KSENIA BISTI ARCHITECTURAL PORTFOLIO
01
02
CONTENT Selected Architectural works
00. Curriculum Vitae...............................................................................................04 01. Academic works NECCHI FACTORY RENOVATION. Data storage as a public facility...........................08 LEEUWARDEN 2018......................................................................................................32 URBAN SPORT HUB.......................................................................................................40
02.
Work experience SHOWROOM Rolls Royce...............................................................................................52 INSTITUTE OF PEDIATRIC ENDOCRINOLOGY.........................................................62 MULTIFUNCTIONAL VILLAGE ILYA MUROMETZ....................................................70 PRIVATE INTERIOR......................................................................................................76
03.
Competitions DANILOVSKIJ MARKET................................................................................................82 THE NECESSARY PROJECT. RITMO...........................................................................90
04. 05.
Modelling.........................................................................................................98 Sketching.........................................................................................................118
03
Curriculum Vitae Ksenia Bisti Telephone: E-mail:
Personal skills and competences
Work experience +39 380 4908160 bisti@phobia.it
Languages Russian English Italian Computer skills and competences Adobe Photoshop Adobe Illlustrator Adobe InDesign ArchiCad / Autocad 3D Max+Vray Rhino MS Office tools
Claustrophobia Milano
Entertainment company
Contact Dates Position Duties
www.phobia.it / Milano, Italy November 2015 - current Architect Interior design, scenography, building process control
“Senab Project”
Architectural studio
Contact Dates Position Duties
www.senab.ru / Moscow, Russia September 2011 - April 2014 Former Architect Designing of concept solutions, contractors coordination, site inspections, managing working drawings and documents for all the project phases; visualization
“Paper Team“
Architectural studio
Contact Dates Position Duties
www.paperteam.ru / Moscow, Russia October 2010 - April 2011 Architect/Intern Designing of private housing, managing working drawings and documents for all the project phases; creating representative booklets
“Gerakleya“
Archeological expedition
Contact Dates Position Duties
www.chersonesos.org / Sevastopol, Ukraine July-August, 2004 - 2009 Architect/Archeologist Archeological research of Chersones antique city, depicting constructions and unique findings, drawing plans.
Social skills and competences
04
Personal
Good interpersonal skills in working with different kinds of people, communicative, easy-going and positive
Organisational
Good analytical, developing and tchnical skills; responsible, reliable, persistent, working efficiently and committed
Crossover
Experience in concept development, planning, visualization, budget and scheduling, intermediate knowledge of electric and plumbing
Artistic
Hand drawing, sketching, painting, modelling, book illustration
Education and Training
Academic awards and exhibitions Politecnico di Milano
Entertainment company
Dates Program Level Title of qualification awarded
September 2013 - December 2016 Architecture and Society Laurea Magistrale Diploma Laurea Magistrale in Architettura, 110/110
Moscow Architectural Institute (State Academy) Dates Program Level Title of qualification awarded
September 2009 - July 2011 Architecture of Industrial buildings Specialist / Master of science Achieved Qualification of architect (architecture speciality) Degree/ Diploma with honor
Moscow Architectural Institute (State Academy) Dates Program Level Title of qualification awarded
Participation in several exhibitions, including the gallery “KINO” – Moscow, 2006 Publication in the collection “Science, education, and experimental design work in the Moscow Architectural Institute”, volume 2, - Moscow, 2010 Diploma of the Architectural Festival “GORODA” in Greece - Corfu Island, 2010 Diploma of the club travellers “Centaur” with the CDA, for the project in the framework of the Architectural Festival “ GORODA “ in nomination “The Best philosophical allegory” (diploma and a marble centaur) - Moscow, 2010 University Master degree Diploma with Honour - Moscow, 2011 The Institute Diploma project presented at Moscow exhibition “Arch Moscow” – Moscow, 2012 Publishing the book “Green rose: Spanish national folklore fairy tales” with author’s illustrations - Moscow, 2014 Participation in the exhibition “The Author’s book” - Moscow, 2014 Participation in the exhibition “The Artist and the Book” - Moscow, 2015 Participation in the exhibition for Milano Design week 2015 “Atmospheres” P.H.A.N.T.O.M.S in Politecnico di Milano - Milan, 2015
