Portfolio - 2016-2021

Page 1

Neha Singh Architectural Portfolio Selected Work

2016 - 2021


Personal Info.

Phone : 9818259941 E-mail : nehaasingh1501@gmail.com Instagram : neha_singh7062 You Tube : A R C H Studio

Content Creater https://www.youtube.com/channel/UCiEy6COjB-UVOwdn6qIovhw/featured Instagram : https://www.instagram.com/ archstudio.in/ Twitter : https://twitter.com/ArchstudioI

Nationality: Indian : English , Hindi

Name : Neha Singh Date of Birth : 15 Jan 1998

i

ii


Education :

Competition

2004 - 2014

Qualification Awarded Institution

Primary Education Mt. Carmel school Patna , Bihar

2014 - 2016

Qualification Awarded Institution

Higher Education Mt. Carmel school Patna , Bihar

Qualification Awarded Institution

Diploma Autodesk Software Lelogix , Alpha commercial Greater noida , Up

Qualification Awarded Institution

B.Arch Sharda University Greater noida , Up

2019 2016 - 2021

Technical skills :

Autodesk 3dsMax Sketch up Adobe Photoshop

• • •

Timber Pavillion : Site : Sharda University , Greater noida ,Up Concreate Furniture : Site : Sharda University , Greater noida ,Up Digital Fabrication : Rhino and Grasshopper

Interest

Adobe Illustraor

01. Academic Work B.Arch Studio Work 01.1 : Parametric Design 1.1.1 : Pvillion Design 1.1.2 : Lamp Design 01.2 : Tactical urbanism Site : Jagdeopath , Patna , Bihar 01.3 : Chanki Gadh site museum Site : Chanki gadh , Bihar

02. Internship Work Sp & Associates , Maharaja Kameshwar complex Patna 02.1 : Bunglow Design Site : Purnia , Bihar Area : 15 X 27 m

Adobe Indesign

3D modelling

Adobe Premier Pro

Sketching

02.3 : Working Drawing Site :

Rhinocerous / Grasshopper

Physical models

GNIDA - Greater Noida Industial Development Authority

Lumion

Presentation Drawing Designing

02.3 : Rejuvenation of Alpha Commercial belt , Greater Noida , Up Site : Greater Noida Up

Experiance : Academic

Internship

Self Project

These Project done under the supervision of Collage project guide and teachers .

3 Month Internship Under SP and Associates , Ar.Shayam Prasad , Patna Bihar

Delivered project Consistently during academic Time

Designed Duplex Bunglow (30 x 40) m - start in 2021 • Designed Duplex Bunglow (20 x 30) m - start in 2021 • Designed Marriage hall , Hajipur ,Bihar - On soil level • Working Drawing Nursing home Project done under the supervision of Ar. Shayam Prasad

2 month Internship under GNIDA - Greater Noida Industrial development Authority

Organised parametric Workshop For 1st , 2nd and 3rd year B.Arch Student of sharda university

Workshop Attended

• Talk On Power of Design : By Prof , Martha Thorne , Dean of IE Sap • Futuristic Architecture Trends : International Conferrence Guest : : Christopher Charles Beninger : Rewati kamath

Autodesk Revit

• • • • •

Awarded 2nd place in Rejuvwnation of Alpha Commercial Belt , Greater noida Certificate for Portal design for new capital city Amravati Certificate for Design Whack star student award for cultural centre

Seminar Attended

Autodesk AutoCad

• • •

CONTENT

Chanki-Gadh Site museum Riverfront Development Tourism Centre Spritual centre Resiential Tactical urbanism Parametric design - tensigrity Pavillion Working Drawing

• •

Hobbies

03. Workshop Summer term hand on workshop 03.1 : Concreate Furniture Site : Sharda University , Greater Noida , Up 03.2 : Timber Laminated pavillion Site : Sharda University , Greater Noida , Up

Farm House Chanki gadh , Bihar - On First level Office and Shop - parihar , Bihar On soil level Floor Extention , Patna Jakanpura Start in 2022

03.3 : Petal Concreate Pavillion

04. Self - Intervention Delivered project Consistently during academic Time 04.1 : Farm House Site : Chanki gadh , Bihar 04.2 : Floor Extension Project Site : Jakanpura , Patna 04.3 : Organised Parametric workshop Site : Sharda University 04.3 : Shelf Design

iii

iv


PARAMETRISM

PARAMETRIC DESIFN

Semester work : 7th

EXPERIMENTS 1 : TO ACHEIVE DOUBLY CURVED SURFACE WITHOUT TIEING STRUTS

TRIANGULATION MATERIAL : Bamboo struts & lycra , to fixed structure third matrial pico thread used to tie.

Lightweight , tensigrity membrane

1

2


EXPERIMENTS 2 : TO ACHEIVE DOUBLY CURVED SURFACE WITHOUT TIEING STRUTS

FINAL FORM ANALYSIS

TENSe - FRAMING MATERIAL : Bamboo struts & lycra , to fixed structurewithout third material..

Lightweight , tensigrity membrane FRONT VIEW

SIDE VIEW

ISOMETRIC

DAYLIGHT ANALYSIS

PLAN

Summer solstice 21 june analysis Average value =3.2

winter solstice 22 december analysis Average value =2.5

Hottest day : 2 aug daylight coldest day : 23feb daylight analysis analysis Average value = 3.2 hours Average value = 2.82 hours

SOLAR RADIATION ANALYSIS

PLAN

PLAN

Summer solstice 21 june analysis Average value= 0.8kWh/ m2

winter solstice 22 decem- Hottest day : 2 aug daylight coldest day : 23feb daylight ber analysis analysis analysis Average value= 0.1kWh/m2 Average value= 0.7kWh/m2 Average value= 0.13kWh/m2

Summer daylight on surface

Sunpath hour analysis

PLAN

3

Summer solstice 21 june sunpath analysis

winter solstice 22 december Sunpath analysis

Winter daylight on surface

Wind rose analysis

Summer solstice 21 june winter solstice 22 december wind analysis wind analysis

4



Parametric Digital : Lamp Designed Semester work - 10 Lamp : Design Process

5

6


Design intervention

TACTICAL URBANISM Site selection / Site location

Activity analysis

Issue identified • Food stall under flyover • Adevertisement poster on piller

Bihar

Patna

• no-signage provided

India

• Vacant space are used as Garbage dumping .

Purpose

MORNING :

• No sitting area located for emergency Traveller.

• • • • • • • •

All age group.

• No meeting or gathering place

Morning tea Breakfast vegetable Dairy Walking Schools bus Offices Private vehicles

• • • • • • •

Safe space for Walking , cycling , driving , Pedestrarian. Horizontal and vertical space for vendors vertical Gardening on coloumn Outdoor seating Provide parking. Provided signages. Graffity on coloumn

Theme for design

• Bottle pavillion and Bottle facade for traveller and street dogs . • Seating is made up of rejected wood • Facade is made up of plastic bottle.

• Place alloted for vendors denoted as circular design with lime , fevicol and Red colour. • Bottle pavillion to protect them from bad weather cover with polythene sheets.

• Bottle pavillion and table chair for seating and to distract crowd from under the bridge. • Pavillion , table , chair is made up plastic bottle

• Alternate block removed and grass planted

• WASTE MATERIALS

Material choice Focusing more on Waste material : • PLASTIC WASTE ( Plastic bottle , polythene , milk plastic etc) • PAPER WASTE ( News paper etc) • CARDBOARD

30 M span of Road and 10 M span of bridge.

• No specified parking place . • Improper landscaping.

• Authorised parking provided.

• Signages provided

Plastic bottle

No signage / no proper landscape Purpose • • • • •

Vegetable school bus Private vehicles Auto / Rikshaw Govn. bus

• • • • •

Unused cloths

Bottle pavillion : 594 bottle used for makinh one pavillion. Table : 130 bottle used for making table. Chair : 145 bottle used for making chair. Unused cloth has been used to make vertical garden on coloumn Streets Blocks has been remove and relocate for more landscape

AFTERNOON : All age group.

• Signages provided

KEYPLAN

Site

Poster on pillar creating bad impression Unused cloth

JAGDEOPATH JUNCTION UNDER FLYOVER BRIDGE

Traffic movements and pedestrarian movements.

Relation between flyover and ground / vehicular movement / buildings surrounding.

Relation between flyover and ground / vehicular movement / Building surroundings.

Purpose • Vegetable • Dairy • Private vehicles • Vegetable market • Auto /RIkshaw • Office

Relation between buildings surrounding and flyover / Vehicular movement / buildings.

7

Rolled in cement sand mix

EVENING : All age group.

Rolled in cement sand mix

Plaster with cement

vacant space are used as garbage dumping

8

• Graffity on upper part of coloum for promoting bihar tourism ( madhubani painting ) • Vertical gardening on lower part • Stand for plant is made up of unused cloth , cement and sand.


