE LEVEL 4 N ROOM SCHEDULE-CONCOURSE ROOM NO. ROOM NAME AREA(SQM) A-01 SCR 37.95 D-1.1 PHE SHAFT 0.71 D-1.2 PHE SHAFT 0.71 D-1.3 PHE SHAFT 0.77 D-2.1 ELEC & S&T SHAFT 0.71 D-2.2 ELEC & S&T SHAFT 1.11 D-2.3 ELEC,S&T SHAFT 2.00 D-2.4 ELEC .&S&T SHAFT 1.11 D-2.5 ELEC & S&T SHAFT 0.71 D-3.1 FIRE SHAFT 1.11 D-3.2 FIRE SHAFT 0.60 D-3.3 FIRE SHAFT 1.11 P-06 DB ROOM 12.00 P-07 S&T MAINTAINENCE 10.46 T-01 TOILET(P) 7.38 T-02 TOILET(F) 22.64 T-03 TOILET(M) 21.63 T-04 CLEANER'S ROOM 15.88 T-05 TOM/EFO-01 14.16 T-06 TOM/EFO-02 12.36 T-07 SECURITY ROOM 11.69 T-08 STAFF ROOM 39.93 T-10 RETAIL 125.91 T-19 DB CLOSET 3.95

7)REFERPLUMBINGDRAWINGSFORPLUMBINGANDDRAINAGELAYOUT.

8)ALLABOVEGROUNDSTRUCTURESTOBEDESIGNEDASPERDETAILEDARCHITECTURALDRAWINGS.

9)FORFINISHESREFERFINISHEDDRAWINGSANDTYPICALDETAILDRAWINGS.

10)THISDRAWINGWILLBEREVISEDONFINALIZATIONOFFINISHESANDABOVEGROUNDSTRUCTURES.

THEALIGNMENTANDELEVATEDSECTIONFROMPIERAFTERMEENAKSHI COLLEGEUGSTATIONTOPOONAMALLEBYE-PASS(CH10027.102TO25829.793),

ROADLVL +14.652m ROADLVL +14.533m ROADLVL +14.699m ROADLVL +14.575m ROADLVL +14.633m ROADLVL +14.443m ROADLVL +14.456m ROADLVL +14.550m ROADLVL +14.486m ROADLVL +14.595m ROADLVL +14.745m ROADLVL +14.654m UPPERRAILLEVEL EL+34.7000m CONCOURSELEVEL EL+22.4400m LOWERPLATFORMLEVEL EL+28.7400m LOWERRAILLEVEL EL+27.6500m UPPERPLATFORMLEVEL EL+35.7900m ROOFLEVEL EL+40.8850m C/L 7 6 5 4 3 8 9 10 11 12 2 1 GROUNDLEVEL ELVARIES 15000 15000 12000 18000 12000 18000 18000 18000 12000 18000 12000 PLATFORMLENGTH 138000 LIFT-03 O-01.4 PLATFORM4 O-01.4 PLATFORM4 P-01.2 ASS-02 P-01.1 ASS-02 C-01 SER A-01 SCR P-02 UPS C-02 CER T-09.1 TELECOMCLOSET T-09.4 TELECOMCLOSET T-09.2 TELECOMCLOSET T-08.2 DBROOM D-02.1 ELEC&S&TSHAFT 1200MMHIGHRAILINGWITH UPTANDASPERDETAIL LOWHEIGHTPLATFORM SCREENGATE 2100MMHIGH GLASSPARTITION PLATFORM SEATING LOWHEIGHTPLATFORM SCREENGATE T-09.3 TELECOMCLOSET INELEVATION ACCESSSTAIRCASE-01 LVL-PlatformtoRaillvl Width=820mm Tread=210mm Riser=181.6mm Steps=7 ACCESSSTAIRCASE-05 LVL-PlatformtoRaillvl Width=820mm Tread=210mm Riser=181.6mm Steps=7 ACCESSSTAIRCASE-02 LVL-PlatformtoRaillvl Width=795mm Tread=210mm Riser=181.6mm Steps=7 D-01.1 RWP&FFSHAFT RAILINGCLOSURE BELOWSTAIRCASE RAILINGCLOSURE BELOWESCALATOR T-08 ELECTRICAL ROOM T-08.6 SPAREROOM A-02 TOM/EFO T-08.4 TELECOMCLOSET INELEVATION D-01.3 PHERWP&FF SHAFT LVL-ConcoursetoLower platform Width=1800mm Tread=300mm Riser=150.00mm Steps=42 FIRESTAIRCASE-01 LVL-LowerPlatformto UpperPlatform Width=3550mm Tread=300mm Riser=150.00mm Steps=47 STAIRCASE-02 LVL-ConcoursetoLower platform Width=3550mm Tread=300mm Riser=150.00mm Steps=42 STAIRCASE-01 LVL-LowerPlatformto UpperPlatform Width=3550mm Tread=300mm Riser=150.00mm Steps=47 STAIRCASE-03 LVL-ConcoursetoLower platform Width=1800mm Tread=300mm Riser=150.00mm Steps=42 FIRESTAIRCASE-02 FHC-12 FHC-08 TVM FHC-02 FHC-04 FHC-09 FHC-10 LVLLowerPlatformto UpperPlatform Width1750mm Length19711mm ESC03 LVL-LowerPlatformto UpperPlatform Width1750mm Length19711mm ESC-05 LVLConcoursetoLower Platform Width-1000mm Length-18412mm ESC01 ACCESSSTAIRCASE-06 LVL-PlatformtoRaillvl Width=795mm Tread=210mm Riser=181.6mm Steps=7 20802-02 B 20802-03 C 20802-01 A 5210 1090 5960 1090 5095 POWERHOUSE POONAMALLEEBYPASS
LEADDESIGN CHECKERCERTIFICATION NOOBJECTIONFROMCMRL ThedesignanddrawingsascertifiedandsubmittedbytheDesigner havebeenreviewedandproofcheckedbyCMRL. NoObjection NoObjectionSubjecttothe commentsasnoted RevisionandResubmissionRequired subjecttothecommentsasnoted CHECKEDBYREVIEWEDBYAPPROVEDBY DATE CHECKEDBYREVIEWEDBYAPPROVEDBY DATE ByDetailDesignConsultant REVISIONS REV. DATE BY DESCRIPTION REFERENCEDRAWINGS/NOTES:PROJECTTITLE CHENNAIMETRORAILDETAILEDDESIGNCONSULTANCY
THECIVIL,STRUCTURAL,ARCHITECTURAL,MEP,VAC&TRACKWORKSCOVERING
INCLUDINGAPPROACHTODEPOT&MAINTENANCEDEPOTATPOONAMALLEE. CLIENT DRAWINGTITLE DRAWINGNUMBER CHENNAIMETRORAILLTD.
PackageNo P2C4/05 DWGIssueRecord PreliminaryDesign DefinitiveDesign ConstructionReference GoodForConstruction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKDAPP. NOTES1)ALLLEVELSAREINMETERSANDDIMENSIONSAREINMILLIMETER. 2)GROUNDLEVELWHERESHOWN,AREINDICATIVE.ACTUALLEVELSSHALLBETAKENFROMSURVEY DRAWINGSANDSHALLBECONFIRMEDATSITE. 3)RCCDIMENSIONSOFEXTERNALELEMENTSAREINDICATIVEONLYANDSUBJECTTOSTRUCTURALDESIGN.
DETAILDESIGNCONSULTANT
PHASE-2,CORRIDOR-4,PACKAGE-05 FORTHEWORKSANDSERVICESOFTHEDETAILEDDESIGNANDDRAWINGSFOR
ADMINISTRATIVEBUILDING,CMRLDEPOT,POONAMALLEEHIGHROAD,KOYAMBEDU,CHENNAI600107(INDIA)
4)RAILLEVELSHOWNINARCHITECTURALDRAWINGISINDICATIVEONLY.ABSOLUTERAILLEVELSHALLBE DERIVEDFROMTHEALIGNEMENTDRAWING. 5)INFORMATIONONACTUALSIZEOFCUTOUTANDOPENINGSSHALLBEASPERE&MDESIGN. 6)ESCALATORANDLIFTSIZESAREINDICATIVEONLY,ANDFINALSIZESSHALLBEASPERMANUFACTURER'S REQUIREMENTASFINALIZEDBYCMRLANDTHEIRPITDRAINAGETOBEASPERE&MDRAWINGS.
✓ BIM360://60613850-DDCforCorridorPackage-5_CMRL-Phase-2/DDC-P2C4-05-ARC-M3-SAN-20001.rvt A ISSUEDFORAPPROVAL 06.01.2021 B ISSUEDFORAPPROVAL 22.04.2022 LONGSECTIONA ALAPAKKAMJUNCTION B SV MS SR 22.04.2022 SV NV SV SV MS MS DDC-P2C4-05-ARC-DR-SAJ-20801-01 1:250 LONGSECTIONAA 1:250@A1 LONGSECTIONA RoomCode RoomName Area(Sqm) A-02 SCR 35.41 C-01 UPS 38.08 C-02 CER 37.53 C-03 SER 35.18 D-1.2 PHERWP&FFSHAFT 1.49 D-1.5 PHERWP&FFSHAFT 0.88 D-2.1 HT&LTSHAFT 2.13 D-2.1A HT&LTSHAFT 1.40 O-01.4 PLATFORM4 506.69 P-01 DBROOM 23.76 P-03 ASS-02 79.97 P-09 ASS-01 79.20 T-07 ASSEXTN+ELEC.ROOM 62.57 T-08 TELECOMCLOSET 7.20 T-11 TELECOMCLOSET 6.92 T-16 TELECOMCLOSET 6.39