September 2005 - July 2009 Architecture Specialist / Master of science Achieved Bachelor of Architecture Degree
First prize of the II International Workshop LASUE “The necessary project of public space in the relation between present and memory; project area study P.ta Genova” - Milan, 2015 Arriving to the short list in architectural competition “Danilovskij market” Moscow,2015
05
01. Academic works
Politecnico di Milano [Master Thesis] 2015-2016
NECCHI FACTORY RENOVATION Data storage as a public facility
06
Author: Ksenia Bisti Supervisor: Riccardo Mazzoni
Data center is a very specific structure, which requires a lot of security for the data stored and a lot of special engineering systems (such as special fire protection, energy and cooling systems). Usually, Data centers are very isolated from the city life and look more like castles than the public centers. But why should we hide all that world of cables and connections behind a huge wall? Why can’t we know where does all that data we search live? Data storage is a sort of library of contemporary world, we just don’t need to go there, we get all the information from thousands kilometers away less than in a second. The main idea of the project is to open up the data storage for the public, keeping the safety in the highest level in the same time, and create a Data district, another city center, which allows people to visit a place they had never been before. An abandoned Necchi factory can perfectly fit the needs of a new generation of data center with its amazing structures and wide scale for the new Data Storage district.rants inside the rotating platform an local food market, boat camping and other facilities on coasts); and in the end Landmark, a place to be. The abandoned Necchi factory has a spirit of the past and inspires a visitor with its amazing structures and wide scale. Closed for public visit nowadays, it could be an important and interesting city district with different functions and purposes. The Data storage as a main function of the complex is a very specific purpose, which requires a lot of security and special fire protection, energy and cooling systems. Usually, Data storages today are very isolated from the public and look more like castles than the public centers. The main idea of the project is to open up the data storage for the public, keeping the safety in the highest level in the same time. The complex has technical spaces (storage itself and engineering services), spaces for workers (offices with secure access) and public spaces (museum, hotel, library, conference halls and auditoriums, restaurants and shops, huge park and train station). Mostly the public spaces are grouped around the main path from the canal to the train station. Mixing of functions makes the visitor of the complex be inside of the data center without really being inside the secure space. Glass walls with high safety features and security systems separates public spaces and server rooms, giving the feeling of being inside the usually hidden behind the walls data center.
07
08
Location should be close to Milan, since it is •The commercial and economic center of Italy •Home to over 300,000 national and international businesses •Excellent national and international transport links •Excellent telecom infrastructure •Highly educated workforce The site of abandoned Necchi factory in Pavia fits the requirements of the future facility, which are: Necchi factory existing structure: •Overall site size: 126,000 sqm •Facility size: 68,000 sqm (after reuse, including public facilities such a museum, library etc)
Data storages in Italy Milan Rome Torino Bologna Florence Arezzo Udine Venice Padova Palermo Pisa Pordenone Ascoli Piceno Bari Bergamo Brescia Catania Citta St Angelo Genova Lucca
2 2 2 2 2 2
3
4
5
18
1 1 1 1 1 1 1 1 1 1
Italian data centers
Sondrio
Varese
Lecco Como Bergamo Monza Brescia MILANO
Lodi PAVIA Cremona
Mantova
Biggest data centers of the world and Europe
Necchi factory
09
Necchi factory
City dwelling area
City center
Pavia center map
10
Necchi factory
11
Rizza-Pantaleona
Pavia Nord
Necchi
Castello Visconteo-Musei Civici
Pavia
Via Montebello della Battaglia
Pavia Porta Garibaldi Ex Snia Viscosa Bellaria Pavia Est
Ovest di Pavia
New light metro map
12
Masterplan
Train station in the complex
13
Axonometric view
14
15
1. Cleaning up the site buildings to remove
3. Redistributing of the volumes
parts to cut off
4. Final result
recovered facade
green spaces
new buildings
flexible public spaces
Main steps of design process
16
2. Cutting off the volumes
new buildings
View on the complex from naviglio
17
Hotspot Flexible public space Greenhouse Train station Tennis and badminton fields Bar
Table tennis Cultivated field Open stage for public events Picnic place Flower cultivation Kids playground Internal courtyard Handle bars Music spot Hotspot Library on wheels Historical heritage Summer coffeeshop Open air public events Market place
Bike sharing Restaurant terrace Work interlude
Train station Client service Offices
