N AT H A L I E
RESTREPO
P R TF Selected Works LI
NATHALIE RESTREPO EDUCATION
CONTACT
May 2018
MASTERS DEGREE IN ARCHITECTURE, FLORIDA INTERNATIONAL UNIVERSITY, MIAMI, FL
May 2017
STUDY ABROAD , TOKYO, JAPAN
July 2013
FINE ARTS FOUNDATION COURSES, TECHNOLOGICAL UNIVERSITY OF PEREIRA , PEREIRA, COLOMBIA
nrest008@fiu.edu 786.548.5765
lANGUAGES
EXPERIENCE
Bilingual in: English Spanish
January 2018 - Present
Basic fluency in: Portuguese Sign Language
August 2017- December 2017
GRADUATE ASSISTANT, ADVANCED THEORIES (NEIL LEACH)
July 2017
COUNSELOR, AIA SUMMER CAMP
June 2017
DESIGN + 3D INNOVATION CONSULTANT,
August 2016 - May 2017
GRADUATE ASSISTANT, STRUCTURAL SYSTEMS 1 & 2 (SHAHIN VASSIGH)
SKILLS
Adobe Suite Microso Suite Revit Rhino Grasshopper AutoCAD Maya Sketchup Lumion
INTERESTS
Design for humanitarian relief Robo c Design & Fabrica on Coding + Visual Programming Short Movie Making Graphic Design
GRADUATE ASSISTANT, ENVIRONMENTAL SYSTEMS 2 (THOMAS SPIEGELHALTER) FLORIDA INTERNATIONAL UNIVERSITY, MIAMI, FL UNDERSTAND REVIT BIM AS WELL AS CDF , FLOW DESIGN, AND GREEN BUILDING STUDIO WORKFLOWS.
November 2015 - January 2016
October 2014
FLORIDA INTERNATIONAL UNIVERSITY, MIAMI, FL CLEAR COMMUNICATION VIA EMAILS, MANAGERIAL TASKS, EFFECTIVE LISTENING AND RESPONSIVE TO STUDENTCONCERNS.
UNIVERSITY OF MIAMI, MIAMI FL FACILITATE DESIGN AND ARCHITECTURE UNDERSTANING, GROUP DIRECTOR
MIAMI BEACH URBAN STUDIOS, MIAMI BEACH FL INTERDISCIPLINARY COLLABORATION WITH MBA STUDENT BUSINESS OWNERS; 3D MODELING, RENDERING AND PROTOTYPING
FLORIDA INTERNATIONAL UNIVERSITY, MIAMI, FL PROJECT MGMT., LEADERSHIP SKILL DEVELOPMENT, EFFECTIVE PUBLIC SPEAKING GRAPHIC DESIGNER, DO NOT SIT ON THE FURNITURE MIAMI BEACH, FL CREATE APPEALING GRAPHICS TO ENTICE AUDIENCE CONSTRUCTION VOLUNTEER, WILLIAM O’ BRIEN’S ARCHITECTURAL INSTALLATION FLORIDA INTERNATIONAL UNIVERSITY, MIAMI, FL TEAM COLLABORATION, TIME MGMT., READ CONSTRUCTION DRAWINGS TO BUILD AS INSTRUCTED BY ARCHITECT
NOTABLE ACCOMPLISHMENTS PROCORE CERTIFICATION IN PROGRESS, MARCH 2018 - APRIL 2018 BEA DESIGN SCHOLARSHIP FINALIST, SPRING 2015 TAU SIGMA DELTA HONOR SOCIETY , SPRING 2017- PRESENT
INTEGRATED BUILDING DESIGN Workforce Housing, Building Systems
TABLE OF CONTENTS
DESIGN 10
Master Plan, Japanese Architecture, Landscape
DESIGN 9
Environmental Systems, Modular Building, Sea Level Rise
DESIGN 8
Miami Beach Pavillion, Responsive Building Skin, Micro-Controllers.
03 07 11 15
INTEGRATED BUILDING DESIGN
There is an increasing need for workforce housing in Miami Beach. This project is an a�empt to create affordable housing while emphasizing a sense of community by creating open outdoor areas that can be used for play, to hold workshops, as well as other ac�vi�es. This structure can be percieved as a “city within a city” in the sense that the emphasis on the ver�cality of the apartment towers helps give a sense of iden�ty within the building complex and also provides opportuni�es for people watching.
