Jonathan Windsor Corriveau Harrison Avenue Community Fitness Center
A-A Yoga
Down Down
B-B
Open to Below
Fourth Floor Stor. BR. Personal
A-A
Personal
Down
Down Up
Up
Stor.
Fitness Area
B-B Open to Below
Down
Third Floor Up
Down
A-A
Down
Down
Down
Open to Below
Up
Up Up
t
a B le
B-B
Ma
Fitness Area
m
o hro
Female Bathroom
Second Floor
Up Down
Up
Down
A-A Up
Multi-Purpose Area
Up Down
Kitchen
Up
B-B Café
Office
Down
BR. BR.
BR.
BR.
Office
Up
Office
Office
Ground Floor
A-A Up
Up
B-B
Female Lockers
Male Lockers
Up
Scale: 1/8” = 1’ 0”
Below Grade
A-A
B-B
South Elevation Scale: 1/8” = 1’ 0”
Harrison Avenue
Learning Pool
Boston Common
The Greenway
Chinatown Tufts Campus
Peter’s Park
South Station
10 Minute Walk
Urban Context
Figure Ground Circulation
Fitness
s
Fitness
Pool
es
Pool
ls o Po Fitn
Pool
Circulation
blic Pu
Site Response Sequence Pool & Garden Zone
Primary Circulation
Fitness Area
Egress
Primary Circulation
North Facade as Threshold
Egress
South Facade as Visual Buffer
Primary Gym Circulation
Circulation Sequence
Secondary Pool Circulation Egress
Circulation Sequence Load Bearing Wall
Structural Spatial Truss Load Bearing Wall Load Bearing Wall Steel Columns
Load Bearing Wall Concrete Slab
Curtain Wall Steel Columns
Curtain Wall
Structural System
Jonathan Corriveau 10 December 2014 Chinatown Community Recreation Center Professor Ryan Senkier