[YMCA pool project]
[ [ jon levine arch 2130 sam choi
site analyses | recreation center
ew
buffer
secondary alignment
main alignment
density density density density density density density density density density density density density density density density density density density density density density density density density density
vi
site concept diagram
|
1/100”-1’
figure ground diagram
|
1/100”-1’
site plan
|
1/16”-1’
jonathan levine
view
buffer
floor plans | recreation center jonathan levine
B
U
U
A
A
floor plan 1
|
1/8”-1’
U
U
U
D
A
A D
floor plan 2
|
1/8”-1’
U
U
A
A
D
floor plan 3
|
1/8”-1’
D
D
B
elevation
|
1/8”-1’
left elevation
|
1/8”-1’
front elevation
|
1/8”-1’
section B-B
|
1/8”-1’ section A-A
|
1/8”-1’
sections and elevations | recreation center
jonathan levine
parti | recreation center jonathan levine
pool
office
circ.
pool
multipurpose
circ.
yoga fitn.
circ.
circ.
multipurpose
hot tub
pool
well
circ.
circ.
hot tub
cafe
pool
hot tub
pool
well
yoga fitn.
circ.
circ. yoga fitn.
circ.
well
yoga | fitness
multipurpose offices entry | cafe
well
yoga | fitness
pool
offices entry | cafe
well
pool
circulation
circulation
circulation
office
hot tub
cafe
entry
circ.
multipurpose
entry
pool
pool
entry
pool
entry
pool
structural analysis
B
U
U
A
A
U
U
less stress
the structure cantilevers on both ends, making the columns near the center more loadbearing, and spreading more weight to every column and wall
more stress
public stair | access to first, second, third floor pool stair | access to first, second floor, pools egress stair | access to all floors
B
U
U
D
U U
A
A
U
D
A
A
A
A
D
D
U
U
D
B