13 7
8
79
7 109
8
11
12
13
7
12
8
13
79
7 109
8
8 9 11 10
10 13
12 11
11
12
12
13
13
W8X24
W12X26 W12X26
W12X26W12X26
Ground Floor Framing Plan
W12X26
1" = 20'-0"
1" = 20'-0"
W21X44
W8X24 W24X55
W8X24 W8X24 W8X24 W8X24 W8X24
W27X84
W8X24
W21X44
W8X24 W8X24
W8X24
W8X24
W8X24
Uper Level Framing Plan
W8X24 W8X24
W8X24
W8X24
J
W24X55
W8X24
W24X55
W8X24
W8X24 W8X24 W8X24 W8X24
W21X44 W27X84
W12X26
B
H I
C
D E F G
H I
W21X44
I
W8X24
W8X24 W8X24
E
G
W21X44
W27X84
H
D F
W12X26
W12X26 W8X24 W8X24
W8X24
W8X24
W24X55
W12X26 W12X26
W21X44 W21X44
F
W8X24
W8X24 W8X24
W21X44
W21X44 W24X55
W8X24
W8X24
APARTMENT FRAMING PLAN APARTMENTAPARTMENT FRAMINGResiden�al PLAN FRAMING PLAN Tower 1" = 20'-0"
E
W21X44 W21X44
W21X44
W8X24
W8X24 W8X24
W8X24
W8X24
W12X26
W8X24 W8X24
W8X24 W8X24 W8X24 W8X24 W8X24
W8X24
B
C
G
W8X24
W21X44
W8X24
W27X84
W12X26
D
W8X24
W8X24
W8X24
W8X24
W12X26
W8X24 W8X24
W21X44
W8X24
W8X24
W8X24
W8X24
W8X24
W12X26
W12X26
W21X44
W8X24
W8X24
W12X26
W8X24
W12X26
W8X24 W8X24
W12X26 W8X24
W14X30
W8X24 W8X24
W8X24
W27X84
W12X26
W21X44
W8X24
W12X26 W8X24
W8X24
W14X30 W12X26
W8X24 W8X24
W21X44
W21X44
W24X55 W21X44
W21X44 W21X44
W21X44
W21X44 W14X30
W21X44
W21X44
W21X44
W8X24
W27X84 W8X24
W14X30
W12X26
Structural Axonometric Residen�al Tower AXONOMETRIC NTS STRUCTURAL 1" = 20'-0"
W21X44
W12X26
W8X24
W14X30 W8X24
W8X24
W21X44 W21X44
W8X24
W8X24
1" = 20'-0"
W8X24
W8X24
W8X24
1" = 20'-0"
W8X24
W8X24 W8X24
W8X24
W12X26
W8X24
W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W14X30 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W21X44
W8X24
W12X26
W8X24
W8X24
W8X24
W8X24
W8X24
W8X24
W14X30
W14X30
W8X24
W14X30
W8X24
W8X24
W8X24
W8X24
W14X30
W8X24
C
W27X84
W14X30
W8X24
B
W8X24
W12X26 W27X84 W8X24
W14X30 W12X26 W14X30
W8X24
W21X44
W21X44
W8X24 W27X84
W14X30 W8X24
W8X24 W27X84 W8X24W8X24 W8X24 W8X24 W8X24 W8X24W8X24 W8X24 W8X24 W21X44
W8X24
W8X24 W8X24 W8X24
W8X24
W8X24 W8X24
W14X30
W8X24
W14X30
W27X84
W8X24 W8X24
W8X24
W21X44
W8X24
W27X84
W8X24
W14X30
W14X30
W8X24 W14X30
W12X26
W21X44
W8X24
W8X24
W8X24
W8X24 W8X24
W8X24 W8X24
W8X24
W14X30
W8X24
W8X24
W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W14X30
W8X24
W12X26 W8X24
W8X24
W8X24 W21X44
W8X24 W8X24
W8X24
W14X30
W8X24
W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W8X24 W14X30 W8X24 W8X24 W21X44 W21X44 W24X55
W8X24 W8X24
W8X24 W14X30
W14X30
W8X24 W14X30
W8X24 W8X24
W21X44
W8X24 W8X24 W24X55 W21X44
W8X24 W8X24
W8X24
W8X24
W14X30
W8X24 W14X30
W8X24
W8X24
W12X26
W8X24 W24X55 W27X84
W8X24 W8X24
W21X44 W21X44
W8X24
W8X24 W8X24
W14X30
W8X24 W8X24
W21X44
W8X24
W12X26 W12X26 W21X44
W21X44
W8X24
W21X44 W21X44
W8X24
W8X24
W8X24 W8X24
W14X30
W24X55
W21X44
W8X24
W21X44
W21X44
W8X24
