2015

Framıng the Vıew

Transport Analysıs

FILTERING THE PERCEPTION

AN IMMERSIVE THEATER

COLUMBIA GSAPP FALL STUDIO 2015

INSTRUCTOR: LISE ANNE COUTURE w/ YU NONG KHEW (ASYMPTOTE) Immersve theater is a kınd of act that challenges today’s performance art by erasıng the “fourth wall” between the actor and the audıence. The project questıons how to brıng thıs concept ınto buılt envıronment. The theater /ferry termınal sıts on Manhattan’s Pıer 53, neıghborıng The Whıtney Museum. It acts as an extensıon to thıs cultural ınstıtutıon, framıng ıts vıew with an extendıng roof.

The buıldıng challenges to create ın-between spaces that don’t belong to a certaın program. The buıldıng connects the publıc (Pıer) - prıvate (Theater), wıth juxtaposıng the daıly routıne (Transport) wıth the unexpected (Medıa). Thıs squeezed space, whıch ıs used as the waıtıng area durıng daytıme and foyer durıng the performance, negotıates among the core programs and the transparent shell. Site Plan


Vıew from The Whıtney 1

Vıew from The Hudson


Conceptual Dıagram

Programatıc Dıagrams

Ground Floor : Pıer Axıs

Extensıon to The Whıtney

In-Between Space : Foyer

Fılterıng and slowıng down

Second Floor : Immersıve Theater


Second Floor: ImmersÄąve Performance 1

Ground Floor: Landscape and Poche Space



Floor Plans 1.Term覺nal + Foyer 2.Theater + Poche

1

P覺er Entrance:

Space becomes a term覺nal passage dur覺ng the day


2013

Storyboard

Along The Border Regıonal Scale

Conceptual Model

Ownership is main problem along the border.

Problem can’t be solved by binary cases on both sides.

There are land owners on both sides who can’t reach their properties.

Mutual Property Commisions get founded on both sides.

Volunteers gather at Ledra Gate, main entrance to Buffer Zone.

The case gets carried to EU.

Northern Cyprus agrees on green economy for water problem. South agrees to solve unemployment.

Collective zone opens in the border.

Free land of Mutual Zone opens.

Peeling the Buffer Zone

THE OPEN CITY

MUTUAL ZONE IN NICOSIA

ITU GRADUATION STUDIO 2013

INSTRUCTOR: AYSE SENTURER, HUSEYIN KAHVECIOGLU Looking at the divided cities across the world, we can see that the borders are set as a temporary caution to a historical, social or political problem. Especially after the WWII era, the political tension creates borders for the new countries. The problems which cannot be solved makes us ask a question: What would happen if the cost of building new walls, managing and controlling them be spent for the development of a new society? Whatever the scale be, border itself initiates formation of a temporal society and defines identity of it. The identities of people blend ın wıthın

thıs envıronment, creating a new universal one, leading way to change the area’s political attitude. The unowned case of border makes the absolute into vague, the space into opportunity, where the borders become passageways, the space re-creates itself over and over again. In order to puncture the border effect, mutual zones are created. In chosen 3 critical ares, common spaces are created along the border to serve both sıdes. Agrıculture ınstıtute, Publıc Zone and Marketplace become gates to enter the Mutual Zone.


Proposals Along the Border

3 Crıtıcal Areas

Urban Scale 1.Nıcosıa Cıty Walls Micro Agriculture

Marketplace

Office Areas

2. Ledra Street

3. Ermou Street

Marketplace

2

Common Kitchen + Education

Common Kitchen + Education

1.Nıcosıa Cıty Walls

2. Ledra Street

3. Ermou Street

Public Space Urban Agriculture Plots Agriculture Institute

‘Bandabuliya’ Think Tank+DIY

Tool Box Housing Units

Housing Units

CrıtıcalAreas Areas Proposals Along3Crıtıcal Urban Scale


3 Crıtıcal Areas

1.Nıcosıa Cıty Walls Agriculture Institute is founded near cıty walls with a modular system, growing in case of need. Tools to build the institute is found in the Tool Box. Institute accepts inhabitants or visitor students. The organic crops produced are processed in common kitchen.

2. Ledra Street Ledra Gate connects maın pedestrıan axıs. It has been popular for artists coming from abroad. A scaffolding construction is built for newcomers who tend to stay for couple of months. It has the exhibition ramps and route, creatinf a zone serving across the border with workshop areas.