POWERHOUSE

COLLEGEUGSTATIONTOPOONAMALLEBYE-PASS(CH10027.102TO25829.793), INCLUDINGAPPROACHTODEPOT&MAINTENANCEDEPOTATPOONAMALLEE.

HonedGraniteRiser 600x600mm20mmthickhonedGranite Anti-dustsealerpaint Perforatedstainlesssteelsheetriser Wallsupto2100mmheightfinishedwith300x600mm glazedvitrifiedtiles InteriorAcrylicEmulsionPaint 100mmhighglazedvitrifiedtileskirting 300mmhighcementskirting Concretefinishtexturepaint LaminatedGlasscladding 25mmthickgraniteskirtingincludingplaster 6mm+1.52mm+6mmlaminatedtoughenedglass

W13Wallsupto2100mmht.finishedwithglazedvitrifiedtiles

CODE F1

F2

ROADLVL +14.652m ROADLVL +14.533m ROADLVL +14.699m ROADLVL +14.654m 10 11 12 12000 18000 1090 1090 LVL-LowerPlatformto UpperPlatform Width=3550mm Tread=300mm Riser=150.00mm Steps=47 STAIRCASE-05 F3,F4,F10 C3 +2.70m A-02 SCR F4 C5 +4.225m T-09.4 TELECOMCLOSET F4 C5 +3.56m T-09.2 TELECOMCLOSET LVL-ConcoursetoLower platform Width=1800mm Tread=300mm Riser=150.00mm Steps=42 FIRESTAIRCASE-02 ACCESSSTAIRCASE-06 LVL-PlatformtoRaillvl Width=795mm Tread=210mm Riser=181.6mm Steps=7 ACCESSSTAIRCASE-02 LVL-PlatformtoRaillvl Width=795mm Tread=210mm Riser=181.6mm Steps=7 3560 D-01.3 PHERWP&FFSHAFT 1200MMHIGHRAILINGWITH UPTANDASPERDETAIL LOWHEIGHTPLATFORM SCREENGATE PLATFORM SEATING 2100MMHIGH GLASSPARTITION EQUIPMENT HATCH STEELROOF ASPERDETAIL W6 W7 W8 W3 4225 W8 W3 W8 W3 RAILINGCLOSURE BELOWSTAIRCASE 6800 2450 3800 2450 3560 2700 5250 5200 8600 W3 W9 W11W9 5450 6050 LOWHEIGHTPLATFORM SCREENGATE F1,F2,F9 C5 +5.095m+35.790m O-01.3 PLATFORM3 F1,F2,F9 C5 +6.80m+28.740m O-01.1 PLATFORM1 W11 W8 3100 1150 F1,F2,F9 C5 +6.05m+22.440m UNPAIDAREA 3620 F1,F2,F9 C5 +6.05m+22.440m UNPAIDAREA +35.790m FD3 FD3 GD2 FD8 FD8 5100 2810 3560 +29.040m FHC-08 4475 +28.740m C1 +2.81m T-08.2 DBCLOSET +22.440m F5 54502810 LOWHEIGHTPLATFORM SCREENGATE 6050 9 200MMTHK BLOCKWORKWALL STRUCTURALWALL (THK.AS/STR.Dwg.) SEC/ELENAME DRAWINGNUMBER CEILINGHEIGHT FROMFFL FLOORFINISH LEVEL CEILINGTYPE FLOORFINISH TYPE LEGEND F-00 C-00 +0.000m+0.00m ROOMNUMBER ROOMNAME 1 00000-00 SIM D:\00NANDHINI\STATIONS\SAJ\00ref\DDC-P2C4-05-ARC-M3-SAJ-20001-aarveelogo-2028423.png DETAILDESIGNCONSULTANT LEADDESIGN CHECKERCERTIFICATION NOOBJECTIONFROMCMRL ThedesignanddrawingsascertifiedandsubmittedbytheDesigner havebeenreviewedandproofcheckedbyCMRL. NoObjection NoObjectionSubjecttothe commentsasnoted RevisionandResubmissionRequired subjecttothecommentsasnoted CHECKEDBYREVIEWEDBYAPPROVEDBY DATE CHECKEDBYREVIEWEDBYAPPROVEDBY DATE ByDetailDesignConsultant REVISIONS REV.DATEBY DESCRIPTION REFERENCEDRAWINGS/NOTES:PROJECTTITLE CHENNAIMETRORAILDETAILEDDESIGNCONSULTANCY PHASE-2,CORRIDOR-4,PACKAGE-05 FORTHEWORKSANDSERVICESOFTHEDETAILEDDESIGNANDDRAWINGSFOR THECIVIL,STRUCTURAL,ARCHITECTURAL,MEP,VAC&TRACKWORKSCOVERING THEALIGNMENTANDELEVATEDSECTIONFROMPIERAFTERMEENAKSHI