W12X26
W21X44
W21X44 W8X24
W8X24 W21X44
W8X24
W8X24
W8X24 W8X24
W21X44
W12X26
W8X24
W8X24
W21X44
W12X26
W8X24
W8X24
W8X24
W12X26
GROUND FLOOR FRAMING PLAN GROUND FLOOR GROUND FRAMING FLOOR PLAN FRAMING PLAN Residen�al Tower 1" = 20'-0"
W8X24 W12X26 W21X44
W8X24
W8X24 W21X44
W12X26
W8X24
W8X24 W8X24
W12X26
W21X44
W12X26
W12X26 W12X26
W8X24
W8X24
W8X24
W8X24
W8X24 W8X24
W8X24
W8X24 W8X24
W8X24 W8X24W21X44
W8X24 W8X24
W12X26W12X26
W12X26 W12X26
W8X24W21X44 W8X24
W8X24
W8X24 W8X24 W8X24
W12X26 W12X26
W12X26
W8X24
W12X26 W12X26
W14X30
W8X24
W8X24
W8X24 W8X24
W27X84 W24X55
W14X30
W12X26
W14X30
W14X30 W8X24
W8X24 W8X24
W8X24
W8X24
W8X24 W8X24
W8X24
W8X24
W12X26
W8X24 W8X24
W8X24 W8X24 W12X26
W8X24 W8X24
W8X24 W8X24
W8X24 W8X24
W8X24 W8X24
W8X24 W8X24 W12X26
W8X24
W12X26
W8X24
W8X24 W8X24
W8X24
W8X24
- 2 1/8" 13' - 5 " 19' - 6 3/32" 9' W8X24
W8X24
W8X24
W8X24
W8X24
W8X24
W8X24
W8X24
W8X24
W8X24
W14X30
W8X24
W8X24
W8X24
W14X30 W8X24 W8X24
W8X24
W8X24
W24X55
W8X24
W8X24
W8X24
W8X24 W8X24
W8X24
W12X26
W14X30 W8X24
W21X44
W8X24
W12X26
W12X26
W12X26 W14X30
W8X24
W8X24
W12X26
W8X24
W8X24
W12X26 W14X30 W12X26
W21X44
W8X24
A
W12X26
W12X26
W27X84
W12X26W12X26
W12X26 W12X26
W12X26 W12X26
W21X44
W12X26 W12X26
A
W12X26
W12X26
W12X26
W8X24
W12X26W12X26
A
W12X26
W12X26
W12X26
W12X26
W12X26 W12X26
W8X24
W12X26 W12X26 W12X26
W21X44
W12X26 W12X26
7' " 4' 5' - 9 "
7' " 4' 5' - 9 "
W21X44
W21X44
W21X44
W12X26W12X26
W12X26 W12X26
W12X26
W12X26
W12X26 W8X24
W12X26 W12X26 W12X26 W21X44
W21X44
W12X26W12X26 W8X24 W12X26 W21X44
W12X26 W12X26
W21X44 W21X44
W12X26 W12X26 W12X26
W12X26
W12X26W12X26 W8X24 W12X26
W12X26
W12X26
W8X24 W8X24
W8X24
W8X24
W12X26
W12X26
14' - 2 1/32"
W8X24
W12X26
19' - 4 "
W8X24
W8X24
19' - 4 "
14' - 2 1/32"
W8X24
W12X26
W12X26 W12X26 W12X26
W12X26
W12X26
W12X26
19' - 6 3/32" 9' - 2 1/8" 13' - 5 "
14' - 2 1/32" 19' - 4 " 7' " 4' 5' - 9 " 19' - 6 3/32" 9' - 2 1/8" 13' - 5 "
W8X24
W12X26
W12X26
W12X26
W21X44
W12X26 W12X26
W21X44 W21X44 W21X44
W12X26 W12X26
W12X26 W8X24
W21X44 W21X44
W12X26 W8X24
W12X26
W12X26
W8X24 W12X26
W12X26
W12X26
Founda�on Plan FOUNDATION PLAN FOUNDATION FOUNDATION PLAN PLAN Residen�al Tower 1" = 20'-0" 1" = 20'-0" 1" = 20'-0"
W8X24 W12X26
W8X24 W8X24
W21X44
W12X26 W12X26
26' - 10 25/32"
W12X26
W12X26 W8X24
W21X44
W8X24 W12X26
W12X26
26' - 10 25/32"
26' - 10 25/32"
W12X26 W12X26
W12X26
W12X26
10 13
12 11
15' - 0"
W12X26
W12X26
8 9 11 10
W8X24
19' - 2" 9' - 5 11/16" 25' - 4 5/16" 20' - 0" 20' - 4 1/16" 19' - 3 3/32" 9' - 5 11/16" 19' 25'- 2" - 4 5/16" 9' - 5 11/16" 20' 25'- -0"4 5/16" 20' - 4 1/16" 20' - 0" 19' - 320' 3/32" - 4 1/16"15' - 0" 19' - 3 3/32" 15' - 0"
14
W8X24 W8X24
12 14
W8X24 W8X24
13
W8X24 W8X24
11 12 14