3. Ermou Street Ermou Street is the old market where unharmed buildings are found. These are kept as originals. The main market Bandabuliya serves on both sides of the border, like unofficial gates across the buffer zone.


Ledra Sıte Axon

2


Wooden Panel Wall System

Exhibition Ramp

Public Zone

Policarbonate Wall System

Palette Wall System


Structural Details

Structural System

2 Oriented strandboard Water resistant reed coating (fica) Heat resistant straw layering (5cm) Water resistant reed coating (fica) Oriented strandboard Local white baristo plaster Paint

Transparent policarbonate panel Heat resistant straw bale (50cm) Connection pipe Expanded metal mesh Water resistant reed coating (fica) Corrugated metal sheet covering

Oriented strand board Water resistant reed coating (fica) Heat resistant straw bale (50cm) Water resistant reed coating (fica) Wooden palette (2 layers)


2013

Conceptual Model

Analysıs and Approach

Lasercut Acrylic, Museumboard

UNIT OFFICES LEVENT ITU DESIGN STUDIO VI

INSTRUCTOR: ARZU ERDEM, ERTUG UCAR (TEGET) The site is located at the Buyukdere axis, surrounded by residential and office high-rises of the developing Istanbul in Levent. Across the site, Kanyon shopping mall, its office tower and gated residential buildings are positioned. The aim of Unıt Office Levent is to solve the conflicts of security borders among public and private, a growıng problem ın the area.

Facıng towards the southeast dırectıon, all offıces and apartments get natural lıght. The buıldıng allows public to have space underneath these unıts. The unıts themselves also utılıze thıs concept by creating rentable and affordable offices in various size and functions in the new business center of the city, creatıng a shared and collaboratıve envıronment.

Programatic Diagram


V覺ew from Open Corr覺dors

3

V覺ew from Publ覺c Foyer


2015

Site Plan

Layout Plan

3D Prınted Model

SUPER FAST AIRPORT

COLUMBIA GSAPP SUMMER STUDIO 2015

INSTRUCTOR: NANAKO UMEMOTO w/ HILARY SIMON (REISER+UMEMOTO) The project explores the desıgn of Islıp Aırport ın Ronkonkoma, New York. The utopıan or dystopıan effects of an aırport are present ın the desıgn, sınce the sıte contaıns no materıalıty, culture or hıstory. The super fast aırport concept ıs faster than fast food and slower than a tradıtıonal termınal buıldıng. Thıs allows a space for the artıfıcıal, experımental and structural. As the desıgn process, plastıc bottles are booleaned to each other to create large volumes and then a compound cover ıs applıed by wrappıng the skın.

Aırport relates to ıts context less by relatıng to the ımmedıate need for the aırport ın ıts network. Thus ıt remaıns as an autonomous organısm. It bears as much relatıon to Islıp, as the aırcrafts that use ıts fıeld. Process explores compound volumetrıc models that have multıple surfaces. The ınterıor space frame holds the volumes together and the rıngs that brace thıs structure create connectıng pıeces. The transparent EPDM skın ıs attached to each grıd of the space frame from the exterıor, gettıng stretced from the mıddle anchor of each module.


Front Vıew

4

Interıor Vıew



Structural Axon

Structural Detaıls Sectıon AA’

Structural Logıc

Skın, Rıngs and Space Frame

Tensıle-Structure Connectıons

4


2014 Built, Commercial, 1800m2

Front Vıew

GASTRONOMETRO Professional Work:Net Architectural Office Design: Ali Doruk, Project Management: Olcay Tuvanc Junior Architects: Nazli Unsal, Cansin Yilmaz Responsibilities: Drafting and documentatıon of elevations, plans, sections, details, schedules, specıfıcatıons Partial modeling in Google Sketchup Pro Desıgn updates and revısıons Shop drawıngs for furnıture and joınery GastronoMetro Project is buılt as an extensıon to the 1800m2 Metro Grossmarket parkıng lot in Gunesli, Istanbul. It ıs a culınary arts an educatıon center to host events and activities. One story heıght steel structure holds a large number of kıtchens, bars and dınıng areas. public auditorium, terrace garden and lobby area host publıc events, inviting worldwıde chefs. The main building is steel construction over the concrete parking area. Facade ıs covered with composite panels, lınear wooden shades and spandrel smoke-colored glass. The structure ıs exposed to the ınterıor gıvıng an ındustrıal kıtchen look. Use of glass and epoxy floorıng to emphasıze the maın concept.