9)FORFINISHESREFERFINISHEDDRAWINGSANDTYPICALDETAILDRAWINGS. 10)THISDRAWINGWILLBEREVISEDONFINALIZATIONOFFINISHESANDABOVEGROUNDSTRUCTURES. ✓ 1100@A1 BIM360://60613850-DDCforCorridorPackage-5_CMRL-Phase-2/DDC-P2C4-05-ARC-M3-SAJ-20001.rvt A ISSUEDFORAPPROVAL 30.12.2020 LONGSECTIONA(PARTC) ALAPAKKAMJUNCTIONSTATION B SV MS SR 22.04.2022 SV SVMS DDC-P2C4-05-ARC-DR-ALP-20802-01 DOORSCHEDULE DOORTAGDIMENSIONS FIRE RATINGSILLLEAF D6 1200x2100 - -SINGLE FD1 1800x24002HRS-DOUBLE (900/900) FD2 1000x21002HRS-SINGLE FD3 1500x24002HRS-DOUBLE (750/750) FD4 1000x24001.5HRS-SINGLE FD5 1000x21000.5HRS-SINGLE FD7 75018001.5HRS300SINGLE FD8 75018000.5HRS300SINGLE FD10 240030002HRS-DOUBLE (1200/1200) FD11 1500x24002HRS-DOUBLE (750/750) GD1 1000x2100 - -SINGLE GD2 1000x21002HRS-SINGLE B ISSUEDFORAPPROVAL22.04.2022NV SVMS 5095 7050 6300 1090 1090 ROOFLEVEL EL+40.885m UPPERRAILLEVEL EL+34.700m CONCOURSELEVEL EL+22.440m LOWERPLATFORMLEVEL EL+28.740m LOWERRAILLEVEL EL+27.650m UPPERPLATFORMLEVEL EL+35.790m GROUNDLEVEL ELVARIES MATCHLINE REF.NO-20802-02

30mmthickManufacturedQuartz 20mmthickhonedgranite 600x600mmUSF1500raisedaccessfloor300mmhigh Granitestonetread 52mmHardoniteflooringwithEpoxycoating 600x600mmdoublechargevitrifiedtile 14mmthick600x600mmfull-bodyvitrifiedtile Anti-dustsealercoatonconcretefloor TactileS.SStuds316grade Graniteworktopwithsupports Anti-dustsealercoatonsurfaces C2 CalciumSilicateboard C3 MetalPanelCeiling C4Galvalumesheetw.flashing,trim&continuousmetaledge C5 Acrylicemulsioncoatonsurfaces

FLOOR&CEILINGFINISH SCHEDULE CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12
DESCRIPTION
F3 F4 F5 F6 F7 F8 F9 F10 C1
INTERIORWALLFINISHING SCHEDULE
CLIENT DRAWINGTITLE DRAWINGNUMBER
PackageNo P2C4/05 DWGIssueRecord PreliminaryDesign DefinitiveDesign ConstructionReference GoodForConstruction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKDAPP. NOTES1)ALLLEVELSAREINMETERSANDDIMENSIONSAREINMILLIMETER. 2)GROUNDLEVELWHERESHOWN,AREINDICATIVE.ACTUALLEVELSSHALLBETAKENFROMSURVEY DRAWINGSANDSHALLBECONFIRMEDATSITE. 3)RCCDIMENSIONSOFEXTERNALELEMENTSAREINDICATIVEONLYANDSUBJECTTOSTRUCTURALDESIGN. 4)RAILLEVELSHOWNINARCHITECTURALDRAWINGISINDICATIVEONLY.ABSOLUTERAILLEVELSHALLBE DERIVEDFROMTHEALIGNEMENTDRAWING. 5)INFORMATIONONACTUALSIZEOFCUTOUTANDOPENINGSSHALLBEASPERE&MDESIGN. 6)ESCALATORANDLIFTSIZESAREINDICATIVEONLY,ANDFINALSIZESSHALLBEASPERMANUFACTURER'S
POONAMALLEEBYPASS
CHENNAIMETRORAILLTD. ADMINISTRATIVEBUILDING,CMRLDEPOT,POONAMALLEEHIGHROAD,KOYAMBEDU,CHENNAI600107(INDIA)
REQUIREMENTASFINALIZEDBYCMRLANDTHEIRPITDRAINAGETOBEASPERE&MDRAWINGS.
7)REFERPLUMBINGDRAWINGSFORPLUMBINGANDDRAINAGELAYOUT.
8)STRUCTURALWALLPROFILEANDTBMSHAFTSIZESTOSUITTHEFINALTRACKALIGNMENTANDASPER CONTRACTOR'SDESIGN.

POWERHOUSE

6)ESCALATORANDLIFTSIZESAREINDICATIVEONLY,ANDFINALSIZESSHALLBEASPERMANUFACTURER'S REQUIREMENTASFINALIZEDBYCMRLANDTHEIRPITDRAINAGETOBEASPERE&MDRAWINGS.

7)REFERPLUMBINGDRAWINGSFORPLUMBINGANDDRAINAGELAYOUT.

CONTRACTOR'SDESIGN. 9)FORFINISHESREFERFINISHEDDRAWINGSANDTYPICALDETAILDRAWINGS.

INTERIORWALLFINISHING SCHEDULE

HonedGraniteRiser

W13Wallsupto2100mmht.finishedwithglazedvitrifiedtiles

DESCRIPTION

30mmthickManufacturedQuartz 20mmthickhonedgranite 600x600mmUSF1500raisedaccessfloor300mmhigh Granitestonetread 52mmHardoniteflooringwithEpoxycoating 600x600mmdoublechargevitrifiedtile 14mmthick600x600mmfull-bodyvitrifiedtile Anti-dustsealercoatonconcretefloor TactileS.SStuds316grade Graniteworktopwithsupports Anti-dustsealercoatonsurfaces C2 CalciumSilicateboard C3 MetalPanelCeiling C4Galvalumesheetw.flashing,trim&continuousmetaledge C5 Acrylicemulsioncoatonsurfaces

DETAILDESIGNCONSULTANT

10)THISDRAWINGWILLBEREVISEDONFINALIZATIONOFFINISHESANDABOVEGROUNDSTRUCTURES. ✓ 1100@A1 BIM360://60613850-DDCforCorridorPackage-5_CMRL-Phase-2/DDC-P2C4-05-ARC-M3-SAJ-20001.rvt A ISSUEDFORAPPROVAL 30.12.2020 LONGSECTIONA(PARTB) ALAPAKKAMJUNCTIONSTATION B SV MS SR 22.04.2022 SV SVMS DDC-P2C4-05-ARC-DR-ALP-20802-01 DOORSCHEDULE DOORTAGDIMENSIONS FIRE RATINGSILLLEAF D6 1200x2100 - -SINGLE FD1 1800x24002HRS-DOUBLE (900/900) FD2 1000x21002HRS-SINGLE FD3 1500x24002HRS-DOUBLE (750/750) FD4 1000x24001.5HRS-SINGLE FD5 1000x21000.5HRS-SINGLE FD7 75018001.5HRS300SINGLE FD8 75018000.5HRS300SINGLE FD10 240030002HRS-DOUBLE (1200/1200) FD11 1500x24002HRS-DOUBLE (750/750) GD1 1000x2100 - -SINGLE GD2 1000x21002HRS-SINGLE B ISSUEDFORAPPROVAL22.04.2022NV SVMS 5095 7050 6300 1090 1090 ROOFLEVEL EL+40.885m UPPERRAILLEVEL EL+34.700m CONCOURSELEVEL EL+22.440m LOWERPLATFORMLEVEL EL+28.740m LOWERRAILLEVEL EL+27.650m UPPERPLATFORMLEVEL EL+35.790m GROUNDLEVEL ELVARIES MATCHLINE REF.NO-20802-01 MATCHLINE REF.NO-20802-03