W21X44 W8X24 W8X24 W8X24 W8X24
10 13
W8X24
12 11
W8X24 W8X24 W8X24
8 9 11 10
W8X24 W8X24 W8X24
7 109
W8X24 W8X24 W8X24
8
W8X24 W8X24 W8X24
19' - 2"
79
W8X24 W8X24
8
W8X24 W8X24 W8X24
7
W8X24
J
J
Sec�on A-A 1” = 40’ - 0”
Sec�on B-B 1” = 40’ - 0”
Sec�on C-C 1” = 40’ - 0”
B
C
27 th Street 1
2
3
4
5
6
7
8
9
10
11
12
13
Flashing Shading device: Perforated Metal Panels (Holes too small to show at this scale)
e Driv A
D E F G H
J
Insulation Interior Finish
6” Composite Metal Deck
I
+69’
Ground Floor Plan 1” = 40’ - 0” 1
2
3
4
5
6
7
C 8
9
10
12
13
3.5' C.&G.
3 6. 0 000
No Parking
5' SIDEWALK
Electrical Meter
360.00'
DROP CURB
3.5' C.&G.
11
PEDESTRIAN RIGHT OF WAY
SWR
Drains
B
27 th Street
+59’
30'
6” Composite Metal Deck
Collins Ave
+79’
B C
I
6” Composite Metal Deck
A
eek n Cr a i d n
Base Flashing
SWR
5' SIDEWALK
MH 30'
TS
SWR 360.00'
Garbage
25' 72.00'
TSB
20' Setback Front
Drop Ceiling
20'
3 0. 0 000
6” Composite Metal Deck
+49’
Drains
15 301'-2 __ " 16
A
122'-6"
7' SIDEWALK
5' ALK EW SID
D E F G
Drains
UP
Collins Ave
e Driv
H
3.5' G. C.&
I
255'-9 _41 "
6 000 .00
25'
J
7.5'
Indi
-8"
+29’
C
130'
reek an C
Drop Ceiling
B
20' DN
294.32'
30' 360.00'
+39’
8” Concrete Slab
' .00 160
UP
BLOCK WALL
P L
300.00'
Residen�al Level 1 Plan 1” = 40’ - 0” Level Two - Dependent 1 1" = 20'-0"
27 th Street 7
8
9
10
11
12
13
No Parking
Electrical Meter
+9’
360.00'
3.5' C.&G.
PEDESTRIAN RIGHT OF WAY
Ramp Slope 1:12
30'
+19’
SWR
5' SIDEWALK
MH 30'
TS
SWR 360.00'
TSB
Garbage
Drains
A
B
20'
C
122'-6"
DN
D E F G H I
255'-9 _41 "
294.32'
J
7.5'
Residen�an Level 4 Plan 1” = 40’ - 0”
30' 360.00'
Residen�al Tower Axonometric Sec�on NTS
P L
Level Four - Dependent 1 1" = 20'-0"
BLOCK WALL
Collins Ave
= Open Communal Spaces
A
Pavillion
Rock Garden Parking Lot
Japanese Bath House
Sentō
Westernized Lodging
Hotel
Tradi�onal Lodging
Ryokans
Ritual & Bonding
Tea Houses
Japanese Cuisine
Restaurant
Wedding ceremony & contempla�on space
Shrine
Cultural center
Morikami Museum
Corporate retreat space & wedding recep�ons
DESIGN 10
N
Exis�ng Structure
Site Plan NTS
A master plan proposal for expanding Morikami Museum & Gardens. This project is the fruit of a group collabora�on, highly influenced by a trip abroad to Japan. Our aim is to further immerse visitors in the tradi�onal Japanese culture as well as address local needs for company retreats and wedding venues. By relying on Japanese concepts such as wabi-sabi and the enzo symbol, we are able to preserve the essence of the site while crea�ng a new and exci�ng addi�on. OUR PROPOSAL 3D SITE PLAN
EXISTING PROPOSED BY PALM BEACH COUNTY
The newly wedded couple con�nuing their procession towards the pavillion for the recep�on.