Restaurant Reception Shop
Public library Museum Conference hall Hotel
Restaurant
Conceptual program and distribution of the space
18
View on the museum
19
Activity loop as a running path with stops for different kind of exercises
Landscape loop as a nature path for gardening and outdoor activities
- tennis fields - basketball fields - badminton fields - handle bars - stretching spaces
- Greenhouse - Cultivated fields - Flower cultivations - Kids playgrounds
Loop concept of organization of the space
20
Diversity loop as a work and leisure path with hotspot stops for different kinds of activities - Hotspots - Music spots - Gathering - Food courts/trucks - Extraordinary occurrences -Weekly events -Work interlude -Open air shows - Market place - Outdoor coffee shops - Soundstages
Park view
21
Underground floor scheme Redundancy principle
Technical space Public space Private space
Underground floor scheme
Ground floor scheme
Redistribution of the space
Redundancy and energy redistribution schemes
22
First floor scheme
Second floor scheme
Third floor scheme
Public library view
23
Ground floor plan
Section
24
First floor plan
View on the complex from naviglio
25
Scheme for perforated skin of hotel
Glazed facade
Scheme for perforated skin of museum
Vertical structural elements
Horisontal structural elements
Glazed facade
Perforated shell
Structural scheme. Hotel
Public space with the site view
Facade 1. Opaque shell for conference rooms
Vertical structural elements
Hotel rooms
Facade 2. Transparent shell for the site view
26Facade 1.Gradient opacity for different functions of public space Museum wirh permanent exposition
Horisontal structural elements
Perforated shell
Structural scheme. Museum
Conference rooms and auditoriums
Facade 3. Different levels of opacity for different functions
Public space with the site view
Facade 2. Transparent shell for the site view
Facade 3. Opaque shell for the exhibition
Section. Hotel
Section. Museum
27
01. Academic works
Politecnico di Milano [Design studio 2] 2014-2015
LEEUWARDEN 2018
28
Design team: Bisti Ksenia, Valentina Manente Professors: Mark Visser, Elisa Cataneo, Davide Colaci
Working on the strategy for Leeuwarden as a city of Cultural Capital of Europe 2018 we considered the existing water system as the main point of interest and the main connector as well. We decided that cultural capital should be considered not only in terms of city scale, but rather in regional one. The analysis of the report from European Union about the ECOC showed us clearly that the most effective strategy is to involve the entire region around chosen city. That is why the Frisland region was analyzed on a macro scale, in order to find points of interest and attraction and to make them magnets for visitors. Artificial canals are the old and effective system of communication in the Netherlands. The choice of thewater system as the main factor of Cultural capital Event, we analyzed canals as connections of the region: they are subdivided into several types depending on their depth, width and capacity. Using them as main arteries in order to bring people in any place of the province, we consider canals as main connectors. We choose the canal between Leeuwarden and Harlingen-Haven in order to demonstrate our strategy. The canal is big enough in terms of navigating and traveling, so we organized a regular ferry boat with several stops along the canal, bringing people to different parts of the region as cities and also natural and agricultural points of interest. Working on the “FrisianHub”we followed the developed strategy and analysis had been done on the context. Our intervention works on two fronts. First of all, reconnection of the isolated territories, and secondly reaction to the artificial nature of the landscapewith a strong sign that underline the statement. The shape of the “artificial lake” of the Hub is related to those fronts of development and with organization of the rotatingplatform which is technically a moving bridge, gives the connection to the whole area and gives opportunity to people to experiencing the Mienskip by interacting with the locals while visiting the hinterland. Apart of transportation meaning, the Hub has a strong symbolic sign of connector and the landmark in analogy with the Erasmus Bridge in Rotterdam. By the event of Cultural capital of Europe of 2018 the Hub and public space around it developed as an architectural intervention provides different functions for visitors such as connection and transportation (moving from disconnected sides of canals and organizing a stop of the regular Ferry boat); interchanging point (bike and boat rental centers, bus stop, train station and pedestrian ways); cultural events (exhibition space inside of the device itself, stage to host musical and theatric events); public spaces (site view points, bars and restaurants inside the rotating platform an local food market, boat camping and other facilities on coasts); and in the end Landmark, a place to be.
