SUEN 7140

Page 1

1

MVP REALTY CO. - CO, SO2 , NO2, VOCS

11

EXXON MOBIL EVERETT TERMINAL - HYDRAULIC OIL

21

CHELSEA SANDWICH PETROLEUM STSORAGE FACILITY - METAL CONTAMINATANTS, OIL, GAS, ETHANOL, KEROSENE

2

MONSANTO CHEMICAL CO. - POLYCHLORINATED BIPHENYLS, AGENT ORANGE

12

LEE PRODUCTS CO. - CO2

22

SIGNATURE BREADS - ETRACHLOREOTHYLENE, TRICHLORETHYLENE, METHYLENE CHLORIDE

3

MONSANTO CO. EVERETT - METHYL ETHYL KETONE, POLYCHLORINATED BIPHENYLS (PCBS)

13

SPRAGUE EVERETT TERMINAL - LEAD, NICKEL, HEAVY METALS

23

CAMBRIDGE MACHINED PRODUCTS - ETRACHLOREOTHYLENE, PETROLEUM

4

NABISCO INC. - RELEASED YEAST LIQUOR BUBBLES, CO2

14

NEW ENGLAND PRODUCE CENTER - CO2

24

WESTBROOK VILLAGE - CO, SO2 , NO2, VOCS

5

MBTA EVERETT BUS OVERHAUL GARAGE - OIL SEAPAGE, SULPHUR DIOXIDE, DIESEL, HYDRAULIC OIL

15

GENERAL STEEL PRODUCTS - HEAVY METALS

25

FEDERAL METAL FURNISHING INC. - CO, SO2 , NO2, VOCS

6

NORTH AMERICAN INDUSTRIES INC. - OIL, GAS SEEPAGE

16

BEST PETROLEUM CO. LLC - CAS, ETHANOL, DIESEL, KEROSENE

26

SCHRAFFT CENTER - CO, SO2 , NO2, VOCS

7

BOSTON GAS EVERETT - LEAD, BENZENE, MERCURY, IGNITABLE SOLID AND CHEMICAL WASTE

17

CHELSEA HIGH SCHOOL - CO2

27

LAFARGE BUILDING MATERIALS C0. - CO, SO2 , NO2, VOCS

8

CONSTELLATION MYSTIC GENERATING STATION - POLYCHLORINATED BIPHENYLS (PCBS), VOCS

18

CHELSEA CLOCK LLC - KEROSENE

28

UNITED STATES GYPSUM CO. - LEAD, AMMONIA, MERCURY, HEAVY METALS

9

SCHNITZER NORTHEAST - ANTIMONY, ARSENIC, BARIUM, BERYLLIUM, CADMIUM, CHROMIUM, COBALT

19

PILLSBURY CO. - DIESEL, GAS

10

ALLIED INDUSTRIES INC. - GAS, CO, SO2 , NO2, VOCS

20

MODINE NORTHEAST INC. - GAS, OIL SEAPAGE

1

16 11 1

2

14

12 3

5

15 18

13

6

19 4

2

10 9

23

7

22

21

8 24

WATER CONTAMINATION

25

INDUSTRIAL INFLUENCE E X I ST I N G S I T E C O N TA M I N AT I O N

26

AIR CONTAMINATION

27

28

SOIL CONTAMINATION


2020

2030

CLIMATE CHANGE - RAPID EXTREME

STORY 1

SITE PHYTOREMEDIATION - IMMEDIATE AND DRASTIC PLANTING SITE EARTH WORK - IMMEDIATE EXCAVATION FOR CANAL NETWORK AND EARTH MOUNDS COVID RESOURCE WAR - LACK OF RESOURCES POPLAR HARVEST - ENERGY BIOMASS + TIMBER BUILDING INDUSTRY - STORAGE AND PRODUCTION OF EXPORT/IMPORTS IN RESPONSE TO RESOURCE WAR RESIDENTIAL - POPULATED BUILDING + SHORT-TERM MODULAR HOUSING ON SITE