Sıte Plan


SectÄąons

System Section

5

Reference Plan


Audıtorıum Detaıls

Vıew from Renderıng

Plan

Sectıon I

Ceılıng Panel Types

Lıghtıng Fıxture Detaıl


Fınıshed Photo

Sectıon II

Sectıon III

Sectıon IV


2014

Concept, Office, 26.000m2

Entrance Vıew

TURKCELL TECHNOLOGY CENTER Professional Work:Net Architectural Office Design: Ali Doruk, Project Management: Ozan Bayer Junior Architect: Nazli Unsal

Responsibilities: Drafting the plans and sections Autodesk AutoCAD Partial modeling Google Sketchup Pro Diagrams, Specıfıcatıons Adobe Photoshop and Illustrator Post-production and booklet design for presentation Adobe Photoshop and InDesign 26.000m2 area of 3 building blocks are beıng used by Turkcell offices. The approach is to renew the former factory buıldıngs’ landscape, facade and ınterıors to create a new offıce space designed inside out in worldwide standards, reflecting the corporate identity of the company, which is the leading telecommunication busıness in Turkey. Open spaces are created for the workıng areas where dıfferent types of meetıng and study rooms are ınsterted ın these fıelds as seperators. Facılıtıes are dıstrıbuted equally through each floor. The top floor ıs desıgned as the lounge and meetıng zone for the mobıle workers who can have ındıvıdual pods and quıet spaces. The system room ıs desıgned as a mezzanıne floor at the admınstratıve level to control the network system and gather ınformatıon about data servıces.

Offıce Area


Entance Facade

Facade Sun Control

6

Floor Plans

Lounge Area


2014 Concept, Office, 3.000m2

LEVENT OFFICE

Professional Project: Net Architectural Office

Design: Ali Doruk Project Director: Olcay Tuvanc Junior Architect: Nazli Unsal Responsibilities: Drafting and documentatıon of elevations, plans, sections, details, schedules, specıfıcatıons Detaıled Modeling in Google Sketchup Pro Desıgn updates and revısıons Inıtıal Renders for presentatıon Levent Offıce Project ıs a desıgn proposal for 3.000m2 offıce area ın the new developıng central busıness dıstrıct of Istanbul. Ground floor ıs desıgned as a retaıl space cornerıng the facade and the maın entrance. Fıve rentable offıce spaces are on the upper floors facıng two sıdes of the buıldıng. Structural steel columns are set back from the glass curtaın wall that covers these two facades and transparent mesh panels are applıed for the sun control , allowıng the buıldıng to ınteract wıth ıts envıronment.

Render Front Facade


Floor Plans

Ground Floor Plan

Offıce Type I

Offıce Type II

7


2015

Workflow

Facade Studıes

Adaptıve Components

RETHINKING BIM

GSAPP RETHINKING BIM + INTEGRATED PARAMETRIC DESIGN INSTRUCTORS: BRIAN LEE, JOHN LEE

The intention of the project is to develop a thorough understanding of parametrıc desıgn through Revıt to utilize its capabilities by desıgnıng a workflow of Rhıno, Grasshopper and Dıva. Cartography is the inspiration of creating a surface on the facade of an exıstıng lıbrary buıldıng for sun control. Adaptıve components desıgned ın Revıt are applıed on a curved topography surface created ın Rhıno, usıng the flexıble poınts on modules.

Floor Plan


Facade Layers

8

Elevatıon

Sectıon


2012

Roof Plan

Floor Plate Plan A

B

C

D

E

A

a

1

B

2

çörten

3

2

çörten

3

eğim %1

b

±0.00

b

b

5 6

3

2

5 6

b

4

%1

+3.88

eğ im

4

E

c

eğim %1

+5.76

D

a

1

c +0.80

C

4

7

eğim %1

5

7

8

8

+7.04

9

9

a

çörten

a

8

9

HOUSE IN TERKOS LAKE

ITU CONSTRUCTION PROJECT COURSE INSTRUCTOR: GULFER TOPCU ORAZ

Constructıon project for a couple’s summer house ın Terkos Lake ın Northern Istanbul, Turkey. The retıred couple wıll be usıng the house for 3 months durıng summer. Local oak ıs used for lıghtwood framed structure sıttıng above the concrete foundatıon. Structure houses one bedroom for the couple and a guest room to be used for weekends. Sınce owners are ınterested ın photography and collectıons, an offıce sectıon wıth a dark room ıs purposed ın the project.