CHANKI - GADH SITE MUSEUM India

Bihar

Map of West Champaran Gadh ( protected area )

Site Details Site area is divideded into the followings : : Total Plot Area : 40277 sq m : Fort (Gadh Local Language) area :- 20869 sq m : Pond area :- 2192 sq m : Built up area :- 200 sq m : Open area :- 17016 sq m

Map of Chanki Garh gadh and Pipra village

Chanki Garh

9

10


200 meter

Regulated Area / Buffer Zone Owner : Archaeological survey of India

Govr. School of Chanki

Ram

Ram

nag

nag

ar

Prohibited Area Owner : Archaeological survey of India

100 meter

e

ar

Narkatia

ganj

Desity / Massing Agriculture land / Farming Road Network Property Prohibited area Buffer Area

Map showing Entrance loop to protected area

nag

ar

Entranc

Protected Area Owner : Archaeological survey of India

Chanki Village Border Pipra Village Border Ram

Chanki Village Border Pipra Village Border

Chanki Village Border Pipra Village Border

Map showing for one day visitor loop

ganj

Property Owner

Property Owner

ASI - Archaeological survey of India ASI - Archaeological survey of India / State government ASI - State Government Owned / State government Private Ownership / Agricultural land

ASI - Archaeological survey of India ASI - Archaeological survey of India / State government ASI - State Government Owned / State government Private Ownership / Agricultural land

Chanki Village Border Pipra Village Border

Entrance 3

Ram

nag

ar

Chanki Village Border Pipra Village Border

Ram

Narkatia

Desity / Massing Agriculture land / Farming Road Network Property Prohibited area Buffer Area

Four wheeler

Entrance to protected area

nag

ar

4+ Wheeler 2 wheeler Restricted area for vehicles

Entrance 2 Entrance 1

Narkati

aganj

Desity / Massing Agriculture land / Farming Road Network Property Prohibited area Buffer Area

Desity / Massing Agriculture land / Farming Road Network Property Prohibited area Buffer Area

Chanki Village Border Pipra Village Border

ASI - Archaeological survey of India ASI - Archaeological survey of India / State government ASI - State Government Owned / State government Private Ownership / Agricultural land

Chanki Village Border Pipra Village Border

nag

ar

Map showing Pedestrarian Movement

care taker Room

ar

Desity / Massing Agriculture land / Farming Road Network Property Prohibited area Buffer Area

Auditorium Ticket counter

Total area

Kiosk One lane cottage / hotels/ Parking for them

Open space for exhibition space Interpretation centre Shops/food street/office support

Service intensity diagram

Seating area for visitors Kiosk

Kiosk

Cottages Hospitality area

Open -Lawn / exhibition area / events

Managment office Food court and Restaurant

Parking 01 / Car /Buses/ motor cycle

Auditorium Ticket counter Kiosk Open space for exhibition space Interpretation centre

Kiosk

Interpretation centre Multiple -Ticket Counter Auditorium

Food Court / 24x7 food court/Restaurant Souvenier shops / weekly bazaar

Narkatia

ganj

Desity / Massing Agriculture land / Farming Road Network Property Prohibited area Buffer Area

Narkatia

ganj

Map showing Analysed footfall area

Property Owner ASI - Archaeological survey of India ASI - Archaeological survey of India / State government ASI - State Government Owned / State government Private Ownership / Agricultural land

Property Owner

Kiosk

Public

ASI - Archaeological survey of India ASI - Archaeological survey of India / State government ASI - State Government Owned / State government Private Ownership / Agricultural land

nag

Hospitality area Food court and Restaurant

Semi-Private

Property Owner

Map showing for more than one day visitor loop

Ram

Ram

Preservation of temple

Cottages Managment office

Private

ganj

Parking 02 -for visitors comimg from village site

Privacy diagram

Public

ganj

Property Owner

ASI - Archaeological survey of India ASI - Archaeological survey of India / State government ASI - State Government Owned / State government Private Ownership / Agricultural land

Semi-Private

Narkatia

Map showing vehicular entrance and Pedestrarian Seconadry Entrance

Property Owner

Private

Narkatia

Desity / Massing Agriculture land / Farming Road Network Property Prohibited area Buffer Area

ASI - Archaeological survey of India ASI - Archaeological survey of India / State government ASI - State Government Owned / State government Private Ownership / Agricultural land

Srating area

Ground Floor Parking area = 4900 Sq.m Shop area = 500Sq.m Ticket counter and Locker area = 150 Sq.m Shop and Restaurant = 1350 Sq.m = 6900 sq .m Basement Site Museum and Auditorium = 8800 sq . m

Prohibited Area Protected Area

Entrance of Site Museum Pipra village

Chanki village

Restaurant

Accomodation for Visitors Parking at Ground Level

Total Area Cover = 8800 + 6900 =15700 sq .m

Locker and Multiple Ticket Counter Gaurd Room

Auditorium Road From Narkatiganj

Traditional cloth market

Shops/food street/office support Agricultural Land

11

Regulated area

Chanki - Gadh

Care Taker Room / gaurd Room

Souvenier Shop

Road from ramnagar

12


00 cc

WAY

TO CHANK I GADH

12 m@ 10 m 40 x Purlins x 0 z 12 ROOM -3 AUDIO EXHIB ITION VIDEO ROOM -4 PRES ENTA TION EXHIB | ITION

+450 LVL

ROOM SCULPTUR -2 E EXHIB

ROOM -1 RIAL EXHIB

ITION

ITION

PICTO

Care Taker Room

ITION

ROOM Gallery PICTORIAL -1 EXHIB Works 10 ITION hops Bihar Painti jute craft ngs Bihar festiva l

20000

GADH

ROOM -3 AUDIO EXHIB ITION

WAY

ROAD

WAY

TO CHANKI

GADH

MAIN 20' WIDE

Stairca to Galleryse leding 800 sq.m

ce

LVL

Way to

+450

market

/ Open

Parkin

g Lane

r/ Restaur

ant

Main 02

m Up

rant r/ Restau

E MAIN

air Threate

Parkin

g

ROA

WID

+450

LVL

Way to

Audito

rium

g area

SCULPTURE

SCULPTURE

um

ROOM -2 PTUR E EXHIB

SCUL

Exit stairca

se Ramp and

s + 1 Acces

sibility

RY

ROOM PICTO -1 RIAL EXHIB ITION Galler y 04 Sufi 20000 Circuit x2000 0 mm

SCULPTURE

Toilet

lobby

SCULPTURE

Parkin

g Lane

Way to

01

ROOM -3 AUDIO EXHIB ITION

Toilet Toilet

Female 7800mm Toilet x4500 mm

GADH TO CHANKI

ORIUM

EXHIB

ITION

WAY

Restaurant

8

RESTAURAN

10 M WIDE -Narka tiaganRamnagar j Road

Pedestrarian movement 7. Open Air Threater 8. Restaurant 9. Traditional cloth Markets

Restaurant

T

10 M WIDE Ramn -Nark atiaganj agar 10 M WIDE Road Way to Road ramnagar

lane

Main

Entran

+450 LVL

+450 LVL

LVL

+450 LVL

FLAT

+300 LVL -+0.00 LVL

ce

SLOP

E

SLOP

E

+450 LVL

ENTRANCE TO GADH

+450 LVL

A

10 M WIDE Way to Pipra Road village

+27450 LVL

SLOP

E

Down

lane +450

5 m Service

SLOP

E

5 m Service

Care Taker Room

ENTRANCE TO GADH

+450 LVL

Care Taker Room

GADH

air Threater/

air Threater/

Auditorium

ce Foyer

ing Area

CHANKI

/ Open

/ Open

Way to

/ Shops

LVL

Entran

Unload

lane

10 M WIDE Way to Pipra Road village

+300 LVL 6 5

4

3

2

1

+300 LVL

- 750 LVL

Staircase

POND 2192 sq . m

Shedding / Sitting

/ Waiting Area

WAY TO

/ Shops

Cycle Track

+450

ce Plaza

10 M Way WIDE Road to Nark atiag anj

market

Site Museum

g and

ORIUM

Entran

GADH

Way to

Parking

market

Way to

VIDEO ROOM -4 PRES ENTATION EXHIB | ITION

AUDIT

A

CHANKI

LVL

Up

LVL

ROAD

+450 LVL

WAY

TO CHANKI

GADH

WAY TO

Way to

MAIN

Loadin

+300 LVL -+0.00 LVL

Entrance

PLAZ

Gaurd Room 110 sq.m

WAY TO

LVL

Way to

+450

Ticket Counter 350 Sq.m

+450

WIDE

AIR THREATER

7

3

SLOPE 5m

OPEN

ROOM -3 AUDIO EXHIB ITION

ITION

GADH

Entrance

FLAT

SLOPE

SLOPE

UM ENTR

LVL

5 m Service

RIUM

ROOM -1 RIAL EXHIB

Gallery 06 Eco 20000 Circuit x2000 0 mm

TO CHANKI

Main

Locker Room 700 sq.m

4

SLOPE

VIDEO ROOM -4 PRES ENTATION EXHIB | ITION

WAY

5

+450

ROOM -3 AUDIO EXHIB ITION

GADH

day market day to

GADH

shop and

TO CHANKI WAY

Entrance Lobby 280 Sq.m

SLOPE

Vehivular movement

Souvenier

6

Staircase to Gallery leding 800 sq.m

Main

AQUA

ITION PICTO

TION |

CHANKI

1

/ BUS

SLOPE

SLOPE

FOR CAR

SLOPE

AREA

Visitors accomodation

mm

Section at AA’ SCUL ROOM -2 PTUR E EXHIB

AUDITORI

ANCE

10 M Way WIDE Road to Narka tiagan j

WAY

Agriculture area

10 M Way toWIDE Road ramna gar

TO CHANKI

GADH

Prohibited area

PARKING

ROOM -1 RIAL EXHIB ITION Galler y 05 Sufi Circui t 20000 x2000 0 mm

20' WIDE MAIN ROAD

ENTRA

Down

+450

Vigilance 7000 mm x2800

ITION

NCE PLAZA

Parking Gaurd Room Ticket Counter Locker Room Staircase leading to gallery 6. Souvenier Shops / Markets

Meeting 5400 mm Room x3200 mm

Maintenance 4200 mm office x3000 mm

ROOM -3 AUDIO EXHIB ITION

ROOM -2 PTUR E EXHIB

VIDEO ROOM -4 PRES ENTA

Parking

Up

AUDIT

1. 2. 3. 4. 5.

