ARCH 5120 FINAL SUBMISSION CHERIE WAN & NICOLAS NEFIODOW
CONTENT Structural and Egress Analysis Enclosure Analysis Program and MEP Analysis Benchmarks Overview Site Plan Systems Integration Brewery, Museum, Art Institution Scenario Planning - Brewery Integrated Systems Serial Section Elevations Rendering Cut Away Wall Section Solar Studies Landscaping Studies Model Photos
1
2
3
4
EGRESS
5
6
E
STORROW DRIV
WESTERN AVE
SITE PLAN
7
ST
WE
OVERVIEW
N ER
E AV
ST OR
RO
W
DR
IV
E
8
9
FLOOR -2 PARKING
10 N
FLOOR -1 - SCENARIO 01 BREWING COMPANY
N11
FLOOR 1 - SCENARIO 01 BREWING COMPANY
12 N
FLOOR 2
13 N
ROOF PLAN
14 N
FLOOR -1 SCENARIO 02 MUSEUM
15 N
FLOOR -1 SCENARIO 03 ART INSTITUTION
16 N
17
NORTH ELEVATION
SOUTH ELEVATION
WEST ELEVATION
EAST ELEVATION
FACADE STRATEGY
18
19
20
21
22
23
24
Site model 1/32”=1’ Scale
N 25
Section model 1/8”=1’ Scale
26
Early Structural Model 1/32”=1’ Scale
27
28’ x 28’ Module 1/4”=1’ Scale
28