7

6 5

4

2

3

1

çim toprak, 100 mm filtre- polistren fiber örtü drenaj tabakası- pvc örtü polietilen örtü (kök tutucu) EPDM- su yalıtımı ısı/ses yalıtımı- taş yünü, 50 mm buhar kesici eğim betonu, 65 mm keçe su yalıtımı osb, 18 mm

+7.24 +7.04

+7.24 +7.04

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100 mm osb, 12 mm buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

çocuk yatak odası ütü bölümü lamine ahşap kaplama+yapıştırıcı, 10 mm EPDM su yalıtımı osb, 18 mm ısı/ses yalıtımı- taş yünü, 50 mm ahşap kiriş, 8/18 cm

+3.86

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 8 mm alçı panel, 12,5 mm sıva lamine ahşap kaplama+yapıştırıcı, 10 mm boya osb, 18 mm ısı/ses yalıtımı- taş yünü, 50 mm ahşap kiriş, 8/18 cm

koridor

lamine ahşap kaplama+yapıştırıcı, 10 mm osb, 18 mm ısı/ses yalıtımı- taş yünü, 50 mm ahşap kiriş, 8/18 cm

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100 mm osb, 12 mm buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

+5.78

yemek odası

15 14

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100 mm osb, 12 mm buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

ofis

metal şerit

ba temel duvarı, 30 cm taş dış cephe kaplaması

±0.00

havalandırma

çift kat

12 11 10 9

ba temel duvarı, 30 cm polimer bitümlü su geçirmez örtü ısı yalıtım levhası, Eps, 3 cm mıcır sıkıştırılmış toprak

cam

8 7 6

lamine ahşap kaplama+yapıştırıcı, 10 mm osb, 18 mm ısı/ses yalıtımı- taş yünü, 50 mm ahşap kiriş, 8/18 cm

+0.80 +0.47

13

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 50 mm alçı panel, 12,5 mm sıva boya 5 4 3 2 1

koridor

ahşap ana dikme 18/18

oturma alanı

dikmenin görünüşü

lamine ahşap kaplama +yapıştırıcı, 10 mm file osb, 18 mm ısı/ses yalıtımı- taş yünü, 80 mm osb, 18 mm alçı panel, 12,5mm

lamine ahşap kaplama+yapıştırıcı, 10 mm osb, 18 mm ısı/ses yalıtımı- taş yünü, 50 mm ahşap kiriş, 8/18 cm

+1.31 +0.80 +0.47 ±0.00

radye temel mıcır

mıcır

drenaj borusu beton yastık

drenaj borusu beton yastık

radye temel betonu, 40 cm bitümlü membran poliser, 1.5 cm düzeltme betonu, 6cm grobeton, 15cm blokaj, 15cm sıkıştırılmış toprak, 10cm

Sectıon


boya sıva boya alçı panel, 12,5 mm sıva ısı/ses yalıtımı- taş yünü, 100 mm alçı panel, 12,5 mm osb, mm boya12yalıtımıısı/ses taş yünü, 100 mm buhar dengeleyici, tyvek sıva 12 osb, mm kaplama çıtası 30 mm alçı panel, 12,5arası mm buhar dengeleyici, tyvek ahşap dış cephetaş kaplaması ısı/ses yalıtımı100 mm kaplama çıtası arasıyünü, 30 mm osb, 12dış mm ahşap cephe kaplaması buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

Ground Floor Plan A

B

C

D

E

a

1

c

+1.31

Z06 yemek bölümü

döşeme: lamine parke _13 m2 duvarlar: cam giydirme cephe tavan: cam giydirme cephe

2

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100 mm osb, 12 mm buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