Regulated area

Toilet 1 x 1200 mm

Toilet 2 1800 x 1200 mm

Toilet 3 1800 x 1200 mm

PICTO

Disable

g

Storage 02 2700 x 3000 mm

SCUL

mm

Disable

Parkin

5 m Wide

ITION

ITION

LIBRA

g Space

URANT

ROOM -2 PTUR E EXHIB

SCUL

Galler Gandh y 07 20000 i Circuit x2000 0 mm

VIDEO ROOM -4 PRES ENTA TION EXHIB | ITION

SCULPTURE

site muse

Ticket Coun 350 Sq.m ter

1800

ITION

g / Restin

SCULPTURE

male 7800 mm toilet x4500

40 Parkin RESTA

Way to

5m

Way to

/ Shops

D

SLOPE

LVL

market

+450

/ Open

WAY

TO CHANKI

GADH

FLAT SLOPE

Way to Locke r Room 700 sq.m

MAIN

Ticket Counte 350 Sq.m r

+450 LVL

PICTO ROOM -1 RIAL EXHIB

n

Seatin

Administr 2500 mm ation office x7200 mm

A

Rock Garde tibule 700 sq.m gallery

120 x 100 x 12 mm Top and Bottom Chord

Accountin 4200 mm g Office x4000 mm

Gallery 08 Sikh 20000 Circuit x2000 0 mm VIDEO ROOM -4 PRES ENTATION EXHIB | ITION

ROOM -3 AUDIO EXHIB ITION

Treasury 2500 mm Office x3200 mm

Foyer/Ves

Entrance

TION |

E PLAZ

mm

Cycle Track

site museu

Locker Room 700 sq.m

SLOPE

5 m Wide air Threate

ITION

PTUR

Entrance Lobby 280 Sq.m 02

LVL

/ Shops

ROAD

+450

SLOPE

Lane 02 40 40 ParkinParking Space g Space s in Lane

AIR THREA

TER

Way to

Entran

20' WIDE

12

Main / Waiting Area

EXHIB

n

Ra 45 mp 0 sq .m

Stairc to Galle ase leding ry 800 sq.m

SLOPE OPEN

Entran ce Lobby 280 Sq.m

Shedding / Sitting

VIDEO ROOM -4 PRES ENTA

Rock Garde

3800 MM

market to day and day

I GADH

Souven ier shop

CHANK WAY TO

/ BUS

mm

FOR CAR

|

Toilet 1800 x 1200 mm

NG AREA

POND 2192 sq . m

TION

SCUL

Storage 1800 x 1200 mm

PARKI

- 750 LVL

ITION

Reception 6000 mm x5000

Office 2700 mm x3200

1

EXHIB

Co

rrid 42 or Ga 0 Sq ller .m y

ITION

Staff toilet 2700x1600 mm

2

VIDEO ROOM -4 PRES ENTA

03

Information 2700 mm Desk 02 x3200 mm

3

SLOPE

4

g Lane

Information 2700 mm Desk 01 x3000 mm

SLOPE

6 5 +300 LVL

Staircase

Parkin

ROOM -1 RIAL EXHIB

PICTO

Wide Passa geway

5 m Wide

Wide Passa geway

ROOM -3 AUDIO EXHIB ITION

03

ROOM -2 PTUR E EXHIB

SCUL

ITION

Galler Shiv-S y 09 hakti Circui 20000 t x2000 0 mm ROOM -3 AUDIO EXHIB ITION

TION |

3800 MM

Lane 03 40 40 ParkinParking Space g Space s in Lane

ITION

SLOPE

ROOM -1 RIAL EXHIB

PICTO

ITION

EXHIB

+300 LVL

ITION

0 mm

VIDEO ROOM -4 PRES ENTA

80 x 80 x 12 mm Member Chord

ROOM -2 PTUR E EXHIB

SCUL

x2000

Galler Ramayan y 01 Circuit 20000 x2000 0 mm

TO CHANKI

ROOM SCULPTUR -2 E EXHIB

Galler y 03 Jain 20000 Circuit x2000 0 mm PICTO ROOM -1 RIAL EXHIB ITION

ROOM -2 PTUR E EXHIB

SCUL

ITION

PASSAGWAY

ENTRANCE TO GADH

WIDE

ITION

TO CHANK I GADH

11

VIDEO ROOM -4 PRES ENTA TION EXHIB | ITION

Galler y 03 Jain 20000 Circuit x2000 0 mm PICTO ROOM -1 RIAL EXHIB ITION

ROOM -2 PTUR E EXHIB

SCUL

WAY

+450 LVL

ROOM -3 AUDIO EXHIB ITION

+27450 LVL

1800 mm

13

+450 LVL

TO CHANKI WAY

day market day to

GADH

/ BUS

Staircase to Gallery leding 800 sq.m

SLOPE

OPEN

Entrance

Lobby 280 Sq.m

Main

Way to

Entrance

+450

LVL

Way to

+450

market

AIR THREATER

E

LVL

/ Shops

/ Open

air Threater/

Restaurant

Cycle Track

site museum Up

Locker Room 700 sq.m

SLOPE

SLOP

SLOPE

shop and

TO CHANKI

CAR

WAY

FOR

Souvenier

AREA

SLOPE

Restaurant

Ticket Counter 350 Sq.m

+450

MAIN

LVL

Way to

Parking

ROAD +450 LVL

Way to

SLOPE

SLOPE RESTAURANT

+450 LVL

/ Shops

WIDE

Auditorium

+27450 LVL

SLOPE

Way to

5m

market

SLOPE

/ Open

SLOPE

air Threater/

FLAT

SLOPE

SLOPE

SLOPE

Up

AUDITORIUM

ENTRANCE

PLAZA +450 LVL

ENTRANCE TO GADH

+450 LVL

SLOPE

Down

Loading

+300 LVL -+0.00 LVL

SLOPE

and Unloading

Area

Care Taker Room 5 m Service

lane

lane

WAY TO

CHANKI

5 m Service

GADH

Road

LVL

Entrance

10 M Way WIDE Road to Narkatiaganj

10 M 10 MWIDE Road Way toWIDE Ramnagar -Narkatiaganj ramnagar

+450

Main

10 M WIDE Way to Pipra Road village

5 m Service

9

lane

11. Care Taker Room / Gaurd

6 5 +300 LVL

Staircase

4

3

2

SLOP

E

+300 LVL 1 - 750 LVL

WAY

TO CHANKI

GADH

POND 2192 sq . m

Shedding / Sitting

/ Waiting Area

WAY TO

CHANKI

GADH

+450 LVL

WAY

TO CHANKI

LVL

GADH

Down

to Ramnagar

PARKING

SLOPE

PLAZA

SLOPE

ENTRANCE

10 +450

GADH

10. Auditorium

Up

AUDITORIUM

2

KEY MAP Proposal for Chanki-Garh SITE PLAN Chanki - Gadh Site Museum

Sheet No.

Name : Neha Kumari Guide : Ar. Sakshi Kumar Studio : Architectural thesis 2021 Roll : 160695058 School of Architecture and Planning

Scale 1 : 500

Signature

day market day to

GADH

SLOPE

shop and

TO CHANKI WAY

/ BUS

Souvenier

CAR

Staircase to Gallery leding 800 sq.m

SLOPE

OPEN

Entrance

Lobby 280 Sq.m

Main

Way to

Entrance

+450

LVL

Way to

+450

market

AIR THREATER

LVL

/ Shops

/ Open

air Threater/

FLAT

Restaurant Cycle Track

site museum Up

Locker Room 700 sq.m

Restaurant

Ticket Counter 350 Sq.m

MAIN

LVL

air Threater/

Way to

Parking

ROAD +450

LVL

Way to

SLOPE

SLOPE RESTAURANT

/ Shops

WIDE

Auditorium

SLOPE

Way to

5m

/ Open

+450

SLOPE

market

SLOPE

SLOPE

SLOPE

SLOPE

Up

AUDITORIUM

ENTRANCE

PLAZA

SLOPE

Down

+450

Road

Main

LVL

Loading

Entrance

+300 LVL -+0.00 LVL

SLOPE

5 m Service

and Unloading

Area

5 m Service

lane

lane

10 M WIDE Way to Pipra Road village

5 m Service

lane

+300 LVL

SLOP

E

Proposal for Chanki-Garh ROOF PLAN Chanki - Gadh Site Museum

Name : Neha Kumari Guide : Ar. Sakshi Kumar Studio : Architectural thesis 2021 Roll : 160695058 School of Architecture and Planning

Scale 1 : 250

Sheet No.