CODE F1
F2
FLOOR&CEILINGFINISH SCHEDULE CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12
F3 F4 F5 F6 F7 F8 F9 F10
C1
600x600mm20mmthickhonedGranite Anti-dustsealerpaint Perforatedstainlesssteelsheetriser Wallsupto2100mmheightfinishedwith300x600mm glazedvitrifiedtiles InteriorAcrylicEmulsionPaint 100mmhighglazedvitrifiedtileskirting 300mmhighcementskirting Concretefinishtexturepaint LaminatedGlasscladding 25mmthickgraniteskirtingincludingplaster 6mm+1.52mm+6mmlaminatedtoughenedglass
18000 18000 18000 C/L 7 6 8 9 5095 3000 2250 2200 D-02.2B ELECTRICAL&S&TSHAFT 6050 5450 6800 5250 3560 3560 1200MMHIGHRAILINGWITH UPTANDASPERDETAIL LOWHEIGHTPLATFORM SCREENGATE LOWHEIGHTPLATFORM SCREENGATE 3250 2750 2600 PLATFORM SEATING RAILINGCLOSURE BELOWSTAIRCASE RAILINGCLOSURE BELOWSTAIRCASE LIFT-03 10140 8600 9880 10840 1200MMHIGHRAILINGWITH UPTANDASPERDETAIL LOWHEIGHTPLATFORM SCREENGATE 2750 2300 4295 1090 1090 F4 C4 T-08.4 DBCLOSET F1,F2,F9 C5 +5.095m+35.790m O-01.3 PLATFORM3 F1,F2,F9 C5 +5.095m+35.790m O-01.3 PLATFORM3 +5.095m+35.790m 1375 LIFTPIT RAILINGCLOSURE BELOWESCALATOR F1,F2,F9 C5 +6.05m+22.440m PAIDAREA F1,F2,F9 C5 +6.80m+28.740m O-01.1 PLATFORM1 5 12000 F1,F2,F9 C5 +6.05m+22.440m PAIDAREA F1,F2,F9 C5 +6.80m+28.740m O-01.1 PLATFORM1 LVL-LowerPlatformto UpperPlatform Width=3550mm Tread=300mm Riser150.00mm Steps=47 STAIRCASE-04 LVLLowerPlatformto UpperPlatform Width1750mm Length19711mm ESC05 LVLConcoursetoLower Platform Width1750mm Length18412mm ESC02 LVL-ConcoursetoLower platform Width=3550mm Tread=300mm Riser=150.00mm Steps42 STAIRCASE-03 42705500 4800 2250 3620 1200MMHIGHRAILINGWITH UPTANDASPERDETAIL FD7 FD7 FHC-02 FHC-07 FHC-13 F7,F10 C5 +2.30m+22.440m TOM/EFO A-02 ROADLVL +14.699m ROADLVL +14.575m ROADLVL +14.633m ROADLVL +14.443m ROADLVL +14.456m 200MMTHK BLOCKWORKWALL STRUCTURALWALL (THK.AS/STR.Dwg.) SEC/ELENAME DRAWINGNUMBER CEILINGHEIGHT FROMFFL FLOORFINISH LEVEL CEILINGTYPE FLOORFINISH TYPE LEGEND F-00 C-00 +0.000m+0.00m ROOMNUMBER ROOMNAME 1 00000-00 SIM D:\00NANDHINI\STATIONS\SAJ\00ref\DDC-P2C4-05-ARC-M3-SAJ-20001-aarveelogo-2028423.png
LEADDESIGN CHECKERCERTIFICATION NOOBJECTIONFROMCMRL ThedesignanddrawingsascertifiedandsubmittedbytheDesigner
RevisionandResubmissionRequired subjecttothecommentsasnoted CHECKEDBYREVIEWEDBYAPPROVEDBY
ByDetailDesignConsultant REVISIONS REV.DATEBY DESCRIPTION
POONAMALLEEBYPASS
havebeenreviewedandproofcheckedbyCMRL. NoObjection NoObjectionSubjecttothe commentsasnoted
DATE CHECKEDBYREVIEWEDBYAPPROVEDBY DATE
THEALIGNMENTANDELEVATEDSECTIONFROMPIERAFTERMEENAKSHI COLLEGEUGSTATIONTOPOONAMALLEBYE-PASS(CH10027.102TO25829.793), INCLUDINGAPPROACHTODEPOT&MAINTENANCEDEPOTATPOONAMALLEE. CLIENT DRAWINGTITLE DRAWINGNUMBER CHENNAIMETRORAILLTD. ADMINISTRATIVEBUILDING,CMRLDEPOT,POONAMALLEEHIGHROAD,KOYAMBEDU,CHENNAI600107(INDIA) PackageNo P2C4/05 DWGIssueRecord PreliminaryDesign DefinitiveDesign ConstructionReference GoodForConstruction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKDAPP. NOTES1)ALLLEVELSAREINMETERSANDDIMENSIONSAREINMILLIMETER. 2)GROUNDLEVELWHERESHOWN,AREINDICATIVE.ACTUALLEVELSSHALLBETAKENFROMSURVEY DRAWINGSANDSHALLBECONFIRMEDATSITE. 3)RCCDIMENSIONSOFEXTERNALELEMENTSAREINDICATIVEONLYANDSUBJECTTOSTRUCTURALDESIGN. 4)RAILLEVELSHOWNINARCHITECTURALDRAWINGISINDICATIVEONLY.ABSOLUTERAILLEVELSHALLBE DERIVEDFROMTHEALIGNEMENTDRAWING. 5)INFORMATIONONACTUALSIZEOFCUTOUTANDOPENINGSSHALLBEASPERE&MDESIGN.
REFERENCEDRAWINGS/NOTES:PROJECTTITLE CHENNAIMETRORAILDETAILEDDESIGNCONSULTANCY PHASE-2,CORRIDOR-4,PACKAGE-05 FORTHEWORKSANDSERVICESOFTHEDETAILEDDESIGNANDDRAWINGSFOR THECIVIL,STRUCTURAL,ARCHITECTURAL,MEP,VAC&TRACKWORKSCOVERING
8)STRUCTURALWALLPROFILEANDTBMSHAFTSIZESTOSUITTHEFINALTRACKALIGNMENTANDASPER

6)ESCALATORANDLIFTSIZESAREINDICATIVEONLY,ANDFINALSIZESSHALLBEASPERMANUFACTURER'S REQUIREMENTASFINALIZEDBYCMRLANDTHEIRPITDRAINAGETOBEASPERE&MDRAWINGS.

7)REFERPLUMBINGDRAWINGSFORPLUMBINGANDDRAINAGELAYOUT.

8)STRUCTURALWALLPROFILEANDTBMSHAFTSIZESTOSUITTHEFINALTRACKALIGNMENTANDASPER

POONAMALLEEBYPASS

INTERIORWALLFINISHING SCHEDULE

HonedGraniteRiser 600x600mm20mmthickhonedGranite Anti-dustsealerpaint Perforatedstainlesssteelsheetriser Wallsupto2100mmheightfinishedwith300x600mm glazedvitrifiedtiles InteriorAcrylicEmulsionPaint 100mmhighglazedvitrifiedtileskirting 300mmhighcementskirting Concretefinishtexturepaint LaminatedGlasscladding 25mmthickgraniteskirtingincludingplaster 6mm+1.52mm+6mmlaminatedtoughenedglass

W13Wallsupto2100mmht.finishedwithglazedvitrifiedtiles

LEGEND

CEILINGTYPE FLOORFINISH TYPE

CEILINGHEIGHT FROMFFL FLOORFINISH LEVEL

SEC/ELENAME

DRAWINGNUMBER

200MMTHK BLOCKWORKWALL STRUCTURALWALL (THK.AS/STR.Dwg.)

