NATALIA ORDONEZ Arquitect
PORTFOLIO
MASTER PLAN OF TERRITORIAL ORDERING OF BOGOTA USME EXPANSION PLAN URBAN PLANNING PROJECT 2017
BOGOTA- COLOMBIA
XL
DIAGNOSIS Master plan of territorial ordering of Bogota is the most important urban planning instrument in the city and is modified every 12 years as part of the city's restructuring process. As part of the plan, the growth areas of the city are determined and a master plan is made for each of them.
Total area: Proteccion area: Regional road system: Available area:
1.056 has 324 has 62 has 670 has
Usme's master plan responds to the southern area of the city and the priority reason to develop it is low-quality economic, social and environmental conditions.
CONFIGURATION ECOLOGICAL STRUCTURE RESPECT + PRESERVE Quebrada Yomasa Gavilan Mountain La Requilina Forest Reserve Quebrada La Requilina Tunjuelo River
ROAD SYSTEM CONECT + RELATIONS
Av. Villavicencio Av. Uval Av. Circunvalar del sur Av. Caracas Av. Los alisos
PUBLIC EQUIPMENT SYSTEM ENDOW + MIXTURE
Public Services University Primary School Social Center
PUBLIC SPACE SYSTEM ENDOW + MIXTURE Transition Park Public Park Urban Park Local Park
URBAN MODEL Equipment System Public Space System Regional road system Available area
9% 9% 10% 35%
97 has 97 has 99 has 376 has
MASTER PLAN ALAMEDA DEL RIO URBAN PLANNING PROJECT + PUBLIC SPACE DESIGN 2012 - 2017
BARRANQUILLA- COLOMBIA
L
MASTER PLAN Total Area Protected Area Regional road system Available Area
183 has 13 has 12 has 158 has
42 has Public Space system Public Equipment system 10 has 15 has Local road system Available Area 89 has Residential Commercial Private Equipment
69 has 10 has 10 has
The objetive of Alameda del Rio is to develop the growth area of Barranquilla city. The project started in 2010 and is currently under construction. It was possible to participate in 4 stages of this process: planning, urban design, public space and housing design.
PUBLIC SPACE SYSTEM REGIONAL PARK GREEN BELT LOCAL PARK SCHOOL UNIVERSITY
+ ROAD SYSTEM REGIONAL PARK GREEN BELT LOCAL PARK SCHOOL UNIVERSITY
URBAN DESIGN STAGE 1
40%
STAGE 2
40%
M_C3
M_R17
E.PUB 1
M-R 20
M_R19 M_R14
M_R18
E.PRIV 1
M_R16
M-EPRIV 2
STAGE 3
40%
M_C4 E_PUB 5
M_R2
STAGE 4
40%
STAGE 5
40%
M_R13
M_R15
M_C2
M_R4
M_R6
M-R21
M_R8
M_R1
E.PUB 2
M_C5
M_R10 E.PUB 4 M_R7
NES
M_R9
M_R 11
STAGE 6
M_R3
M_R5
M-EPRIV 3
CIO CONVEN LA 1 :2500
40%
ESCA
ETAPA 1
M_R12
ETAPA 2
E.PUB 3
ESQUEMA
DE ETAPAS
ETAPA 3
2
ETAPA 4
6
4
ETAPA 5
1
ETAPA 6
1
3
IO
LINDERO PRED
2
CONTIENE:
3
NOMBRE :
5
CONTROL
S FICACIONE
SELLOS Y
APROBACION
FIDUCIARIA
RIA
POR CURADU
BOGOTA ARQUITECTO
PROPIETARIO
ETAPAS DE
DE MODI
PLANCHA
LOCALIZACION:
PLAN PARCIAL
ARIA GAMBOA CAMILO SANTAM 26533 CND. PROF. 25700 MATRICULA
EL VOLADOR
: ALAMEDA
PROYECTO
DEL RIO ESCALA: 1:50.000
BARRANQUILLA
URBAN DESIGN MAIN ROAD Technical Plan
- COLOMBIA
DESAR
:
ADO:
Y/O APODER
:
FECHA:
PGU-4 10/2017