29
Map of attraction points in Frizland
30
Scheme of main attraction points in Frizland
The overall system
31
I Nodes for development
Stages of node V
32
II
III
IV
V
VI
Longitudial section
Plan of the first desck
Cross section
Functional scheme
33
01. Academic works
Politecnico di Milano [Design studio 1] 2013-2014
URBAN SPORT HUB
34
Design team: Bisti Ksenia, Jens Holm Professors: Matteo Poli, Roy Nash, Riccardo Mazzoni
The concept is in creating of interchanging points all around Milan in order to give possibility to people to change different types of transportation and also participate different sport activities without going to special gyms or sport centers. Interchanging is meant to be not just from suburbs to the center and backwards, but the important thing is to provide the opportunity for locals and people who move from one suburban area to another. The sport Hub and alternative transportation interchanging node in Porta Genova is created by specifying different features of existing landscape, defining movements of people through the whole area and giving different functions to each of three sides of given area. Master plan is presented by modulus details which create different atmospheres and facilities in the whole park. They are mixing and working together as a whole system with different density. The main building provides all the facilities like cafĂŠ, shops, bike sharing service and canoe club, changing rooms, showers and lockers, which are designed for people who change the type of transportation at this Hub every day and also for users of skate park, canoe club and yoga center.
35
36
URBAN “PORTA“ concept Transportation changing node / Sport hub
37
URBAN “PIXELS’ concept
38
“COAST” - social zone A place for social wellbeing. Meeting. Exchange. Interaction. Venut. Dialogue. Extrover
“MOUNTAINS” - storts zone
“WOODS’ - relaxing zone A place for physical wellbeing. Introvert. Oasis. Isolation. Rest. Peaceful. Meditative.
“COMMUNICATION” - movements A place for connection. Transportation. Interchange. Infrastructure. Mobility.
39
Masterplan
40
Landscape sections
41
Section 1 42
Section 2
43
02. Work experience
Senab Project [Architectural studio] 2013-2014
SHOWROOM Rolls Royce
44
Design team: Bisti Ksenia, Dmitriy Prokofjev Location: Russia, Saint-Petersburg
Placing the Rolls Royce showroom in the center of the city, moreover in a hotel with such a long history, we wanted to create at least a small intrigue. Visitor moves in the kind of enfilade. Entering from the street, then passing the first, larger room, but with a low ceiling and a simple lack of natural light, and then, passing a small rise, narrowing, and, finally, the visitor is entering a second, smaller room, but with a skylight - and this is the culmination. Ceiling jumps up and opens the sky - lots of light and plenty of space.
45
46
Showroom floor plan
47
Showroom working drawings
48
Structure of the ceiling
49
50
Photos of the interior
51
02. Work experience
Senab Project [Architectural studio] 2008-2013
INSTITUTE OF PEDIATRIC ENDOCRINOLOGY Design team: Bisti Ksenia, Dmitriy Prokofjev, Daniil Rogojnikov, Alexandr Bondarenko, Marina Lapshina, Natalia Birukova, Vasiliy Zapenin Location: Russia, Moscow
52
Institute of Pediatric Endocrinology is the final step of the developing of the Endocrinology Research Center in Moscow. The complex consists of two new buildings - Medical Diagnostic and Subsidiary buildings. Medical-diagnostic building includes a full range of modern medical research institution from radio therapy and maternity to surgery rooms and all necessary laboratories. Since Endocrinology Research Center is a leading research institute of endocrinology in Russia, it needs both - the main medical building and also the methodological center. So the auxiliary building includes a conference room for 400 people, a mini TV studio, a hotel with 40 rooms and other related services.
53
54
Floor plans and schemes of moving of visitors and workers
Bird view
55
Photos of the developed complex
56
View on the Subsidary building
57
02. Work experience
Senab Project [Architectural studio] 2012-2013
MULTIFUNCTIONAL VILLAGE ILYA MUROMETZ Design team: Bisti Ksenia, Dmitriy Prokofjev, Daniil Rogojnikov, Alexandra Kudryashova, Lubov Vasiljeva, Ekaterina Shvidchenko, Vasiliy Zapenin Location: Russia, Moscow area, Bolshoye Sovrasovo
58
The site where the village is located is the picturesque bank of the river Pakhra, gradually going down to the water’s edge. The structure of the village is a three-part composition. In the center, in the middle of the park area, sports facilities are located; on the left quarter there are blocked dwellings and the right part is designed for individual cottages. All the parts of the village - sports facilities, commercial buildings and row houses united by a single material facades, but painted in their colors.