CODE F1
F2 F3 F4 F5 F6 F7 F8 F9 F10 C1
CODE W1 DESCRIPTION W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12
F-00 C-00 +0.000m+0.00m ROOMNUMBER ROOMNAME 1 00000-00 SIM FLOOR&CEILINGFINISH SCHEDULE
DESCRIPTION
30mmthickManufacturedQuartz 20mmthickhonedgranite 600x600mmUSF1500raisedaccessfloor300mmhigh Granitestonetread 52mmHardoniteflooringwithEpoxycoating 600x600mmdoublechargevitrifiedtile 14mmthick600x600mmfull-bodyvitrifiedtile Anti-dustsealercoatonconcretefloor TactileS.SStuds316grade Graniteworktopwithsupports Anti-dustsealercoatonsurfaces C2 CalciumSilicateboard C3 MetalPanelCeiling C4Galvalumesheetw.flashing,trim&continuousmetaledge C5 Acrylicemulsioncoatonsurfaces
POWERHOUSE
F5 C1 P-01.2 ASS-01 F5 C1 P-01.1 ASS-02 F5 C1 +6.75m T-08.6 SPAREROOM F3,F4 C5 +6.47m C-01 SER F1,F2,F9 C5 +5.095m+35.790m O-01.3 PLATFORM3 F3,F4 C5 +6.47m C-02 CER F5 C1 +6.77m P-02 UPS F4 C4 T-09.3 TELECOMCLOSET LVL-ConcoursetoLower platform Width=1800mm Tread=300mm Riser=150.00mm Steps=42 FIRESTAIRCASE-01 LOWHEIGHTPLATFORM SCREENGATE 1200MMHIGHRAILINGWITH UPTANDASPERDETAIL EQUIPMENT HATCH PLATFORM SEATING STEELROOF ASPERDETAIL ACCESSSTAIRCASE-05 LVL-PlatformtoRaillvl Width=820mm Tread=210mm Riser=181.6mm Steps7 ACCESSSTAIRCASE-01 LVL-PlatformtoRaillvl Width=820mm Tread=210mm Riser=181.6mm Steps=7 450X450CUTOUTFOREXHAUSTFAN SILLHEIGHT2925MM 450X450CUTOUTFOREXHAUSTFAN SILLHEIGHT2925MM W3 W8 W3 W8 W9 W11 W9 W11 W3 W8 W6 W7 W6 W7 W3 W8 RAILINGCLOSURE BELOWESCALATOR W3 W8 420X320CUTOUTFOR FRESHAIRFAN SILLHEIGHT4530MM 170X170MMPRD CUTOUT SILLHEIGHT 2695MM 400X400CUTOUTFOR EXHAUSTFAN SILLHEIGHT2700MM 720X420CUTOUTFOR FRESHAIRFAN SILLHEIGHT2700MM 200MM RCUPSTAND 4 3 2 1 12000 15000 15000 UPPERRAILLEVEL EL+34.700m CONCOURSELEVEL EL+22.440m LOWERPLATFORMLEVEL EL+28.740m LOWERRAILLEVEL EL+27.650m UPPERPLATFORMLEVEL EL+35.790m ROOFLEVEL EL+40.885m GROUNDLEVEL ELVARIES 5 18000 6300 7050 5095 1090 1090 ROADLVL +14.456m ROADLVL +14.550m ROADLVL +14.486m ROADLVL +14.595m ROADLVL +14.745m FD2 FD2 FD8 FD7 FD7 FD4 FD3 F5 C1 +6.75m T-08 ELECTRICALROOM LVLLowerPlatformto UpperPlatform Width1750mm Length19711mm ESC03 FHC-10 D-01.1 RWP&FFSHAFT 2925 3595 3800 2925 4745 3560 6775 6500 3260 6475 3560 6775 3100 3050 3000 4700 5095 6800 5450 6050 10840 5170 3090 2700 4530 2695 2695 2800 F1,F2,F9 C5 +6.80m+28.740m O-01.1 PLATFORM1 F1,F2,F9 C5 +6.05m+22.440m PAIDAREA +5.095m+35.790m +3.595m+35.790m +3.595m+35.790m LOWHEIGHTPLATFORM SCREENGATE +28.740m +29.040m +28.740m +28.740m +29.040m D:\00NANDHINI\STATIONS\SAJ\00ref\DDC-P2C4-05-ARC-M3-SAJ-20001-aarveelogo-2028423.png DETAILDESIGNCONSULTANT LEADDESIGN CHECKERCERTIFICATION NOOBJECTIONFROMCMRL ThedesignanddrawingsascertifiedandsubmittedbytheDesigner havebeenreviewedandproofcheckedbyCMRL. NoObjection NoObjectionSubjecttothe commentsasnoted RevisionandResubmissionRequired subjecttothecommentsasnoted CHECKEDBYREVIEWEDBYAPPROVEDBY DATE CHECKEDBYREVIEWEDBYAPPROVEDBY DATE ByDetailDesignConsultant REVISIONS REV.DATEBY DESCRIPTION REFERENCEDRAWINGS/NOTES:PROJECTTITLE
THEALIGNMENTANDELEVATEDSECTIONFROMPIERAFTERMEENAKSHI COLLEGEUGSTATIONTOPOONAMALLEBYE-PASS(CH10027.102TO25829.793), INCLUDINGAPPROACHTODEPOT&MAINTENANCEDEPOTATPOONAMALLEE. CLIENT DRAWINGTITLE DRAWINGNUMBER CHENNAIMETRORAILLTD. ADMINISTRATIVEBUILDING,CMRLDEPOT,POONAMALLEEHIGHROAD,KOYAMBEDU,CHENNAI600107(INDIA) PackageNo P2C4/05 DWGIssueRecord PreliminaryDesign DefinitiveDesign ConstructionReference GoodForConstruction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKDAPP. NOTES1)ALLLEVELSAREINMETERSANDDIMENSIONSAREINMILLIMETER. 2)GROUNDLEVELWHERESHOWN,AREINDICATIVE.ACTUALLEVELSSHALLBETAKENFROMSURVEY DRAWINGSANDSHALLBECONFIRMEDATSITE. 3)RCCDIMENSIONSOFEXTERNALELEMENTSAREINDICATIVEONLYANDSUBJECTTOSTRUCTURALDESIGN. 4)RAILLEVELSHOWNINARCHITECTURALDRAWINGISINDICATIVEONLY.ABSOLUTERAILLEVELSHALLBE DERIVEDFROMTHEALIGNEMENTDRAWING. 5)INFORMATIONONACTUALSIZEOFCUTOUTANDOPENINGSSHALLBEASPERE&MDESIGN.
CHENNAIMETRORAILDETAILEDDESIGNCONSULTANCY PHASE-2,CORRIDOR-4,PACKAGE-05 FORTHEWORKSANDSERVICESOFTHEDETAILEDDESIGNANDDRAWINGSFOR THECIVIL,STRUCTURAL,ARCHITECTURAL,MEP,VAC&TRACKWORKSCOVERING
CONTRACTOR'SDESIGN. 9)FORFINISHESREFERFINISHEDDRAWINGSANDTYPICALDETAILDRAWINGS. 10)THISDRAWINGWILLBEREVISEDONFINALIZATIONOFFINISHESANDABOVEGROUNDSTRUCTURES. ✓ 1100@A1 BIM360://60613850-DDCforCorridorPackage-5_CMRL-Phase-2/DDC-P2C4-05-ARC-M3-SAJ-20001.rvt A ISSUEDFORAPPROVAL 30.12.2020 LONGSECTIONA(PARTA) ALAPAKKAMJUNCTIONSTATION B SV MS SR 22.04.2022 SV SVMS DDC-P2C4-05-ARC-DR-ALP-20802-01 DOORSCHEDULE DOORTAGDIMENSIONS FIRE RATINGSILLLEAF D6 1200x2100 - -SINGLE FD1 1800x24002HRS-DOUBLE (900/900) FD2 1000x21002HRS-SINGLE FD3 1500x24002HRS-DOUBLE (750/750) FD4 1000x24001.5HRS-SINGLE FD5 1000x21000.5HRS-SINGLE FD7 75018001.5HRS300SINGLE FD8 75018000.5HRS300SINGLE FD10 240030002HRS-DOUBLE (1200/1200) FD11 1500x24002HRS-DOUBLE (750/750) GD1 1000x2100 - -SINGLE GD2 1000x21002HRS-SINGLE B ISSUEDFORAPPROVAL22.04.2022NV SVMS MATCHLINE REF.NO-20802-02