ESCALA :
46
47
45
44
48
56
53
54
55
52
Vía Local 11
43 42
49
50
51
41
37
38
39
40
36
35
34
33
32
31
30 29
26
27
28
24
25
9 m2
cal 3 Lote 1 8.831,01 m2
9,33
Vía Local 1Tramo 2: 3.920,54 m2
m2
m2
15.806,36 m2
o 2: 9.70
Lote 2 8.617,01 m2
6,75 m2
m2
SM 14 Lote 6 10.107,78 m2
Lote 5 8.691,05 m2
Z.V
Lote 1 9.986,98 m2
1-8
11
Lote 3 9.089,85 m2
M_R14
62.124,18 m2
Lote 4 14.977,53 m2
Reserva Vial Av. Circunvalar Entregada
Vía Local 1Tramo 3: 5.022,63 m2
: 7.6
04,81
12 Peatonal -14: 272.32 m2
7 m2
l -2: 1.56
M_R16 - Tram
13
LAT 1-2: 983,43 m2
SM 16
Peatona
2.058,66 m2
1.144,31
7.092,40
Z.V 3-6: 2.990,63 m2 Lote 2 10.426,96 m2
Lote 1 7.189,35 m2
Cra 43
Z.V 1-7:
m2
M_C4 40.796,70 m2
Lote 1 12.528,86 m2
Z.V
m2
14
Equipamiento -1: 11.629,63 m2
m2
M_R18
18.789,28 m2
SM 4
o 2: 5.18 7,67
Peatonal -15: 33,38 m2
Z.V 3-3: 8.182,9
Lote 2 11.028,82 m2
3 - tramo 1:
tramo 1:
Vía Local
Cll 117 Lote 1 7.760,46 m2
Cra
M_R2
M_R4
38.647,31 m2
12.528,87 m2
- Tr
1-9
: 4.4
93,84
m2
am
o 3:
15.34
LAT 1-3: 8.616,08 m2
5.60 2,87
1 m2
10
M_C2
SM 2
6.841,81 m2
LOCALIZACION:
Vía Loc al 3
- tram
o 2:
Lote 2 19.422,19 m2
43
5,8
m2
- tram Cll 117
15
Z.V 3-2: 6.515,08 m2
3: 3.187,66 m2
m2
Z.V 6: 4.267,74 m2
SM 18
Vía Local 2 - tramo 1: 3.151,20
12
Peatonal -1: 624.53
Vía Local
Vía Local 12 - tramo
1 m2
2.265,8 - tramo 1:
CONVENCIONES
NOMBRE :
CONTROL DE MODIFICACIONES
SELLOS Y APROBACION POR CURADURIA
FIDUCIARIA BOGOTA
CONTIENE:
1
TORRE
ETAPAS RESTANTES
PROYECTO URBANISMO ETAPA 1
CESIONES ENTREGADAS PROPIETARIO Y/O APODERADO:
ARQUITECTO :
TORRE
LIMITE POMCA Rs = Radio Sardinel Rp = Radio Paramento
TORRE TORRE
BARRANQUILLA - COLOMBIA
CAMILO SANTAMARIA GAMBOA MATRICULA PROF. 25700 26533 CND.
ESCALA:
ETAPA 1 LINDERO PREDIO
TORRE
TORRE
PLANCHA :
1 de 5
UR-01
FECHA:
ESCALA :
10/2017
1:1.000
Avenida Circunvalar
Vía Local 12 - tramo 2: 2.541,03 m2
16
3 m2
l2
Vía Local 1Tramo 1: 4.392,19 m2
17
14.883,68 m2
TORRE
00 00 1:25 1:25
19
M_C3
-10: 764.1
27.186,35 m2
1: 1.289,96 m2
LAT 1-1: 3.465,95 m2
Peatonal
M_R17
M_R13
ca Vía Lo
25.663,88 m2
Vía Lo
117
SM 17
24.761,50 m2
Z.V 3-1: 2.457.6
SM 13
M_R15
PLAN PARCIAL EL VOLADOR
5 5 4 de 4 de
20
18
SM 15
PROYECTO: ALAMEDA DEL RIO
LOLO OLOL RR
21
22
23
Vía Local 11 - Tramo
e Call
The plan was raised in 6 stages of development according to the owners of the lots, the economic cost and the execution times of each one. The process is accompanied by technical documentation that is delivered to the institutions in charge.
PUBLIC SPACE
HOUSING AREA STUDIO
RIVERCITY RENOVATION MASTERPLAN URBAN PLANNING PROJECT 2015
BARRANQUILLA - COLOMBIA
M
DIAGNOSIS The project consists of the renovation of an old industrial area of Barranquilla where the most important heavy industries of the country are currently located. This project is part of a series of interventions led by the city government and private companies interested in working on the development of the city.