59
Renders of shopping mall
Shopping mall under construction
60
Renders of the main parts of the project
61
02. Work experience
Freelance work 2016
PRIVATE INTERIOR
62
Author: Bisti Ksenia Location: Italy, Milano, Porta Nuova
Private interior in one of the towers of Porta Nuova was designed according to the client’s preferences and kept the modern style of apartment design. Living room has cold colors and a lot of light coning from the wide windows of the building. Textured stucco of the walls emphasizes dark wooden texture of the library, designed specially for this apartment. Furniture choice was made on Minotti brand, including sofas, coffee table, chairs and armchair. The design of bedrooms was based on warmer colors to create more cozy atmosphere of the private spaces. Different textures and colors of stucco in different rooms makes the apartment more interesting, keeping the same style in the same time.
63
Bedroom renders.
64
Living room renders. Design of the library
65
03. Competitions
[Competition] 2015
DANILOVSKIY MARKET Short list of finalists
66
Design team: Bisti Ksenia, Anna Chistopolova, Ivan Moiseenko Location: Russia, Moscow
Creation process of such a major cultural center is important, not only the development of expressive three - dimensional solution, but also the organization of adjoining territory, which is affected by the closeness of the river. The whole complex is raised at the stylobate, which goes directly from roadside pavements with wide alley. Recreation area with a fountain and benches is located a level below, so the flows of people, who go to the show and those, who just enjoy spending time in this area, are separated. The main function of the complex is still a product market, so as the main part of the project there was the system of modular selling tables organized in different ways. Counters are composed by universal cell, which can create diferent variations.
67
Different options of counters combinations
68
Conceptual schemes of space distribution
Danilovskiy market as a landmark in Moscow
69
Shopping passage
Goods loading
Shopping gallery Courtyard farm Second storey gallery
Multifunctional public space Second storey gallery
3D-scheme of the ground floor with surrounding
70
Scheme of flexible external space
Section
71
03. Competitions
Politecnico di Milano [Workshop competition] 2015
THE NECESSARY PROJECT. RITMO First prize
72
Design team: Bisti Ksenia, Camilla Mori, Diana Ranghetti Location: Italy, Milano, Porta Genova
La stazione luogo di transito vari elementi si muovano in varie direzioni, su vari piani, a varie velocita; alcuni in maniera disordinata, altri seguendo un ordine. Su tutti il treno e il protagonista, quello dove gli altri elementi cercano una guida e lui stesso trova la sua nel binario. Ma il treno medesimo non ha un ritmo stabile, bensi un’ alternanzadi momenti veloci, momenti lenti e momenti fermi. E tutti gli altri assumono contemporaneamente lo stesso ritmo, fino a che, in maniera volontaria ritrovano il proprio, abbandondndo la stazione. La memoria di un posto cosi non puo che restare la’ dove, su una guida, saranno permessi movimenti in varie direzioni su vari piani ed a varie velocita. alcuni in maniera disordinata, altri seguendo un ordine. la presenza di protagonisti principiali guidera gli altri elemeniti a ritmi diversi per riconduri ai propri. Ed a questo punto i binari si moltiplicano, si interescano, si spezzano, si svuotano e si avvicinaro e diventano guida di ritmi fermi lenti veloci ritmi urbani.
73
74
Plans
Masterplan
75
3D functional scheme of the complex
76
Project sketches
77
04. Modelling
[Modelling] 2011-2016
THE MODELS
78
Works by: Bisti Ksenia with design team members
‘‘Architecture is not an inspirational business, it’s a rational procedure to do sensible and hopfully beautiful things; that’s all” - Harry Seidler
79
80
Politechnico di Milano thesis model “NECCHI FACTORY RENOVATION. Data storage as a public facility“
81
Politechnico di Milano thesis model Details. “NECCHI FACTORY RENOVATION. Data storage as a public facility“
82
83
Moscow Architectural Institute History of architecture course model REIMS CATHEDRAL Co-author: Evgeniya Bobkova
84
Politechnico di Milano design studio concept model “LEEUWARDEN 2018“
85
Politechnico di Milano workshop model “THE NECESSARY PROJECT. RITMO. Sinfonie Urbane“
86
87
88
Politechnico di Milano workshop model Details. “THE NECESSARY PROJECT. RITMO. Sinfonie Urbane“
89
Politechnico di Milano design studio model “URBAN SPORT HUB“
90
91
92
Politechnico di Milano design studio model “PIOLTELLO“
93
05. Sketching
THE SKETCHES
94
[Sketching] 2014-2016
Works by: Bisti Ksenia with design team members
‘‘The world is but a canvas to our imagination” - Henry David Thoreau
95
96
97
98
99
100
101
102