CLIMATE CHANGE - SLOWED

STORY 2

SITE PHYTOREMEDIATION - TARGETTED PLANTING AS NECESSARY

COVID

EXTREME GOVERNMENT ACTION RESOURCE WAR - DAILY NECESSITIES AND BASIC UTILITIES POPLAR HARVEST - PAPER GOODS + FACE MASKS + TRANSITIONS TO TIMBER

BUILDING INDUSTRY - STORAGE AND PRODUCTION OF DAILY NECESSITIES IN RESPONSE TO RESOURCE WAR RESIDENTIAL - POPULATED BUILDING WITH EMPHASIS ON SOCIAL DISTANCING

CLIMATE CHANGE - FLUCTUATED BY QUARANTINE PERIODS

STORY 3

SITE PHYTOREMEDIATION - IMMEDIATE PLANTING WITH TARGETTED MAINTENANCE SITE EARTH WORK - EXCAVATION FOR EARTH MOUNDS COVID RESOURCE WAR - IMMIGRATION POPLAR HARVEST - PAPER GOODS + FACE MASKS BUILDING INDUSTRY - STORAGE AND PRODUCTION OF DAILY NECESSITIES IN RESPONSE TO RESOURCE WAR RESIDENTIAL - POPULATED BUILDING WITH EMPHASIS ON SOCIAL DISTANCING

2040

2050


SCENARIO 1

INLAND POPLAR PLANTATIONS ARE SPACED FOR PAPER GOODS AND FACE MASK PRODUCTION IN RESPONSE TO RESOURCE CONFLICT DREDGED CANAL NETWORK BECOME ECO CORRIDORS IN RESPONSE TO MINIMAL SEA LEVEL RISE. THEY ARE POPULATED WITH POPLARS FOR PHYTOREMEDIATION DREDGED CANAL NETWORK ACTS FLEXIBLY IN RESPONSE TO UNPREDICTABLE SEA LEVEL RISE. POPLARS ARE PLANTED TO PROMOTE ECOLOGICAL DIVERSITY AND PHYTOREMEDIATION BETWEEN FLOODINGS INLAND POPLAR PLANTATIONS ARE SPACED FOR BIOMASS AND TIMBER HARVESTS IN RESPONSE TO RESOURCE CONFLICT DREDGED CANAL NETWORK ACTS AS EMERGENCY FLOOD CONTROL AS SEA LEVEL RISE REACHES MAX EXTREME MOUND NETWORK IS USED TO DETER IMPACTS OF SEA LEVEL RISE. MOUNDS ARE PLANTED WITH POPLARS FOR PHYTOREMEDIATION AND EROSION CONTROL

SCENARIO 2

SCENARIO 3


INTEGRATED SYSTEMS SECTION REQUIRED

2,774,000 GALLONS PER YEAR

693.5 TONS PER YEAR

50 Gallons per day per person 76 Units overall 7600 gallons per day

ESTIMATED

983840 GALLONS

55480 pounds building Bio Waste 636560 pounds Populus Bio Waste 105120 pounds Bio waste from Landscape

1747620 GALLONS PER YEAR

Roof Area(sq.ft) X Precipitation(in) X 0.623 = Amount collected in Gallons Roof Area = 16800sft Precipitation=Average precipitation is 47inches

21 Gallons per day per person 76 Units overall 4788 gallons per day

693.5 TONS PER YEAR

1640MWH PER YEAR

55480 pounds building Bio Waste 636560 pounds Populus Bio Waste 105120 pounds Bio waste from Landscape

Energy converted from Bio water from building Bio mass from Populus trees Bio waste from Landscape

RAIN WATER SYSTEM RUNNING THROUGH GREEN HOUSE FOR DRIP IRRIGATION.