RIVER CITY MAGDALENA RIVER
COUNTRY CLUB
Magdalena River Heavy industries Low quality residential buildings Main city avenue Green public areas
PUBLIC
Residential
EXISTING
Green and parks area
PRIVATE
CONFIGURATION Equipment
Commercial
Industrial
Metropolitan Context
Total Area: 33 has. Public Space: 6 has. Road System: 1 ha. Available Area: 18 has.
URBAN MODEL
Creation of 4 super blocks, plus a metropolitan commercial space and outdoor recreational activities on the linear park of the Magdalena River. These are some of the benefits with which the project seeks to create a city.
MASTER PLAN RE- ORDENING OF SECTION B OF THE BOGOTA RIVER GRADUATION PROJECT 2013
BOGOTA - COLOMBIA
XL
CONCEPT - URBAN NETWORKING The master plan for the re-ordening of Bogota river establishes guidelines for the recovery and development of the western edge of Bogota in the towns of Bosa and Kennedy through urban strategies such as the prioritization of the landscape and the renovation of the built edge.
1.
WEST BORDER - MEDIUM WATERSHED OF BOGOTA RIVER
2.
MEDIUM WATERSHED OF BOGOTA RIVER ZONE B BETWEEN BOSA AND KENNEDY FUCHA RIVER
B ZONE
D ZONE
C ZONE TUNJUELO RIVER
B ZONE
Unhealthy state of Bogota river Social and economic inequality
Actual Situation =
No appropiation for the residents Lack of public space Road system in poor condition
APPROACH TO TERRITORY
RELATIONS + SYSTEMS IDENTITY + NETWORK = CONNECTIVITY
1
2
URBAN NETWORK - REGION NODE CONNECTION HIERARCHY
MIXED BORDER + CITY
URBAN NETWORK - CITY ACTUAL
PROPOSAL
NODE
NODE
CONNECTION
CONNECTION
HIERARCHY
HIERARCHY
DINAMIC DEVELOPMENT PROCESS
3
URBAN NETWORK - BORDER - B ZONE URBAN BORDER CONSOLIDATION NODE CONNECTION HIERARCHY
TRANSITION BETWEEN URBAN AND RURAL
ACTIVITIES WITH REGIONAL INFLUENCE
CONSOLIDATION OF URBAN STRUCTURE
URBAN GROUND
URBAN GROUND
URBAN MODEL Border emerges as an opportunity to: -Form urban networks (regional and metropolitan). -Redefine and characterize the territory. -Consolidate existing urban structures. -Integration os different types of existing communities. -Propose a landscape system with strategic and effective interventions.
AREA TABLE
E Q U I P M E N T
TOTAL AREA ROAD SYSTEM AREA SUBTOTAL AREA PUBLIC SPACE EQUIPMENT AREA
USE LAND
11,1 HAS 0,7 HAS 10,4 HAS 2,1 HAS 8,3 HAS
EQUIPMENT
FLOOR NUMBER FIRST FLOOR
2 18%
PARKING SPACE - RESIDENT - GUEST
1 X 100 M2 1 X 40 M2
AREA TABLE
R E S I D E N C I A L
TOTAL AREA ROAD SYSTEM AREA SUBTOTAL AREA
5,2 HAS 0,5 HAS 4,7 HAS
PUBLIC SPACE EQUIPMENT AREA
0,9 HAS 3,6 HAS
USE LAND
RESIDENCIAL
FLOOR NUMBER FIRST FLOOR
6 20%
PARKING SPACE - RESIDENT - GUEST
1 X HOUSE 1 X 5 HOUSE
AREA TABLE
URBAN PLANNING INTERVENTION METHOD REGULATION ACCORDING TO USE LAND
C O M M E R C I A L
TOTAL AREA ROAD SYSTEM AREA SUBTOTAL AREA
6,2 HAS 0,6 HAS 5,6 HAS
PUBLIC SPACE EQUIPMENT AREA
0,6 HAS 5,0 HAS
USE LAND
COMMERCIAL
FLOOR NUMBER FIRST FLOOR
2 20%
PARKING SPACE - RESIDENT - GUEST
1 X 200 M2 1 X 25 M2
1. Road System
2. Pedestrian System
3. Public Space
4. Land Uses
5. Density
6. Gestion
MODEL APPLICATION
The main objective of the intervention is to develop an urban-landscape proposal that projects the border of the city as a space of integration between the community and the dynamics of the territory and transition between the built space and the natural space.