A’

GADH

E

TO CHANKI

SLOP

KEY MAP

Signature

Proposal for Chanki-Garh BASEMENT PLAN Chanki - Gadh Site Museum

Sheet No.

Name : Neha Kumari Guide : Ar. Sakshi Kumar Studio : Architectural thesis 2021 Roll : 160695058 School of Architecture and Planning

Scale 1 : 200

SLOP

Signature

E

Shedding / Sitting

SLOP

E

FLAT

E

SLOP

E

ROOF PLAN

/ Waiting Area

KEY MAP

SLOP

BASEMENT PLAN

Roof Detail Of Car Parking

WAY

TO CHANKI

GADH

WAY

TO CHANKI

GADH

SITE PLAN

6 5 +300 LVL

Staircase

KEY MAP

WAY

lane

FOR

FLAT

GADH

5 m Service

AREA

SLOPE

CHANKI

village

PARKING

SLOPE

WAY TO

Pipra

TO CHANKI

GADH

WIde 10 M

Way to

WAY

12. Shed / Resting / seating Place 13. Temple

lane

lane

10 M 10 MWIDE Road Way toWIDE Ramnagar -Narkatiaganj ramnagar

WIde 10 M

5 m Service

Road

/ Way

Area

SLOPE

5 m Service

and Unloading

10 M Way WIDE Road to Narkatiaganj

j

/ Way

Loading

+300 LVL +0.00 LVL

e

SLOPE

Road

Entranc

to Narkatiagan

Main

day to

GADH / BUS

SLOPE

shop and

TO CHANKI

CAR

WAY

FOR

Souvenier

AREA

SLOPE

PARKING

day market

SLOPE

Gadh Level +27000 lvl

Staircase to Gallery leding 800 sq.m

SLOPE

OPEN

Entrance

Lobby 280 Sq.m

Main

Way to

Entrance

+450

SLOP

Way to

+450

market

/ Open

air Threater/

Restaurant

Cycle Track Up

Locker Room 700 sq.m

SLOPE

AIR THREATER

LVL

/ Shops

site museum

Ticket Counter 350 Sq.m

Restaurant

E

LVL

WIDE

MAIN

LVL

Way to

Parking

ROAD +450

LVL

Way to

Auditorium

NT SLOPE

Restaurant Staircase Leading to Site Museum

M ENTRANCE

Open Air Threater

CHAN WAY TO

5 m Driveway

Ramp Staircase Leading to Site Museum

Road Leading To Chanki - Gadh

ROAD MAIN 5m WIDE

KI GADH

g Lane

Main

02

Way to

Entrance

ROAD

+450

MAIN 1 - 750 LVL

9

1

+450 LVL

5 m Wide

+450 LVL

+450 LVL

/ Waiting Area

marke to day

er/ Restau

rant

Cycle Track

um Up

Parkin

+450

g Lane

01

Service Area Way to

2

WID

Way to

Parking

AD

+450

LVL

Way to

Auditorium

rant

REST

NT

WC

garba

ge

kitche

wareh

ouse

- 750 LVL

6 5 +300 LVL

Staircase

4

3

2

1 - 750 LVL

5

POND 2192 sq . m

UM ENTR

ANCE

7

+450 LVL

or

A

Refrig

eratio

Traditional

Down

10 M WIDE Way to Road ramnagar

+450

Entran

Scale : 1: 500

cloth marke

t

LVL

n cham

ber

Staircase and Ramp area Loadi

ng and

+300 LVL +0.00 LVL

ce

10 M Way WIDE Road to Nark atiag anj

09. seating area 10. View spots

Main

cloakroom

Corrid

PLAZ

Gaurd Room 110 sq.m

/ Waiting Area

+450 LVL

Protected area Site Plan

washing

AUDITORI

6

4

Wide

Shedding / Sitting

WC

Up

+300 LVL

POND 2192 sq . m

Lobby

1

Wide

2

2500 m

3

Lobby

4

2500 m

6 5 +300 LVL

Staircase

Ground level +0.00 lvl

AURA

Pepsi

3

+300 LVL

loading and Unloading space

AREA

n

/ Waiting Area

Restaurant

Traditional cloth

Road Leading to auditorium

SEATING

+450 LVL

Shedding / Sitting

Shop Lobby

Entrance Plazza

Restau

Way to

5m

LVL

IN RO

E MA

+450 LVL

Care Taker Room

ATER

Pepsi

Care Taker Room

air Threat

site muse

Ticket Coun 350 Sq.m ter

g Space Lane 01 41 Parkin s + 1 Acces sibility g Space in Lane Parking 01

+27450 LVL

AIR THRE

Entrance Plazza

Gathering Area

Unloa

ding Area

5 m Servic

e lane

10 M WIDE Way to Pipra Road village

Section at BB”

5 m Servic

5 m Servic

e lane

e lane

5 m Servic

Gadh Level

e lane

WAY

TO CHANKI

GADH

A ROAD

27000 m

MAIN

SHOP

5m WIDE +450 LVL

6 5

4

3

2

1 - 750 LVL

WAY

TO CHANKI

GADH

POND 2192 sq . m

Shedding / Sitting

/ Waiting Area

Parking

Lane

SHOP

TO CHANKI

GADH CHANKI WAY TO

5 m Wide

+300 LVL

+300 LVL

03

SHOP

3

SLOPE

OPEN

Lobby 280 Sq.m

Way to

Entrance

+450 LVL

Way to

+450

market

AIR THREATER

/ Open

air Threater/

420 or Galle Sq.m

C

Cycle Track

Restaurant

MAIN

LVL

air Threater/

Way to

Parking

ROAD +450 LVL

Way to

SLOPE

SLOPE RESTAURANT

/ Shops

WIDE

Auditorium

SLOPE

Way to

5m

/ Open

+450

SLOPE

market

SLOPE

SLOPE

SLOPE

SLOPE

Up

AUDITORIUM

ENTRANCE

SLOPE

Road

10 M 10 MWIDE Road Way toWIDE Ramnagar -Narkatiaganj ramnagar

LVL

Loading

Entrance

+300 LVL -+0.00 LVL

10 M Way WIDE Road to Narkatiaganj

Lane 40 Parking 02 40 Parking Spaces Space in Lane 02

PLAZA

Down

+450

Main

SLOPE

5 m Service

and Unloading

Area

5 m Service

lane

lane

Lane 40 41 Parking parking 01 + 1 acceesibility Parking

10 M WIDE Way to Pipra Road village

5 m Service

lane

5 m Wide

Section at AA’

Parking

Lane

02

ROAD

LVL

Way to

MAIN

market

SLOPE OPEN

LVL

/ Shops

/ Open

air Threater/

Restaurant

Cycle Track Up

Ticket Counter 350 Sq.m Restaurant

Way to

40 Parking

+450

Lane

01 MAIN

LVL

Way to

Parking

ROAD +450

LVL

Way to

Auditorium

SEATING

B

PROTECTED AREA SITE PLAN

GROUND FLOOR PLAN

warehouse

WC

Locker room

Multiple Ticket counter

Road - Leads to Chanki - Gadh

Wide Lobby

Main

10 M WIDE Way to Pipra Road village

Entran

n chamber

LVL

cloth market

Loading

+300 LVL +0.00 LVL

ce

5 m Service

cloakroom

Corridor

Refrigeratio

Traditional

Down

+450

and Unloading

B’

Area

lane

5 m Service

5 m Service

lane

5 m Service

lane

lane

Section at CC” Scale

Proposal for Chanki-Garh SECTION Chanki - Gadh Site Museum

Sheet No.

DETAILED SECTION 13

garbage

Gaurd Room 110 sq.m

2500 m

Sheet No.

WC

washing PLAZA

Wide Lobby

Proposal for Chanki-Garh GROUND FLOOR PLAN Chanki - Gadh Site Museum

kitchen

M ENTRANCE

2500 m

Signature

A’

NT

Up

AUDITORIU

10 M Way WIDE Road to Narkatiag anj

Sheet No.

