Construction documents for Phase 1 of the UW-owned Burke Gilman Trail corridor.
Designed and documented by Nathan J Hilmer for PLACE studio.
Documentation supported by Azad Sadjadi.
Work performed under the direction of Mauricio Villarreal (design principal) and Eric Bode (managing principal).