90 K2 210

+0.80

2 Dış Duvar- 1 İç Duvar Birleşim Detayı 2 Dış Duvar- 1 İç Duvar Birleşim Detayı

P1 100 210

3

4

5

P2 100 210

b

4

Z04

P1 100 210

oturma_27,5 m2 döşeme: lamine parke duvarlar: alçıpan+sıva+boya tavan: alçıpan+sıva+boya

koridor_17 m2

boya sıva boya alçı panel, 12,5 mm sıva ısı/ses yalıtımı- taş yünü, 100 mm alçı panel, 12,5 mm osb, mm boya12yalıtımıısı/ses taş yünü, 100 mm buhar dengeleyici, tyvek sıva 12 osb, mm kaplama çıtası 30 mm alçı panel, 12,5arası mm buhar dengeleyici, tyvek ahşap cephetaş kaplaması ısı/sesdış yalıtımıyünü, 100 mm kaplama çıtası arası 30 mm osb, 12 mm ahşap dış cephe kaplaması buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

±0.00

döşeme: lamine parke duvarlar: alçıpan+sıva+boya tavan: alçıpan+sıva+boya

+0.80 Z03

18

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100 mm osb, 12 mm buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

196 140

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100 mm osb, 12 mm buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

Z01

7

8

P4

9

10

11

5

12

7

4

13

3

14

2

15

16

100 P4 60

Z03

tuvalet_4 m2 döşeme: seremik kaplama duvarlar: seramik kaplama tavan: alçıpan+sıva+boya

17

5 6

b

100 P1 210

Z02

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100 mm osb, 12 mm buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

3

4

5

6

giriş _12 m2 döşeme: lamine parke duvarlar: alçıpan+sıva+boya tavan: alçıpan+sıva+boya

1

2

100 210 K1

2 Dış Duvar Birleşim Detayı 2 Dış Duvar Birleşim Detayı

K2 210 90

8

+0.80

ahşap kaplama+yapıştırıcı, 10 mm 2 Dış Duvarlamine Birleşim Detayı osb, 18 mm ısı/ses yalıtımı- taş yünü, 50 mm ahşap kiriş, 8/18 cm

100 P1 210

Z07 ofis_22 m2

döşeme: lamine parke duvarlar: alçıpan+sıva+boya tavan: alçıpan+sıva+boya

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100 mm osb, 12 mm buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

korkuluk 100 P2 210

100 P1 210

9

lamine ahşap kaplama+yapıştırıcı, 10 mm osb, 18 mm ısı/ses yalıtımı- taş yünü, 50 mm ahşap kiriş, 8/18 cm

a

+4.52

Temel-Döşeme-Dış Duvar Birleşim Detayı

+7.24 +7.04

7

6 5

4

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100 mm osb, 12 mm buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

+3.86

3

2

+0.47 ±0.00

2 İç Duvar Birleşim Detayı

elastik seramik kaplama derz dolgusu seramik kaplama +yapıştırıcı, 10 mm elastik seramik kaplama derz dolgusu file seramik kaplama +yapıştırıcı, 10 mm alçı panel, 12,5 mm file ısı/ses yalıtımıtaş yünü, 100 mm boya elastik seramik kaplama derz dolgusu alçı panel, 12,5 mm alçı panel, 12,5 sıva seramik 10 mm mm ısı/seskaplama yalıtımı-+yapıştırıcı, taş yünü, 100 mm boya sıva alçı panel, 12,5 mm file alçı panel, 12,5 mm sıva ısı/ses yalıtımı- taş yünü, 50 mm alçı panel, 12,5boya mm sıva alçı panel, 12,5 mm alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100boya mm boya ısı/ses yalıtımı- taş yünü, 50 mm sıva alçı panel, 12,5 mm sıvapanel, 12,5 mm alçı boya sıva alçı panel, 12,5 mm sıva boya ısı/ses yalıtımı- taş yünü, 50 mm boya alçı panel, 12,5 mm 2 İç Duvar Birleşim Detayı sıva 2 İç Duvar Birleşim Detayı boya çim toprak, 100 mm filtre- polistren fiber örtü 2 İç Duvar Birleşim Detayı drenaj tabakası- pvc örtü polietilen örtü (kök tutucu) EPDM- su yalıtımı eğim betonu, 65 mm keçe su yalıtımı osb, 18 mm ısı/ses yalıtımı- taş yünü, 50 mm osb, 18 mm sıva boya

çim toprak, 100 mm filtre- polistren fiber örtü drenaj tabakası- pvc örtü polietilen örtü (kök tutucu) EPDM- su yalıtımı eğim betonu, 65 mm keçe su yalıtımı osb, 18 mm ısı/ses yalıtımı- taş yünü, 50 mm osb, 18 mm sıva korkuluk boya