Name : Neha Kumari Guide : Ar. Sakshi Kumar Studio : Architectural thesis 2021 Roll : 160695058 School of Architecture and Planning

Signature 10 M WIDE Way to Road ramnagar

Scale

Name : Neha Kumari Guide : Ar. Sakshi Kumar Studio : Architectural thesis 2021 Roll : 160695058 School of Architecture and Planning

Pepsi

Proposal for Chanki-Garh Site Plan - Protected area

Scale 1 : 200

AREA

RESTAURA

Way to

WIDE

Pepsi

5m

/ Open

Parking

/ Shops

5 m Wide

Restaurant

air Threater/

Lane 01 Spaces 41 Parking + 1 Accessibility Space in Lane Parking 01

KEY MAP

KEY MAP

AIR THREATER

10

site museum

Locker Room 700 sq.m

5m WIDE

C’

Way to

Entrance

18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Up

8

9

1

SHOP +450

7

SLOPE SHOP

SHOP

SHOP

Entrance Lobby 280 Sq.m

Main

2

Ramp 450 sq.m

Staircase to Gallery leding 800 sq.m

+450

Scale : 1: 250

SHOP

ry

Restaurant

Up

shop and

Corrid

LVL

/ Shops

site museum

Ticket Counter 350 Sq.m

FLAT

Souvenier

MAIN 5m WIDE

Staircase to Gallery leding 800 sq.m Entrance

Main

Locker Room 700 sq.m

SLOPE

5m WIDE

ROAD

GADH TO CHANKI WAY GADH TO CHANKI WAY

day to

GADH

SLOPE

shop and

TO CHANKI

/ BUS

WAY

CAR

Souvenier

FOR

SLOPE

AREA

day market

SLOPE

PARKING

SLOPE

MAIN

WAY TO

CHANKI

GADH

ROAD

+450 LVL

Ground Level

6

4

GADH

Parking Lane 03 32 ParkingSpaces and 3 Bus Space in Lane parking 03

+450 LVL

Care Taker Room

Staircase

5 SHOP

SHOP

29 car

+27450 LVL

ENTRANCE TO GADH

WAY

+450 LVL

day to

Protected Site Protected boundary

market

Shedding / Sitting

E

40 Parkin

8

+450 LVL

+27450 LVL

SLOP OPEN

day market

+450 LVL

Aquarium

10

ter/ Resta

10

Way to

9

1

urant

POND 2192 sq . m

/ Open

air Threa

2

Gallery 6 Eco- Circuit exhibition

LVL

/ Shops

/ Open

3

+450

market

Gallery 5 Bihar Tradition exhibition

Gadh Level +27000 lvl

t / Shops

4

8

marke

6 5

LVL

Locke r Room 700 sq.m

5m WIDE

+300 LVL

+300 LVL

E

SHOP

Parkin

Gallery 4 Gallery 4 Sufi circuit sculpture exhibition Sufi circuit Pictorial exhibition

Sculpture Lobby

18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Up

SLOP SHOP

SHOP

SHOP

Entrance Lobby 280 Sq.m

02

5 m Wide

Staircase

2

Ra 45 mp 0 sq .m

Stairc to Galle ase leding ry 800 sq.m Lane 02 40 40 ParkinParking Space g Space s in Lane

SHOP

nier shop

MAIN

rrid 42 or Ga 0 Sq ller .m y

Souve

07. Way to Gadh 08. Temple

3

Co

5m WIDE

03. Pathway lead to resting point & gadh 04. Seating/ Resting /waiting Area

SHOP

and day

03

7

t

CHAN

g Lane

ROAD

05. View of Pond and ritual spot 06. Way to Gadh after washing leg and hand

MAIN

01 . Starting Point 02 . Care taker / Guide Information

5m WIDE

More Footfall area

Care Taker Room

Parkin

ROAD

5 m Wide

Travelling Loop

Pedesterarian Movement

WAY TO

Travel Loop of Protected area

+450 LVL

Reception area

FP

+27450 LVL

+450 LVL

6

FP

+450 LVL

SHOP

SHOP

SLOPE

LVL

Loading

+300 LVL -+0.00 LVL

ce

SLOPE

5 m Service

14

Name : Neha Kumari Guide : Ar. Sakshi Kumar Studio : Architectural thesis 2021 Roll : 160695058 School of Architecture and Planning

Signature

and Unloading

Area

5 m Service lane

5 m Service

Staff Toilet Information Desk

Section at AA”

5

4

Entran

10 M Way WIDE Road to Narkatiaga nj

KI GADH

10 M 10 MWIDE Road Way toWIDE Ramnagar -Narkatiag ramnagar anj Road

+450

Main

10 M WIDE Way to Pipra Road village

5 m Driveway

SHOP

Parkin Lane 03 g 32 Parkin Spaces and 3 Bus g Space in Lane parking 03

PLAZA

Down

Rock garden Roof

Ground level +0.00 lvl

SHOP

29 car

SLOPE

AUDITORIU

Basement Level - 4600 lvl

B

SLOPE

SLOPE

Up

Clay Roof Tile

A

SLOPE

SLOPE RESTAURA

Way to

5m

/ Open

+450

SLOPE

/ Shops

E

market

SLOP

air Threater/

FLAT

Roof Level +7600 lvl

lane

lane

4

3

2

1 - 750 LVL


Regulated area

Proposed Site Plan

Protected area 13

+450 LVL

+450 LVL

Pipra village

11

+27450 LVL

ENTRANCE TO GADH

+450 LVL

WAY

TO CHANKI

GADH

Care Taker Room

+300 LVL 6 5 +300 LVL

Staircase

4

3

2

1 - 750 LVL

WAY

TO CHANKI

GADH

POND 2192 sq . m

12

Shedding / Sitting

/ Waiting Area

WAY

TO CHANKI

GADH

+450 LVL

WAY

TO CHANKI

GADH

Chanki Village

Regulated area TO CHANKI

GADH

Prohibited area WAY

Agriculture area

1

day market day to

GADH

Main

+450

Entrance

LVL

Way to

market

/ Shops

air Threater/

SLOPE

AIR THREATER

7

Cycle Track

Restaurant Parking

LVL

Way to

8

RESTAURANT

/ Shops

+450

Auditorium

2

ENTRANCE

10

PLAZA

Down

to Ramnagar

+450

9

11. Care Taker Room / Gaurd Loading

+300 LVL +0.00 LVL

Entrance

5 m Service

and Unloading

Area

5 m Service

12. Shed / Resting / seating Place 13. Temple

lane

lane

10 M

WIde

Road

/ Way

10 M

WIde

Road

to Narkatiaganj

/ Way

Main

LVL

Way to

Pipra

village 5 m Service

lane

KEY MAP Proposal for Chanki-Garh SITE PLAN Chanki - Gadh Site Museum

15

Parking Gaurd Room Ticket Counter Locker Room Staircase leading to gallery 6. Souvenier Shops / Markets

10. Auditorium

Up

AUDITORIUM

1. 2. 3. 4. 5.

Pedestrarian movement 7. Open Air Threater 8. Restaurant 9. Traditional cloth Markets

Restaurant

air Threater/

Way to

/ Open

LVL

ROAD

Way to

MAIN

/ Open

Site Museum Up

+450

WIDE

OPEN

LVL

Way to

+450

Ticket Counter 350 Sq.m

3

SLOPE 5m

Vehivular movement

shop and

TO CHANKI WAY

6

Staircase to Gallery leding 800 sq.m

Entrance Lobby 280 Sq.m

5 Locker Room 700 sq.m

4 FLAT

SLOPE

SLOPE

Souvenier

/ BUS

SLOPE

market

FOR CAR

SLOPE

SLOPE

AREA

SLOPE

PARKING

Visitors accomodation

Sheet No.

Scale 1 : 500

Name : Neha Kumari Guide : Ar. Sakshi Kumar Studio : Architectural thesis 2021 Roll : 160695058 School of Architecture and Planning

Signature

16


02 : Internship Work : SP $ Associates Bunglow

: Total plot / site area in sq m = 405 sq.m 200 sq m = To design , duplex bunglow containing : Role of trainee student

five rooms , launge, stairs leading to first first floor and terrace , kitchen , pooja room store room.

: Stage of the project

= Design

: Site Plot type 10m x 20m

Plot type 15m x 27m

Plot type C

Designed Boundary wall for This Site Designed bunglow for different plot and client requirment

= Purnia , Bihar Whole project is being proposed at the Purnia , Bihar . The Site have benefit of two side river facing Which is increasing value of the site and project. At the bank of the river ghat is being proposed for taking advantage of river and celebrating funtion like chhat puja , fest and etc. And the facing river ,commercial area is like restaurant , grand apartment , swimming pool , children play area , more recreation area is being proposed. Internal area of site is for residential purpose , where whole site is divided into three plot type for bunglow. Designed Boundary wall for This Site

17

18


Working Drwaing for proposed Dr. Alok Nursery , Sitamarhi ,Bihar

projection from roof slab & beam bottom

Client

: Wow infra

Project glow plan

: Duplex bun-

Project budget

: 70 lakh

SECOND FLOOR FINISHED LVL +26'-4"

FIRST FLOOR FINISHED LVL +14'-8"

PLINTH FINISHED LVL +3'-0"

14'-11"

2'-8"

1'-8"

Y

10" 8" 10" 10" 10" 8" 5" 5" 5" 5"

1'-11" 1'-11"

3'-5"

4'-5"

3'-10"

5" 6'

X

5"

3'-5"

3'-10"

2'-6"

1'-7"

4'-11"

3'-8" 10"

10"

3'-3"

3'-8"

1'-6"

"

12'-3"

projection from roof slab & beam bottom

10"

5"

10"

5'

1'

W1

2'

4'-2"

14'-11"

14'

10"

10" 8" 10" 10" 10" 8" 5" 5" 5" 5"

BALCONY 15'11" LENGHTWISE

5'

8'-6"

1'-10"

projection from sill & beam bottom

10"

6'-8" 10"