POPULUS PLANTATION

RAIN WATER STORAGE TANK

EXCESS WATER FLOW CONNECTED MAIN STORM WATER DRAIN. SPRINKLERS

2 SEPERATE AIR HANDLING UNITS ONE FOR THE MODUL ONE FOR GREEN HOUSE. CONTROL BOARD

SURFACE STORM WATER DRAINS ON SITE PROCESS LINES FROM CONTROL BOX

POWER ACCESS TO WATER PUMPS AND IRRIGATION SUSTEM

SPRINKLERS

ROAD SURFACE

INLET

MANHOLE COVER

BIO WASTE FILTERATION

WATER REUSED FOR GARDENING AND WATERING POPULUS PLANTATION.

STORM WATER

UNDISTURBED SOIL

LEFT OVER SLUDGE USED FOR PLANTATION PUMP PIT

TRAP

GREY WATERTANK / REUSE PROCESS

UNDISTURBED SOIL

TRAP SANITARY SEWER

ELECTRIC PUMP TO GENERATE ELECTRICITY BIO GAS

PROCESS LINES FROM CONTROL BOX

CATCH BASIN

EXPOSED TO SUNLIGHT

SAND FILTERATION

SPRINKLER SYSTEM

CATCH BASIN

BIO GAS STORAGE

AIR HANDLING UNIT

EXCESS WATER FLOW CONNECTED MAIN SEWAGE DRAIN.

CONNECTED TO SPRINKLER SYSTEM THROUGH A AUTOMATED VALVE OPERATED TO SWITCHES FOR OPEN/CLOSE.

BLOWER

ON SITE UNDERGROUND BIO GAS PLANT. IT USES BIO WASTE FROM MODULES, POPULAR PLANTATION, ON SITE LANDSCAPE AND GREEN HOUSES.


Module A SYSTEMS

A/C Cooling Vent 10” vent

VTAC: Vertical Terminator Air Conditioner 10” vent

Biowaste - Graywater 6” pipe Heating Vent 10” vent

RESIDENTIAL

2-3 people per unit, residents work either in the adjacent greenhouse or in production modules in the building units feature a kitchen, dining space, living room, balcony, and bathroom on the first level with portals into adjacent garden sleeping area on upper level via stairs

COVID ICU

2-3 ICU beds per module; interior space can be divided via non-structural partitions or plastic dividers kitchen space is used as a medical prep station, upper level for storage or less severe symptoms entryway is a sanitation chamber

VTAC: HVAC System

Vertical Terminator Air Conditioner prevents cross-contamination of air Exterior Grille VTAC Vent

Toekick Vent 14” vent

Potable Water 6” pipe

Biowaste - Bathroom 10” pipe

920 ft2 requires 16,000-18,000 BTU capacity


COVID-19 ICU Adaptation

’6 23

Air Conditioning

0 26’ Heating

’0”

30

26’0”

VTAC: Vertical Terminator Air Control


Greenhouse Adaptation

’0 30

Air Intake Vent Grow Lights

Air Handling Unit (Fan)

0 26’

Biowaste: Graywater

Potable Water


BUILDING ATRIUM - RENDERING


THE CARBON EQUATION Building Emissions

WOOD Modular Material, Structural Base

deforestation + production

transportation of resins + lumber

assembly + construction

9,330,460 kg

500 kg minimum*

12,908,332 kg

*with multiple varying factors

mining + smelting

STEEL HVAC, Piping, Connections

transportation Mauritania to Canada Canada to Boston

235,276 kg

8,943 kg

23,159,146.5 kg Lorem ipsum

total CO2 emissions* GLASS

production

transportation

548,629 kg

Jamaica to Iceland Iceland to Pittsburgh Pittsburgh to Boston

Envelope, Cladding

9,368 kg

transportation

IMPORT/EXPORT Resource Dependent Number

*does not account for operation of machinery and maitenance, and assumes number as minimum without import/exports.

truck/freight car train boat plane

1.04 kg per mile 1.26 kg per mile 1.55 kg per mile 53.3 kg per mile


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.