CROSS SECTION CC 1

CROSS

GROUND LEVEL EL +14.850 m UPPER RAIL LEVEL EL +34.700 m CONCOURSE LEVEL EL +22.440 m LOWER PLATFORM LEVEL EL +28.740 m LOWER RAIL LEVEL EL +27.650 m UPPER PLATFORM LEVEL EL +35.790 m ROOF LEVEL EL +40.885 m D C E B F A G ROAD LVL +14.640m FOOTPATH LVL +14.790m ROAD LVL +14.640m FOOTPATH LVL +14.790m 7M WIDE ROAD FOOTPATH FOOTPATH 7M WIDE ROAD ROW LINE 24000 7000 2900 7000 2900 MM MEDIAN 6300 7050 5095 1090 1090 HEIGHT 6530 HEIGHT 6030 1200MM HIGH RAILING WITH UPTAND AS PER DETAIL 22250-01 FACADE TO DETAIL 22250-01 FACADE TO DETAIL LOW HEIGHT PLATFORM SCREEN GATE LOW HEIGHT PLATFORM SCREEN GATE LOW HEIGHT PLATFORM SCREEN GATE LVL-Lower Platform to Upper Platform Width = 3550 mm Tread = 300 mm Riser = 150.00 mm Steps = 47 STAIRCASE-02 LVL-Concourse to Lower Platform Width = 3550 mm Tread = 300 mm Riser = 150.00 mm Steps = 42 STAIRCASE-01 3110 4410 2110 2410 SLOPE 1:300 F1,F2,F9 C5 +5.25m +35.790m O-01.3 PLATFORM 3 F1,F2,F9 C5 +5.25m +35.790m O-01.4 PLATFORM 4 F1,F2,F9 C5 +6.80m +28.740m O-01.1 PLATFORM 1 F1,F2,F9 C5 +6.80m +28.740m O-01.2 PLATFORM 2 F7, F10 C5 +2.30m +22.740m A-02 TOM/EFO 1540 2050 4860 2050 1540 1540 2655 3600 2705 1540 2500 550 6020 6020 550 2500 18140 CONCRETE GUTTER AS PER DETAIL 2250 FHC-12 STEEL COLUMN FOR ROOF SUPPORT AS PER STRUCTURAL DETAIL VIADUCT SEEN IN ELEVATION 1200MM HIGH RAILING WITH UPTAND AS PER DETAIL 1200MM HIGH RAILING WITH UPTAND AS PER DETAIL 40 ° SLOPE 1:300 SLOPE 1:300 SLOPE 1:300 3620 TVM 40 36 5 ° 36 5° LOW HEIGHT PLATFORM SCREEN GATE 1200MM HIGH RAILING WITH UPTAND AS PER DETAIL 200 MM THK BLOCKWORK WALL STRUCTURAL WALL (THK. AS/STR. Dwg.) SEC/ELE NAME DRAWING NUMBER CEILING HEIGHT FROM FFL FLOOR FINISH LEVEL CEILING TYPE FLOOR FINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOM NUMBER ROOM NAME 1 00000-00 SIM DETAIL DESIGN CONSULTANT LEAD DESIGN CHECKER CERTIFICATION NO OBJECTION FROM CMRL The design and drawings as certified and submitted by the Designer have been reviewed and proof checked by CMRL. No Objection No Objection Subject to the comments as noted Revision and Resubmission Required subject to the comments as noted CHECKED BY REVIEWED BY APPROVED BY DATE CHECKED BY REVIEWED BY APPROVED BY DATE By Detail Design Consultant REVISIONS REV. DATE BY DESCRIPTION REFERENCE DRAWINGS / NOTES:PROJECT TITLE CHENNAI METRO RAIL DETAILED DESIGN CONSULTANCY PHASE -2, CORRIDOR -4, PACKAGE -05 FOR THE WORKS AND SERVICES OF THE DETAILED DESIGN AND DRAWINGS FOR THE CIVIL, STRUCTURAL, ARCHITECTURAL, MEP, VAC & TRACK WORKS COVERING THE ALIGNMENT AND ELEVATED SECTION FROM PIER AFTER MEENAKSHI COLLEGE UG STATION TO POONAMALLE BYE-PASS (CH 10027.102 TO 25829.793), INCLUDING APPROACH TO DEPOT & MAINTENANCE DEPOT AT POONAMALLEE. CLIENT DRAWING TITLE DRAWING NUMBER CHENNAI METRO RAIL LTD. ADMINISTRATIVE BUILDING, CMRL DEPOT, POONAMALLEE HIGH ROAD, KOYAMBEDU, CHENNAI -600107 (INDIA) Package No P2C4/05 DWG Issue Record Preliminary Design Definitive Design Construction Reference Good For Construction REV SCALE DWG Status + Filename: Printed on ___% Post-Consumer Recycled Content Paper ISO A1 841mm x 594mm CHKD APP. NOTES1)ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. 2) GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. 3) RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL DESIGN. 4) RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL BE DERIVED FROM THE ALIGNEMENT DRAWING. 5) INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. 6) ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BE AS PER E&M DRAWINGS. 7) REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 8) STRUCTURAL WALL PROFILE AND TBM SHAFT SIZES TO SUIT THE FINAL TRACK ALIGNMENT AND AS PER CONTRACTOR'S DESIGN. 9)FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS. 10)THIS DRAWING WILL BE REVISED ON FINALIZATION OF FINISHES AND ABOVE GROUND STRUCTURES. ✓ 1 100 @ A1 BIM 360://60613850-DDC for Corridor 4 Package-5_CMRL- Phase-2/DDC-P2C4-05-ARC-M3-SAJ-20001.rvt A ISSUED FOR APPROVAL 30.12.2020
STATION A 30.12.2020 SV SV MS DDC-P2C4-05-ARC-DR-SAJ-20902-01 1 : 100
SECTION CC ALAPAKKAM JUNCTION
ROOM SCHEDULE ROOM NO. ROOM NAME AREA(SQM) PAID AREA Not Enclosed UNPAID AREA Not Enclosed A-01 SCR 34.674 m² A-02 TOM/EFO 21.926 m² C-01 SER 38.326 m² C-02 CER 38.353 m² D-01.1 RWP & FF SHAFT 1.082 m² D-01.1A RWP & FF SHAFT 1.145 m² D-01.1B RWP & FF SHAFT 1.129 m² D-01.2 PHE, RWP & FF SHAFT 1.485 m² D-01.2A PHE RWP & FF SHAFT 1.485 m² D-01.2B PHE RWP & FF SHAFT 1.485 m² D-01.3 PHE RWP & FF SHAFT 0.876 m² D-01.3A PHE RWP & FF SHAFT 0.850 m² D-01.3B PHE RWP & FF SHAFT 0.876 m² D-02.1 ELEC SHAFT 0.438 m² D-02.1 HT & LT SHAFT 1.229 m² D-02.1A HT & LT SHAFT 1.228 m² D-02.1B HT & LT SHAFT 1.267 m² D-02.2 ELEC & S&T SHAFT 1.485 m² D-02.2 ELEC SHAFT 0.429 m² D-02.2A ELECTRICAL & S&T SHAFT 1.485 m² D-02.2B ELECTRICAL & S&T SHAFT 1.485 m² D-02.3 ELEC & S&T SHAFT 0.874 m² D-02.3 REFUSE Not Placed D-02.3A ELECTRICAL & S&T SHAFT 0.935 m² D-02.3B ELECTRICAL & S&T SHAFT 0.876 m² D-02.6 LIFT 5.086 m² D-03.1 REFRIGERANT SHAFT 0.999 m² D-03.1A REFIGERANT SHAFT 0.978 m² D-04.1 PHE & FF SHAFT 0.438 m² D-04.2 PHE & FF SHAFT 0.429 m² D-04.34 HT & LT SHAFT Not Placed D-04.37 HT & LT SHAFT Not Placed D-04.40 HT & LT SHAFT Not Placed O-01.1 PLATFORM 1 527.301 m² O-01.2 PLATFORM 2 567.116 m² O-01.3 PLATFORM 3 335.345 m² O-01.4 PLATFORM 4 338.469 m² P-01 RETAIL 16.806 m² P-01.1 ASS-1 79.743 m² P-01.2 ASS-2 79.680 m² P-02 UPS 50.291 m² T-01 STAFF ROOM 32.067 m² T-02.1 TOILET-M 23.028 m² T-02.2 TOILET-F 23.261 m² T-02.3 TOILET-P 6.550 m² T-03 CLEANER ROOM 10.220 m² T-08 ELECTRICAL ROOM 30.276 m² T-08.1 DB CLOSET 7.796 m² T-08.2 DB CLOSET 18.191 m² T-08.3 DB CLOSET 4.457 m² T-08.4 DB CLOSET Not Placed T-08.4 DB CLOSET 3.041 m² T-08.5 DB CLOSET 5.163 m² T-08.6 SPARE ROOM 15.433 m² T-09 SECURITY ROOM 15.630 m² T-09.1 TELECOM CLOSET 7.240 m² T-09.2 TELECOM CLOSET 6.287 m² T-09.3 TELECOM CLOSET 6.960 m² T-09.4 TELECOM CLOSET 4.901 m²
PLAN A B
KEY