5" brickwork upto 4' height

10

10" BED ROOM 11'0" X 13'6"

2'

7'-4"

projection from sill & beam bottom

10"

5"

11'-6" 8'-3"

2'-8"

1'

drop in floor finish

1'-6"

D4

W2

4'-6"

5"

D4 1 2"

9'-4"

1'-7"

3'-9"

4'-5"

8'-3"

4'

4'-6"

10'-5"

11'-6"

10"

1'-8"

Y

10" W1

5'

1'

1'-10"

5"

projection from roof slab & beam bottom

8'-6"

D

C

Y 6'-4"

66'-10"

19'-8"

4" DIA RAIN WATER PIPE

2'-10"

3'-1" 10"

LOBBY 5'6" X 4'8"

61

63

65

67

81

79

77

75

73

DN

71

1:60

X TERRACE

3'-10"

11'

2'-10"

1:60

1 2" drop in floor finish

PE

4'

1'-10" 5" D2

SLO

STAIRCASE 18'10" X 9'7"

OPE

a

TERRACE

4'-7"

1'-6"

a

69

1:60

59

PE

F.W=4'0" T=10" R=5" 83

SL

30'-1"

3'-11"

TERRACE

4" DIA RAIN WATER PIPE

2'-10"

SLO

10'-5"

X

10'-10"

57

12'-1"

SL

OPE

1:60

MACHINE ROOM 12'10" X 4'6"

7'

PRODUCED BY AN AUTODESK STUDENT VERSION SLO

PE

1:60

projection from roof slab & beam bottom

SL

OPE

1:60

PE

SLO

1:60

PE

SLO

24'-4"

PARAPET FINISHED LVL +42'-6"

1:60

OPE

SLO

1:60

PE

SL

4" DIA RAIN WATER PIPE

projection from roof slab & beam bottom

4" DIA RAIN WATER PIPE

1:60

4" DIA RAIN WATER PIPE

projection from roof 18'-10" slab & beam bottom

Y

18'-2" projection from roof slab & beam bottom

TERRACE FINISHED LVL +38'-0"

GROUND FLOOR FINISHED LVL ±0'-0"

19

W2

4'-6"

projection from sill & beam bottom

1'-8"

17'-4"

2

projection from roof slab & beam bottom

14'-11"

1'-11"

5"

1'-11"

1'-11"

12'-3"

1'-11"

10'-2"

5'

1'-8"

1'-8"

4" DIA RAIN WATER PIPE

4'-7" 5" 4'-2"

1'-8" W2

4'-6"

8'-2" 5'-4"

D2

1 2" drop in floor finish

slab sunken by beam bottom

4" DIA RAIN WATER PIPE

17'-5"

4'-5"

3'-10"

5" 6'

5"

3'-8"

4'-11" 10"

1'-6"

10"

SEMI COVERED TERRACE 7'-10"

10"

10"

5"

2'

10"

BED ROOM 11'0" X 13'6"

10"

1'-8"

1'-6"

7'

9'-4"

7'-4"

1'-8"

D4

5"

1 2" drop in floor finish

2'

BALCONY 4'1" WIDE

10"

5" brickwork upto 4' height

PRODUCED BY AN AUTODESK STUDENT VERSION

5" 5" 5" 5"

slab sunken by beam bottom

3'-7" W1

10"

5" 5" 5" 5" 5" 5"

6'-7"

5'-4"

D4

1 2" drop in floor finish

8'-3"

CUT-OUT 19'8" X 9'5"

10"

D2

5'-6"

TOILET 5'6"X9'10"

2'-1"

W4

10"

STORAGE 5'6" X 3'8"

2'

a

8'-2"

3'-8"

4'-6"

FAMILY LOUNGE 19'8" X 9'0"

D2

5"

10"

10"

TOILET 5'6"X9'10"

W3

21'-2"

1

projection from roof slab & beam bottom

1'-3" 4'-6" WIDE CORRIDOR

X

BED ROOM 13'6" X 15'4"

2'-10"

10"

BED ROOM 12'3" X 12'11"

W

1'-7"

11'

9'-10"

DRAWING 19'8" X 13'6"

1'

projection from roof slab & beam bottom

projection from sill & 5" brickwork from outer edge

D4

DRESSING 10'0" X 5'0"

4'

3'-10"

4'-1"

D4

4'

3'-10"

4'-5"

1 2" drop in floor finish

3'-5"

STAIRCASE 18'10" X 9'7"

3'-9"

71

3'-5"

69

4'-6" WIDE CORRIDOR

9'-3"

4'-9"

D4

12'-3"

10'0"X5'0"

2'-6"

73

3'-5"

67

75

8'-3"

4'

5'-2"

65

77

3'-8"

4'-5" 10" 5" 5"

TERRACE FINISHED LVL +38'-0"

63

79

2'-10"

5"

5'-2"

5'-7" 5"

10"

3'-9"

5" brickwork upto 4' height

beam bottom

2'-11"

1 2" drop in floor finish

1'-6" 10" 5" 5" 5"

61

81

DN

1'-10"

D4

SITTING 6'0"X 8'11"

59

1'-7"

4'-6"

3'-4"

4'-10" 2'-5"

3'-1"

7'-5" 1'

2'-7"

3' 10" 8" 7" 5'-6"

10"

2'

cooking top at a height of 2'-10"

2'-8"

4'-1" 5" 3'

10'-5"

5" 3'-5" 10"10" 2'

30'-1" 5'-4"

5" 2'-9" 5" 1'-1"

jali work

LOBBY 5'6" X 4'8" D2

57

F.W=4'0" T=10" R=5" 83

D2

1 2" drop in floor finish

13'-6"

1'-6"

14'-9"

slab sunken by beam bottom

5'-7" 13'-10"

PRODUCED BY AN AUTODESK STUDENT VERSION

TOILET 6'0" X 8'1"

2'-6"

1 2" drop in floor finish

DN 5" brickwork upto 4' height

W4

1'-6"

D3

UP

7'-0"

18'-3"

PRODUCED BY AN AUTODESK STUDENT VERSION

: 2700mm : 1200mm

4

3'-8"

2'-6"

W4

a

projection from roof slab & beam bottom

D3

12'

PARAPET FINISHED LVL +42'-6"

PRODUCED BY AN AUTODESK STUDENT VERSION

: : 750

drop in floor finish

6'-11"

W4

5'-6" 10" 10'-10" 10" PRODUCED BY AN AUTODESK STUDENT VERSION slab sunken by TOILET LIFT 5'6" X 4'6"

1 2" drop in floor finish

a

STORAGE 5'6" X 3'8" 5'-6"

10"

BALCONY 12'10"X6'0"

5"

5"

1'-5" W3

10"

D1

10"

2'-5"

D2

10"

10" 10'

10"

W3

2'-5"

W

projection from roof slab & beam bottom

PRODUCED BY AN AUTODESK STUDENT VERSION

Setback Rear setback mm/1050mm Front setback Back setback

3

1 2" drop in floor finish

3'-6"

1 2"

10'-5" 5"

5" 2'

5'-8"

4'

3'-4" 2'

10" 5'-3"

drop in floor finish

1 2"

B

PRODUCED BY AN AUTODESK STUDENT VERSION

: 1.2

2

KITCHEN 8'4" X 10'5"

2'

5"

W4

10"

1'-10"

PUJA 8'4"X 6'0"

projection from roof slab & beam bottom

9"

F.A.R

W3

3'-4" STORE 6'6" X6'0"

5" 2'

10'

5'-2"

2'

2'-8"

3'-3" 5" 3' 5"

cooking top at a height of 2'-10"

2'-7"

10'-5"

3'-4" 10" 10"

2'

DINING 12'10"X14'11"

4'-8"

G

2'-

: : 110 Sq.m : 130 sq.m : 240 sq.m

X

1'-4"

sunk 1'6"x1'6"

19'-8"

5"

W4

F

1"

Total build up area Ground floor area First floor area

: 200 Sq.m

2'-9"

5" 2'

7'-11"

9'-10"

projection from sill & 5" brickwork from outer edge

BED ROOM 13'6" X 15'4"

D4

2'-10"

11'

5"

UP 3'-8"

projection from sill & beam bottom

5'-

Total site area

: Purnia , Bihar

projection from roof slab & beam bottom

6'-4"

10"

W3

4'-1"

DRESSING 10'0" X 5'0"

4'

D1

5"

BALCONY 9'2"X2'6"

PRODUCED BY AN AUTODESK STUDENT VERSION

Site

5" 3'-1"

7'-9"

W3

E

projection from sill & beam bottom

66'-10"

43

10"

PRODUCED BY AN AUTODESK STUDENT VERSION

Designed bunglow for different plot and client requirment

15'-8"

5"

4'-10"

1

projection from sill & beam bottom

45

SECOND FLOOR FINISHED LVL +26'-4"

FIRST FLOOR FINISHED LVL +14'-8"

PLINTH FINISHED LVL +3'-0"

GROUND FLOOR FINISHED LVL ±0'-0"

20

PRODUCED BY AN AUTODESK STUDENT VERSION

: 1.42 crore

D

C

Y

47

slab sunken by beam bottom

D4

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

Project budget

B projection from roof slab & beam bottom

49

3'-10"