ECOSYSTEM = ACTIVITIES
CONCEPT
CONFIGURATION
FIRE
AIR
WATER
EARTH
HOT ACTIVITY TRANSFORMATION
INTELLECTUAL SOFT UNEXPECTED
FLUID CALM CONSTANCY
SOLID FERTILITY CONCRETION
AIR
WATER
EARTH
FIRE
Square
Interactive learning center
Square
Creative and artist center
Square
Recreational pond
Cultural center
Square
Environmental research center
Dock
Kids Games
Climbing Wall
Avifauna forest
Viewpoint
Urban Beach
Dock
Invetigation pond
Greenhouses
Botanical garden
Camping area
Dock
Sport Fishing
Dock
Hydroponic crops
ACUATIC ROUTE ROUTE
STAY
BOGOTA RIVER
DOCK
PUBLIC TRANSPORT ROUTE STAY
ROUTE
BUS
INTERCHANGE
PEDESTRIAN ROUTE ROUTE
STAY
TEMATIC SQUARE
PATH
BYCICLE ROUTE ROUTE
STAY
PATH
INTERCHANGE
PATH ON TALUD - ROAD OF THE TILE
DOCK
AVIFAUNA ISLAND - AVIARY
AIR ZONE DETAIL CONCEPT
ROUTE
GEOMETRY AS A METHOD TO CONFIGURE TERRITORY
ACUATIC ROUTE
ACTIVITY NUDE POND
TILE PATH
EQUIPMENT PRINCIPAL SQUARE
BYCICLE ROUTE
ENTRANCE POINT HUMMINGBIRD PATH
TRANSITIONS
ZONING
PROTECTION AREA AGAINST FLOODING LOOKOUT TRANSITIONS
INTENSE ACTIVITY AREA
EQUIPMENTS
FOREST AREA
MASTER PLAN OF CARTAGENA HISTORICAL CENTER ACADEMIC 2010
CARTAGENA - COLOMBIA
L
DIAGNOSIS Historical center of Cartagena is an uncosolidated area with a low index of public space per habitant, failure in the network of public and private facilities, and mobility problems due to the confluence of vehicular and pedestrian flows. The study area is delimited by the historical wall, the Fernandez de Madrid public park and low central towns. The total area is 18 has. 1 Mayor de Bolivar School 2 Santo Domingo´s Church 3 Santo Domingo´s Square 4 Esmeralda Museum 5 Merced Square 6 Heredia Theater 7 Cartagena University 8 Student square 9 San Toribio´s Church
Historic center wall Main road system Local road system Residential Commercial Equipment Square
N
High Impact Equipment Access Point
5 1
9
6
7 8
2
3
4
IDENTIFY
Low quality of public space
+ Lack of health equipments
+ Unconsolidated cultural equipment network
+ No green areas
+ Informal commerce
+ Road congestion
OPPORTUNITY
PROPOSE
ACTION
CHOOSE
STRATEGY
Change roads trafic from car to pedestrian Closing roads in neuralgic points Extension of platforms
Develop a local system health equipments Add health areas inside existing equipments Create an unique urban scale equipment
Network of libraries and museums supporting existing equipment. Exclusive area for cultural equipment Expand the scale of existing equipment
Park system inside the building areas Demolition of existing buildings Adaptation of the existing empty urban spaces
Relocate commercial areas according to the type of offer. Replacement commercial use for other uses Design new specific commercial areas in neuralgic points
Replacement car by bicycle Implement massive public transport Eliminate every transport system
PEDESTRIAN PATH
+ HEALTH EQUIPMENTS
+ LIBRARIES & MUSEUMS
+ PARK SYSTEM
+ COMMERCIAL AREAS
+ BIKE
Commercial Areas
N
Green Public Space
Cultural Equipment
EUROPEAN MASTER IN URBANISM ACTION ON NORTH ENVIRONMENT 22 @ ACADEMIC 2017
BARCELONA - ESPAÑA
L
URBAN MODEL
Residential Activities Equipments Commerce
EQUIPAMENT + RESIDENTIAL
@ ACTIVITIES + RESIDENTIAL
PROTOTYPES
CONFIGURATION
Public Space 30%
Edificability coefficient: 4.7
50%
Residential
17%
20m wide pedestrian path location in the General Plan.