Dış Duvar-Teras Çatı Birleşim Detayı

+4.52

+4.22

+4.22

+3.88

+3.88

oturma alanı

Dış Duvar-Pencere Birleşim Detayı

Elevatıon

2 İç Duvar Birleşim Detayı

1

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100 mm osb, 12 mm buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

+0.80

2 İç Duvar Birleşim Detayı

Döşeme-Teras Çatı Birleşim Detayı

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100 mm osb, 12 mm buhar dengeleyici, tyvek kaplama çıtası arası 30 mm ahşap dış cephe kaplaması

Details

lamine ahşap kaplama+yapıştırıcı, 10 mm osb, 18 mm ısı/ses yalıtımı- taş yünü, 50 mm ahşap kiriş, 8/18 cm

+7.57 +7.24 +7.04

+0.80 +5.78

Temel-Döşeme-İç Duvar Birleşim Detayı

+0.80

+0.52 ±0.00

+0.52 ba temel duvarı, 30 cm polimer bitümlü su geçirmez örtü ısı yalıtım levhası, Eps, 3 cm mıcır sıkıştırılmış toprak

±0.00

+1.31

mıcır

+0.80

drenaj borusu

+0.47 ±0.00

boya sıva alçı panel, 12,5 mm ısı/ses yalıtımı- taş yünü, 100 mm osb, 12 mm buhar dengeleyici, tyvek Temel-Döşeme-2 İç Duvar kaplama çıtası arası 30 mm Birleşim Detayı ahşap dış cephe kaplaması

90 210

+7.57

8

Temel-Döşeme Birleşim Detayı

K2

9

boya sıva boya alçı panel, 12,5 mm sıva ısı/ses yalıtımı- taş yünü, 50 mm alçı panel, 12,5 mm alçı panel, 12,5 mm boya ısı/ses yalıtımı- taş yünü, 50 mm sıva sıvapanel, 12,5 mm alçı boya alçı panel, 12,5 mm sıva ısı/ses boya yalıtımı- taş yünü, 50 mm alçı panel, 12,5 mm sıva boya

elastik seramik kaplama derz dolgusu seramik kaplama +yapıştırıcı, 10 mm elastik seramik kaplama derz dolgusu file seramik kaplama +yapıştırıcı, 10 mm alçı panel, 12,5 mm file ısı/ses yalıtımıtaş yünü, derz 100 mm elastik seramik dolgusu alçı panel, 12,5 kaplama mm alçı panel, 12,5 mm seramik kaplama 10 mm ısı/ses yalıtımıtaş+yapıştırıcı, yünü, 100 mm sıva file panel, 12,5 mm alçı boya alçı panel, 12,5 mm sıva ısı/ses yalıtımı- taş yünü, 100 mm boya alçı panel, 12,5 mm sıva boya

2 Dış Duvar- 1 İç Duvar Birleşim Detayı

100 P2 210

mutfak_10,5 m2 döşeme: lamine parke duvarlar: alçıpan+sıva+boya tavan: alçıpan+sıva+boya

Z05

1

2

K2 210 90

3

1

Details

beton yastık radye temel betonu, 40 cm bitümlü membran poliser, 1.5 cm düzeltme betonu, 6cm grobeton, 15cm blokaj, 15cm sıkıştırılmış toprak, 10cm

9 System Section


2012

[INTER] SECT ACT SCHINDLER AWARD COMPETITION ENTRY INSTRUCTOR: TOMAS OOMS (SINT-LUCAS GENT) The desıgn of Schutzenmatte area responds to creatıng dıfferenczones wıth dıverse functıons. The key to desıgn ıs connectıons whıch are based on the exıstıng paterns. Sıte’s secluded area where Reıtschule ıs located, connects to Neustadt of Bern. The program challanges the desıgn by ınsertıng a drug center ın a publıc zone. The project gets ınspıratıon from ancıent greek typology of Pnyx, carved ın a slope, where everyone ıs welcome to express theır ıdeas. Thıs ıs the place for democracy.

drug center facılıtıes

the sıte

two brıdges borderıng

two by-pass brıdge proposal

pnyx and agora

pedestrıan shortcuts

dısabled routes


site is segregated by bridges

currently used as car park

kunstmuseum and reitschule are cultural centers to be connected

two by-passes proposed to connect these two

the buildings fit at one side of the bridge

pedestrian connections create axes between buildings