STAIRCASE 11'0" X 12'0" F.W=3'6" T=10" R=6"

PRODUCED BY AN AUTODESK STUDENT VERSION

A

51

12'-3"

10" 1'-7"

7'-8"

53

1 2" drop in floor finish

3'-5"

STAIRCASE 18'10" X 9'7"

8'-3"

Y

11'-10"

41

7'-0"

18'-3"

4'

projection from roof slab & beam bottom

6'-4"

39

1'-7"

18'-10"

4

3'-8" 5" brickwork TOILETupto 4' height 10'0"X5'0"

10"

37

35

6'-11" 3'-9"

4'-6" WIDE CORRIDOR

1'-6"

projection from roof slab & beam bottom

33

2'-10"

1'-10"

5"10'-5" 5" 2'

5'-8"

4'

24'-4"

2'

5"

10"

10"

4 projection from roof slab & beam bottom

jali work

5" 1'-2" 5"

10"

14'-11"

8 FT WIDE DRIVEWAY

projection from roof slab & beam bottom

3'

31

G

W4

10'-10"

29

DN

1 2" drop in floor finish

D2

5"

F

projection from sill & beam bottom

W4

F.W=4'0" T=10" R=5" 55

5'-7"

projection from roof slab & beam bottom

a

5" 2'

10'

UP

10"

PARKING 66'10"X18'10"

8'-2"

D3

1'-6"

LOBBY 5'6" X 4'8"

1 2" drop in floor finish

3'-6"

14'-11"

13'-6"

a

2'-6"

5"

3'-4"

66'-10"

19'-8"

5"

10"

LIFT 5'6" X 4'6"

1'-6"

11'-1"

3'-11"

T=10" R=6"

a

5'-6"

1'6"x1'6"

3'

4'-5"

5' 10"10"

5' ENTERANCE LOBBY 22'10"X5'0"

3

3'-4"sunk

W4

5"

7'-3"

D

1'-9"

1'-1"

1'-6"

30'-1" 5'-4"

projection from sill & beam bottom

9'-10"

5"

5" 2'

7'-11"

E

projection from sill & beam bottom

W4

KITCHEN 15'3"X10'5"

10"

3'-2"

3'-3"

6'-4"

10"

2'

jali work

4'-5" 5"

5"

X

5"

7'-3"

3'-10"

4'-5"

2'-10"

2

W3

4'-11"

10"

5"

10"

5"

1'-6"

10'-3"

D2

X

projection from sill & beam bottom

projection from sill & beam bottom

W3

2'-9"

13'-6"

3' 3'-5"

sunk 1'6"x1'6"

W

1'-8"

11'

3'-5"

4'-6"

4'-6"

3'-11"

3'-10"

30'-1" 5'-4"

3

4'

BED ROOM 13'6" X 10'5"

D4

1

5" 3'-1"

7'-9"

W3

D

C

Y

15'-8"

5"

4'

8'-11"

1 2" drop in floor finish

2

KITCHEN 10'0" X 5'0"

drop in floor finish

PRODUCED BY AN AUTODESK STUDENT VERSION

15

1 2"

5"

17

2'

6'

19

drop in

4'-6"

21

1 2"

TOILET 10'0"X5'0"

1'-8"

23

STAIRCASE 18'10" X 9'7" 4'

25

5" brickwork upto 4' height

slab sunken by floor finish beam bottom D4

5"

13

11

10"

9

12'-3"

3'-8"

10"

7

3'-9"

2'-6"

5

3'-5"

F.W=4'0" T=10" R=5" 27

3

cooking top at a height of 2'-10"

1

7'-0"

18'-3"

6"

3'-8"

4'

5'-2"

1'-6"

10'-10"

UP

6'-11"

5"

W4

2'

2'-6"

FORMAL SITTING 14'10"X15'4"

10'-5"

5" 2'

5'-8"

8'-3"

1'-6"

8'-3"

10'-5"

X

12'-1"

3'-4"

LIFT 5'6" X 4'6"

5"

W4

10"

4'-6"

5'-6"

5" 2'

10'

1'-7"

3'-4"

66'-10"

19'-8"

5"

W4

2'-6"

PRODUCED BY AN AUTODESK STUDENT VERSION

: Duplex bunglow plan

1'-9"

5" 2'

B projection from sill & beam bottom

PRODUCED BY AN AUTODESK STUDENT VERSION

Project

2'-9"

projection from roof slab & beam bottom

Y

11'-10"

W3

A

G

9" 2'-

: Wow infra

1

6'-4"

5"

7'-9"

W3

F

projection from sill & beam bottom

1"

Client

15'-8"

5"

4'-10"

E

projection from sill & beam bottom

5'-

:1 : : 750 mm : 4900mm : 750mm

projection from sill & beam bottom

PRODUCED BY AN AUTODESK STUDENT VERSION

: : 240 Sq.m : 160 sq.m : 400 sq.m

Setback Rear setback Front setback Back setback

D

C

5'

F.A.R

B projection from roof slab & beam bottom

PRODUCED BY AN AUTODESK STUDENT VERSION

Total build up area Ground floor area First floor area

A

: 405 Sq.m

PRODUCED BY AN AUTODESK STUDENT VERSION

Total site area

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

: Purnia , Bihar

PRODUCED BY AN AUTODESK STUDENT VERSION

Site


02 : Internship Work : GNIDA - Greater Noida Industrial Development Authority

DEVELOPED OPEN AREA

REJUVENATION OF ALPHA COMMERCIAL EXISTING Site : Alpha commercial belt , greater noida

land marks

Grey shaded part are open area for which area development happend suraj kasna road

Alpha metro station Alpha circle

Alpha road

Alpha road

metro

road network

landscape

shaded structure at the back side of tower

footfall area

food truck

21

shaded structure at the back side of tower 22


03.1 : CONCREATE WORKSHOP

Limitation :

Location : Sharda University , Greater Noida Project : Concrete Workshop - Furniture Year : 2018 Instructor : T.P Singh, Ceo of construction Research Technology

1. Impression should be sticked properly to avoid displacement of design. 2. bleeding should be soaked by jute or cotton material. 3. formwork should be reusable to save time , material.

Fig. 1. Adding plasticizer in concrete

The workshop was aimed at understanding the concrete as a material for furniture and construction system and exploring the upcoming construction techniques related to concrete and its flexibility.

Fig. 2 . Testing strength of concrete

Concrete mixture ( cement : sand : aggregate ) ratio 1:1.5:2 for seating and adding chemical , Plasticizer for more strength in place of adding more water .

Top view After painting Fig. 3.Frame and pattern arrangement

Fig. 4.Bench top

Step for making furniture: Fig. 6. Front view of concrete bench

1. 2. 3. 4.

Wooden formwork Oiling of frame Fixing Rcc bar with frame work Eva sheets and Thermocol cut into required pattern to get desired impression on slab. 5. Concrete mixture prepaired with adding plasticizer chemical for increase workability and strength of concrete. 6. Testing of concrete workability and strength. 7. Pouring of concrete mixture into framework. 8. leaving it for 24 hours concrete to set . 9. Removing the frame and eva , thermocol sheets. 10. Joining leg .

Learning :

Fig. 5. Frame and pattern arrangment

1. Concrete can be cast in any shape with proper formwork of any material like wood, aluminium etc. 2. Rcc should not oiled becaue it doesnot set with concrete . 3. Continuos vibration should be there while pouring the mixture for proper setting of concrete.

23

24


03.2 : LAMINATED TIMBER PAVILLION Location : Sharda University , Greater Noida Project : Pavillion Year : 2019 Instructor : Jason griffiths The workshop was aimed at understanding the timber and its construction and exploring the upcoming construction techniques related to timber. Bending strips cross laminated pavillion is the structure designed and built with the half of waste long wooden logs, which is used for creating an arches . The set of 10-15 strips gluing them together and bending manually . And arches was formed with the help of glue and clamps were used for binding the offcuts together.

Front view of pavillion

Gutter Drain pipe

Concrete layer Drainage layer Gravel layer Brick masonary

Detail of one bay Four wooden strips are glued together to make purlin which can carry load of PVC sheets and bind arches for more stability.

The strips were staggered to avoid the failure at the joints and to increase the durability of structures. Then arches were combined to form a barrel vault which is covered with (PVC sheets ) polycarbonate sheets , intension to provide shade in summer and winter.

Making of strips 25

Side view of pavillion 26


03.2 : Design development through model

27

28


03.2 : CONCREATE PETAL PAVILION Pavillion offer a shaded passage , in a park providing a social anchor at the convergence of countless flow . This concrete petal pavillion is a highly curated scheme of computationally fitnessed protocol informing a graphically rich structural skin . The rise and fall of the form influenced by various traffic in human emotion which is stressed , anxious exhausted, overwelmed , exited , confused , fear , frustration , nervous. And for enjoyment for every group of people , student while studing , discussing with coffee, older on debating on something .