1)ALLLEVELSAREINMETERSANDDIMENSIONSAREINMILLIMETER.

2)GROUNDLEVELWHERESHOWN,AREINDICATIVE.ACTUALLEVELSSHALLBETAKENFROMSURVEY DRAWINGSANDSHALLBECONFIRMEDATSITE.

3)RCCDIMENSIONSOFEXTERNALELEMENTSAREINDICATIVEONLYANDSUBJECTTOSTRUCTURALDESIGN.

4)RAILLEVELSHOWNINARCHITECTURALDRAWINGISINDICATIVEONLY.ABSOLUTERAILLEVELSHALLBE DERIVEDFROMTHEALIGNEMENTDRAWING.

5)INFORMATIONONACTUALSIZEOFCUTOUTANDOPENINGSSHALLBEASPERE&MDESIGN.

6)ESCALATORANDLIFTSIZESAREINDICATIVEONLY,ANDFINALSIZESSHALLBEASPERMANUFACTURER'S REQUIREMENTASFINALIZEDBYCMRLANDTHEIRPITDRAINAGETOBEASPERE&MDRAWINGS.

7)REFERPLUMBINGDRAWINGSFORPLUMBINGANDDRAINAGELAYOUT.

8)ALLABOVEGROUNDSTRUCTURESTOBEDESIGNEDASPERDETAILEDARCHITECTURALDRAWINGS.

9)FORFINISHESREFERFINISHEDDRAWINGSANDTYPICALDETAILDRAWINGS.

10)THISDRAWINGWILLBEREVISEDONFINALIZATIONOFFINISHESANDABOVEGROUNDSTRUCTURES.

SECTION-A

SECTION-B

FORTHEWORKSANDSERVICESOFTHEDETAILEDDESIGNANDDRAWINGSFOR THECIVIL,STRUCTURAL,ARCHITECTURAL,MEP,VAC&TRACKWORKSCOVERING THEALIGNMENT,ANDELEVATEDSECTIONFROMPIERAFTERMEENAKSHICOLLEGE UGSTATIONTOPOONAMALLEEBYE-PASS(CH10027.102TO25829.793),INCLUDING APPROACHTODEPOT&MAINTENANCEDEPOTATPOONAMALLEE.

UP PUMPACCESS AREA AIREXHAUST AIREXHAUST FIRETANK-01 SIZE-50kL DOMESTIC TANK-01 FIRETANK-02 SIZE-50kL DOMESTIC TANK-02 MANHOLE ACCESS DRAINPIT MANHOLE ACCESSPUMPROOM -6.000 F5 WIDTH-2100mm TREAD300mm RISER-150mm NOOFSTEPS-49 STAIRCASE-01A LEVEL-PLINTHTOPUMPROOM FLOORDRAIN CHANNEL ABLIFT 5000 4170 7250 5810 27470 4170 2230 2210 2250 2950 2250 7950 FD5 WIDTH-2100mm TREAD300mm RISER-150mm NOOFSTEPS-49 STAIRCASE-01A LEVEL-PLINTHTOPUMPROOM STAIRCASE-01B LEVEL-PLINTHTOCONCOURSE WIDTH-2400mm TREAD300mm RISER-150mm NOOFSTEPS-46 LIFTPIT 4048 5748 4170 4170 4400 5450 2230 2210 5749 7348 1100 1100 MANHOLE ACCESS MANHOLE ACCESS AIREXHAUST FIRETANK-01 SIZE-50kL DOMESTIC TANK-01 FIRETANK-02 SIZE-50kL DOMESTIC TANK-02 BOTTOMOFPUMPROOM LEVEL EL6.000m ROADLEVEL EL±0.000m FOOTPATHLEVEL EL+0.150m BOTTOMOFFIRETANK LEVEL EL5.200m DN. PUMPACCESS AREA AIREXHAUST AIREXHAUST ABLIFT DRAINPIT D-02.1PHE&FF SHAFT D-01.1ELEC&S&T SHAFT FD5 UP UP WIDTH-5430mm TREAD-300mm RISER-150mm NOOFSTEPS-8 ENTRY/EXITSTAIRCASE01 LEVEL-GROUNDTOPLINTH LEVEL RAMP-01A LEVEL-GROUNDTOPLINTH LEVEL WIDTH-3590mm SLOPERATIO1:10 16501650 2350 2400 16501650 RS1 WIDTH-2100mm TREAD300mm RISER-150mm NOOFSTEPS-49 STAIRCASE-01A LEVEL-PLINTHTOPUMPROOM RS1 AIR EXHAUST RAMP-01A LEVEL-GROUNDTOPLINTH LEVEL WIDTH-3590mm SLOPERATIO1:10 WIDTH-2100mm TREAD300mm RISER-150mm NOOFSTEPS-49 STAIRCASE-01B LEVEL-PLINTHTOCONCOURSE WIDTH-2400mm TREAD300mm RISER-150mm NOOFSTEPS-46 STAIRCASE-01A LEVEL-PLINTHTOPUMPROOM BOTTOMOFPUMPROOM LEVEL EL-6.000m ROADLEVEL EL±0.000m FOOTPATHLEVEL EL+0.150m BOTTOMOFFIRETANK LEVEL EL5.200m WIDTH-5430mm TREAD300mm RISER-150mm NOOFSTEPS-8 ENTRY/EXITSTAIRCASE01 LEVEL-GROUNDTOPLINTH LEVEL DATE REV. BY REVISIONS DESCRIPTION CHKD APP. BYDETAILDESIGNCONSULTANT ISO A1 594mm x 841mm Printed on ___% Post-Consumer Recycled Content Paper Filename:
APPROVEDBY DATE NoObjection NoObjectionSubjecttothe commentsasnoted RevisionandResubmissionRequired subjecttothecommentsasnoted APPROVEDBY CHECKEDBY DATE ThedesignanddrawingsascertifiedandsubmittedbytheDesigner havebeenreviewedandproofcheckedbyCMRL. NOOBJECTIONFROMCMRL REVIEWEDBY PROJECTTITLE DRAWINGNUMBER DRAWINGTITLE REV CHENNAIMETRORAILLTD. DETAILDESIGNCONSULTANT CHENNAIMETRORAILDETAILEDDESIGNCONSULTANCY
SCALE + ADMINISTRATIVEBUILDING,CMRLDEPOT,POONAMALLEEHIGHROAD,KOYAMBEDU,CHENNAI600107(INDIA) PreliminaryDesign DefinitiveDesign ConstructionReference GoodForConstruction DWGIssueRecord DWG Status CLIENT PackageNo P2C4/05 LEADDESIGN CHECKERCERTIFICATION CHECKEDBYREVIEWEDBY PLAN@PUMPROOM SCALE1:1002
D:\00NANDHINI\STATIONS\SPT\wetransfer_ddc-p2c4-05-arc-m3-spt-20001-rvt_2021-12-01_0502\SPTEntry-2WithPumproomDetail_20211203.dwgDec03,20215:55pmmadhuri.sekar
PHASE-2,CORRIDOR-4,PACKAGE-5
SCALE1:100
3
SCALE1:100
4
A 17.11.21 RK ISSUEDFORAPPROVAL MS SR MS SV SR 03.12.2021 PUMPROOMDETAIL POONAMALLEEBUSTERMINUS
A ASSHOWN ü
DDC-P2C4-05-ARC-DR-SPT-29301-01
NOTES-
FLOORCEILING&WALLFINISH LEGEND CODE F5 DESCRIPTION 52mmHardoniteFlooringWithEpoxycoating SEC/ELENAME DRAWINGNUMBER CEILINGHEIGHT FROMFFL FLOORFINISH LEVEL CEILINGTYPE FLOORFINISH TYPE LEGEND F-00 C-00 +0.00m +0.000m ROOMNUMBER ROOMNAME 1 00000-00 SIM STREETLEVELPLAN SCALE1:100
1

