Gowanus Canal - Urban Design Project

Page 1

GOWANUS

Enhancing Livability Through Urban Design

Justin Romeo Matthias Neill


Context

Midtown 45 Mins

Downtown 30 Mins

1 Mile

Downtown Brooklyn 15 Mins

Commercial Residential Industrial Green Space Community Facility Mixed Use Transport Parking

0.25 Miles


Context Canal surrounded by farmland in 1840’s Canal upgraded in 1849 to full scale industrial canal

Long term pollution from heavy industrial activity


Context


Issues

Red Hook Park 15 Mins

Prospect Park 30 Mins

Distance to Green Space Lack of Canal Access & Activity Canal Pollution


Inspirations for Improvement

Active & Accessible Canal Regent’s Canal, London Riverwalk, Chicago Cheonggyecheon, Seoul

Public Seating Riverwalk, Chicago

‘Naturalized’ Space


Goals for Gowanus Neighborhood Revitalization

Canal Improvement Strategies

Strategies

• Enhance Accessibility • Increase Activity • Address Pollution

• Allow for a variety of development • Provide attractive features to anchor the neighborhood • Preserve and integrate existing industrial character PHASING!!!!

Outcomes

Outcomes

• Accessible, continuous pedestrian-oriented waterfront • Lively public spaces • Attractive pedestrian realm • ‘Renaturalized’ water body

• • • •

More dense, mixed-use community New residents New businesses Desitnation Gowanus


Concept


Design Methodology Existing Street Heirarchy

0.25 Miles


Design Methodology Missing Connections

0.25 Miles


Design Methodology Future Pedestrian Canal Route

0.25 Miles


Proposal

Pedestrianized Canal & New Development


Proposal

Adding A Mixture of Uses & Activities to Gowanus

Renovated Building Community Facility Swimming Pool Residential Flexible Space Commercial/Office Green Space Site Boundary


Pedestrian Network

Cross Canal Connections

Expansive Pedestrian Realm

Both Sides of the Canal


Green Space Concept

Entry/Exit Space

Large Multi-Use Parks

Small Squares & Plazas

Entry/Exit Space


Urban Form


Urban Form


Canal Pathway Details 2

10’ - 1 Story

1

8' 7' 6'

60'

100'

24'

Current

1

30'

10’ - 1 Story

50’ - 5 Stories 8' 7'

100'

30' - 3 Stories

30'

6'

60'

100'

24' 8'

Future

7' 6'

6' 5'

30'

100'

24' 50’ - 5 Stories

30' - 3 Stories

8' 7' 6'

6' 30'

100'

6'

24'

5'

30'

100'

24'


Canal Pathway Details Cement Works

2

1

Car Lot Cement Barge 7' 6'

Cement Works 20'

30'

Cement Barge

100'

Current

30'

Car Lot

7'

2

6' 20'

30'

100'

30'

Future 7' 6' 24'

24' 100'

30'

30'

7' 6' 24'

30' 100' 30'

30'

24' 100'

30'


Pedestrian Experience


Pedestrian Experience


Pedestrian Experience


Phase 1 3rd Street Entrance & Basin Pool


Phase 2 2nd Basin, Large Parks, & Additional Southern Development


Phase 3 Path & Green Space Completion, Additional Southern Development


Phase 4 Full Development Completion


Final Vision


Final Vision


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.