03.2 : WORKSHOP ORGANISED - SHARDA UNIVERSITY

10000mm

6000 mm

Got the Oppertunity to conduct Parametric workshop for First , second , third year student of architecture of Sharda university . In this 2 day workshop student were devided into 10 groups and each group have same amount of student from different year for understanding better the form , Parametric and Doubly curve surface which we are going to obtain from two material : First - Mdf , Lycra Here we have aware the student about different material , materials scope and limitation and about material flexibility . Each and every detail with the all Parameters to obtain different form in parametric design with its limitation of material. we have showed 1000 experiment done by us to Obtain different form and with Considerable parametres . After that student come up with different ideas and we fixed the design and the parameters because without Fixing parametres material can be at high tension and can break it from middle. For Mdf , as we increase length (x) of the strips then x is directly propotional to height of the form . we Introduced laser cut for mdf and lycra and mdf introducing with moisture and by dryning we can obtain our desired shape and form. Here , Product obtained During Workshop

29

30


PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

03.2 : House Plan : Chanki garh

DRESSING

UP

PRODUCED BY AN AUTODESK STUDENT VERSION STAIRCASE 14'10" X 10'

ENTERANCE LOBBY 31'11"X4'0"

UP

STAIRCASE 14'10" X 10'

UP

BALCONY 15'10"X14'10"

DN

FIRST FLOOR PLAN

AREA= 1350.00 Sq.Ft.

10"

11'-5"

9'-7"

10"

11'-5"

4'

10"

10'-10" 6' 10" ENTERANCE LOBBY 31'11"X4'0"

4'

UP

31'-9" 10'-5"

5'-5"

10"

14'-7"

13'-2" 12'-10" 44'-11"

15'-5"

STAIRCASE 14'10" X 10'

4

GROUND FLOOR PLAN

10" 2'-10"

9'-5"

6'-1"

4'

12'-5"

1 2" drop in floor finish

BED ROOM 15'0" X 14'0"

14'

slab sunken by beam bottom

13'-7"

slab sunken by beam bottom

1'-4" 10" 5"

2'

TOILET 9'0"X6'0" 2'-6"

drop in floor finish

4'

2'-2" 6'-1"

1'-6"

1'-4"

14'

3'

5" brickwork upto 4' height

5" 1'-4" 10"

6'-1" 9'-5" 14'-5"

15' 10'-10"

7"

4'

BALCONY 15'10"X14'10"

29

31

33

35

37

39

41

55

53

51

49

47

45

13

STAIRCASE STAIRCASE 14'10" X 10' 14'10" X 10'0"

6'

F.W=4'0" T=10" R=5"

4'

UP

DN 6' 10"

9'-7"

10"

11'

5"

10'-5"

5'-5"

30'-1"

11'

10"10" 5"

11'

10"

3'-3"

10"

1'-3"

6'-4"

5"

9'-7"

3'-3"

5'

3'-3"

30'-1"

5' 15

1'-6"

6'

10'-10" 10"

4' 14'-7"

12'-10" 44'-11"

15'-5"

6' 10'-10"

17

1'-6"

5"

19

projection from sill & beam bottom

5" brickwork upto 4' height

TOILET 9'0"X6'0" 1 2"

2

3

3'

5" 3'-3"

10"

10" 2'-5"

21

DRAWING ROOM 15'0" X 14'0"

1'-6"

15'-5" 10'

5"

2'-10"

23

2'-2"

5" 3'-3" 5"

4'

25

4'

27

STAIRCASE 14'10" X 10'0"

5"

1'-2" 5"

10'

9'-7"

30'-1"

13

4'

5" 3'

projection from sill & beam bottom

1'-2" 5"

11

2'

12'-10" 2'-7" 5"

5" 3'

5"

5"

9

4'

5" 3'-3"

12'-2"

7

10'

E

projection from sill & beam bottom

44'-11"

5'-5"

10'-10"

5

2'-10"

10'-10" 10'

3

6'

1

1

5"

10'-5"

projection from sill & beam bottom

10"

UP F.W=4'0" T=10" R=5"

4'

1'-3"

10'-10"

7"

2'-10"

6'

4'

6'-5" LIVING AREA 10'0" X 10'0"

10"

sunk 1'6"x1'6"

1'-4"

1'-4"

3'-3"

5'

15'

5"

9'-7" 10" OPEN KITCHEN & DINING 10'0" X 10'0"

3'-3"

5'

12'-5"

6' 10'-10"

slab sunken by beam bottom

BED ROOM 15'0" X 14'0"

14'

slab sunken by beam bottom

drop in floor finish

13'-7"

TOILET 9'0"X6'0" 1 2"

D

C

4'

9'-5"

6'-1"

2'-10"

PRODUCED BY AN AUTODESK STUDENT VERSION

10" 2'

2'-2"

5"

cooking top at a height of 2'-10"

10"

5"

5' 10"

9'-7"

10'-10" 10'

30'-1"

3'-3"

10" 2'-5"

1'-4" 10" 5"

drop in floor finish

1'-6"

5" 3'-3"

10"10" 5"

1 2"

2'-6"

14'

14'-5"

BED ROOM 15'0" X 14'0"

3'

5" brickwork upto 4' height

15'-5" 10'

5"

PRODUCED BY AN AUTODESK STUDENT VERSION

4

1'-6"

TOILET 9'0"X6'0"

2

3

1'-6"

6'-1"

3'

5" brickwork upto 4' height

9'-5"

1'-6"

5" 3'-3" 5"

2'-6"

5"

5" 3'

B projection from sill & beam bottom

5" 1'-4" 10"

2'-2"

12'-10" 5"2'-7" 5"

5" 3'

6'-1"

2'

5" 3'-3"

6'-1"

2'-10"

44'-11"

5'-5"

10'

A

projection from sill & beam bottom

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

10'-5"

projection from sill & beam bottom

PRODUCED BY AN AUTODESK STUDENT VERSION

1

5"

projection from sill & beam bottom

E

10'

D

C

projection from sill & beam bottom

3'-3"

AREA= 1350.00 Sq.Ft.

PRODUCED BY AN AUTODESK STUDENT VERSION

B

STAIRCASE 14'10" X 10'

PRODUCED BY AN AUTODESK STUDENT VERSION

GROUND FLOOR PLAN A

BED ROOM 15'0" X 14'0"

6'-1"

LIVING AREA 10'0" X 10'0"

2'-6"

OPEN KITCHEN & DINING 10'0" X 10'0"

PRODUCED BY AN AUTODESK STUDENT VERSION

DRESSING EGDIRF

TOILET 9'0"X6'0"

DRAWING ROOM 15'0" X 14'0"

DRESSING

BED ROOM 15'0" X 14'0"

PRODUCED BY AN AUTODESK STUDENT VERSION

TOILET 9'0"X6'0"

BED ROOM 15'0" X 14'0"

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

Duplex Bunglor For Chanki Garh

projection from sill & beam bottom

FIRST FLOOR PLAN

AREA= 1350.00 Sq.Ft.

AREA= 1350.00 Sq.Ft.

31

32


PRODUCED BY AN AUTODESK STUDENT VERSION

03.2 : House Plan - Jaganpura , Patna Floor Extension Project In Jaganpura , Patna

2' 10'' WIDE BALCONY

STAIRCASE 1' 11'' WIDE BALCONY

FRIDGE

POOJA ROOM 8'10'' X 5'0''

DN

DISPLAY

TOILET 9'0"X4'11"

LIVING ROOM 13'4"X13'2"

CABINET/ DISPLAY

BEDROOM 13'11" X 12'6" BEDROOM 13'10" X 10'11"

TOILET 9'0"X5'0" BALCONY 8'7"X6'2"

PRODUCED BY AN AUTODESK STUDENT VERSION

KITCHEN STORE 8'2" X 3'8"

DINING AREA 12'1" X 11'2"

DRESSING

PRODUCED BY AN AUTODESK STUDENT VERSION

UP

KITCHEN 8'10" X 8'8"

3' 1'' WIDE BALCONY

FIRST FLOOR PLAN

SECOND FLOOR PLAN

1' 11'' WIDE BALCONY

KITCHEN 6'0" X 10'2"

DN

DINING AREA 10'9" X 12'1"

DINING AREA 7'11" X 13'3"

TV / DISPLAY AREA

DN 3' 5'' WIDE STAIRCASE LOBBY

KITCHEN STORE 9'3" X 3'0" TOILET 8'10"X5'0"

DRESSING

6 ' 7'' WIDE BALCONY

WIW 7'7"X5'0"

ROOM 11'2" X 8'11"

PRODUCED BY AN AUTODESK STUDENT VERSION

UP

3' 5'' WIDE STAIRCASE LOBBY

STAIRCASE

2' 10'' WIDE BALCONY

STAIRCASE

MASTER BEDROOM 12'6" X 13'11"

ROOF PROJECTION BEDROOM 01 13'11" X 12'6"

TOILET 9'0"X5'0"

3' 1'' WIDE BALCONY

3' 1'' WIDE BALCONY

THIRD FLOOR PLAN OPTION 03

ROOF FLOOR PLAN 33

34



Shelf Designed - Patent File in Process

Images of Shelf

Semester worl -10 Shelf Designed For Patent , and Design Detail

35

36


37

38


SHELF + SEATING Designed for Library,Restaurant,pharmacy


Created Content On You Tube Channel

39

40


Mobile no

: 9818259941

E-Mail

: nehaa.singh1501@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.