Number of lots: 4
15%
Commercial @ Activities
10m wide public path loation in the GeneralPlan.
Minimum lot: 2.000 m2 Maximum lot: 4.000 m2
5%
5% 8%
Urban Garden minimum 800 m2 in front of public road and th e others sides with buildings for residential use.
Private lot occupation: 60% Maximum height: B+7 : Residential + Commerce B+13 : @ Activities
Public Space 30%
Edificability coefficient: 2.6
30%
Residential
17%
20m wide pedestrian path location in the General Plan.
Number of lots: 2
15%
Commercial Equipment
10m wide public path loation in the GeneralPlan.
Minimun lot: 2.000 m2 Maximum lot: 4.000 m2
25%
5% 8%
Square 750 m2 : 25 m X 30 m
Private lot occupation: 60% Maximum height: B+7 : Residential + Commerce B+2: Equipament
3 @
4 @
5 @
6 @
7 @ 16 R
2 @
8 @
10 @
9 e
11 @
me
19
m@ HAS 50,3
PUBLIC SPACE Equipment Green space TOTAL
Area 50.830 99.710 150.539
% 10% 20% 30%
USO Residential Commercial @ Activity TOTAL
Occupied Area 71.990 28.324 183.349 283.663
% Ocup 14% 6% 50% 70%
Housing Number Density (viv/has)
4.499 89
26
@+
Biuldability Coefficient 450.027 0,9 1.042.245 1.520.596
21
m@
27
28
22
me
29
23
m@
30
15 R
24 me
31
25
m@
32
@+
@+
@+
@+
@+
33 @
34 @
35 @
36 @
37 @
38 @
2,1 3,0
Public space 25%
Edificability coefficient: 4.7
7%
10m wide public path loation in the GeneralPlan.
Number of lots: 3
3%
2 pedestrian path of 5m wide minumim that conect with the road
15%
Urban garden minimum area 800 m2 in front of public space and the other sides with residential buildings
75%
Residential
Minimum lot: 1.000 m2 Maximum lot: 5.000 m2 Private lot occupation: 100% Maximum height: B+4
Equipamento 10% 1 frente a via publica y 1 frente al corredor publico.
@ ACTIVITIES
17 R
@+
RESIDENTIAL
TOTAL AREA
M2 502.715
13 R
12 R
20
14 R
Public space 15%
Edificability coefficient: 3.0
10%
Equipament
10%
Public space 12m wide maximum.
Number of lots: 3
65%
@ Activities
5%
2 predestrian path 5m wide to conect public space with road.
Minimum lot: 1.200 m2 Maximum lot: 5.000 m2 Private lot occupation: 75% Maximum height: B+4 Side insulation against property neighbour: 5 mts.
18 R
PUBLIC SPACE
IMAGE
EUROPEAN MASTER IN URBANISM ROOTING 1 LOOK 3 STRATEGIES ACADEMIC - HANDMADE 2018
CATALUNYA - ESPAÑA
XL
TERRITORIAL MODEL THE TERRITORY
LINEAR SYSTEM
PENEDES VALLEY
VILAFRANCA
From the coast to the interior
Transport of merchandise from Garraf flat to Penedes Valley.
GARRAF MASSIF
PLAIN
VILANOVA´S PORT
DURABLE development MODEL that recognizes elements of NATURAL, HISTORICAL and CONTEMPORARY value HISTORICAL ROAD
S. XIX
System adapts the topographic conditions guaranteeing direct contact in its route.
The car developed a more effective road but with less relationship with the landscape.
CROSS Garraf massif located in the middle of two planes.
CONDITIONED Location of the urban center
GARRAF MASSIF
CANYELLES
S. XX System of tunnels that cut and modify the territory avoiding contact with it.
The metodology Support + Infrastructure + Activities
Friction
+
Rooting 3 Strategies
+
Chaining
3 STRATEGIES
Linked Itineraries
Sustainable Mobility
Environmental Equipment
Recognition of historical territory
Reduce car use
Resource utilization
Cogullada
Daltmar
FROM
TO
GREEN INFRASTRUCTURE
ROOTING
Link the territory to and from settlements. Canyelles
Vertebrate the territory towards a development sustainable and durable Les Palmeres
California
ROOTING
Equipment linked to the territory
Micro centrality + Viewpoint
Itineraries center - agricultural
Itineraries to the sea
Landscape axis
Bike lane
3 STRATEGIES
Homogenean Areas
Ecological corridors
Areas agrĂcolas, bosques de pinos blancos y matorrales.
