Table 2: Land Use Plan – POT
Table 2: Land Use Plan - POT
Projects
AIM Modal Exchange Area Vital Neighbourhoods CIM Modal Integration Complex High-capacity corridor Corridor green Arterial Road Grid Regional Integration Road Network Intermediate Road Grid Cycle Infrastructure Network (Micromobility) Pedestrian Infrastructure Network Maintenance of the Arterial Road Network to be implemented by 2021 Maintenance of the Intermediate Road Network to be implemented in 2021. Maintenance of vehicular bridges to be implemented by 2021 Strengthen regional coordination bodies for the planning, management and operation of the urban-regional mobility system.
Overall total Estimated Budget (Million COP)
$COP 200,000 $COP 250,000 $COP 752,314 $COP 28,822,770 $COP 1,881,588 $COP 18,232,267 $COP 5,385,072 $COP 1,316,766 $COP 3,917,316 $COP 232,600 $COP 219,456 $COP 14,989 $COP 14,814 $COP 5,164
$COP 61,245,116 (US$ 16,000 million)
Source: Urban Development Institute-IDU and Budget execution programme of the Land-Use Plan-POT