ESCALATORRAILINGDETAIL SCALE1:501

DETAIL-A-PLAN

1)ALLLEVELSAREINMETERSANDDIMENSIONSAREINMILLIMETER.

2)GROUNDLEVELWHERESHOWN,AREINDICATIVE.ACTUALLEVELSSHALLBETAKENFROMSURVEY DRAWINGSANDSHALLBECONFIRMEDATSITE.

3)RCCDIMENSIONSOFEXTERNALELEMENTSAREINDICATIVEONLYANDSUBJECTTOSTRUCTURALDESIGN.

4)RAILLEVELSHOWNINARCHITECTURALDRAWINGISINDICATIVEONLY.ABSOLUTERAILLEVELSHALLBE DERIVEDFROMTHEALIGNEMENTDRAWING.

5)INFORMATIONONACTUALSIZEOFCUTOUTANDOPENINGSSHALLBEASPERE&MDESIGN.

6)ESCALATORANDLIFTSIZESAREINDICATIVEONLY,ANDFINALSIZESSHALLBEASPERMANUFACTURER'S REQUIREMENTASFINALIZEDBYCMRLANDTHEIRPITDRAINAGETOBEASPERE&MDRAWINGS.

7)REFERPLUMBINGDRAWINGSFORPLUMBINGANDDRAINAGELAYOUT.

8)ALLABOVEGROUNDSTRUCTURESTOBEDESIGNEDASPERDETAILEDARCHITECTURALDRAWINGS.

9)FORFINISHESREFERFINISHEDDRAWINGSANDTYPICALDETAILDRAWINGS.

10)THISDRAWINGWILLBEREVISEDONFINALIZATIONOFFINISHESANDABOVEGROUNDSTRUCTURES.

FORTHEWORKSANDSERVICESOFTHEDETAILEDDESIGNANDDRAWINGSFOR THECIVIL,STRUCTURAL,ARCHITECTURAL,MEP,VAC&TRACKWORKSCOVERING THEALIGNMENT,ANDELEVATEDSECTIONFROMPIERAFTERMEENAKSHICOLLEGE UGSTATIONTOPOONAMALLEEBYE-PASS(CH10027.102TO25829.793),INCLUDING

1250 360 1750 300110 A 30x30mmSSMID-RAIL PERFORATEDSHEET 50x50mmSSBALUSTER 25 200 BEAMEXTENDEDTO SUPPORTRAILING 80 B ESCALATORRAILING
MSSTEELCOLUMN RAILINGASPER DETAIL F.F.L 1250 PERFORATEDSHEET SECTION-A UPSTANDTOSUPPORT RAILING 300 1000 1250 360 950 300 110 ESCALATORRAILING 80 50 85 1565 BEAMEXTENDEDTO SUPPORTRAILING DN DETAIL-A KEYPLAN DN 1000 1250 80 50x50mmSSBALUSTER PERFORATEDSHEET F.F.L 200 25 ESCALATORRAILING
25 50x50mmSSBALUSTER MSSTEELCOLUMN 30x30mmSSMID-RAIL 50mmØSSGRABRAIL 50mmØSSGRABRAIL 30x30mmSSMID-RAIL UPSTANDTOSUPPORT RAILING BEAMEXTENDEDTO SUPPORTRAILING REV.DATEBY REVISIONS DESCRIPTION CHKDAPP. BYDETAILDESIGNCONSULTANT ISO A1 594mm x 841mm Printed on ___% Post-Consumer Recycled Content Paper Filename:D:\00NANDHINI\STATIONS\Escalatordetail\05.04.2022ESCALATORHANDRAILDETAIL.dwgApr05,20224:49pmmadhuri.sekar APPROVEDBYDATE NoObjection NoObjectionSubjecttothe commentsasnoted RevisionandResubmissionRequired subjecttothecommentsasnoted APPROVEDBY CHECKEDBY DATE ThedesignanddrawingsascertifiedandsubmittedbytheDesigner havebeenreviewedandproofcheckedbyCMRL. NOOBJECTIONFROMCMRL REVIEWEDBY PROJECTTITLE DRAWINGNUMBER DRAWINGTITLE REV CHENNAIMETRORAILLTD. DETAILDESIGNCONSULTANT CHENNAIMETRORAILDETAILEDDESIGNCONSULTANCY
CADFileName05.04.2022ESCALATORHANDRAILDETAIL.dwg SCALE + ADMINISTRATIVEBUILDING,CMRLDEPOT,POONAMALLEEHIGHROAD,KOYAMBEDU,CHENNAI600107(INDIA) PreliminaryDesign DefinitiveDesign ConstructionReference GoodForConstruction DWGIssueRecordDWG Status CLIENT PackageNo P2C4/05 LEADDESIGN
APPROACHTODEPOT&MAINTENANCEDEPOTATPOONAMALLEE. 05.04.2022 TypicalRailingDetailnearEscalator (Concourselevel) DDC-P2C4-05-ARC-DR-C4E-22312-03 A1:50@A3 ü CHECKEDBYREVIEWEDBY NOTES-
SECTION-B
PHASE-2,CORRIDOR-4,PACKAGE-5
CHECKERCERTIFICATION

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.