Forest areas, agricultural areas and roads historical.
FROM
TO
ENVIRONMENTAL SUPPORT
FRICTION
Territory support recognition Ecotones: biodiversity strips that are transition zones between two or more ecological communities.
FRICTION TRANSITION + PERMEABILITY + CONTINUITY Bosc del Collet
Puig del Aguila
Puig de Les Forques
Riera de Vilafranca
Parque del Garraf
3 STRATEGIES FROM
TO
ACTIVITY SYSTEM
CHAINING
Incorporation of productive activities of agricultural areas. Integration of heritage and environmental resources with economic activities.
Cogullada
Nucleo Urbano
Nueva California
Las Palmeras
CHAINING CENTRALITY SYSTEM = CHAINING The nodes establish an urban chain with the old town and the new areas of increase.
Cogullada square
Goverment square
Vilafranca street
California square
Las Palmeras square
EUROPEAN MASTER IN URBANISM REVALUATING THE ECONOMIC MODEL ACADEMIC 2018
BARCELONA - SPAIN
L
FROM LINEAR ACTUAL ECONOMIC MODEL
To recognize the phases of the linear economic model existing in the territory.
50 25 14 11
Production Distribution Sale Abandonated Wasteland
51 19 14 5 11
49 9 18 10 14 25 27 36 4 8
15 38 44 3
34 30 33 3
ECONOMIC ACTIVITIES
To identificate of existing economic activities according to the categories of economic projection of the metropolitan area.
1 29 14 9 5 8 34
Food Resources and Energy Industry Sistem Design Movility Health Culture 13 4 5 2 14 4 6 52
7%
7 17 1 4 17% 1 2 68
Other 1%
4%
1%2%
1%
68%
12 2 7 10 30 33 5
17 1 3 12 10 57
9 4 9 6 42 4 25
TO CIRCULAR PROPOSED ECONOMIC MODEL
To define areas according to the branches of economic activity proposed by the metropolitan area of Barcelona Orange Industry Energy and resources Re-urbanization
PO
Grow - Live - Work
T
Energy ecological corridor Re-industrialization
POTENTIAL ECONOMIC ACTIVITIES
To redefine the categories of economic activities according with the projection of the metropolitan area. Feeding Industry A
PO
Energy and resources Health
T
Design Industry B
Sustainable mobility Culture Industrial system
STRATEGIES
T-1
T-1
T-2 T-2 T-2
T-1
T-1 T-1
T-3 T-3
T-3 T-1 T-3
T-1
T-1
T-1 T-1 T-2 T-2
T-1 T-1
T-1
T-1 T-1 T-1
T-1 T-1
Reurbanization Remodelation Permeability Porosity Consolidation Transformation
T-2
T-2
T-1
T-1 T-1
REDEVELOPMENT Readjustment of the road profile.
REMODELATION <40%
Treatment of built-up fronts on ground floors.
PERMEABILITY Treatment of fronts linked to natural elements in floor 0.
POROSITY Open the block to public spaces.
<10m
<20%
2.0
60% 40%
2.0
60% 40%
CONSOLIDATION Empowerment of economic activity.
TRANSFORMATION Land use change.
CONFIGURATION PROGRESIVE TRANSFORMATION
1.5
70% 30%
ACTION PLAN
+
2.0
60% 40%
+
2.5
60% 40%
URBAN PROJECT FROM THE AGRARIAN PARK TOWARDS COLLSEROLLA Transformation and renaturalization of Canal de la Infanta
Incorporation of land by change of use
URBAN PROJECT Sanson special operation
Revalorization of Salut river
Re-industrialization of the Pla
SUPER BLOCKS STUDENT COMPETITION 2014
BARCELONA - ESPAÃ&#x2018;A
CONCEPT
Connectivity is an attribute that develops in the existence of bond between objects and functions that relate. The physical representation on this concept is an structure conformed by a net of corridors that mobilize assets, services, information and people between different points in the territory.
URBAN MODEL
The projectâ&#x20AC;&#x2122;s main goal is to eliminate the intermediary between the producer and the buyer of food that comes from outside the city. An exchange platform that is used for trading, teaching and form community.