Karen kong portfolio

Page 1


A great building must begin with the unmeasurable, must go through measurable means when it is being designed and in the end must be measurable - Louis Kahnt


Kong Tse Hing Karen

Size : 10 Sq.m. Location : Ive (Tsing Yi) Purpose : Open Day Aim : Show the understanding of material

Consider to be placed in open area, the first criteria is strengthening the corrugated fiberboard. Fold along the fluted side can be strong enough to be a strusture pillar. Plus mortise and tenon joint, it become able to extense and create forms.

Design Process

Rigid

Inclined

Disorder

Connect each pillar

Extense longer






Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.