Sec�on A-A NTS
A
View from the Pavillion through the courtyard to the Shrine
N
A
Zoomed In Site Plan & Exploded Axonometric NTS
The tea house + Waterfall + Lake serve as a picturesque backdrop view for wedding ceremonies
The orange arrow indicates the path from the Hotel to the Shrine and Pavillion; the red arrow leads from the hotel to the Ryokans and Sentō.
The connec�ng bridge along the orange path
The soil excavated to create the lake is used to generate a gentle change in eleva�on, simula�ng Japan’s mountainous landscapes.
Site Model
DESIGN 09
58’
This modular laboratory serves as a learning center and living space for two scientists. The building is meant to adapt to Sea Level Rise and resist hurricane-force winds. In addition, this structure provides an elevated public space that activates the building, making it an important node along the Indian Creek Greenway (initially proposed by AECOM.)
40'
N Aerial View of Site NTS
PRIVATE BATHROOM
KITCHEN
Hours of Opera�on: 7:00 AM - 8:00 AM 8:00 PM - 9:00 PM
Hours of Opera�on: · 8:00 AM - 10:00 AM 2:00 PM - 3:00 PM 7:00 PM - 8:00 PM
60 sq �
130 sq �
MECHANICAL
100 sq �
BEDROOM
LEARNING CENTER
PUBLIC RESTROOM
Hours of Opera�on: 9:00 PM - 7:00 AM
Hours of Opera�on: · 10:00 AM - 4:00 PM
110 sq �
730 sq �
Hours of Opera�on: 10:00 AM - 6:00 PM 100 sq �
STORAGE ROOM 127 sq �
LAB CIRCULATION 583 sq �
Hours of Opera�on: · 10:00 AM - 4:00 PM
700 sq �
Programma�c Diagrams NTS
View of People Engaging with Public Space NTS
1/4” = 1’-0” Scale Model. En�rely 3D Printed NTS
SERVICE
PRIVATE
SEMI-PRIVATE
Frequent Public Circula�on
PUBLIC
Less Frequent Public Circula�on Private Circula�on
PRIVATE BATHROOM
KITCHEN
Hours of Opera�on: 7:00 AM - 8:00 AM 8:00 PM - 9:00 PM
Hours of Opera�on: 8:00 AM - 10:00 AM 2:00 PM - 3:00 PM 7:00 PM - 8:00 PM
60 sq �
130 sq �
BEDROOM
LEARNING CENTER
Hours of Opera�on: 9:00 PM - 7:00 AM
Hours of Opera�on: 10:00 AM - 4:00 PM
110 sq �
730 sq �
MECHANICAL 100 sq ft
PUBLIC RESTROOM Hours of Operation: 10:00 AM - 6:00 PM 100 sq ft
STORAGE ROOM 127 sq �
LAB CIRCULATION 583 sq �
Hours of Opera�on: 10:00 AM - 4:00 PM
700 sq �
Circula�on & Public vs Private Diagrams NTS
Hollow Steel Bars-
Electrical wires and pipes can be passed through
Vegetaion-
Provides shading
Glass-
Operable Windows allows Cross Ventilation
Solar Panels
This drawing emphasizes the use of passive strategies to reduce solar heat gain . The concrete structure and modular quality is also expressed. Concrete-
Main Structure
Sec�on Perspec�ve + Materiality NTS
DESIGN 08
This project was all about experimen�ng with form and materiality to generate a pavillion that would ac�vate the alleys of South Beach. As I conducted site analysis, I observed a prominent characteris�c which is that of harsh boundaries marking property extents. The responsive facade system I developed is an a�empt to so�en the boundary condi�ons and to celebrate rainfall. The skin is meant to capture rain and “swell” as it becomes fuller. Due to limita�ons, I simulated the act of swelling with air pumps instead of water.
3D printed models showing form experimenta�on using Rhino + Grasshopper
Plexi molds used for cas�ng EcoFlex Silicone
Arduino Micro-conrtollers were programed to inate and light up the pavillion in the ďŹ nal model